JPS6351501A - Temporary restoration of road under drilling construction - Google Patents

Temporary restoration of road under drilling construction

Info

Publication number
JPS6351501A
JPS6351501A JP19286586A JP19286586A JPS6351501A JP S6351501 A JPS6351501 A JP S6351501A JP 19286586 A JP19286586 A JP 19286586A JP 19286586 A JP19286586 A JP 19286586A JP S6351501 A JPS6351501 A JP S6351501A
Authority
JP
Japan
Prior art keywords
unit body
road
groove
square steel
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP19286586A
Other languages
Japanese (ja)
Inventor
荒田 治
亜樹夫 澤路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP19286586A priority Critical patent/JPS6351501A/en
Publication of JPS6351501A publication Critical patent/JPS6351501A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Abstract] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔発明の技術分野〕 この発明は、管の埋設工事等のために掘削した溝を、短
時間に塞いで道路に仮復旧するための、掘削工事中の道
路の仮復旧方法に関するものである。
[Detailed Description of the Invention] [Technical Field of the Invention] This invention is a method for temporarily restoring a road during excavation work, by quickly closing a trench excavated for pipe burying work, etc., and temporarily restoring it to a road. This relates to recovery methods.

〔従来技術とその問題点〕[Prior art and its problems]

現在性われている、都市部における道路下への管の埋設
工事等は、交通事情等によシ夜間に施工される場合が多
い。従って、埋設工事のために掘削した溝は、昼間の交
通の支障にならないように、工事中でも埋め戻して仮復
旧しなければならない。
Currently, construction works such as burying pipes under roads in urban areas are often carried out at night due to traffic conditions. Therefore, trenches excavated for burial work must be backfilled and temporarily restored even during construction so that they do not interfere with daytime traffic.

第4図〜第8図は、従来の掘削工事中の道路の仮復旧方
法の1例を示す垂直横断面図である。第4図〜第8図に
示すように、従来の仮復旧は、道路2下に掘削された溝
3の内部に山砂9を投入し溝3の開口部付近まで充填し
、さらに、山砂9の上面表層をランマー10により水平
に展圧し、展圧した山砂9の上面表層に砕石11を投入
してならして水平に展圧し、最後に舗装材のアスファル
ト4による打設および展圧を施し、道路2と水平にアス
ファルト4の路面を形成することによシ行われている。
FIGS. 4 to 8 are vertical cross-sectional views showing an example of a conventional method for temporarily restoring a road during excavation work. As shown in Figures 4 to 8, the conventional temporary restoration involves putting mountain sand 9 into the groove 3 excavated under the road 2, filling it up to the vicinity of the opening of the groove 3, and then adding mountain sand. The top surface layer of the mountain sand 9 is horizontally rolled out using a rammer 10, crushed stone 11 is thrown into the top surface layer of the rolled mountain sand 9, leveled and rolled out horizontally, and finally the paving material asphalt 4 is placed and rolled out. This is done by applying asphalt 4 and forming an asphalt 4 road surface parallel to the road 2.

8は埋設された管である。8 is a buried pipe.

しかしながら、このようにして行われる従来の仮復旧方
法は、かなりの時間を要するため、管の埋設、接続等、
本工事のための時間が短縮されてしまう。平均すると従
来の仮復旧に要する時間は、工事のために許可された1
日の作業時間の約20%にも達している。このような状
態が何日も続けば、累積された時間の喪失は相当なもの
となる問題がある。
However, the conventional temporary restoration method performed in this way takes a considerable amount of time, so it is necessary to bury pipes, connect them, etc.
This will shorten the time required for the main construction work. On average, the time required for traditional temporary restoration is 1
It accounts for about 20% of the daily work time. If this situation continues for many days, the cumulative loss of time becomes considerable.

さらに、溝に投入される山砂等はかなシの量になり、近
年山砂等の材料の値上りとともに、工事にかかる材料の
コストが高くなる問題がある。
Furthermore, the amount of mountain sand, etc. that is thrown into the ditch is small, and as the price of materials such as mountain sand has risen in recent years, there is a problem that the cost of materials required for construction increases.

〔発明の目的〕[Purpose of the invention]

従ってこの発明の目的は、管の埋設工事のために掘削し
た溝を短時間で塞ぎ道路に仮復旧することができ、しか
も、工事にかかる材料費を節約することができる、掘削
工事中の道路の仮復旧方法を提供することにある。
Therefore, an object of the present invention is to temporarily restore the road by closing the trench excavated for pipe burying work in a short time, and to save the cost of materials for the construction work. The objective is to provide a temporary recovery method.

〔発明の概要〕[Summary of the invention]

この発明は、断面が四角形状の複数個の角型鋼管を、堀
削された溝の内部形状に合わせてあらかじめ層状に組み
立て、且つ、相互に固定してユニット体となし、前記ユ
ニット体の上面が前記溝の開口部付近に位置するように
、前記ユニット体を前記溝内に埋設し、前記ユニット体
を構成する角型鋼管の最上層の上面に舗装材による舗装
を施し、道路の地表面と水平の路面を形成することに特
徴を有するものである。
In this invention, a plurality of rectangular steel pipes having a square cross section are assembled in advance in a layered manner according to the internal shape of a groove that has been excavated, and are fixed to each other to form a unit body, and the upper surface of the unit body The unit body is buried in the groove so that the unit body is located near the opening of the groove, and the top surface of the top layer of the square steel pipes constituting the unit body is paved with a paving material, and the ground surface of the road is It is characterized by forming a horizontal road surface.

〔発明の詳細な説明〕[Detailed description of the invention]

次にこの発明の方法を図面を参照しながら説明する。第
1図はこの発明の方法の1実施態様を示す垂、直積断面
図、第2図および第3図は、角型鋼管の端部を示す斜視
図である。
Next, the method of the present invention will be explained with reference to the drawings. FIG. 1 is a vertical cross-sectional view showing one embodiment of the method of the present invention, and FIGS. 2 and 3 are perspective views showing the end of a square steel pipe.

第1図に示すように、正方形の断面を有する複数個の角
型鋼管1を、あらかじめ道路2に堀削された溝3の内部
形状に合わせて層状に組み立て、角型鋼管1同士をそれ
ぞれビルト5により互いに固定することにより、ユニッ
ト体7を調製する。
As shown in Fig. 1, a plurality of square steel pipes 1 having a square cross section are assembled in layers according to the internal shape of a groove 3 excavated in a road 2 in advance, and the square steel pipes 1 are built together. 5 to prepare the unit body 7.

角型鋼管1の一方の端部1aには、第2図または第3図
に示すように、管端から水平に突出する差し込み治具6
または6′が取シ付けられている。
At one end 1a of the square steel pipe 1, as shown in FIG. 2 or 3, there is an insertion jig 6 that protrudes horizontally from the pipe end.
Or 6' is attached.

差し込み治具6または6′は、接続すべき角型鋼管1の
他方の端部1bに嵌挿され、これによって、角型鋼管1
,1は、相互に接続される。
The insertion jig 6 or 6' is inserted into the other end 1b of the square steel pipe 1 to be connected, and thereby the square steel pipe 1
, 1 are interconnected.

角型鋼管1の断面形状は、溝3の横断面形状によって長
方形にしてもよい。
The cross-sectional shape of the square steel pipe 1 may be rectangular depending on the cross-sectional shape of the groove 3.

ユニット体7は、例えば溝3の内部に障害物があれば、
これを回避する形状に調製する。
For example, if there is an obstacle inside the groove 3, the unit body 7
Prepare the shape to avoid this.

ユニット体7を構成する角型鋼管1を、溝3の長さ方向
に預次差し込み治具6により連結し、溝3内に次々と埋
設して溝3全体を塞ぐ。
The square steel pipes 1 constituting the unit body 7 are connected in the length direction of the groove 3 by a holding insertion jig 6, and are buried in the groove 3 one after another to close the entire groove 3.

本発明の方法による掘削工事中の道路の仮復旧作業は、
次のようにして行われる。即ち溝3の底部に埋設されて
いる管8の周囲に山砂9を投入して管8を山砂9の中に
埋設した後に、あらかじめ溝3の形状に応じて調製され
たユニット体7を埋設する。さらに、溝3の長さ方向に
埋設したユニット体7を順次差し込み治具6によシ連結
し、溝3全体を塞ぎ、その後、ユニット体7を構成する
角型鋼管1.1・・・の最上層の上面に、アスファルト
4による打設および展圧を旅し、道路2の地表面と水平
の路面を形成する。
Temporary road restoration work during excavation work by the method of the present invention is as follows:
This is done as follows. That is, after putting mountain sand 9 around the pipe 8 buried in the bottom of the groove 3 and burying the pipe 8 in the mountain sand 9, the unit body 7 prepared in advance according to the shape of the groove 3 is inserted. Bury it. Furthermore, the unit bodies 7 buried in the length direction of the groove 3 are sequentially inserted and connected with the jig 6 to close the entire groove 3, and then the square steel pipes 1.1 . . . On the upper surface of the top layer, the asphalt 4 is placed and rolled out to form a road surface that is horizontal to the ground surface of the road 2.

なお、溝3内に管8等が埋設されていないときは、ユニ
ット体7のみで、溝3の開口部付近まで溝3を塞ぐ。
Note that when the pipe 8 or the like is not buried in the groove 3, the unit body 7 alone closes the groove 3 up to the vicinity of the opening of the groove 3.

ユニット体7は、上下に2層に分割して、まず下層のユ
ニット体を埋設し、その後上層のユニット体を下層のユ
ニット体の上面に載置して同定してもよい。または、3
層以上に分割してもよい。
The unit body 7 may be divided into two layers, upper and lower, and the lower layer unit body may be buried first, and then the upper layer unit body may be placed on the upper surface of the lower layer unit body for identification. Or 3
It may be divided into more than one layer.

このような方法によれば、仮復旧に要する時間は大幅に
短縮される。
According to such a method, the time required for temporary restoration is significantly shortened.

〔4発明の効果〕 以上説明したように、この発明の方法によれば、掘削工
事中の道路の仮復旧作業に要する時間が大幅に短縮でき
、しかも、材料のコストを大幅に低減できる産業上有用
な効果がもたらされる。
[4 Effects of the Invention] As explained above, according to the method of the present invention, the time required for temporary road restoration work during excavation work can be significantly shortened, and the cost of materials can also be significantly reduced. Useful effects are produced.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の方法の1実施態様を示す垂MvL断
面図、第2図および第3図は角型鋼管の端部を示す斜視
図、第4図〜第8図は、従来の掘削工事中の道路の仮復
旧方法の1例を示す垂直横断面図である。図面において
、 1・・・角型鋼管、     2・・・道路、3・・・
溝、        4・・・アスファルト、5・・・
ボルト、     6.6′・・・差し込み治具、7・
・・ユニット体、    8・・・管、9・・・山砂、
      10・・・ランマー、11・・・砕石。
FIG. 1 is a vertical MvL sectional view showing one embodiment of the method of the present invention, FIGS. 2 and 3 are perspective views showing the end of a square steel pipe, and FIGS. 4 to 8 are conventional drilling methods. FIG. 2 is a vertical cross-sectional view showing an example of a temporary restoration method for a road under construction. In the drawings, 1... Square steel pipe, 2... Road, 3...
Groove, 4... Asphalt, 5...
Bolt, 6.6'...Insert jig, 7.
... Unit body, 8 ... Pipe, 9 ... Mountain sand,
10... Rammer, 11... Crushed stone.

Claims (1)

【特許請求の範囲】[Claims] 断面が四角形状の複数個の角型鋼管を、掘削された溝の
内部形状に合わせてあらかじめ層状に組み立て、且つ、
相互に固定してユニット体となし、前記ユニット体の上
面が前記溝の開口部付近に位置するように、前記ユニッ
ト体を前記溝内に埋設し、前記ユニット体を構成する角
型鋼管の最上層の上面に舗装材による舗装を施し、道路
の地表面と水平の路面を形成することを特徴とする、掘
削工事中の道路の仮復旧方法。
A plurality of square steel pipes with a square cross section are assembled in advance in a layered manner according to the internal shape of the excavated trench, and
They are fixed to each other to form a unit body, and the unit body is buried in the groove so that the upper surface of the unit body is located near the opening of the groove, and the top of the square steel pipes constituting the unit body is buried. A method for temporarily restoring a road during excavation work, which is characterized by paving the upper surface with paving material to form a road surface that is horizontal to the ground surface of the road.
JP19286586A 1986-08-20 1986-08-20 Temporary restoration of road under drilling construction Pending JPS6351501A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19286586A JPS6351501A (en) 1986-08-20 1986-08-20 Temporary restoration of road under drilling construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19286586A JPS6351501A (en) 1986-08-20 1986-08-20 Temporary restoration of road under drilling construction

Publications (1)

Publication Number Publication Date
JPS6351501A true JPS6351501A (en) 1988-03-04

Family

ID=16298258

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19286586A Pending JPS6351501A (en) 1986-08-20 1986-08-20 Temporary restoration of road under drilling construction

Country Status (1)

Country Link
JP (1) JPS6351501A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06109682A (en) * 1992-02-28 1994-04-22 Ind Technol Res Inst Manufacture of gas sensor and gas sensor manufactured by method thereof
JP2017078304A (en) * 2015-10-21 2017-04-27 植村 誠 Road surface lining method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57100203A (en) * 1980-12-15 1982-06-22 Osaka Gas Co Ltd Temporary embedding construction of drilling pit
JPS5820804A (en) * 1981-07-31 1983-02-07 大阪瓦斯株式会社 Temporal embedding method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57100203A (en) * 1980-12-15 1982-06-22 Osaka Gas Co Ltd Temporary embedding construction of drilling pit
JPS5820804A (en) * 1981-07-31 1983-02-07 大阪瓦斯株式会社 Temporal embedding method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06109682A (en) * 1992-02-28 1994-04-22 Ind Technol Res Inst Manufacture of gas sensor and gas sensor manufactured by method thereof
JP2017078304A (en) * 2015-10-21 2017-04-27 植村 誠 Road surface lining method

Similar Documents

Publication Publication Date Title
JPS6351501A (en) Temporary restoration of road under drilling construction
CN109137970A (en) Arterial highway underground pipe gallery construction method
JP3138950B2 (en) Roadway construction method on slope
CN101839141B (en) Emergency subaqueous tunnel flood-prevention construction method for subaqueous tunnels
Bailey The Antonine frontier in Callendar Park, Falkirk: its form and structural sequence
CN109797637B (en) Geological exploration construction method and structure
Forbes Landslide investigation and correction
SU1654418A1 (en) Culvert
JPH07300845A (en) Preventive method against liquefaction of underground linear structure
SU1134658A1 (en) Method of constructing a highway overpass above pipeline sunk in soil
CN1115820A (en) Construction process of herringbone retaining wall
SU1409717A1 (en) Method of constructing water removal ditch
JP3352951B2 (en) Installation method of invert and underground drainage in mountain tunnel
Khali et al. Conventional tunneling challenges in the Himalayas: a case study
Anderson et al. Geosynthetics facilitate road construction and mitigate environmental impact in Amazon Basin rainforest–10 years of performance
RU77615U1 (en) CROSSING THE ROAD THROUGH WATERWATERS
Howison et al. TRUNK ROAD A82: LOCH LOMONDSIDE ROAD: CONCEPTION TO IMPLEMENTATION.
Kemp Roman and Medieval Boundary Ditches along Ermine Street, Godmanchester
CN101845823B (en) Steel plate mound used as temporary anti-flood structure for subaqueous tunnel
JP2516442B2 (en) Pipe burying device
JPS5833337B2 (en) How to bury the pipe
Hair et al. Excavations at Parton Colliery
Petrofsky Mixed Face Tunneling on Melbourne Underground
Roberts 19th Century Burials at St. Mary's Churchyard, Buckden: an Evaluation Report
Pederson Construction of Roads and Appurtenances for Dillon Dam