JPS5833337B2 - How to bury the pipe - Google Patents
How to bury the pipeInfo
- Publication number
- JPS5833337B2 JPS5833337B2 JP50116758A JP11675875A JPS5833337B2 JP S5833337 B2 JPS5833337 B2 JP S5833337B2 JP 50116758 A JP50116758 A JP 50116758A JP 11675875 A JP11675875 A JP 11675875A JP S5833337 B2 JPS5833337 B2 JP S5833337B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- sand
- earth
- trench
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
【発明の詳細な説明】 本発明は管を地中に埋設する方法に関するものである。[Detailed description of the invention] The present invention relates to a method for burying pipes underground.
地中埋設管が土圧のために変形することはよく知られて
おり、土圧Wと管の変形量σとの間には、次の関係があ
る。It is well known that underground pipes deform due to earth pressure, and the following relationship exists between the earth pressure W and the amount of deformation σ of the pipe.
KWR”
’ EI=0.061eR
上記において、Eは管のヤング率、■は管の単位長さ当
りの管壁の断面二次モーメント、Rは管の半径、Kは基
礎の支持角による係数、eは管両側の受働土圧係数であ
る。KWR"' EI=0.061eR In the above, E is the Young's modulus of the pipe, ■ is the moment of inertia of the pipe wall per unit length of the pipe, R is the radius of the pipe, K is the coefficient due to the support angle of the foundation, e is the passive earth pressure coefficient on both sides of the pipe.
上記から明らかなように管の変形量は受働土圧係数eを
大きくすれば、小さくなる。As is clear from the above, the amount of deformation of the pipe decreases as the passive earth pressure coefficient e increases.
従来、土庄による管の変形防止を言するために、管両側
の埋戻し土を極力つき固めて、上記した受働土圧係数e
を増大させている。Conventionally, in order to prevent deformation of pipes due to tonosho, the backfilling soil on both sides of the pipes was compacted as much as possible to reduce the above-mentioned passive earth pressure coefficient e.
is increasing.
しかし埋戻し土砂をつき固めても、矢板を引き抜く際、
矢板の引き抜き跡の孔に管両側の土砂の一部が流れ込ん
で、管両側のつき固め土砂に緩みが生じるため、受働土
圧係数を大きくし得ないことが往々にしである。However, even if the backfill soil is compacted, when pulling out the sheet pile,
Part of the earth and sand on both sides of the pipe flows into the hole where the sheet pile was pulled out, causing the compacted earth and sand on both sides of the pipe to become loose, so it is often impossible to increase the passive earth pressure coefficient.
このため、本出願人は管両側の埋戻し土砂にセメントを
混合し、管理段溝全体の埋戻し後に、上記セメント混合
土砂の硬化をまって矢板を引抜くことを提案したが、こ
の場合でも、湧水箇所ではセメントが湧水のために流出
されて、上記した受働土圧係数eを充分に大きくし得な
いことがある。For this reason, the applicant proposed mixing cement with the backfilling soil on both sides of the pipe, and after backfilling the entire management groove, waiting for the cement-mixed soil to harden before pulling out the sheet pile. , Cement may be washed away by the spring water at spring locations, making it impossible to sufficiently increase the above-mentioned passive earth pressure coefficient e.
この不利は、管両側の埋戻し土砂にセメントを混入しな
い場合でも、土砂の一部が流出される結果、避けられな
い事柄である。This disadvantage is unavoidable because even if cement is not mixed into the backfilling soil on both sides of the pipe, some of the soil will be washed away.
本発明に係る管の埋設方法は、湧水箇所であっても管を
安定に埋設し得る方法であり、管理設用溝の底面に玉石
または砕石を敷き、該敷石上並びに溝底部両側面にまた
がって遮水シートを敷き、而るのちに、上記溝内に管を
配設し、次いで同溝内への土砂の埋戻しを行うことを特
徴とするものである。The method of burying a pipe according to the present invention is a method that allows a pipe to be buried stably even in a spring water location, by laying cobblestones or crushed stones on the bottom of a management trench, and placing the pipes on the paving stones and on both sides of the bottom of the trench. The feature is that a water-blocking sheet is laid across the trench, and then a pipe is placed in the trench, and then the trench is backfilled with earth and sand.
以下、図面により本発明を説明する。The present invention will be explained below with reference to the drawings.
図において、Dは掘削溝であり、溝の両側面に沿って矢
板Pが打込まれている。In the figure, D is an excavated groove, and sheet piles P are driven along both sides of the groove.
本発明によって管を埋設するには、まず、溝りの底面上
に玉石または砕石1を敷き、更に、該敷石1上並びに溝
底部の両側面にまたがって遮水シート2を敷設する。To bury a pipe according to the present invention, first, cobblestones or crushed stones 1 are laid on the bottom of the trench, and then water-blocking sheets 2 are laid over the paving stones 1 and across both sides of the trench bottom.
この遮水シート2には、硬質ビニルシート、ポリエチレ
ンシート等が用いられる。A hard vinyl sheet, a polyethylene sheet, or the like is used for this water-blocking sheet 2.
遮水シート2の敷設後は基礎砂3を30〜50αの厚さ
に敷き、これをランマー、タコ棒等により充分につき固
める。After laying the water-shielding sheet 2, base sand 3 is laid down to a thickness of 30 to 50 α, and thoroughly hardened with a rammer, a tacho rod, etc.
この基礎砂3には必要に応じてセメントを2〜10饅混
入することもできる。If necessary, 2 to 10 times of cement may be mixed into this basic sand 3.
基礎を施工したのちは、管Aを常法に従って配管し、該
管Aの両側に土砂4,4を投入し、これを充分につき固
める。After constructing the foundation, pipe A is installed in accordance with the usual method, earth and sand 4, 4 are poured into both sides of pipe A, and the earth and sand are sufficiently hardened.
この上砂4,4にも前記と同様、必要に応じてセメント
を混入することができる。Cement can be mixed into these top sands 4, 4 as well, if necessary, as described above.
また、前記した遮水シート2の上端21は管両側への土
砂4の充填レベルよりもや\上刃に配することが好まし
い。Further, it is preferable that the upper end 21 of the above-described water-blocking sheet 2 be arranged at a level slightly higher than the filling level of the earth and sand 4 on both sides of the pipe.
この上砂4,4の充填後は、管Aの上部を、良質土また
は砂5で埋戻し、この埋込め戻し後に、矢板Pを引抜き
、これにて、施工を終了する。After filling with the top sand 4, 4, the upper part of the pipe A is backfilled with high-quality soil or sand 5, and after this backfilling, the sheet pile P is pulled out, thereby completing the construction.
この場合、矢板Pの引き跡の孔と管両側の土砂4との間
には遮水シート2が隔壁として介在しているから、矢板
引き跡の孔への土砂4,4の流れ込みはなく、土砂4,
4のつき固めが緩められるようなことはない。In this case, since the water-blocking sheet 2 is interposed as a partition between the hole in the trail of the sheet pile P and the earth and sand 4 on both sides of the pipe, the earth and sand 4 do not flow into the hole in the trail of the sheet pile P. Sediment 4,
There is no way that the tenacity of 4 will be loosened.
なお、土砂4,4にセメントを混入する場合はこのセメ
ントの硬化をまって(上記埋戻し完了後、2〜3日放置
すればよい)、矢板Pを引抜くことが望ましい。In addition, when mixing cement into the earth and sand 4, 4, it is desirable to wait for this cement to harden (it may be left to stand for 2 to 3 days after the completion of the above-mentioned backfilling), and then pull out the sheet pile P.
本発明に係る管の埋設方法は、上述した通り管理設用溝
の底面に玉石または砕石を敷き、その上に遮水シートを
敷設したうえで、管を埋設する方法であるから、管理設
用溝に局部的に湧水が生じても、この湧水は玉石または
砕石の層によって分散され、かつ遮水シートのために管
近傍の土砂への浸水が防止され得る。As described above, the method for burying a pipe according to the present invention is to lay cobblestones or crushed stones on the bottom of the management installation trench, lay a water-blocking sheet on top of that, and then bury the pipe. Even if spring water occurs locally in the ditch, this spring water is dispersed by the layer of cobblestones or crushed stones, and the impermeable sheet prevents water from seeping into the earth and sand near the pipe.
従って、管近傍の土砂が湧水のために、流出されるとい
ったことは良好に防止でき、そのつき固め状態は初期の
ま〜に保持し得るから既述した受働土圧係数eを充分に
大きくし得、埋設管の土砂による変形を僅かにとどめる
ことができる。Therefore, it is possible to effectively prevent the earth and sand near the pipe from being washed away by spring water, and the compacted state can be maintained at the initial stage, so the passive earth pressure coefficient e mentioned above can be sufficiently increased. This makes it possible to minimize deformation of buried pipes due to earth and sand.
図面を本発明を示すための説明図である。
図において、Aは管、Dは管理設用溝、1は玉石または
砕石、2は遮水シート、3,4.4並びに5は土砂であ
る。FIG. 1 is an explanatory drawing for illustrating the present invention. In the figure, A is a pipe, D is a management groove, 1 is a boulder or crushed stone, 2 is a water-blocking sheet, and 3, 4.4, and 5 are earth and sand.
Claims (1)
上並びに溝底部両側面にまたがって、遮水シートを敷設
し、而るのちに、上記溝内に管を配設し、次いで同溝内
への土砂の埋戻しを行うことを特徴とする管の埋設方法
。1 Lay cobblestones or crushed stones on the bottom of the management facility trench, lay a water-blocking sheet over the paving stones and across both sides of the bottom of the trench, and then install a pipe in the trench, and then A pipe burying method characterized by backfilling a trench with earth and sand.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP50116758A JPS5833337B2 (en) | 1975-09-27 | 1975-09-27 | How to bury the pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP50116758A JPS5833337B2 (en) | 1975-09-27 | 1975-09-27 | How to bury the pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5241417A JPS5241417A (en) | 1977-03-31 |
JPS5833337B2 true JPS5833337B2 (en) | 1983-07-19 |
Family
ID=14695002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP50116758A Expired JPS5833337B2 (en) | 1975-09-27 | 1975-09-27 | How to bury the pipe |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5833337B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60115143U (en) * | 1984-01-12 | 1985-08-03 | 高橋 満次 | Automobile back mirror |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0415381A (en) * | 1990-05-09 | 1992-01-20 | Kubota Corp | Formation of pipe bed |
-
1975
- 1975-09-27 JP JP50116758A patent/JPS5833337B2/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60115143U (en) * | 1984-01-12 | 1985-08-03 | 高橋 満次 | Automobile back mirror |
Also Published As
Publication number | Publication date |
---|---|
JPS5241417A (en) | 1977-03-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108457289A (en) | A kind of open caisson construction method of complex condition | |
CN110344439B (en) | Construction method of rear retaining wall drain hole | |
CN109024657B (en) | Construction method of super high-rise core tube deep pit edge tower crane foundation under complex conditions | |
JP3366580B2 (en) | How to install an invert in the bottom of an existing mountain tunnel | |
CN216615676U (en) | Bottom sealing structure suitable for soft plastic silt riverbed | |
JPS5833337B2 (en) | How to bury the pipe | |
JP2776695B2 (en) | Prevention of settlement of buried pipeline by civil engineering sheet | |
Ward et al. | The use of simple relief wells in reducing water pressure beneath a trench excavation. | |
JP2002317430A (en) | Method and structure for burying material to be buried under ground | |
JPS6124624Y2 (en) | ||
CN218814180U (en) | Recoverable type combination formula escape canal of prefabricated bellows | |
JP3352951B2 (en) | Installation method of invert and underground drainage in mountain tunnel | |
JPS6124623Y2 (en) | ||
JPH07300845A (en) | Preventive method against liquefaction of underground linear structure | |
JPS6124627Y2 (en) | ||
JPH01151621A (en) | Connecting method for underground conduit | |
JPS6124625Y2 (en) | ||
JPH11182737A (en) | Pipe burying construction method | |
JP2004232232A (en) | Reinforced earth method with impervious function | |
CN117513197A (en) | Box culvert diversion construction method | |
JPS6124626Y2 (en) | ||
JPH07317959A (en) | Pipe burying method | |
CN114561939A (en) | Anti-floating anchor rod sectional grouting construction method | |
JPH05248570A (en) | Underground conduit | |
JP2556415B2 (en) | Construction method of self-supporting retaining wall |