JP6688397B2 - クリーンで効率的な採炭方法 - Google Patents

クリーンで効率的な採炭方法 Download PDF

Info

Publication number
JP6688397B2
JP6688397B2 JP2018539320A JP2018539320A JP6688397B2 JP 6688397 B2 JP6688397 B2 JP 6688397B2 JP 2018539320 A JP2018539320 A JP 2018539320A JP 2018539320 A JP2018539320 A JP 2018539320A JP 6688397 B2 JP6688397 B2 JP 6688397B2
Authority
JP
Japan
Prior art keywords
face
mining
short
cutting face
short cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2018539320A
Other languages
English (en)
Japanese (ja)
Other versions
JP2020506309A (ja
Inventor
▲張▼▲農▼
▲謝▼正正
周俊▲瑶▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Publication of JP2020506309A publication Critical patent/JP2020506309A/ja
Application granted granted Critical
Publication of JP6688397B2 publication Critical patent/JP6688397B2/ja
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/06Filling-up mechanically

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Processing Of Solid Wastes (AREA)
JP2018539320A 2017-12-08 2018-03-13 クリーンで効率的な採炭方法 Expired - Fee Related JP6688397B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201711290893.8 2017-12-08
CN201711290893.8A CN108331580B (zh) 2017-12-08 2017-12-08 一种清洁高效的采煤方法
PCT/CN2018/078771 WO2019109535A1 (zh) 2017-12-08 2018-03-13 一种清洁高效的采煤方法

Publications (2)

Publication Number Publication Date
JP2020506309A JP2020506309A (ja) 2020-02-27
JP6688397B2 true JP6688397B2 (ja) 2020-04-28

Family

ID=62923209

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018539320A Expired - Fee Related JP6688397B2 (ja) 2017-12-08 2018-03-13 クリーンで効率的な採炭方法

Country Status (5)

Country Link
US (1) US20210189876A1 (zh)
JP (1) JP6688397B2 (zh)
CN (1) CN108331580B (zh)
AU (1) AU2018208634B2 (zh)
WO (1) WO2019109535A1 (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707380A (zh) * 2018-11-09 2019-05-03 内蒙古福城矿业有限公司 一种煤炭无氧开采方法
CN113622916B (zh) * 2021-07-12 2024-04-09 山东黄金矿业(莱州)有限公司三山岛金矿 一种采场点柱支护加固及回收方法
CN114215591B (zh) * 2021-11-30 2024-07-16 中国矿业大学 充填工作面巷旁矸石与超高水材料混合充填沿空留巷方法

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1145135A1 (ru) * 1983-10-31 1985-03-15 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Скрепероструг
CN100567703C (zh) * 2005-05-19 2009-12-09 兖矿集团有限公司 长壁采煤法综采工艺
CN101372891B (zh) * 2008-06-10 2010-08-11 沈阳市华祥矿山机械厂 条带充填整体回采采煤方法
CN101737049B (zh) * 2008-11-25 2012-06-20 宝钢集团上海梅山有限公司 一种多作业面循环的采准掘进生产组织方法
CN101749020A (zh) * 2010-01-26 2010-06-23 淄博市王庄煤矿 充填法前进式采煤
CN102230396A (zh) * 2011-05-31 2011-11-02 大连大学 煤矿采空区随采随充充填方法
CN102996131B (zh) * 2012-12-10 2014-10-29 中国矿业大学 一种预掘两巷前进式固体充填采煤方法
CN103993881A (zh) * 2014-05-21 2014-08-20 中国矿业大学 一种长壁巷式胶结充填开采方法
CN104775816B (zh) * 2015-02-27 2017-04-26 中国矿业大学 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法
CN104775819B (zh) * 2015-03-27 2017-01-18 中国矿业大学 一种深部倾斜煤层回采巷道矿压控制开采方法
CN105298496B (zh) * 2015-12-17 2018-02-27 冀中能源集团有限责任公司 设置预留工作面煤柱的全采全充采煤方法
CN106522948A (zh) * 2016-11-25 2017-03-22 山东科技大学 一种短壁矸石胶结连采连充采煤法

Also Published As

Publication number Publication date
CN108331580A (zh) 2018-07-27
WO2019109535A1 (zh) 2019-06-13
JP2020506309A (ja) 2020-02-27
AU2018208634B2 (en) 2020-01-02
US20210189876A1 (en) 2021-06-24
AU2018208634A1 (en) 2019-06-27
CN108331580B (zh) 2020-01-10

Similar Documents

Publication Publication Date Title
RU2645694C2 (ru) Способ раздельной разработки и транспортировки мощных угольных пластов с пустой породой и закладки выработанного пространства пустой породой
JP6688397B2 (ja) クリーンで効率的な採炭方法
WO2016045440A1 (zh) 一种采矿方法
AU2018431390B2 (en) Method for recovering room-type coal pillars by cemented filling of reserved roadways
JP6684922B2 (ja) ぼたゼロ排出短切羽無支柱石炭採掘方法
WO2014187163A1 (zh) 一种特厚煤层倾斜分层固体充填采煤方法
CN105317459A (zh) 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法
CN103883329A (zh) 矿山硬岩井巷掘进施工方法
CN112049650B (zh) 一种大盾构扩挖既有小盾构隧道的方法
CN103527196A (zh) 一种黄土充填回收房式煤柱的方法
JP2020504253A5 (zh)
CN111005392A (zh) 一种含缓倾软弱夹层矿山高陡滑坡的治理方法
Phadke et al. Construction of tunnels, by new austrian tunneling method (NATM) and by tunnel boring machine (TBM)
CN107366322B (zh) 一种自动吸料的铣挖机
CN110714759B (zh) 一种开采遗失煤炭的方法
CN203394529U (zh) 露天矿山清底机
CN205742318U (zh) 一种自动吸料的铣挖机
CN212424722U (zh) 一种煤矿井下用装煤机械
CN103867203A (zh) 矿山井巷链锯式硬岩掘进机
RU2329380C1 (ru) Способ открыто-подземной разработки целиков угля, оставленных между границей шахтного поля и бортом карьера
CN107237635B (zh) 一种一次采全厚的特厚固体钾盐矿开采方法
CN204875893U (zh) 四履带碎石挖掘一体机
CN110374598B (zh) 人工矿柱协同矸石充填置换工业广场保护煤柱的方法
CN102716901A (zh) 煤矿区附近建筑垃圾处理回用方法
Shukurov et al. To the question of increasing efficiency of developing soils of higher strength

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180724

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200114

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200305

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200323

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200403

R150 Certificate of patent or registration of utility model

Ref document number: 6688397

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees