JP3245260B2 - Foundation structure and construction method - Google Patents

Foundation structure and construction method

Info

Publication number
JP3245260B2
JP3245260B2 JP13350793A JP13350793A JP3245260B2 JP 3245260 B2 JP3245260 B2 JP 3245260B2 JP 13350793 A JP13350793 A JP 13350793A JP 13350793 A JP13350793 A JP 13350793A JP 3245260 B2 JP3245260 B2 JP 3245260B2
Authority
JP
Japan
Prior art keywords
underground beam
independent foundation
foundation
formwork
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP13350793A
Other languages
Japanese (ja)
Other versions
JPH06346467A (en
Inventor
孝夫 高本
Original Assignee
高伸建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高伸建設株式会社 filed Critical 高伸建設株式会社
Priority to JP13350793A priority Critical patent/JP3245260B2/en
Publication of JPH06346467A publication Critical patent/JPH06346467A/en
Application granted granted Critical
Publication of JP3245260B2 publication Critical patent/JP3245260B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、地下構造を有しない基
礎の施工方法に関する。さらに詳しくは、地盤に堀溝し
た根切り溝に構築される建屋の基礎構造の施工コスト,
施工期間に係る改良と、その基礎構造を施工するに好適
な施工方法とに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a foundation having no underground structure. In more detail, the construction cost of the foundation structure of the building constructed in the
The present invention relates to an improvement relating to a construction period and a construction method suitable for constructing the foundation structure.

【0002】[0002]

【従来の技術】従来、基礎構造としては、例えば、特開
平2−248527号公報に記載のものが知られてい
る。
2. Description of the Related Art Conventionally, as a basic structure, for example, a structure described in JP-A-2-248527 is known.

【0003】この従来の基礎構造は、地盤に独立基礎を
構築する独立基礎用根切り溝と地中梁を構築する地中梁
用根切り溝とを掘溝し、独立基礎用根切り溝,地中梁用
根切り溝に墨出しを行って埋殺しとなる独立基礎用捨型
枠,地中梁用捨型枠を夫々地中に係止して建込みする。
その後に、独立基礎用捨型枠,地中梁用捨型枠に囲まれ
た部分に砕石を敷設し転圧し、その上に捨コンクリート
を打設する。打設後に、独立基礎用捨型枠,地中梁用捨
型枠の周囲を独立基礎用根切り溝,地中梁用根切り溝を
堀溝した削土で埋戻し、その後に独立基礎用捨型枠,地
中梁用捨型枠の内部に鉄筋を配筋してコンクリートが連
続的に打設される施工方法が採られている。
In this conventional foundation structure, an independent foundation grooving groove for constructing an independent foundation on the ground and an underground girder grooving groove for constructing an underground beam are dug, and the independent foundation grooving groove and the underground are constructed. The foundations for the independent foundations and the foundations for the underground beams, which are to be buried by inking the root trenches for beams, will be locked in the ground.
After that, crushed stone is laid and compacted in the area surrounded by the discarded formwork for the independent foundation and the underground beam, and concrete is poured on it. After the casting, the surrounding area around the discarded formwork for the independent foundation and the underground beam is backfilled with the excavated trenches for the rooting groove for the independent foundation and the underground beam, and then the discarded formwork for the independent foundation. In addition, a construction method is adopted in which concrete is continuously cast by arranging reinforcing steel inside the underground beam-removing formwork.

【0004】[0004]

【発明が解決しようとする課題】前述の従来の基礎構造
では、独立基礎用根切り溝内と地中梁根切り溝内とで型
枠用パネルを溝底などに係止して建込み作業しなければ
ならず、型枠組立作業の面倒さが依然解消されていなか
った。
In the above-mentioned conventional foundation structure, the formwork panel is fixed to the groove bottom or the like in the independent foundation root cutting groove and the underground beam root cutting groove, and the construction work is performed. And the trouble of assembling the formwork has not been eliminated.

【0005】また、従来の基礎の施工方法では、独立基
礎用捨型枠,地中梁用捨型枠の建込みや鉄筋の配筋が独
立基礎用根切り溝,地中梁用根切り溝や独立基礎用捨型
枠,地中梁用捨型枠の内部で型枠用パネル,ジョイント
部材,セパレータ等の連結組立てや鉄筋の針金による結
縛等によって行われることから、施工にかなり手間が掛
かってしまい、施工コストの低減,施工期間の短縮が充
分に達成されていないという問題点を有している。特
に、型枠組立後の型枠内での砕石転圧をしたうえで捨て
コンクリート打設を行うので、施工作業が非常に面倒で
あった。
[0005] In the conventional method for constructing a foundation, the construction of a discarded formwork for an independent foundation and a groundwork beam and the arrangement of reinforcing bars are performed by using an independent foundation cutout groove, an underground beam cutout groove and an independent cutout. Since it is performed by connecting and assembling form panels, joint members, separators, etc. inside the base form and underground beam form, and by tying the rebar with wire, it takes a lot of time to complete the construction. As a result, there is a problem that the reduction of the construction cost and the shortening of the construction period are not sufficiently achieved. In particular, since concrete is cast after crushed stones are compacted in the formwork after the formwork is assembled, the construction work is very troublesome.

【0006】本発明は、このような問題点を考慮してな
されたもので、施工コストの低減,施工期間の短縮を充
分に達成可能な基礎構造と、この基礎構造を実施するに
好適な基礎構造の施工方法とを提供することを課題とす
る。
The present invention has been made in view of such problems, and has a foundation structure capable of sufficiently reducing the construction cost and the construction period, and a foundation suitable for implementing the foundation structure. It is an object to provide a construction method of a structure.

【0007】[0007]

【課題を解決するための手段】前述の課題を解決するた
め、本発明に係る基礎構造は、請求項1に記載のよう
に、外部で組み立ててユニット化され独立基礎用根切り
溝に埋殺される独立基礎用捨型枠と、外部で組み立てて
ユニット化され独立基礎用捨型枠に固定されて地中梁用
根切り溝に埋め殺される地中梁用捨型枠と、外部で組み
立ててユニット化され独立基礎用捨型枠と地中梁用捨型
枠との内部の双方に連続してまたは片方ごとに個別に落
し込み配筋される鉄筋とからなる手段を採用する。
According to a first aspect of the present invention, there is provided a base structure according to the present invention. Disassembled formwork for independent foundations, externally assembled and unitized, and dismantled formwork for underground beams that are fixed to the independent foundation disposable formwork and buried in the underground girder grooving groove, assembled externally and unitized Then, a means is used which comprises reinforcing bars which are continuously dropped into each of the inside of the discarded formwork for the independent foundation and the inside of the discarded formwork for the underground beam or individually for each one.

【0008】また、本発明に係る基礎構造の施工方法
は、地盤に独立基礎を構築する独立基礎用根切り溝と地
中梁を構築する地中梁用根切り溝とを掘溝し、独立基礎
用根切り溝に埋殺しとなる上部開放形に外部で組み立て
てユニット化された独立基礎用捨型枠を建込み、地中梁
用根切り溝に埋殺しとなる上部開放形に外部で組み立て
てユニット化された地中梁用捨型枠を建込み、独立基礎
用捨型枠と地中梁用捨型枠とを根切り溝で連結して後、
独立基礎用捨型枠と地中梁用捨型枠との内部の双方に連
続してまたは片方ごとに個別に、外部で組み立ててユニ
ット化した鉄筋を上方から落込んで配筋し、その後に独
立基礎用捨型枠と地中梁用捨型枠との内部の双方に連続
してコンクリートを打設することを特徴とする手段を採
用する。
Further, the method for constructing a foundation structure according to the present invention is a method for digging an independent foundation grooving groove for constructing an independent foundation on the ground and an underground beam grooving groove for constructing an underground beam. The unit is built and assembled externally into an open-top form that is externally assembled and unitized into an open-top form that is buried in the root trench, and externally assembled into an open-top form that is buried in the root groove for underground beams After building the discarded formwork for underground beams, connecting the discarded formwork for independent foundation and the underground beam with root cutting grooves,
The rebar assembled and assembled externally is dropped from above and arranged in the inside of the discarded formwork for independent foundation and underground beam, or individually for each side. A means is adopted in which concrete is continuously poured into both the inside of the foundation and the underground beam.

【0009】[0009]

【作用】前述の手段によると、請求項1では、独立基礎
用捨型枠と地中梁用捨型枠とがユニット化されているこ
とから、地上から独立基礎用根切り溝と地中梁用根切り
溝に据え付け作業される。溝内では、独立基礎用捨型枠
と地中梁用捨型枠とが連結される。鉄筋はユニットされ
て地上から型枠内に据え付けされる。
According to the above-mentioned means, in the first aspect, since the discarded formwork for the independent foundation and the discarded formwork for the underground beam are unitized, the root-cutting groove for the independent foundation and the basement for the underground beam are provided from the ground. It is installed in the kerf. In the trench, the discarded formwork for the independent foundation and the underground beam are connected. The rebar is united and installed in the formwork from the ground.

【0010】また、請求項2では、独立基礎用捨型枠,
地中梁用捨型枠が上部開放形のユニットとなっているこ
とから、独立基礎用根切り溝,地中梁用根切り溝を独立
基礎用捨型枠,地中梁用捨型枠に落込んで据え付けし、
さらに、ユニット化された鉄筋をもを独立基礎用捨型
枠,地中梁用捨型に落込んで据え付けされる。その後に
コンクリートが打設されて施工される。
According to a second aspect of the present invention, a disposable formwork for an independent foundation,
Since the underground beam truss form is an open-top unit, drop the independent foundation and underground beam truss into the independent foundation and underground beam trusses. Installation,
Further, the unitized rebar is also dropped into the discard form for the independent foundation and the disc for the underground beam and installed. After that, concrete is cast and constructed.

【0011】[0011]

【実施例】以下、本発明に係る基礎構造およびその施工
方法の実施例を図面に基いて説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing an embodiment of a foundation structure and a construction method according to the present invention.

【0012】まず、図2〜図12に示した本発明に係る
基礎構造の施工方法の実施例を説明する。
First, an embodiment of the method for constructing a foundation structure according to the present invention shown in FIGS. 2 to 12 will be described.

【0013】この実施例は、まず、前述の従来例と同様
に、地盤に独立基礎を構築するための深い独立基礎用根
切り溝1と、浅い地中梁を構築するための地中梁用根切
り溝2とを堀溝する(図2参照)。
In this embodiment, as in the prior art, first, a deep independent foundation excavation groove 1 for constructing an independent foundation in the ground and an underground beam excavation for constructing a shallow underground beam The trench 2 is trenched (see FIG. 2).

【0014】この堀溝された独立基礎用根切り溝1,地
中梁用根切り溝2は、構築しようとする独立基礎,地中
梁の形状,大きさに略合致している。即ち、図5に示す
ように、独立基礎用根切り溝1の側壁と独立基礎用捨型
枠3との間隔Sが短くなっている(図面には明らかにさ
れないが、地中梁用根切り溝2の側壁と地中梁用捨型枠
4との間隔も同様である。)。従って、独立基礎用根切
り溝1,地中梁用根切り溝2の余掘り量が少なくなる。
The excavated trenches for the independent foundation 1 and the underground beams 2 substantially match the shape and size of the independent foundation and the underground beam to be constructed. That is, as shown in FIG. 5, the distance S between the side wall of the independent foundation root cutting groove 1 and the independent foundation discarded formwork 3 is reduced (not shown in the drawing, but the underground beam root cutting groove 2 is not shown). The same applies to the distance between the side wall of the underground beam and the shaping frame 4 for underground beams.) Therefore, the amount of extra digging of the root grooving for the independent foundation 1 and the root grooving 2 for the underground beam is reduced.

【0015】続いて、独立基礎用根切り溝1の底部の全
体に砕石5を敷設し転圧してその上に捨コンクリート6
を打設する(図3参照)。このとき、地中梁用根切り溝
2の底部には、このような砕石5,捨コンクリート6の
施工は行わない。
Subsequently, crushed stone 5 is laid on the entire bottom of the root excavation groove 1 for independent foundation, rolled, and concrete is discarded thereon.
(See FIG. 3). At this time, such crushed stone 5 and concrete 6 are not applied to the bottom of the underground beam root cutting groove 2.

【0016】その後、墨出しを行うことなく(簡単な中
心点出しなどを行うことはあり得る。)、独立基礎用根
切り溝1の外部で予め組立てユニット化された上部開
放,下部開放形の独立基礎用捨型枠3をクレーン等で吊
下げて(図4参照)、独立基礎用根切り溝1の上方から
落込んで前記捨コンクリート6の上に据え付ける(図5
参照)。
Thereafter, the upper opening and the lower opening, which are pre-assembled and unitized outside the independent foundation root cutting groove 1, are not formed without ink marking (simple centering or the like may be performed). The discarded formwork 3 for an independent foundation is hung by a crane or the like (see FIG. 4), dropped from above the root cutting groove 1 for an independent foundation, and installed on the discarded concrete 6 (FIG. 5).
reference).

【0017】さらに、地中梁用根切り溝2の外部で組立
てユニット化された上部開放,有底形の地中梁用捨型枠
4をクレーン等で吊下げて(図6参照)、地中梁用根切
り溝2の上方から落込んで底部に据え付ける(図7参
照)。
Further, an open-ended, bottomed underground beam disposable form frame 4 assembled and unitized outside the underground beam root cutting groove 2 is suspended by a crane or the like (see FIG. 6). It is dropped from above the kerf 2 and installed on the bottom (see FIG. 7).

【0018】独立基礎用捨型枠3,地中梁用捨型枠4の
据え付けが終了した後には、独立基礎用捨型枠3,地中
梁用捨型枠4を溶接、あるいは必要に応じてボルト締め
により連結固定する。この連結固定によって、独立基礎
用捨型枠3と地中梁用捨型枠4とが一体化され、建込み
が完了する。
After the installation of the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam is completed, the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam are welded or, if necessary, And fix the connection by bolting. By this connection and fixing, the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam are integrated, and the installation is completed.

【0019】独立基礎用捨型枠3と地中梁用捨型枠4と
の連結固定では、独立基礎用捨型枠3と地中梁用捨型枠
4とが嵌合可能な連結窓部3’が独立基礎用捨型枠3に
設けられ、独立基礎用捨型枠3,地中梁用捨型枠4が強
固に一体化されるようになっている。
In connection and fixing between the discarded form frame 3 for the independent foundation and the discarded form frame 4 for the underground beam, a connection window portion in which the discarded form frame 3 for the independent foundation and the discarded form frame 4 for the underground beam can be fitted. 3 'is provided on the discarded formwork 3 for the independent foundation, and the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam are firmly integrated.

【0020】このような独立基礎用捨型枠3,地中梁用
捨型枠4の建込みでは、独立基礎用根切り溝1,地中梁
用根切り溝2の内部での面倒,複雑な作業が伴わないた
め、前記間隔Sが短くても何ら支障は生じない。また、
地中梁用捨型枠4は底板4’を備えた有底形に形成され
ており、地中梁用根切り溝2に砕石5,捨コンクリート
6により整地を施工しなくても何ら支障は生じない。ま
た、落込み据え付け工法であるため、周囲に障害物等が
あっても確実に施工することができる。
In the installation of such a form 3 for an independent foundation and a form 4 for an underground beam, it is troublesome and complicated work inside the root cutting grooves 1 and 2 for the independent foundation. Is not accompanied, no problem occurs even if the interval S is short. Also,
The underground beam truss form 4 is formed in a bottomed shape with a bottom plate 4 ′, and there is no problem even if the ground is not constructed with the crushed stone 5 and the crushed concrete 6 in the underground beam root cutting groove 2. . In addition, since the installation method is a recessed installation method, it is possible to reliably perform the work even if there are obstacles or the like in the surrounding area.

【0021】独立基礎用捨型枠3,地中梁用捨型枠4の
建込みの後には、直ちに独立基礎用捨型枠3,地中梁用
捨型枠4の周囲を独立基礎用根切り溝1,地中梁用根切
り溝2を堀溝した削土7により埋戻す(図8参照)。
Immediately after the disposing of the foundation frame for the independent foundation 3 and the disposal frame for the underground beam 4, the surroundings of the disposal foundation frame for the independent foundation 3 and the disposing form frame 4 for the underground beam are separated. The kerfs 1 and the underground beam root kerfs 2 are backfilled with excavated soil 7 (see FIG. 8).

【0022】この埋戻しは、独立基礎用根切り溝1,地
中梁用根切り溝2の開口状態が無用に継続されて作業員
が転落等するのを防止することができ、工事の安全性の
向上に寄与する。また、独立基礎用根切り溝1,地中梁
用根切り溝2の側壁と独立基礎用捨型枠3,地中梁用捨
型枠4の側壁とを削土7で押圧して、独立基礎用根切り
溝1,地中梁用根切り溝2の内部での独立基礎用捨型枠
3,地中梁用捨型枠4の安定化に寄与する。
This backfilling prevents the open state of the independent foundation root cutting groove 1 and the underground beam root cutting groove 2 from being used unnecessarily, thereby preventing the worker from falling down and the like. Contribute to improvement. In addition, the side walls of the root cut groove 1 for the independent foundation, the root groove 2 for the underground beam, and the side walls of the discarded formwork 3 for the independent foundation 3 and the discarded formwork 4 for the underground beam are pressed by the earth shaving 7 to form the independent foundation cutout. This contributes to stabilization of the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam inside the root cutting groove 1 and the underground beam root cutting groove 2.

【0023】独立基礎用捨型枠3,地中梁用捨型枠4の
周囲の埋戻しの後には、独立基礎用捨型枠3,地中梁用
捨型枠4の外部で独立基礎用捨型枠3,地中梁用捨型枠
4の内部の双方に連続するように組立てユニット化され
た格子骨形の鉄筋8をクレーン等で吊下げて(図9参
照)、独立基礎用捨型枠3,地中梁用捨型枠4の上方か
ら落込んで独立基礎用捨型枠3,地中梁用捨型枠4の内
部に配筋する(図10参照)。
After backfilling around the discarded formwork 3 for the independent foundation, the discarded formwork 3 for the underground beam, A grid-frame-shaped reinforcing bar 8 assembled and unitized so as to be continuous with both the inside of the discarding mold frame 3 and the underground beam discarding frame 4 is hung by a crane or the like (see FIG. 9), and is dismantled for an independent foundation. Reinforcement is dropped from above the formwork 3 and the underground beam discarding form 4 and arranged inside the independent foundation discarding formwork 3 and the underground beam discarding form 4 (see FIG. 10).

【0024】このような鉄筋8の配筋では、独立基礎用
捨型枠3,地中梁用捨型枠4の内部での面倒,複雑な作
業が伴なわず、周囲に障害物等があっても確実に施工す
ることができる。なお、図12に示すように、地中梁用
捨型枠4の上縁に跨ぐように設置された門形のスタンド
10にジャッキ11を装備して鉄筋8を吊降ろすように
すると、作業が簡単かつ正確になる。
In the arrangement of the reinforcing bars 8 as described above, there is no trouble or troublesome work inside the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam, and there are obstacles and the like around. Even if it does, it can be done reliably. In addition, as shown in FIG. 12, when a jack 11 is mounted on a portal-shaped stand 10 which is installed so as to straddle the upper edge of the underground beam discarding frame 4 and the reinforcing bars 8 are suspended, work is performed. Be easy and accurate.

【0025】鉄筋8の配筋の後には、独立基礎用捨型枠
3,地中梁用捨型枠4の内部へ連続的にコンクリート9
を打設することになる(図11参照)。
After the reinforcing bars 8 are arranged, the concrete 9 is continuously introduced into the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam.
(See FIG. 11).

【0026】なお、図13は、前述の本発明に係る基礎
構造の施工方法の施工区域G全体における効率的な施工
例を示すものである。
FIG. 13 shows an example of an efficient construction in the entire construction area G by the above-described construction method of the foundation structure according to the present invention.

【0027】この施工例では、施工区域Gを複数(4
個)の区画A,B,C・・に分割しておき、まず、1つ
の区画Aの地盤に独立基礎用根切り溝1,地中梁用根切
り溝2を堀溝する。そして、その独立基礎用根切り溝
1,地中梁用根切り溝2に独立基礎用捨型枠3,地中梁
用捨型枠4を建込む。このとき、独立基礎用根切り溝
1,地中梁用根切り溝2を堀溝した削土7は場外へ搬出
される。
In this construction example, a plurality of construction areas G (4
Are divided into sections A, B, C,..., And first, an independent foundation root cutting groove 1 and an underground beam root cutting groove 2 are dug in the ground of one section A. Then, the discarded formwork 3 for the independent foundation and the discarded formwork 4 for the underground beam are erected in the root cutout groove 1 for the independent foundation and the cutout groove 2 for the underground beam. At this time, the excavated soil 7 formed by digging the root excavation groove 1 for the independent foundation and the root excavation groove 2 for the underground beam is carried out of the site.

【0028】続いて、別の区画Bに同様に独立基礎用根
切り溝1,地中梁用根切り溝2の堀溝,独立基礎用捨型
枠3,地中梁用捨型枠4の建込みを行って、その独立基
礎用根切り溝1,地中梁用根切り溝2の堀溝の際の削土
7を先の区画Aの独立基礎用捨型枠3,地中梁用捨型枠
4の周囲で場内処理する。
Subsequently, similarly, in another section B, the trenches for the independent foundation root cutting groove 1, the underground beam root cutting groove 2, the trenches for the independent foundation, the disposable formwork for the independent foundation 3, and the disposable formwork 4 for the underground beam are installed. Then, the excavation 7 at the time of the trench of the independent foundation root cutting groove 1 and the underground beam root cutting groove 2 is removed around the independent foundation disposing frame 3 and the underground beam disposing frame 4 of the section A. Process in the hall.

【0029】而後、このような独立基礎用根切り溝1,
地中梁用根切り溝2の堀溝,独立基礎用捨型枠3,地中
梁用捨型枠4の建込み,削土7の埋戻しを各区画A,
B,C・・に次々に実施していき、施工区域Gの最後に
残った区画の独立基礎用捨型枠3,地中梁用捨型枠4の
周囲には削土7の残土で場内処理する。
Thereafter, the root grooves 1 for such independent foundations are used.
The trenches of the underground girder ditches 2, the foundations for the independent foundations 3, the construction of the foundations for the underground beams 4, and the backfilling of the excavated soil 7 were performed for each section A
B, C, etc. are carried out one after another, and the remaining area of the last remaining section of the construction area G is around the discarded formwork 3 for the independent foundation 3 and the discarded formwork 4 for the underground beam. To process.

【0030】このような施工例によると、施工区域Gの
一部づつ独立基礎用根切り溝1,地中梁用根切り溝2が
開口され削土7によって次々に場内処理されることか
ら、独立基礎用根切り溝1,地中梁用根切り溝2の開口
されている状態を短縮することができるため、独立基礎
用根切り溝1,地中梁用根切り溝2への作業員の転落の
危険性が低下して施工の安全性が高くなる。また、独立
基礎用根切り溝1,地中梁用根切り溝2の開口されてい
る状態が短縮されて転落防止等のための作業足場を架設
する必要がなくなること、独立基礎用根切り溝1,地中
梁用根切り溝2の開口されている状態の短縮に削土7を
有効利用することにより、より施工コストが低減され施
工期間が短くなる。また、削土7等の搬出,搬入用車両
の往来がなくなるため、交通量の緩和,環境汚染の低減
に寄与することができる。
According to such a construction example, since the root-cutting groove 1 for the independent foundation and the root-cutting groove 2 for the underground beam are opened one by one in the construction area G and are successively processed in the yard by the shaving 7, the independent foundation Since the open state of the root grooving 1 and the underground girder 2 can be shortened, there is a danger of the worker falling into the root grooving for the independent foundation 1 and the grooving groove 2 for the underground beam. And the safety of construction increases. In addition, the open state of the independent foundation root cutting groove 1 and the underground beam root cutting groove 2 is shortened, so that there is no need to install a work scaffold for preventing falling or the like. By effectively using the earth shaving 7 to shorten the state in which the underground beam root cutting groove 2 is opened, the construction cost is further reduced and the construction period is shortened. In addition, since there is no traffic of the vehicle for carrying out and carrying in the excavated soil 7 and the like, it is possible to contribute to alleviation of traffic volume and reduction of environmental pollution.

【0031】以上、図示した本発明に係る基礎構造の施
工方法の実施例の外に、小規模の場合には、独立基礎用
捨型枠3,地中梁用捨型枠4を独立基礎用根切り溝1,
地中梁用根切り溝2の外部で連結固定した後に独立基礎
用根切り溝1,地中梁用根切り溝2の内部に建込む実施
例とすることも可能である。
As described above, in addition to the illustrated embodiment of the method for constructing a foundation structure according to the present invention, in the case of a small scale, the disposable formwork 3 for the independent foundation and the disposable formwork 4 for the underground beam are used for the independent foundation. Root cutting groove 1,
It is also possible to adopt an embodiment in which after being connected and fixed outside the underground beam root cutting groove 2, it is built inside the independent foundation root cutting groove 1 and the underground beam root cutting groove 2.

【0032】さらに、鉄筋8を独立基礎用捨型枠3,地
中梁用捨型枠4の内部の片方で個別に組立てユニット化
された格子骨形とする実施例も可能である。
Further, it is also possible to adopt an embodiment in which the reinforcing steel bar 8 is formed into a lattice frame which is individually assembled and unitized with one of the insides of the discarded form frame 3 for the independent foundation and the discarded form frame 4 for the underground beam.

【0033】次に、図1及び図13に示した本発明に係
る基礎構造の実施例に基づいて、前述の本発明に係る基
礎構造の施工方法によって構築された基礎構造の特徴を
説明する。
Next, based on the embodiment of the foundation structure according to the present invention shown in FIG. 1 and FIG. 13, the features of the foundation structure constructed by the above-described construction method of the foundation structure according to the invention will be described.

【0034】独立基礎用捨型枠3は図示するように、鋼
鉄製素材で正方形枠状に成形することができる。側面部
12はパネル素材で成形され、波状に凹凸する薄素材が
望ましく、例えば商品名キーストンデッキが用いられ
る。また、コーナー部12にはL字形を呈する補強リブ
を用い、このリブにパネルを溶接あるいはボルト締めし
て一体化される。また、上下にはL字形を呈する上枠部
13と下枠部14とが一体化されるて構成される。な
お、地中梁用捨型枠4も同様な素材から一体構成される
ことが望ましい。
As shown, the discard frame 3 for an independent foundation can be formed of a steel material into a square frame shape. The side portion 12 is formed of a panel material, and is desirably a thin material having corrugations. For example, a keystone deck (trade name) is used. Further, an L-shaped reinforcing rib is used for the corner portion 12, and a panel is welded or bolted to this rib to be integrated. An upper frame 13 and a lower frame 14 each having an L-shape are integrally formed on the upper and lower sides. In addition, it is desirable that the underground beam discarding frame 4 is integrally formed from a similar material.

【0035】この実施例の基礎構造Mは、前述の従来例
にように独立基礎,地中梁が継目のないコンクリート9
によって一体化されるうえ、セパレータなどを貫通させ
ていないので、継目やセパレータなどからの腐食が起こ
らないようになっている。そして、このコンクリート9
は、さらに内部の鉄筋8,底部,側部に独立基礎用捨型
枠3,地中梁用捨型枠4が一体化して、基礎構造Mを強
化している。
The basic structure M of this embodiment has an independent foundation and a concrete 9 with no underground beam as in the prior art.
In addition, since the separator is not penetrated, corrosion from the seam or the separator does not occur. And this concrete 9
In addition, the reinforcement 8, the bottom part, and the side part of the inside are integrated with the discarded frame 3 for the independent foundation and the discarded frame 4 for the underground beam, thereby strengthening the foundation structure M.

【0036】さらに、この実施例の基礎構造Mは、独立
基礎用捨型枠3,地中梁用捨型枠4や鉄筋8がユニット
化されていることから、独立基礎用根切り溝1,地中梁
用根切り溝2や独立基礎用捨型枠3,地中梁用捨型枠4
の内部で手間の掛かる作業を行う必要がなくなっている
ため、施工コストの低減,施工期間の短縮を充分に達成
可能である。
Further, in the foundation structure M of this embodiment, since the discarded form frame 3 for the independent foundation, the discarded form frame 4 for the underground beam, and the reinforcing bar 8 are unitized, the root cutting groove 1 for the independent foundation, Underground girder root digging groove 2, independent foundation disposable formwork 3, underground girder disposable formwork 4
Since it is no longer necessary to perform troublesome work inside the work, it is possible to sufficiently reduce the construction cost and the construction period.

【0037】以上、図示した本発明に係る基礎構造の実
施例の外に、独立基礎用捨型枠3,地中梁用捨型枠4で
囲まれる土間にも、独立基礎用捨型枠3と地中梁用捨型
枠4とに図示しないが、鋼鉄製土間パネルを一体化した
うえ、連続してコンクリート9を打設し、独立基礎,地
中梁,土間を一体化する実施例とすることも可能であ
る。
As described above, in addition to the illustrated embodiment of the foundation structure according to the present invention, in the soil surrounded by the discarded form frame 3 for the independent foundation and the discarded form frame 4 for the underground beam, the discarded form frame 3 for the independent foundation can be used. Although not shown in the drawing and the underground girder form 4, an embodiment in which a steel-soil panel is integrated, concrete 9 is continuously cast, and an independent foundation, an underground beam, and a soil are integrated. It is also possible.

【0038】[0038]

【発明の効果】以上のように本発明に係る基礎構造は、
独立基礎用捨型枠,地中梁用捨型枠,鉄筋がユニット化
され、独立基礎用根切り溝,地中梁用根切り溝,独立基
礎用捨型枠,地中梁用捨型枠の内部で手間の掛かる作業
を行う必要がなくなっているため、施工コストの低減,
施工期間の短縮を充分に達成することができる効果があ
る。
As described above, the basic structure according to the present invention has the following features.
Inside of the foundation, the underground beam, the underground beam, the underground beam, the underground beam, the underground beam, the underground beam, the underground beam, and the inside of the underground beam It is no longer necessary to carry out labor-intensive work, reducing construction costs.
There is an effect that the shortening of the construction period can be sufficiently achieved.

【0039】さらに、本発明に係る基礎構造の施工方法
は、独立基礎用捨型枠,地中梁用捨型枠が上部開放形の
ユニットで、独立基礎用根切り溝,地中梁用根切り溝を
独立基礎用捨型枠,地中梁用捨型枠に落込んで据え付け
し、さらにユニット化された鉄筋をもを独立基礎用捨型
枠,地中梁用捨型に落込んで据え付けすることができる
ため、限定された空間である独立基礎用根切り溝等の内
部での施工に極めて有効であり、前述の基礎構造を施工
するに好適である効果がある。
Further, the method for constructing a foundation structure according to the present invention is characterized in that the discarded formwork for the independent foundation and the underground beam are formed in an open-top unit, and the root cutout groove for the independent foundation and the underground beam cutout groove are provided. Can be dropped into the discarded formwork for independent foundation and underground beam and installed, and the unitized rebar can also be dropped into the discarded formwork for independent foundation and underground beam and installed. Since it is possible, it is extremely effective for construction inside a limited space, such as a root cutting groove for an independent foundation, and has an effect that is suitable for constructing the aforementioned foundation structure.

【0040】さらに、本発明に係る基礎構造の施工方法
は、上方からの落込み据え付け工法が採用されているた
め、周囲に障害物等があっても確実に施工することがで
きる効果がある。
Furthermore, since the method of constructing a foundation structure according to the present invention employs a drop-down installation method from above, there is an effect that construction can be performed reliably even if there are obstacles or the like in the surroundings.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る基礎構造の実施例を示す断面図で
ある。
FIG. 1 is a sectional view showing an embodiment of a basic structure according to the present invention.

【図2】本発明に係る基礎構造の施工方法の実施例を示
す断面図であり、最初の工程を示すものである。
FIG. 2 is a cross-sectional view showing an embodiment of a method for constructing a foundation structure according to the present invention, showing an initial step.

【図3】図2に続く工程を示す断面図である。FIG. 3 is a sectional view showing a step following the step shown in FIG. 2;

【図4】図3に続く工程を示す断面図である。FIG. 4 is a sectional view showing a step following FIG. 3;

【図5】図4に続く工程を示す断面図である。FIG. 5 is a sectional view showing a step following FIG. 4;

【図6】図5に続く工程を示す断面図である。FIG. 6 is a sectional view showing a step following FIG. 5;

【図7】図6に続く工程を示す断面図である。FIG. 7 is a sectional view showing a step following FIG. 6;

【図8】図7に続く工程を示す断面図である。FIG. 8 is a sectional view showing a step following the step shown in FIG. 7;

【図9】図8に続く工程を示す断面図である。FIG. 9 is a sectional view showing a step following FIG. 8;

【図10】図9に続く工程を示す断面図である。FIG. 10 is a sectional view showing a step following FIG. 9;

【図11】図10に続く工程を示す断面図である。FIG. 11 is a sectional view showing a step following FIG. 10;

【図12】図6の工程を示す拡大斜視図である。FIG. 12 is an enlarged perspective view showing the step of FIG. 6;

【図13】本発明に係る独立基礎用捨型枠を説明する切
欠斜視図である。
FIG. 13 is a cutaway perspective view for explaining a discarded formwork for an independent foundation according to the present invention.

【図14】本発明に係る基礎構造の施工方法の実施例の
施工区域全体の施工例を示す平面図である。
FIG. 14 is a plan view showing a construction example of the entire construction area in the embodiment of the method for constructing a foundation structure according to the present invention.

【符号の説明】[Explanation of symbols]

1 独立基礎用根切り溝 2 地中梁用根切り溝 3 独立基礎用捨型枠 4 地中梁用捨型枠 7 削土 8 鉄筋 9 コンクリート DESCRIPTION OF SYMBOLS 1 Root cut groove for independent foundation 2 Root cut groove for underground beam 3 Discarded formwork for independent foundation 4 Discarded formwork for underground beam 7 Shaving 8 Reinforcement 9 Concrete

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 27/00 - 27/01 Continuation of front page (58) Field surveyed (Int.Cl. 7 , DB name) E02D 27/00-27/01

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 外部で組み立ててユニット化され独立基
礎用根切り溝に埋殺される独立基礎用捨型枠と、外部で
組み立ててユニット化され独立基礎用捨型枠に固定され
て地中梁用根切り溝に埋め殺される地中梁用捨型枠と、
外部で組み立ててユニット化され独立基礎用捨型枠と地
中梁用捨型枠との内部の双方に連続してまたは片方ごと
に個別に落し込み配筋される鉄筋とからなる基礎構造。
An independent assembling unit which is externally assembled and unitized and buried in an independent foundation root cutting groove, and an underground beam root which is externally assembled and unitized and fixed to the independent foundation dismounting frame. A buried formwork for underground beams buried in kerfs,
A foundation structure composed of rebars that are assembled outside and unitized, and that are continuously dropped into each of the insides of the discarded formwork for independent foundation and the underground beam, or individually for each side.
【請求項2】 地盤に独立基礎を構築する独立基礎用根
切り溝と地中梁を構築する地中梁用根切り溝とを掘溝
し、独立基礎用根切り溝に埋殺しとなる上部開放形に外
部で組み立ててユニット化された独立基礎用捨型枠を建
込み、地中梁用根切り溝に埋殺しとなる上部開放形に外
部で組み立ててユニット化された地中梁用捨型枠を建込
み、独立基礎用捨型枠と地中梁用捨型枠とを根切り溝で
連結して後、独立基礎用捨型枠と地中梁用捨型枠との内
部の双方に連続してまたは片方ごとに個別に、外部で組
み立ててユニット化した鉄筋を上方から落込んで配筋
し、その後に独立基礎用捨型枠と地中梁用捨型枠との内
部の双方に連続してコンクリートを打設することを特徴
とする基礎構造の施工方法。
2. An open-top type in which an independent foundation grooving for constructing an independent foundation on the ground and an underground girder grooving for constructing an underground beam are buried in the independent foundation grooving. At the same time, a unitized underground formwork for independent foundation is assembled and unitized, and a unitized underground beam formwork is assembled and externally assembled into an open top that will be buried in the underground beam root trench. After connecting the discarded formwork for independent foundation and the underground beam with root cutting grooves, it is continuously connected to both the inside of the discarded formwork for independent foundation and the underground beam. Alternatively, individually reinforce the steel bars assembled and unitized externally from the outside, drop them from above, arrange them, and then concrete both continuously inside the discarded formwork for independent foundation and underground beam. A method for constructing a foundation structure, characterized by casting.
JP13350793A 1993-06-03 1993-06-03 Foundation structure and construction method Expired - Lifetime JP3245260B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13350793A JP3245260B2 (en) 1993-06-03 1993-06-03 Foundation structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13350793A JP3245260B2 (en) 1993-06-03 1993-06-03 Foundation structure and construction method

Publications (2)

Publication Number Publication Date
JPH06346467A JPH06346467A (en) 1994-12-20
JP3245260B2 true JP3245260B2 (en) 2002-01-07

Family

ID=15106396

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13350793A Expired - Lifetime JP3245260B2 (en) 1993-06-03 1993-06-03 Foundation structure and construction method

Country Status (1)

Country Link
JP (1) JP3245260B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904987A (en) * 2019-11-13 2020-03-24 中国矿业大学 Belly expansion cup mouth type connecting structure and method for reinforced concrete column and foundation

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6315924B2 (en) * 2013-09-02 2018-04-25 高伸建設株式会社 Buttress construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904987A (en) * 2019-11-13 2020-03-24 中国矿业大学 Belly expansion cup mouth type connecting structure and method for reinforced concrete column and foundation
CN110904987B (en) * 2019-11-13 2020-10-30 中国矿业大学 Belly expansion cup mouth type connecting structure and method for reinforced concrete column and foundation

Also Published As

Publication number Publication date
JPH06346467A (en) 1994-12-20

Similar Documents

Publication Publication Date Title
KR102195504B1 (en) Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method
JP2001241053A (en) Method for constructing underground structure
KR100289256B1 (en) Tunnel construction method in shallow toffee area
JP4083334B2 (en) Underground structure having arch roof and method for constructing the same
JP3245260B2 (en) Foundation structure and construction method
JP3390081B2 (en) How to build an underground parking
JP3166007B2 (en) Underground structure and its construction method
JP2005002671A (en) Underpinning method and viaduct
JP2979117B2 (en) Building foundation method
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
JP2973815B2 (en) Construction method of pressure-resistant wall under the building
JP3135495B2 (en) Construction method of avalanche and rock fall protection fence and avalanche and rock fall protection fence
JPS63280153A (en) Underground inverted lining method
JP3245262B2 (en) Underground beam construction method
JP3249636B2 (en) Foundation structure and construction method
JP2571426B2 (en) Construction method of retaining wall
KR102656370B1 (en) Underground structure capable of forming a supporting point of a molded beam and its construction method
JPS6018769B2 (en) Construction method of underground structure
JP3406370B2 (en) Horizontal shaft construction method
JP2915746B2 (en) Foundation formwork
JPH07103583B2 (en) Construction method for large span underground structure
JPS6024249B2 (en) How to build a basement
JP2004285613A (en) Construction method for building foundation
JP2620035B2 (en) Construction method and structure of gas station office building
JPH02266016A (en) Structural process of underground concrete body of building

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071026

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101026

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101026

Year of fee payment: 9

R154 Certificate of patent or utility model (reissue)

Free format text: JAPANESE INTERMEDIATE CODE: R154

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101026

Year of fee payment: 9

R154 Certificate of patent or utility model (reissue)

Free format text: JAPANESE INTERMEDIATE CODE: R154

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111026

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121026

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131026

Year of fee payment: 12

EXPY Cancellation because of completion of term