JP2620035B2 - Construction method and structure of gas station office building - Google Patents
Construction method and structure of gas station office buildingInfo
- Publication number
- JP2620035B2 JP2620035B2 JP22144393A JP22144393A JP2620035B2 JP 2620035 B2 JP2620035 B2 JP 2620035B2 JP 22144393 A JP22144393 A JP 22144393A JP 22144393 A JP22144393 A JP 22144393A JP 2620035 B2 JP2620035 B2 JP 2620035B2
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- concrete
- gas station
- office building
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Foundations (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、ガソリンスタンドにお
ける事務所棟を、従来工法による事務所棟と同様の機能
及び安全性を確保し、短期間で、かつ安価に建築するこ
とを可能とする方法及び構造に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention makes it possible to construct an office building at a gas station in a short period of time and at low cost while ensuring the same function and safety as an office building by a conventional method. Method and structure.
【0002】[0002]
【従来の技術】従来、ガソリンスタンドの事務所棟の建
築方法としては、図6及び図7に示すごとく、ガソリン
スタンドの建設予定地内の事務所棟建築予定地Gを良質
の地盤に達するまで深さ1.5m程度堀り(例えば、
1.5m掘っても良質の地盤に達しないときは、杭を打
つ必要がある)、そこに大型の基礎50(フーチン52
及び地中梁54)をコンクリートの打ち込みにより形成
し、土を埋め戻した後、この基礎50を介在して床面コ
ンクリート56を打ち込み、その基礎上に重量鉄骨58
を使用し、ラーメン工法により鉄骨の骨組みを構築し、
この骨組みに現場で胴縁下地を組んで外壁サイジングを
行っていた。図6において、60は砕石、62は捨てコ
ンクリートである。2. Description of the Related Art Conventionally, as a construction method of a gas station office building, as shown in FIGS. 6 and 7, an office building construction site G in a gas station construction site is deepened until it reaches a high-quality ground. Digging about 1.5m (for example,
If the ground does not reach high quality even after digging 1.5 m, it is necessary to hit a pile.)
And the underground beam 54) is formed by pouring concrete, and after the soil is backfilled, a floor concrete 56 is driven through the foundation 50, and a heavy steel frame 58 is placed on the foundation.
To build a steel frame by the ramen method,
The outer wall was sizing by assembling the frame at the site. In FIG. 6, reference numeral 60 denotes crushed stone and reference numeral 62 denotes discarded concrete.
【0003】しかし、このような従来の建築方法では、
1.5mの深さを堀る作業が大変であり、穴の壁の崩れ
を防ぐための山留工事が必須で、かつ基礎50(フーチ
ン52及び地中梁54)が大型なため、コンクリートの
打ち込みを2度に分けて行なう必要がある上、大量のコ
ンクリートを消費し、型枠材料もそれだけ大量に要し、
工期も長く、工費も多大であった。However, in such a conventional construction method,
Since the work of digging a depth of 1.5 m is difficult, pier work is required to prevent the collapse of the wall of the hole, and the foundation 50 (the footing 52 and the underground beam 54) is large. It is necessary to perform the driving in two separate steps, consumes a large amount of concrete, and requires a large amount of formwork material.
The construction period was long and the construction cost was enormous.
【0004】[0004]
【発明が解決しようとする課題】本発明は、上記した従
来の問題点に鑑みてなされたもので、従来工法による事
務所棟と同様の機能及び安全性を確保し、短期間で、か
つ安価に建築することを可能としたガソリンスタンドの
事務所棟の建築方法及び構造を提供することを目的とす
る。SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned conventional problems, and has the same functions and safety as those of an office building by the conventional method, and is short-term and inexpensive. It is an object of the present invention to provide a construction method and a structure of an office building of a gas station, which can be constructed in an office.
【0005】[0005]
【課題を解決するための手段】上記課題を解決するため
に、本発明のガソリンスタンドの事務所棟の建築方法お
いては、(a)ガソリンスタンドの建設予定地内の事務
所棟建築予定地の床用地面を包囲する基礎形成部分に所
定の深さを有する基礎用溝を掘る工程、(b)該基礎用
溝の底部及び床用地面に砕石を敷く工程、(c)該基礎
用溝内及び床用地面上に鉄筋を配置する配筋工程、
(d)該基礎用溝の外側壁面に型枠を設置する工程、
(e)基礎コンクリート及び床面コンクリートを形成す
るために該基礎用溝及び床用地面にコンクリートを打ち
込む工程、(f)該基礎上にブレース工法により軽量鉄
骨を使って事務所壁の骨組みを構築し、次いで該骨組み
上に屋根を取り付ける工程、(g)該鉄骨の骨組みを介
して外壁を形成する工程とからなるようにした。Means for Solving the Problems To solve the above problems, a method for constructing an office building of a gas station according to the present invention comprises the steps of: Excavating a foundation groove having a predetermined depth in a foundation forming portion surrounding the floor ground, (b) laying crushed stone on the bottom of the foundation groove and the floor ground, (c) in the foundation groove And a reinforcing process of arranging reinforcing bars on the floor for floors,
(D) installing a formwork on the outer wall surface of the foundation groove;
(E) driving concrete into the foundation grooves and floor ground to form foundation concrete and floor concrete, and (f) building a framework of the office wall on the foundation by using a lightweight steel frame by a brace method. Then, a step of mounting a roof on the skeleton, and (g) a step of forming an outer wall through the steel skeleton.
【0006】上記基礎用溝の深さは20〜60cm程度
であるのが好適である。また、上記(g)該鉄骨の骨組
みを介して外壁を形成する工程としては、該骨組みにパ
ネルを取り付ける工程を採用するのがよい。さらに、
b)配筋工程の前に捨てコンクリートを基礎用溝の底部
のみに打っておくのが好ましい。[0006] It is preferable that the depth of the foundation groove is about 20 to 60 cm. As the step (g) of forming an outer wall via the steel frame, a step of attaching a panel to the frame is preferably employed. further,
b) It is preferable to throw the discarded concrete only at the bottom of the foundation groove before the reinforcing process.
【0007】型枠はコンクリートの硬化後取り外すのが
通常であるが、そのまま置いておくこともできる。基礎
用溝の幅については特に限定はないが、二階建ての事務
所の場合で60cm程度、平屋の事務所の場合で30c
m程度である。[0007] The mold is usually removed after the concrete has hardened, but it can also be left as it is. The width of the foundation groove is not particularly limited, but is about 60 cm for a two-story office and 30 c for a one-story office.
m.
【0008】また、本発明のガソリンスタンドの事務所
棟の構造においては、ガソリンスタンドの建設予定地内
の事務所棟建築予定地の床用地面を包囲する基礎形成部
分に打ち込まれる所定深さの基礎コンクリートと、該基
礎コンクリートと一体的に形成される床面コンクリート
と、該基礎コンクリート上にブレーズ工法により軽量鉄
骨を使用して構築される事務所壁の骨組みと、該骨組み
上に取り付けられる屋根と、該骨組みを介して形成され
る外壁とから構成するようにした。Further, in the structure of the office building of the gas station according to the present invention, the foundation having a predetermined depth is driven into the foundation forming portion surrounding the floor for the floor of the office building construction site in the construction site of the gas station. Concrete, floor concrete integrally formed with the base concrete, a skeleton of an office wall constructed using a lightweight steel frame by a brazing method on the base concrete, and a roof attached on the skeleton. , And an outer wall formed through the framework.
【0009】上記基礎コンクリートの深さは20〜60
cm程度であるのが好適である。また、外壁構成手段と
しては、上記鉄骨の骨組みにパネル取り付けて行うのが
よい。ここでいう事務所壁の骨組みは、柱、梁、ブレー
スから構成される。The foundation concrete has a depth of 20 to 60.
It is preferably about cm. Further, as the outer wall forming means, it is preferable to perform panel mounting on the steel frame. The framework of the office wall referred to here is composed of columns, beams, and braces.
【0010】[0010]
【作用】ガソリンスタンドの事務所棟の基礎は従来は独
立基礎で設計されていたが、前述しように、工期も長
く、工費も多大となるという問題があった。本発明によ
れば、事務所棟の建物を極力軽くすることにより、掘ら
ない基礎とすることが可能となった。[Function] Conventionally, the foundation of the office building of the gas station was designed as an independent foundation, but as described above, there was a problem that the construction period was long and the construction cost was large. ADVANTAGE OF THE INVENTION According to this invention, it became possible to make it the foundation which is not dug by making the building of an office building light as much as possible.
【0011】このように基礎を小さくして深く掘らない
基礎とすることによって、根切量が60%程度減とな
り、コンクリート型枠は外型枠のみでよく型材量が50
%程度減少、鉄筋コンクリート量は50%程度減、工期
が60%程度減、工費が50%程度減となるという大き
な利点がある。By making the foundation small and not excavated in this way, the amount of root cut can be reduced by about 60%, and the concrete form only needs to be the outer form, and the amount of mold material is 50%.
%, The amount of reinforced concrete is reduced by about 50%, the construction period is reduced by about 60%, and the construction cost is reduced by about 50%.
【0012】また、軽量鉄骨を使用することによって、
鉄骨量が従来比で60%程度減少、工費が30%程度減
少し、また鉄骨が軽いため作業者が手で運搬でき、大型
重機を要さず、作業の安全性が増す利点がある。Also, by using a lightweight steel frame,
The steel frame volume is reduced by about 60% and the construction cost is reduced by about 30% compared to the conventional case, and since the steel frame is light, an operator can carry it by hand, and there is an advantage that a large heavy machine is not required and work safety is increased.
【0013】さらに、外壁張りに関し、パネルを用いる
場合には、パネルを工場で作る為、現場と重複して作業
が進められるので、工期が90%程度短縮でき、工費は
20%程度減少し、工場での作業の為現場の位置の悪い
ところでの作業がないので、工事の安全性が確保される
利点がある。Further, in the case of using panels for external wall covering, when panels are used in a factory, work is carried out in duplicate with the site, so that the construction period can be reduced by about 90% and the construction cost is reduced by about 20%. There is an advantage that the safety of the construction is ensured because there is no work in a bad place on the site because of the work in the factory.
【0014】[0014]
【実施例】以下に本発明の一実施例を添付図面中、図1
〜図5に基づいて説明する。BRIEF DESCRIPTION OF THE DRAWINGS FIG.
This will be described with reference to FIG.
【0015】本発明のガソリンスタンドの事務所棟の建
築方法においては、まず図1に示すごとく、ガソリンス
タンドの建設予定地内の事務所棟建築予定地10の床用
地面12を包囲する基礎形成部分に20〜60cm程度
の深さを有する基礎用溝14を掘って形成する。In the method for constructing an office building of a gas station according to the present invention, first, as shown in FIG. 1, a foundation forming portion surrounding a floor ground 12 of an office building construction site 10 in a gas station construction site. The base groove 14 having a depth of about 20 to 60 cm is dug and formed.
【0016】この基礎用溝14は、外側壁14aを略垂
直に、内側壁14bを、図示したごとく、側方に傾斜さ
せた形状に形成される。基礎用溝の幅については特に限
定はないが、二階建ての事務所の場合で60cm程度、
平屋の事務所の場合で30cm程度である。The base groove 14 is formed so that the outer wall 14a is substantially vertical and the inner wall 14b is inclined sideways as shown in the figure. There is no particular limitation on the width of the foundation groove, but in the case of a two-story office, it is about 60 cm,
It is about 30cm in the case of a one-story office.
【0017】次いで、該基礎用溝14の底部及び床用地
面12に砕石16を敷く(図2)。該砕石16を敷いた
後、捨てコンクリート18を基礎用溝14の底部のみに
打っておくのが好ましいが、省略することもできる。Next, crushed stones 16 are laid on the bottom of the foundation groove 14 and the floor ground 12 (FIG. 2). After laying the crushed stone 16, it is preferable that the waste concrete 18 be hit only on the bottom of the foundation groove 14, but it can be omitted.
【0018】その後、該基礎用溝14内及び床用地面1
2上に鉄筋20を配置する(図3)。該基礎用溝14の
外側壁面14aに型枠22を設置する(図4)。この型
枠22の上端はは基礎用溝14の上端よりも上方に位置
し、形成される事務所の床面と同じ高さとしておく。After that, the ground 1 and the floor 1
The reinforcing bar 20 is arranged on the upper surface 2 (FIG. 3). A formwork 22 is set on the outer wall surface 14a of the foundation groove 14 (FIG. 4). The upper end of the formwork 22 is located above the upper end of the foundation groove 14 and is at the same height as the floor of the office to be formed.
【0019】次に、該基礎用溝14及び床用地面12に
コンクリートを打ち込んで基礎コンクリート24及び床
面コンクリート26を形成する(図4)。本発明のよう
に、基礎24を小さくして深く掘らない基礎とすること
によって、根切量が60%減となり、コンクリート型枠
は外型枠のみでよく型材量が50%程度減少、鉄筋コン
クリート量は50%程度減、工期が60%程度減、工費
が50%程度減となるという大きな利点がある。また、
沼地以外すべての軟弱な地盤にも設定でき、杭を打つ必
要がないという効果がある。基礎24が浅い為、山留工
事が不要となり工事が安全となる。Next, concrete is driven into the foundation groove 14 and the floor ground 12 to form a foundation concrete 24 and a floor concrete 26 (FIG. 4). By making the foundation 24 small and not digging deep as in the present invention, the amount of root cut is reduced by 60%, the concrete formwork is only the outer formwork, the amount of mold material is reduced by about 50%, and the amount of reinforced concrete is reduced. Has a great advantage that the construction period is reduced by about 50%, the construction period is reduced by about 60%, and the construction cost is reduced by about 50%. Also,
It can be set on any soft ground other than the swamp, which has the effect of eliminating the need to hit piles. Since the foundation 24 is shallow, the shoring work becomes unnecessary and the work becomes safe.
【0020】上記したコンクリートの打ち込みに際し、
該基礎コンクリート24にはアンカー28が設置される
(図5)。該アンカー28を介して、該基礎24上にブ
レース工法により軽量鉄骨を使って事務所壁の骨組み3
0を構築する。該骨組み30は、柱30a、梁30b及
びブレース30cから構成されている。更に、該骨組み
30上には、屋根32が取り付けられる。(図5)At the time of the above-mentioned concrete driving,
An anchor 28 is installed on the foundation concrete 24 (FIG. 5). Via the anchor 28, the frame 3 of the office wall is formed on the foundation 24 using a lightweight steel frame by a brace method.
Construct 0. The frame 30 is composed of columns 30a, beams 30b, and braces 30c. Further, a roof 32 is mounted on the skeleton 30. (Fig. 5)
【0021】本発明のように、基礎24を小さくして深
く掘らない基礎とすることは、基礎24より上の部分を
軽量化することにより実現可能となった。従って、上記
したごとく、骨組みは軽量鉄骨を用いブレース工法によ
るのが必須である。As in the present invention, making the foundation 24 small and not digging deeply can be realized by reducing the weight of the portion above the foundation 24. Therefore, as described above, it is essential that the frame be made of a lightweight steel frame and be constructed by the brace method.
【0022】このように軽量鉄骨を使用することによっ
て、鉄骨量が従来比で60%程度減少、工費が30%程
度減少し、また鉄骨が軽いため作業者が手で運搬でき、
大型重機を要さず、作業の安全性が増す利点がある。By using a lightweight steel frame in this way, the amount of steel frame is reduced by about 60% and the construction cost is reduced by about 30% as compared with the conventional steel frame.
There is an advantage that work safety is increased without requiring large heavy equipment.
【0023】これに対し、重量鉄骨を用いラーメン工法
により骨組みを作成していた従来構造では、大きい基礎
を深く掘って形成することが必須であった。On the other hand, in the conventional structure in which a frame is formed by a ramen method using a heavy steel frame, it is essential to form a large foundation by digging it deeply.
【0024】該骨組み30にはパネル34が取りつけら
れ、事務所の外壁が形成される(図5)。該パネル34
としては、セメント系サイディング又は鉄板でふくサイ
ディングを用いるのが好適である。A panel 34 is attached to the skeleton 30, forming an outer wall of the office (FIG. 5). The panel 34
It is preferable to use cement siding or siding wiping with an iron plate.
【0025】従来の外壁張りは、現場で胴縁下地を組ん
で外壁サイディングを張っていた為、その作業は容易と
はいえなかった。しかし、本発明によれば、外壁張りは
工場でパネル化することも可能であるから、その場合に
はトラック輸送可能なサイズにして現場に運び、現場で
取付けことができ、作業が簡易化される。In the case of the conventional outer wall covering, the outer wall siding is put together with the base of the rim at the site, so that the work is not easy. However, according to the present invention, since the outer wall covering can be panelized in a factory, in that case, the outer wall covering can be transported to the site in a truckable size, and can be mounted on the site, thereby simplifying the operation. You.
【0026】即ち、パネル34を工場で作る為、現場と
重複して作業が進められるので、工期が90%程度短縮
でき、工費は20%程度減少し、工場での作業の為現場
の位置の悪いところでの作業がないので、工事の安全性
が確保される利点がある。なお、本発明においても、現
場で外壁サイディングを行うことも勿論可能である。That is, since the panel 34 is manufactured in the factory, the work is carried out overlapping with the site, so that the construction period can be reduced by about 90%, the construction cost can be reduced by about 20%, and the position of the site for the work in the factory can be reduced. Since there is no work in a bad place, there is an advantage that the safety of construction is ensured. In the present invention, it is of course possible to perform exterior wall siding on site.
【0027】[0027]
【発明の効果】以上述べたごとく、本発明によれば、ガ
ソリンスタンドの事務所棟の建築に当たり、従来工法に
よる事務所棟と同様の機能及び安全性を確保し、短期間
で、かつ安価に建築することが可能となるという著大な
効果が達成される。As described above, according to the present invention, when building an office building of a gas station, the same functions and safety as those of the office building by the conventional method are secured, and the cost is reduced in a short time and at a low cost. The great effect of being able to build is achieved.
【図1】本発明における基礎用溝の一例を示す一部を断
面した斜視的説明図である。FIG. 1 is a perspective explanatory view in which a part of an example of a groove for a foundation in the present invention is sectioned.
【図2】図1の基礎用溝及び床用地面に砕石を敷いた状
態を示す一部を断面した斜視的説明図である。FIG. 2 is a perspective explanatory view showing a state in which crushed stone is laid on a foundation groove and a floor ground of FIG.
【図3】図2の状態からさらに鉄筋を設置した状態を示
す一部を断面した斜視的説明図である。FIG. 3 is a perspective explanatory view showing a state in which a reinforcing bar is further installed from the state of FIG.
【図4】図3の状態からコンクリートを打ち込んで基礎
コンクリート及び床面コンクリートを形成した状態を示
す一部を断面した斜視的説明図である。FIG. 4 is a perspective explanatory view showing a state in which concrete is driven into the base concrete and floor concrete from the state of FIG.
【図5】基礎コンクリート上に骨組みを形成しパネルを
取り付けた状態を示す断面的説明図である。FIG. 5 is a sectional explanatory view showing a state in which a skeleton is formed on a foundation concrete and a panel is attached.
【図6】従来のガソリンスタンドの事務所棟の基礎部分
の一例を示す一部を断面した斜視的説明図である。FIG. 6 is a partially cutaway perspective view showing an example of a basic portion of an office building of a conventional gas station.
【図7】図6の断面図である。FIG. 7 is a sectional view of FIG. 6;
10,G 事務所棟建築予定地 12 床用地面 14 基礎用溝 16 砕石 18 捨てコンクリート 20 鉄筋 22 型枠 24 基礎コンクリート 26 床面コンクリート 28 アンカー 30 骨組み 32 屋根 34 パネル 50 基礎 52 フーチン 54 地中梁 56 床面コンクリート 10, G Office building planned site 12 Floor ground 14 Foundation groove 16 Crushed stone 18 Discarded concrete 20 Reinforcement 22 Formwork 24 Foundation concrete 26 Floor concrete 28 Anchor 30 Frame 32 Roof 34 Panel 50 Foundation 52 Footing 54 Underground beam 56 Floor concrete
Claims (6)
とを特徴とするガソリンスタンドの事務所棟の建築方
法。 (a)ガソリンスタンドの建設予定地内の事務所棟建築
予定地の床用地面を包囲する基礎形成部分に所定の深さ
を有する基礎用溝を掘る工程、(b)該基礎用溝の底部
及び床用地面に砕石を敷く工程、(c)該基礎用溝内及
び床用地面上に鉄筋を配置する配筋工程、(d)該基礎
用溝の外側壁面に型枠を設置する工程、(e)基礎コン
クリート及び床面コンクリートを形成するために該基礎
用溝及び床用地面にコンクリートを打ち込む工程、
(f)該基礎上にブレース工法により軽量鉄骨を使って
事務所壁の骨組みを構築し、次いで該骨組み上に屋根を
取り付ける工程、(g)該鉄骨の骨組みを介して外壁を
形成する工程。1. A method for constructing an office building of a gas station, comprising the following steps (a) to (g). (A) a step of digging a foundation groove having a predetermined depth in a foundation formation portion surrounding a floor ground of an office building construction site in a construction site of a gas station; (b) a bottom portion of the foundation groove and Laying crushed stone on the floor ground, (c) arranging reinforcing bars in the foundation groove and on the floor ground, (d) installing a formwork on the outer wall surface of the foundation groove, ( e) driving concrete into the foundation grooves and floor ground to form foundation concrete and floor concrete;
(F) constructing a skeleton of an office wall on the foundation by using a lightweight steel frame by a brace method, and then attaching a roof on the skeleton; and (g) forming an outer wall via the skeleton of the steel frame.
度であることを特徴とする請求項1記載のガソリンスタ
ンドの事務所棟の建築方法。2. The method according to claim 1, wherein the depth of the foundation groove is about 20 to 60 cm.
を形成する工程が該骨組みにパネルを取り付ける工程で
あることを特徴とする請求項1又は2記載のガソリンス
タンドの事務所棟の建築方法。3. The gas station office building according to claim 1, wherein the step (g) of forming an outer wall through the steel frame is a step of attaching a panel to the frame. Building method.
所棟建築予定地の床用地面を包囲する基礎形成部分に打
ち込まれる所定深さの基礎コンクリートと、該基礎コン
クリートと一体的に形成される床面コンクリートと、該
基礎コンクリート上にブレーズ工法により軽量鉄骨を使
用して構築される事務所壁の骨組みと、該骨組み上に取
り付けられる屋根と、該骨組みを介して形成される外壁
とからなることを特徴とするガソリンスタンドの事務所
棟の構造。4. A foundation concrete of a predetermined depth to be driven into a foundation forming portion surrounding a floor for a floor of an office building construction site in a construction site of a gas station, and a floor formed integrally with the foundation concrete It is composed of a face concrete, a framework of an office wall constructed using a lightweight steel frame by a brazing method on the foundation concrete, a roof attached on the framework, and an outer wall formed via the framework. The structure of the office building of a gas station.
0cm程度であることを特徴とする請求項4記載のガソ
リンスタンドの事務所棟の構造。5. The foundation concrete having a depth of 20-6.
5. The structure of an office building of a gas station according to claim 4, wherein the distance is about 0 cm.
壁を形成することを特徴とする請求項4又は5記載のガ
ソリンスタンドの事務所棟の構造。6. The structure of an office building of a gas station according to claim 4, wherein an outer wall is formed by attaching a panel to the frame of the steel frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP22144393A JP2620035B2 (en) | 1993-09-06 | 1993-09-06 | Construction method and structure of gas station office building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP22144393A JP2620035B2 (en) | 1993-09-06 | 1993-09-06 | Construction method and structure of gas station office building |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0776942A JPH0776942A (en) | 1995-03-20 |
JP2620035B2 true JP2620035B2 (en) | 1997-06-11 |
Family
ID=16766819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP22144393A Expired - Lifetime JP2620035B2 (en) | 1993-09-06 | 1993-09-06 | Construction method and structure of gas station office building |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2620035B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000273985A (en) * | 1999-03-24 | 2000-10-03 | Hosoda Kensetsu Kk | Two-stage brace panel of sheet metal construction, structure of building, and construction method therefor |
-
1993
- 1993-09-06 JP JP22144393A patent/JP2620035B2/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000273985A (en) * | 1999-03-24 | 2000-10-03 | Hosoda Kensetsu Kk | Two-stage brace panel of sheet metal construction, structure of building, and construction method therefor |
Also Published As
Publication number | Publication date |
---|---|
JPH0776942A (en) | 1995-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2001241053A (en) | Method for constructing underground structure | |
JP2620035B2 (en) | Construction method and structure of gas station office building | |
JP3166007B2 (en) | Underground structure and its construction method | |
JP2000212979A (en) | Underground structure having arch roof and construction method therefor | |
JP2979117B2 (en) | Building foundation method | |
JPH0721196B2 (en) | Reverse construction method of underground structure | |
JP3133598B2 (en) | Construction method of small and medium-sized building with basement floor | |
JPH07138972A (en) | Construction method for underground skeleton | |
JP2736542B2 (en) | Construction method of underground structure omitting temporary materials | |
JP2555838B2 (en) | Independent panel mountain retaining method | |
JPH0517955A (en) | Execution method for direct foundation and form panel for direct foundation | |
JP2794330B2 (en) | Method of erection of girder beam for underground structure | |
JP2001164559A (en) | Construction method of continuous underground wall guide wall making use of l-type precast member | |
JP3245260B2 (en) | Foundation structure and construction method | |
JP2637038B2 (en) | Construction method and structure of fire wall of gas station | |
JP3567387B2 (en) | How to build an underground skeleton | |
JP2007002413A (en) | Underground structure construction method | |
JPH06193084A (en) | Construction method for undeground structure | |
JPS626018A (en) | Building utilizing underground cintinuous wall and its construction | |
JPH04360908A (en) | Construction of underground continuous wall and formwork therefor | |
JPS6350491B2 (en) | ||
JP2000144757A (en) | Preparation of foundation for building | |
JP4195215B2 (en) | Mountain retaining method and foundation construction method | |
JP3061934B2 (en) | Retaining wall construction method | |
JP2000144756A (en) | Preparation of foundation for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080311 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090311 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20100311 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20100311 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 14 Free format text: PAYMENT UNTIL: 20110311 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110311 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120311 Year of fee payment: 15 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 16 Free format text: PAYMENT UNTIL: 20130311 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140311 Year of fee payment: 17 |