JP6315924B2 - Buttress construction method - Google Patents

Buttress construction method Download PDF

Info

Publication number
JP6315924B2
JP6315924B2 JP2013181376A JP2013181376A JP6315924B2 JP 6315924 B2 JP6315924 B2 JP 6315924B2 JP 2013181376 A JP2013181376 A JP 2013181376A JP 2013181376 A JP2013181376 A JP 2013181376A JP 6315924 B2 JP6315924 B2 JP 6315924B2
Authority
JP
Japan
Prior art keywords
buttress
bottom plate
pair
frame
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013181376A
Other languages
Japanese (ja)
Other versions
JP2015048647A (en
Inventor
俊介 中新井
俊介 中新井
Original Assignee
高伸建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高伸建設株式会社 filed Critical 高伸建設株式会社
Priority to JP2013181376A priority Critical patent/JP6315924B2/en
Publication of JP2015048647A publication Critical patent/JP2015048647A/en
Application granted granted Critical
Publication of JP6315924B2 publication Critical patent/JP6315924B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、捨型枠を用いた大規模建屋等の基礎を施工する方法に係り、特にバットレスの施工方法に関する。   The present invention relates to a method for constructing a foundation such as a large-scale building using a discard frame, and more particularly, to a buttress construction method.

建設物の基礎でバットレス(控え壁)になる箇所の施工は、バットレスを形成すべき段差部を含む根切り溝を溝し、木製の型枠を設置してコンクリートを打設した後に脱型し、バットレス下部の空いた空間に土を埋め戻す方法が一般的に使われている。 The construction of the portion which becomes a buttress (buttresses) the basis for the construction thereof, and grooving roots kerf including a step portion for forming the buttress, demolding after Da設concrete by installing formwork wooden However, the method of backfilling the soil in the vacant space below the buttress is generally used.

例えば、図10に示すように、従来の施工方法においては、基礎1とバットレス2に対応する根切り溝10を溝し、型枠を設置して鉄筋40を配置し、コンクリート50を打設した後に脱型し、バットレス2下部の空いた空間に土30を埋め戻すことが行われていた。この場合、土30を埋め戻す際に、バットレス2の下部に土30を完全に充填することができず、空洞Hが形成される。 For example, as shown in FIG. 10, in the conventional construction method, and grooving roots kerf 10 corresponding to the base 1 and the buttress 2, by installing formwork placed reinforcing bars 40, Da設concrete 50 After that, the mold was removed, and the soil 30 was backfilled in the vacant space below the buttress 2. In this case, when the soil 30 is backfilled, the lower portion of the buttress 2 cannot be completely filled with the soil 30, and a cavity H is formed.

また、例えば、特許文献1には、バットレス及び錘形基礎を有する擁壁の施工方法が提案されている。この特許文献1の施工方法において、バットレスの上端面は、高地盤G側に水平に延び、バットレスの下端面は、柱の柱脚部から高地盤Gに向かって斜め上方に延びるように形成される。擁壁の施工において、先ず、杭、基礎及びバットレスを施工するために必要とされる最小限の範囲だけ高地盤Gを掘削し、杭の杭孔に鉄筋を配筋し、杭孔にコンクリートを打設して、場所打ちコンクリート杭を施工する。柱及びバットレスの主筋は、杭の配筋と同時に少なくとも部分的に施工され、主筋は、主杭のコンクリートに定着する。次いで、基礎の配筋及びコンクリート打設を行い、基礎を施工する。しかる後、柱、壁体、バットレス及び基礎の配筋並びにコンクリート打設を行う。各部のコンクリート及びモルタルの硬化後、掘削土の埋戻しを行い、擁壁の工事を完了する。この場合も、バットレスの下部に土を完全に充填することができず、空洞が形成される。   Further, for example, Patent Document 1 proposes a method for constructing a retaining wall having a buttress and a weight-shaped foundation. In the construction method of Patent Document 1, the upper end surface of the buttress extends horizontally toward the high ground G, and the lower end surface of the buttress is formed to extend obliquely upward from the column base portion of the column toward the high ground G. The In the construction of the retaining wall, first, excavate the high ground G to the minimum extent necessary for constructing the pile, foundation and buttress, arrange reinforcing bars in the pile hole of the pile, and put concrete in the pile hole. Cast in and cast in place concrete piles. The column and buttress main bars are at least partially constructed at the same time as the pile arrangement, and the main bars settle in the concrete of the main pile. Next, the foundation is laid and the concrete is placed to construct the foundation. After that, pillars, walls, buttresses, foundation reinforcement and concrete placement are performed. After the concrete and mortar of each part is hardened, the excavated soil is backfilled and the construction of the retaining wall is completed. Also in this case, the lower part of the buttress cannot be completely filled with soil, and a cavity is formed.

特開2011−17184号公報JP 2011-17184 A

上述したように、従来のバットレスの施工方法によると、コンクリートを打設し、さらに型枠の脱型の後、バットレス下部の空いた空間にその両側から土を埋め戻すことが要求されるため、土の充填及び埋め戻しが非常に困難であり、どうしても空洞Hが形成されてしまうという問題点があった。また、従来のバットレスの施工方法はコンクリートを打設する前にバットレス下部に土を先行埋め戻することができなかった。   As described above, according to the conventional buttress construction method, after placing concrete, and after demolding the formwork, it is required to backfill the soil from both sides in the vacant space below the buttress, The filling and backfilling of the soil is very difficult, and there is a problem that the cavity H is inevitably formed. In addition, the conventional buttress construction method has not been able to pre-fill the soil below the buttress before placing the concrete.

また、従来のバットレスの施工方法は、型枠を設置してコンクリートを打設した後に脱型する必要となるため、手間がかかり、また、コンクリートを打設した後、コンクリートが固まって強度が出るまで脱型することができないため、工期が長くなるという問題点もあった。   In addition, the conventional buttress construction method requires demolding after placing the formwork and placing the concrete, which takes time, and after placing the concrete, the concrete hardens and increases its strength. There is also a problem that the construction period becomes long because the mold cannot be removed.

従って本発明の目的は、バットレスの傾斜面の下部に土の充填及び埋め戻しが容易にできるバットレスの施工方法を提供することにある。   Accordingly, an object of the present invention is to provide a method for constructing a buttress capable of easily filling and backfilling the soil below the inclined surface of the buttress.

本発明の他の目的は、型枠の脱型が不要であり、工期の短縮を図ることができるバットレスの施工方法を提供することにある。   Another object of the present invention is to provide a buttress construction method that does not require demolding of the formwork and can shorten the construction period.

本発明によれば、バットレスを形成すべき段差部を含む根切り溝を溝し、埋め殺しとなるバットレス用型枠が段差部に位置するように、バットレス用型枠を含む捨型枠を溝した根切り溝内に建込み、建込んだ捨型枠の周囲とバットレス用型枠の位置する段差部とに土を埋め戻した後、建込んだ捨型枠内に配筋を行ってコンクリートを打設するバットレスの施工方法が提供される。 According to the present invention, grooving roots kerf including a step portion for forming the buttress, as buttress mold frame as a killing filling is positioned at the stepped portion, the捨型frame comprising buttress for formwork Kenkomi to drilling groove roots cut in the groove, after backfilling the soil and the step portion which is positioned around the buttress for the formwork of捨型frame that crowded Ken, made Haisuji to it crowded Ken捨型frame A method of constructing a buttress for placing concrete is provided.

コンクリート打設前に捨型枠の外側を先行埋め戻しする際に、バットレスの下部に対応する段差部にも埋め戻しを行うので、バットレスの傾斜面の下部への土の充填及び埋め戻しが容易となり、また、捨型枠を用いることにより、バットレスの下部においても型枠の脱型を行う必要がなくなり、工期の短縮化を図ることができる。   When backfilling the outside of the formwork frame prior to concrete placement, the stepped part corresponding to the bottom of the buttress is also backfilled, so it is easy to fill and backfill the soil below the buttress slope. In addition, by using the discard frame, it is not necessary to remove the mold at the lower part of the buttress, and the construction period can be shortened.

バットレス用型枠が、根切り溝の側壁に対向する1対のバットレス側面型枠と、1対のバットレス側面型枠間に配置され、根切り溝の底面に対して傾斜した状態で1対のバットレス側面型枠に固着されるバットレス底板とを有しており、バットレス底板の少なくとも一部を外した状態で溝した根切り溝内に建込み、建込んだ捨型枠の周囲とバットレス底板の外した状態の少なくとも一部に対応する段差部とに土を埋め戻した後、バットレス底板の外した状態の少なくとも一部を1対のバットレス側面型枠に固着することが好ましい。これにより、バットレス底板が外したところからより容易に土を埋め戻すことができる。 A pair of buttress molds are disposed between a pair of buttress side molds facing the side walls of the root cut grooves and a pair of buttress side molds, and are inclined with respect to the bottom face of the root cut grooves. It has a buttress bottom plate which is secured to the buttress side mold, at least partially dug in disconnected Kenkomi the groove roots cut groove, surrounding the buttress bottom plate of捨型frame forme construction of the buttress bottom plate It is preferable that after the soil is backfilled to the stepped portion corresponding to at least a part of the removed state, at least a part of the removed state of the buttress bottom plate is fixed to the pair of buttress side molds. Thereby, the soil can be backfilled more easily from the place where the buttress bottom plate is removed.

バットレス底板全体を外した状態で溝した根切り溝内に捨型枠を建込み、建込んだ捨型枠の周囲とバットレス底板全体に対応する段差部とに土を埋め戻した後、バットレス底板の全体を1対のバットレス側面型枠に固着することが好ましい。これにより、捨型枠を建込んだ状態でバットレス底板全体に対応する段差部に土を埋め戻すことができる。 After backfilling Kenkomi, the soil and the step portion corresponding to the entire circumference and buttress bottom plate of捨型frame forme denominated the捨型frame to buttress the bottom plate throughout the drilling in disconnected groove roots kerf, buttress The entire bottom plate is preferably fixed to a pair of buttress side molds. As a result, the soil can be backfilled in the stepped portion corresponding to the entire buttress bottom plate in a state in which the discard frame is built.

バットレス底板が複数領域に分割可能に構成されており、バットレス底板の少なくとも1つの分割された領域を外した状態で溝した根切り溝内に建込み、建込んだ捨型枠の周囲とバットレス底板の外した状態の少なくとも1つの分割された領域に対応する段差部とに土を埋め戻した後、バットレス底板の固着されていない少なくとも1つの分割された領域を1対のバットレス側面型枠に固着することが好ましい。これにより、複数領域に分割されたバットレス底板の一部から段差部に土を埋め戻すことができる。 Buttress bottom plate are dividable configured into a plurality of regions, at least one divided Kenkomi in roots kerf was grooving when opening the region, denominated elaborate捨型frame around the buttress buttress bottom plate After the soil is backfilled to the step portion corresponding to the at least one divided region with the bottom plate removed, the at least one divided region to which the buttress bottom plate is not fixed is formed into a pair of buttress side molds. It is preferable to fix. Thereby, the soil can be backfilled in the stepped portion from a part of the buttress bottom plate divided into a plurality of regions.

バットレス用型枠が、前記根切り溝の側壁に対向する1対のバットレス側面型枠と、該1対のバットレス側面型枠間に配置され、該根切り溝の底面に対して傾斜した状態で前記1対のバットレス側面型枠に固着されるバットレス底板とを有しており、該バットレス底板を前記1対のバットレス側面型枠に固着された状態で前記溝した根切り溝内に建込むことが好ましい。 A buttress mold is disposed between the pair of buttress side molds facing the side walls of the root cut groove and the pair of buttress side molds, and is inclined with respect to the bottom face of the root cut groove. said pair of has a buttress bottom plate which is secured to the buttress side mold, Kenkomu to the buttress bottom plate the drilling groove roots cut groove in a state of being fixed to the buttress side mold of the pair It is preferable.

根切り溝の底面に対して傾斜した状態で1対のバットレス側面型枠にそれぞれ固着された1対の受けアングルをさらに備えており、バットレス底板が該1対の受けアングルによって支持されていることが好ましい。これにより、バットレス底板が容易に装着することができる。   A pair of receiving angles each fixed to a pair of buttress side molds in a state of being inclined with respect to the bottom surface of the root cut groove, and the buttress bottom plate is supported by the pair of receiving angles; Is preferred. As a result, the buttress bottom plate can be easily attached.

本発明によれば、コンクリート打設前に捨型枠の外側を先行埋め戻しする際に、バットレスの下部に対応する段差部にも埋め戻しを行うので、バットレスの傾斜面の下部への土の充填及び埋め戻しが容易となり、また、捨型枠を用いることにより、バットレスの下部においても型枠の脱型を行う必要がなくなり、工期の短縮化を図ることができる。   According to the present invention, when the outside of the scraping frame is backfilled prior to the concrete placement, the stepped portion corresponding to the lower portion of the buttress is also backfilled. Filling and backfilling can be facilitated, and by using the discard frame, it is not necessary to remove the mold at the lower part of the buttress, and the construction period can be shortened.

本発明のバットレスの施工方法の実施例を示す完成状態の断面図である。It is sectional drawing of the completion state which shows the Example of the construction method of the buttress of this invention. 本発明のバットレスの施工方法に用いられた捨型枠の構成を概略的に示す斜視図である。It is a perspective view which shows roughly the structure of the discard frame used for the construction method of the buttress of this invention. 本発明のバットレスの施工方法の根切り溝を溝する施工段階を示す断面図である。The construction stage of grooving roots kerf construction method of buttress of the present invention is a cross-sectional view illustrating. 本発明のバットレスの施工方法の捨型枠を溝した根切り溝内に建込む施工段階を示す断面図である。The construction stage of writing denominated in Excavation within grooves which grooving the捨型frame construction method of the buttress of the present invention is a cross-sectional view illustrating. 本発明のバットレスの施工方法の土を埋め戻す施工段階を示す断面図である。It is sectional drawing which shows the construction step which refills the soil of the construction method of the buttress of this invention. 図5中A−A線の断面図である。It is sectional drawing of the AA line in FIG. 本発明のバットレスの施工方法のバットレス底板を取り付ける施工段階を示す断面図である。It is sectional drawing which shows the construction step which attaches the buttress bottom board of the construction method of the buttress of this invention. 本発明のバットレスの施工方法の捨型枠内に配筋する施工段階を示す断面図である。It is sectional drawing which shows the construction step which arranges the bar arrangement in the discard frame of the construction method of the buttress of this invention. 本発明のバットレスの施工方法の他の実施例を示す断面図である。It is sectional drawing which shows the other Example of the construction method of the buttress of this invention. 従来のバットレスの施工例を示すバットレスの下部に土を埋め戻した状態の断面図である。It is sectional drawing of the state which backfilled the soil in the lower part of the buttress which shows the construction example of the conventional buttress.

図1は本発明のバットレスの施工方法の実施形態を示す完成状態の断面図である。図2は本実施形態で用いられたバットレス部分の捨型枠20の構成を示しており、同図(a)はバットレス底板23を外した状態であり、(b)はバットレス底板23が装着された状態である。また、図3〜8は主な施工段階を示している。   FIG. 1 is a sectional view of a completed state showing an embodiment of the buttress construction method of the present invention. FIG. 2 shows the configuration of the buttress portion discarding frame 20 used in the present embodiment. FIG. 2A shows a state in which the buttress bottom plate 23 is removed, and FIG. 2B shows that the buttress bottom plate 23 is attached. It is in the state. Moreover, FIGS. 3-8 has shown the main construction steps.

図1に示すように、本発明のバットレスの施工方法では、バットレス2を有する基礎1を施工する際に、捨型枠20を用いている。これにより、先行埋め戻しを行い、コンクリート50を打設してバットレス2を形成した後、脱型せずに捨型枠20を根切り溝10内に埋め込んだ状態にする。   As shown in FIG. 1, in the buttress construction method of the present invention, a discard frame 20 is used when the foundation 1 having the buttress 2 is constructed. As a result, prior backfilling is performed, the concrete 50 is placed, the buttress 2 is formed, and then the discard frame 20 is embedded in the root cut groove 10 without being removed.

また、図2に示すように、バットレス2を含む基礎1を形成する捨型枠20は、鋼板により構成されたバットレス側面枠21と、底面枠22と、バットレス底板23と、端部枠24とを含むバットレス用型枠を備えている。   As shown in FIG. 2, the discard frame 20 that forms the foundation 1 including the buttress 2 includes a buttress side frame 21, a bottom frame 22, a buttress bottom plate 23, an end frame 24, and a steel plate. A buttress formwork is provided.

バットレス2を形成するためのバットレス用型枠は、根切り溝10の側壁に対向する1対のバットレス側面型枠21と、この1対のバットレス側面型枠21間に配置され、根切り溝10の底面に対して傾斜した状態で1対のバットレス側面型枠21に固着されるバットレス底板23とを有している。バットレス側面枠21は、バットレス2を形成する箇所において、バットレス底板23を装着するための受けアングル23aが設けられている。また、この例において、バットレス底板23は、2枚に分割して構成されている。また、底面枠22は、バットレス底板23の上端に連結する水平部分の底面板である。   The buttress mold for forming the buttress 2 is disposed between the pair of buttress side molds 21 facing the side walls of the root cut groove 10 and the pair of buttress side molds 21. And a buttress bottom plate 23 fixed to a pair of buttress side molds 21 in an inclined state with respect to the bottom surface. The buttress side frame 21 is provided with a receiving angle 23a for mounting the buttress bottom plate 23 at a location where the buttress 2 is formed. In this example, the buttress bottom plate 23 is divided into two pieces. The bottom frame 22 is a horizontal portion bottom plate connected to the upper end of the buttress bottom plate 23.

本発明のバットレスの施工方法は、まず、地盤に根切り溝10を溝する。図3に示すように、根切り溝10は、地中梁を形成するための比較的浅い地中梁部10aと、比較的深い例えば独立基礎部10bと、地中梁部10aと独立基礎部10bとを連結しバットレス2が形成される段差部10cとを有している。 Construction method of buttress of the present invention, first, the grooving roots kerf 10 to ground. As shown in FIG. 3, the root cut groove 10 includes a relatively shallow underground beam portion 10a for forming an underground beam, a relatively deep, for example, independent foundation portion 10b, an underground beam portion 10a, and an independent foundation portion. 10b and a step portion 10c in which the buttress 2 is formed.

次に、捨型枠20を溝した根切り溝10内に建込む工程を行う。この工程において、バットレス側面枠21と、底面枠22と、端部枠24とを組み立て、バットレス底板23が装着されていない状態で根切り溝10の上方から落とし込んで根切り溝10の地中梁部10a及び段差部10c内に据え付ける(図4参照)。独立基礎部10bにおいても周知の方法で捨型枠が建込まれる。 Next, the construction writing process捨型frame 20 digging trenches roots kerf 10. In this process, the buttress side frame 21, the bottom frame 22, and the end frame 24 are assembled and dropped from above the root cut groove 10 without the buttress bottom plate 23 attached, and the underground beam of the root cut groove 10 is inserted. It installs in the part 10a and the level | step difference part 10c (refer FIG. 4). Also in the independent base part 10b, a disposal frame is built by a well-known method.

次に、溝した土30を埋め戻す(先行埋め戻し)工程を行う。この先行埋め戻し工程においては、地中梁部10a及び独立基礎部10bの型枠の外側に土30を埋め戻すことはもちろんのこと、段差部10cにおいても、バットレス側面枠21の外側に土30を埋め戻す(図6参照)。さらに、バットレス底面板23が装着されていない開口部を介してバットレス2の下部となる部分に土30を埋め戻して充填する(図5参照)。 Then, drilling backfilled soil 30 that grooves (prior backfilling) performing step. In the preceding backfilling step, the soil 30 is backfilled outside the formwork of the underground beam portion 10a and the independent foundation portion 10b, and the soil 30 is also placed outside the buttress side frame 21 at the stepped portion 10c. Is backfilled (see FIG. 6). Further, the soil 30 is backfilled and filled in the lower portion of the buttress 2 through the opening where the buttress bottom plate 23 is not mounted (see FIG. 5).

次に、バットレス底板23を取り付ける工程を行う。この取り付け工程においては、バットレス底板23を受けアングル23a上に装着し溶接やボルト締めなどの方法で固着させる(図7参照)。   Next, a process of attaching the buttress bottom plate 23 is performed. In this attachment process, the buttress bottom plate 23 is mounted on the angle 23a and fixed by welding or bolting (see FIG. 7).

次に、捨型枠20内に鉄筋40を配筋する工程を行う。この配筋工程において、捨型枠20内に鉄筋40を配置する(図8参照)。鉄筋40を捨型枠20の内部で組み立てても良いが、外部で組み立てられた格子骨形の鉄筋40を吊り下げ、捨型枠20内部に設置することがより望ましい。   Next, the step of arranging the reinforcing bars 40 in the discarding frame 20 is performed. In this bar arrangement process, the reinforcing bars 40 are arranged in the discarding frame 20 (see FIG. 8). The reinforcing bars 40 may be assembled inside the discarding frame 20, but it is more desirable to suspend the lattice-shaped reinforcing bars 40 assembled outside and install them inside the discarding frame 20.

次に、捨型枠20内にコンクリート50を打設する工程を行う。この工程においては、鉄筋40を設置した捨型枠20内にコンクリート50を打設することによって構造物の基礎を構築する(図1参照)。   Next, a step of placing the concrete 50 in the discard frame 20 is performed. In this step, the foundation of the structure is constructed by placing concrete 50 in the discard frame 20 in which the reinforcing bars 40 are installed (see FIG. 1).

このように、本実施形態では、地中梁部10aと、独立基礎部10bと、地中梁部10a及び独立基礎部10bを連結しておりバットレス2を形成すべき段差部10cとを含む根切り溝10を溝し、バットレス用型枠が段差部10cに位置するように、このバットレス用型枠を含み埋め殺しとなる捨型枠20を溝した根切り溝10内に建込み、建込んだ捨型枠20の周囲とバットレス用型枠の位置する段差部10cとに土30を埋め戻した後、捨型枠20内に配筋40を行ってコンクリート50を打設する。 As described above, in this embodiment, the root includes the underground beam portion 10a, the independent foundation portion 10b, and the step portion 10c that connects the underground beam portion 10a and the independent foundation portion 10b and should form the buttress 2. and grooving the kerfs 10, as buttress for formwork is positioned in the stepped portion 10c, Kenkomi the捨型frame 20 as a killing filling comprises the buttress for formwork in drilling groove roots kerf 10, After the soil 30 is backfilled in the periphery of the built-up discard frame 20 and the stepped portion 10c where the buttress mold is located, the reinforcement 50 is placed in the discard frame 20 and the concrete 50 is placed.

埋め殺しとなる捨型枠20を用い、コンクリート50を打設する前にバットレス用型枠の傾斜面の下部に土30を埋め戻すことにより、バットレス2の傾斜面の下部に土30の充填及び埋め戻しが容易にでき、空洞が形成されることがなくなる。また、従来の施工方法に用いられた型枠の脱型がなく、工期の短縮を図ることができる。   Filling the lower part of the inclined surface of the buttress 2 with the soil 30 by filling the soil 30 back to the lower part of the inclined surface of the buttress mold before placing the concrete 50 using the scraping frame 20 to be buried. Backfilling can be performed easily, and cavities are not formed. Moreover, there is no demolding of the mold used in the conventional construction method, and the construction period can be shortened.

捨型枠であるバットレス用型枠が、根切り溝10の側壁に対向する1対のバットレス側面型枠21と、1対のバットレス側面型枠21間に配置され、根切り溝10の底面に対して傾斜した状態で1対のバットレス側面型枠21に固着されるバットレス底板23とを有しており、バットレス底板23を外した状態で溝した根切り溝10内に建込み、建込んだ捨型枠20の周囲とバットレス底板23に対応する段差部10cとに土30を埋め戻した後、バットレス底板23を1対のバットレス側面型枠21に固着することにより、バットレス底板23を外したところから土30を埋め戻すことができる。 A buttress mold, which is a discarded mold, is arranged between a pair of buttress side molds 21 facing the side walls of the root cut groove 10 and a pair of buttress side molds 21. has a buttress bottom plate 23 which is fixed to the buttress side mold 21 of a pair in an inclined against, Kenkomi the root kerf 10 which grooving in when opening the buttress bottom plate 23, Kenkon After the earth 30 is backfilled in the periphery of the scraped mold frame 20 and the stepped portion 10c corresponding to the buttress bottom plate 23, the buttress bottom plate 23 is fixed to the pair of buttress side surface mold frames 21, thereby removing the buttress bottom plate 23 from the outside. The soil 30 can be backfilled from where it was done.

根切り溝10の底面に対して傾斜した状態で1対のバットレス側面型枠21にそれぞれ固着された1対の受けアングル23aをさらに備えており、バットレス底板23がこの1対の受けアングル23aによって支持されていることにより、バットレス底板23が容易に装着及び固定することができる。   It further includes a pair of receiving angles 23a fixed to a pair of buttress side molds 21 in a state inclined with respect to the bottom surface of the root cut groove 10, and the buttress bottom plate 23 is formed by the pair of receiving angles 23a. By being supported, the buttress bottom plate 23 can be easily mounted and fixed.

図9は、本発明のバットレスの施工方法の他の実施形態を示している。この場合、2枚のバットレス底板23のうち上端側の1枚を外した状態で溝した根切り溝10内に建込むようになっている。 FIG. 9 shows another embodiment of the buttress construction method of the present invention. In this case, so that the writing denominated root kerf 10 was grooving when opening the one upper end of the two buttress bottom plate 23.

図9に示すように、捨型枠20を溝した根切り溝10内に建込む工程において、2枚のバットレス底板23のうち1枚をアングル23aに固着した状態で、捨型枠20を根切り溝10内に建込む。捨型枠20の外部に土を埋め戻す工程において、残った開口部から段差部10c上に土30を埋め戻す。このようにバットレス2の下部に対応する段差部10cに土30を充填した後、もう1枚のバットレス底板23を装着し溶接などの方法で固着させる。 As shown in FIG. 9, in the construction writing process捨型frame 20 digging trenches roots kerf 10, the one of the two buttress bottom plate 23 in a state of being fixed to the angle 23a, the捨型frame 20 It is built in the root cut groove 10. In the step of backfilling the soil outside the discard mold frame 20, the soil 30 is backfilled on the stepped portion 10c from the remaining opening. Thus, after filling the step 30 c corresponding to the lower part of the buttress 2 with the soil 30, another buttress bottom plate 23 is mounted and fixed by a method such as welding.

図9に示すバットレスの施工方法は、上述した2枚のバットレス底板23が装着されていない開口部から土30をバットレス2の下部に対応する段差部10cに埋め戻す方法と同様な効果が得られる。   The buttress construction method shown in FIG. 9 has the same effect as the method of backfilling the soil 30 into the stepped portion 10c corresponding to the lower portion of the buttress 2 from the opening where the two buttress bottom plates 23 are not mounted. .

このように、バットレス底板23が複数領域に分割可能に構成されており、バットレス底板23の少なくとも1つの分割された領域を外した状態で溝した根切り溝10内に建込み、建込んだ捨型枠20の周囲とバットレス底板23の外した状態の少なくとも1つの分割された領域に対応する段差部10cとに土30を埋め戻した後、バットレス底板23の固着されていない少なくとも1つの分割された領域を1対のバットレス側面型枠21に固着することにより、複数領域に分割されたバットレス底板23の一部から段差部10cに土30を容易に埋め戻すことができる。 Thus, the buttress bottom plate 23 is dividable structure into a plurality of regions, but crowded Kenkomi, denominated in the grooving when opening the at least one divided region of the buttress bottom plate 23 roots kerf 10 At least one division in which the buttress bottom plate 23 is not fixed after the earth 30 is backfilled to the stepped portion 10c corresponding to at least one divided region in the state where the buttress bottom plate 23 is removed from the periphery of the scraping frame 20 By fixing the formed area to the pair of buttress side molds 21, the soil 30 can be easily backfilled from the part of the buttress bottom plate 23 divided into a plurality of areas into the stepped portion 10 c.

なお、上述した実施形態においては、バットレス底板23は2枚の板から構成されている例を説明したが、本発明はこれに限定されるものではない。例えば、バットレスの大きさによって、1枚又は3枚以上の板から構成するようにしてもよい。   In the above-described embodiment, the example in which the buttress bottom plate 23 is configured by two plates has been described, but the present invention is not limited to this. For example, you may make it comprise from the board of 1 sheet or 3 sheets or more according to the magnitude | size of a buttress.

また、バットレス底板23は1枚の板から構成されている場合、バットレス底板23全体を外した状態で溝した根切り溝10内に建込み、建込んだ捨型枠20の周囲とバットレス底板23を外した状態の段差部10cとに土を埋め戻した後、バットレス底板23を1対のバットレス側面型枠21に固着する。 Also, if the buttress bottom plate 23 which is composed of one plate, Kenkomi the buttress bottom plate 23 drilling when opening the entire inside roots kerf 10 as grooves, around the buttress bottom plate of捨型frame 20 forme Ken After the soil is backfilled to the stepped portion 10c with the 23 removed, the buttress bottom plate 23 is fixed to the pair of buttress side molds 21.

また、上述した実施形態においては、バットレス底板23の一部又は全部を外した状態で溝した根切り溝10内に建込み、土30を埋め戻す例を説明したが、本発明はこれに限定されるものではない。例えば、バットレス底板23を1対のバットレス側面型枠21に固着した状態で根切り溝内に建込むようにしてもよい。この場合、バットレス用型枠の側面の開口部から土30を段差部10c上に埋め戻すことで、コンクリートを打設する前にバットレス下部に土を先行埋め戻することができ、上述したバットレス底板23が装着されていない開口部から土30を埋め戻す方法と同様な効果が得られる。 Further, in the above-described embodiment, Kenkomi the drilling groove roots kerf 10 when opening the part or all of the buttress bottom plate 23, an example has been described backfilling with soil 30, the present invention is to It is not limited. For example, the buttress bottom plate 23 may be built in the root cutting groove in a state of being fixed to the pair of buttress side molds 21. In this case, the soil 30 can be backfilled before the concrete is placed by backfilling the soil 30 onto the stepped portion 10c from the opening on the side surface of the buttress mold. The same effect as the method of refilling the soil 30 from the opening where the 23 is not mounted is obtained.

以上述べた実施形態は全て本発明を例示的に示すものであって限定的に示すものではなく、本発明は他の種々の変形態様及び変更態様で実施することができる。従って本発明の範囲は特許請求の範囲及びその均等範囲によってのみ規定されるものである。   All the embodiments described above are illustrative of the present invention and are not intended to be limiting, and the present invention can be implemented in other various modifications and changes. Therefore, the scope of the present invention is defined only by the claims and their equivalents.

10 根切り溝
10a 地中梁部
10b 独立基礎部
10c 段差部
20 捨型枠
21 バットレス側面枠
22 底面枠
23 バットレス底板
23a 受けアングル
24 端部枠
30 土
40 鉄筋
50 コンクリート
H 空洞

DESCRIPTION OF SYMBOLS 10 Root cut groove 10a Underground beam part 10b Independent foundation part 10c Step part 20 Discarding frame 21 Buttress side frame 22 Bottom frame 23 Buttress bottom plate 23a Receiving angle 24 End frame 30 Earth 40 Reinforcement 50 Concrete H Cavity

Claims (4)

バットレスを形成すべき段差部を含む根切り溝を溝し、埋め殺しとなるバットレス用型枠が前記段差部に位置するように、該バットレス用型枠を含む捨型枠を前記溝した根切り溝内に建込み、該建込んだ捨型枠の周囲と前記バットレス用型枠の位置する前記段差部とに土を埋め戻した後、前記建込んだ捨型枠内に配筋を行ってコンクリートを打設するバットレスの施工方法であって、
前記バットレス用型枠が、前記根切り溝の側壁に対向する1対のバットレス側面型枠と、該1対のバットレス側面型枠間に配置され、該根切り溝の底面に対して傾斜した状態で前記1対のバットレス側面型枠に固着されるバットレス底板とを有しており、該バットレス底板の少なくとも一部を外した状態で前記掘溝した根切り溝内に建込み、該建込んだ捨型枠の周囲と前記バットレス底板の外した状態の少なくとも一部に対応する前記段差部とに土を埋め戻した後、前記バットレス底板の外した状態の少なくとも一部を前記1対のバットレス側面型枠に固着することを特徴とするバットレスの施工方法。
And grooving roots kerf including a step portion for forming the buttress, as buttress mold frame comprising a killing filling is positioned at the step portion and the digging grooves捨型frame including the buttress for formwork After burying in the root cutting groove, backfilling the soil around the built-up discard frame and the stepped portion where the buttress mold frame is located, reinforcing bars are placed in the built-up discard frame. It is a construction method of buttress to go and place concrete ,
The buttress mold is disposed between a pair of buttress side molds facing the side wall of the root cut groove and the pair of buttress side molds, and is inclined with respect to the bottom face of the root cut groove And a pair of buttress bottom plates fixed to the pair of buttress side molds, and at least a part of the buttress bottom plate is removed and built in the root cut groove, and the built-in The back surface of the pair of buttress side surfaces is removed from at least a part of the buttress bottom plate after the soil has been refilled in the stepped portion corresponding to at least a part of the removed frame and the buttress bottom plate removed. A buttress construction method characterized by being fixed to a formwork .
前記バットレス底板全体を外した状態で前記溝した根切り溝内に建込み、該建込んだ捨型枠の周囲と前記バットレス底板全体に対応する前記段差部とに土を埋め戻した後、前記バットレス底板の全体を前記1対のバットレス側面型枠に固着することを特徴とする請求項に記載のバットレスの施工方法。 After backfilling Kenkomi, the soil and the step portion corresponding to the entire buttress bottom plate and surrounding elaborate捨型frame該建the drilling groove roots cut groove when opening the entire buttress bottom plate, The buttress construction method according to claim 1 , wherein the entire buttress bottom plate is fixed to the pair of buttress side molds. 前記バットレス底板が複数領域に分割可能に構成されており、該バットレス底板の少なくとも1つの分割された領域を外した状態で前記溝した根切り溝内に建込み、該建込んだ捨型枠の周囲と前記バットレス底板の外した状態の少なくとも1つの分割された領域に対応する前記段差部とに土を埋め戻した後、前記バットレス底板の前記固着されていない少なくとも1つの分割された領域を前記1対のバットレス側面型枠に固着することを特徴とする請求項に記載のバットレスの施工方法。 Wherein and buttress bottom plate is dividable structure into a plurality of regions, the buttress bottom plate of at least one of the divided said when opening the area dug Kenkomi the groove roots cut groove,捨型frame forme該建And then backfilling the stepped portion corresponding to at least one divided region in a state where the buttress bottom plate is removed, and then at least one non-fixed region of the buttress bottom plate is fixed. The buttress construction method according to claim 1 , wherein the buttress construction method is fixed to the pair of buttress side molds. 前記根切り溝の底面に対して傾斜した状態で前記1対のバットレス側面型枠にそれぞれ固着された1対の受けアングルをさらに備えており、前記バットレス底板が該1対の受けアングルによって支持されていることを特徴とする請求項からのいずれか1項に記載のバットレスの施工方法。
A pair of receiving angles fixed to the pair of buttress side molds in a state of being inclined with respect to the bottom surface of the root cut groove, and the buttress bottom plate is supported by the pair of receiving angles. The buttress construction method according to any one of claims 1 to 3 , wherein the construction method is a buttress.
JP2013181376A 2013-09-02 2013-09-02 Buttress construction method Active JP6315924B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013181376A JP6315924B2 (en) 2013-09-02 2013-09-02 Buttress construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013181376A JP6315924B2 (en) 2013-09-02 2013-09-02 Buttress construction method

Publications (2)

Publication Number Publication Date
JP2015048647A JP2015048647A (en) 2015-03-16
JP6315924B2 true JP6315924B2 (en) 2018-04-25

Family

ID=52698888

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013181376A Active JP6315924B2 (en) 2013-09-02 2013-09-02 Buttress construction method

Country Status (1)

Country Link
JP (1) JP6315924B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512635A (en) * 2019-08-28 2019-11-29 中国十七冶集团有限公司 A kind of regularization template is in lower pier base support device and its construction method
CN113605304B (en) * 2021-08-05 2024-07-16 广东海工建设工程有限公司 Anti-skid and anti-tilting buttress type wharf structure and construction method thereof

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56159447U (en) * 1980-04-26 1981-11-27
JPH02274922A (en) * 1989-04-18 1990-11-09 Toda Constr Co Ltd Foundation construction
JP2771317B2 (en) * 1990-08-31 1998-07-02 大成建設株式会社 Post tension concrete foundation plate
JP3245260B2 (en) * 1993-06-03 2002-01-07 高伸建設株式会社 Foundation structure and construction method
JP2000257078A (en) * 1999-01-05 2000-09-19 Hitoshi Mori Construction method of mat foundation to use pc foundation beam member and pc support frame for pc foundation beam member
JP2001032293A (en) * 1999-07-21 2001-02-06 Nasu Ryokuchi Kk Foundation floor structure of dwelling building, its construction method and permanent form
JP2001234548A (en) * 2000-02-24 2001-08-31 Shimizu Corp Method for constructing underground beam blinding concrete and forms for use therein
US20030233798A1 (en) * 2002-06-21 2003-12-25 Berkey John William Post-tensioned, below-grade concrete foundation system
JP4396846B2 (en) * 2004-12-21 2010-01-13 良弘 佐藤 Solid foundation construction method and formwork fixture used for it
JP2007303196A (en) * 2006-05-12 2007-11-22 Shimizu Corp Aseismatic reinforcing structure and aseismatic reinforcing method for existing pile

Also Published As

Publication number Publication date
JP2015048647A (en) 2015-03-16

Similar Documents

Publication Publication Date Title
KR101572561B1 (en) Steel assembly for Pile
JP6543176B2 (en) Building method
JP2017210787A (en) Aseismatic structure of cut-and-cover tunnel
KR101674656B1 (en) CIP retaining wall with steel tube
KR102023135B1 (en) Cast-In place concrete Pile method using Octangle-casing
JP6315924B2 (en) Buttress construction method
KR20110070188A (en) Construction method for underground watertight wall
JP2011089361A (en) Slope reinforcing method
JP2020197015A (en) Construction method of foundation
JP2012092601A (en) Open shield machine start method of open shield method
KR101017127B1 (en) Connecting Structure between Foundation and Pier, and Construction Method thereof
JP5367537B2 (en) Construction method and structure of steel pipe sheet pile
JP7115923B2 (en) Foundation structure reinforcement method and foundation structure reinforcement structure
JP2018009388A (en) End structure of preceding element and construction method of underground continuous wall
KR101385090B1 (en) Foundation Structure and the method of wall and cut off wall
JP5639213B2 (en) Open shield method
JP2010116715A (en) Retaining wall construction method
JP2011157719A (en) Earth retaining method
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same
JP2018053467A (en) Open shield method
KR100562686B1 (en) The underground structure and it's construction method is using sheet pile and cast in a place concrete
JP4146250B2 (en) Open caisson bottom plate construction method
JP3766423B2 (en) Retaining wall construction method
JP2005213963A (en) Pile head constructing method
JP2010031564A (en) Basement pillar installation method and construction method for underground structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160831

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20160921

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20160921

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170713

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170815

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171002

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180320

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180327

R150 Certificate of patent or registration of utility model

Ref document number: 6315924

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R154 Certificate of patent or utility model (reissue)

Free format text: JAPANESE INTERMEDIATE CODE: R154

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250