KR100562686B1 - The underground structure and it's construction method is using sheet pile and cast in a place concrete - Google Patents

The underground structure and it's construction method is using sheet pile and cast in a place concrete Download PDF

Info

Publication number
KR100562686B1
KR100562686B1 KR1020050081508A KR20050081508A KR100562686B1 KR 100562686 B1 KR100562686 B1 KR 100562686B1 KR 1020050081508 A KR1020050081508 A KR 1020050081508A KR 20050081508 A KR20050081508 A KR 20050081508A KR 100562686 B1 KR100562686 B1 KR 100562686B1
Authority
KR
South Korea
Prior art keywords
steel sheet
sheet pile
concrete
wall
ground
Prior art date
Application number
KR1020050081508A
Other languages
Korean (ko)
Inventor
노윤근
노실근
노옥근
Original Assignee
우경건설 주식회사
노윤근
노옥근
노실근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 우경건설 주식회사, 노윤근, 노옥근, 노실근 filed Critical 우경건설 주식회사
Priority to KR1020050081508A priority Critical patent/KR100562686B1/en
Application granted granted Critical
Publication of KR100562686B1 publication Critical patent/KR100562686B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

본 발명은 지하 구조체 형성시 자주 사용되는 강널말뚝을 이용하여 지하 구조체를 시공하되, 현장타설 콘크리트를 강널말뚝 부위에 타설 및 양생시켜 강널말뚝과 현장타설 콘크리트가 수평력과 수직력을 모두 분담하는 방법으로 시공이 간편하고 경제성이 뛰어난 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 및 그의 시공방법을 제공하는데 그 목적이 있다.The present invention is to construct the underground structure using the steel sheet pile frequently used in the formation of the underground structure, by placing and curing the site-casting concrete on the steel pile piles by the method in which the steel sheet pile and the site-casting concrete share both horizontal and vertical forces The purpose is to provide an underground structure using the simple and economical steel sheet pile and cast-in-place concrete and its construction method.

상기한 목적을 달성하기 위한 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체는 지면에서 지중으로 소정의 깊이로 삽입되는 강널말뚝과; 상기 강널말뚝의 사이로 삽입되는 철근 조립망과; 상기 강널말뚝과 철근 조립망에 콘크리트가 타설 양생된 벽체 또는 기둥과; 상기 강널말뚝 상에 철근 배근 및 콘크리트가 타설 양생된 상부 바닥판과; 상기 벽체 또는 기둥의 하부에 철근 배근 및 콘크리트를 타설 양생된 하부 바닥판으로 구성됨을 특징으로 한다.Underground structure using a steel sheet pile and cast-in-place concrete according to the present invention for achieving the above object is a steel sheet pile inserted into the ground from the ground to a predetermined depth; A rebar assembly network inserted between the steel sheet piles; A wall or column in which concrete is poured into the steel sheet pile and the reinforcing steel assembly network; An upper bottom plate on which steel reinforcement and concrete are poured on the steel sheet pile; Characterized in that it consists of a lower bottom plate cured by reinforcing reinforcement and concrete in the lower portion of the wall or pillar.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 시공방법은 지면을 종방향 또는 횡방향으로 일정한 폭과 깊이로 굴착하여 굴착공을 형성하는 단계; 상기 굴착공에 소정의 길이를 갖는 강널말뚝을 연결하여 삽입하는 단계; 상기 강널말뚝 사이로 철근 조립망을 삽입하고, 그 내에 콘크리트를 타설 양생시켜 벽체 또는 기둥을 형성하는 단계; 상기 벽체 또는 기둥의 상부 지면을 폭방향으로 일정한 깊이를 굴착하는 단계; 상기 굴착공에 기설치된 강널말뚝의 두부를 정리하고, 상기 강널말뚝 두부상에 철근배근 및 콘크리트를 타설 양생시켜 상부 바닥판을 형성하는 단계; 상기 상부 바닥판상에 교통을 소통시키면서 벽체 또는 기둥의 지하를 굴착하는 단계; 상기 벽체 또는 기둥의 지하 굴착공의 하부에 철근배근 및 콘크리트를 타설 양생시켜 하부 바닥판을 형성하는 단계; 상기 벽체 또는 기둥을 미장정리함과 동시에 하부 바닥판상으로 교통을 소통시키는 단계로 이루어짐을 특징으로 한다.In addition, the underground structure construction method using a steel sheet pile and cast-in-place concrete according to the present invention for achieving the above object comprises the steps of excavating the ground to a predetermined width and depth in the longitudinal or transverse direction to form an excavation hole; Connecting and inserting a steel sheet pile having a predetermined length to the excavation hole; Inserting a reinforcing bar assembly network between the steel sheet piles and pouring concrete therein to form walls or columns; Excavating a predetermined depth in the width direction of the upper surface of the wall or column; Arranging the head of the steel sheet pile pre-installed in the excavation hole, and curing the reinforcement and concrete on the steel sheet pile head to form an upper bottom plate; Excavating the basement of the wall or column while communicating traffic on the upper floor plate; Forming a bottom base plate by curing reinforcing reinforcement and concrete in a lower portion of the underground excavation hole of the wall or column; Placing the wall or column and at the same time characterized in that the traffic made on the lower floor plate communication.

강널말뚝, 현장타설 콘크리트, 지하 구조체, 벽체, 기둥 Steel sheet pile, cast-in-place concrete, underground structure, wall, column

Description

강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 및 그의 시공방법{The underground structure and it's construction method is using sheet pile and cast in a place concrete} The underground structure and it's construction method is using sheet pile and cast in a place concrete}

도 1은 종래의 지하 구조체를 시공하는 상태를 도시한 예시도, 1 is an exemplary view showing a state of constructing a conventional underground structure,

도 2a 내지 2g는 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체를 시공하는 과정을 도시한 공정도,Figure 2a to 2g is a process diagram showing the process of constructing the underground structure using the steel sheet pile and cast-in-place concrete according to the present invention,

도 3a 내지 3e는 본 발명에 따른 지하구조체의 시공중 지반과 접하는 벽체를 시공하는 과정을 도시한 공정도, 3a to 3e is a process diagram showing the process of constructing a wall contacting the ground during construction of the underground structure according to the invention,

도 4a 내지 4e는 본 발명에 따른 지하구조체의 시공중 지반과 접하지 않는 벽체의 양쪽 공간이 되는 부분을 시공하는 과정을 도시한 공정도,Figures 4a to 4e is a process diagram showing the process of constructing the parts of both spaces of the wall not in contact with the ground during construction of the underground structure according to the present invention,

도 5a는 본 발명에 따른 지하 구조체의 중앙부 기둥을 도시한 평면도,Figure 5a is a plan view showing a central column of the underground structure according to the present invention,

도 5b는 본 발명에 따른 지하 구조체의 측벽부 기둥을 도시한 평면도,Figure 5b is a plan view showing the side wall portion pillar of the underground structure according to the present invention,

도 6a는 본 발명에 따른 지하 구조체의 기둥과 바닥판과의 연결상태를 도시한 정단면도,Figure 6a is a front sectional view showing a connection state of the column and the base plate of the underground structure according to the present invention,

도 6b는 본 발명에 따른 지하 구조체의 기둥과 바닥판과의 연결상태를 도시한 평단면도.Figure 6b is a cross-sectional view showing a connection state of the pillar and the base plate of the underground structure according to the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10: 강널말뚝 12: 내측 공간부10: steel sheet pile 12: inner space portion

20: 철근 조립망 30: 벽체20: rebar mesh 30: wall

40: 기둥 40a: 중앙부 기둥40: pillar 40a: central pillar

40b: 측벽부 기둥 50: 상부 바닥판40b: side wall pillar 50: top bottom plate

60: 하부 바닥판 C: 콘크리트60: bottom plate C: concrete

G: 지반 H: 굴착공G: Ground H: Excavator

S: 지하 구조체 S: underground structure

본 발명은 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 및 그의 시공방법에 관한 것으로, 특히 지하 구조체를 형성할 때 주로 사용되는 강널말뚝과 현장타설 콘크리트를 이용하여 지하 구조체를 시공하는 방법에 관한 것이다. The present invention relates to an underground structure using a steel sheet pile and cast-in-place concrete, and a construction method thereof, and more particularly, to a method of constructing an underground structure using a steel sheet pile and cast-in-place concrete mainly used when forming an underground structure.

도 1은 종래의 지하 구조체를 시공하는 상태를 도시한 예시도로서, 시설물을 시공할 공간을 확보하기 위하여 가설토류벽(1)을 시공하고, 굴착공정을 거쳐 기초말뚝(2)을 시공하고, 상기 기초말뚝(2) 상에 하부슬래브(3)를 철근, 거푸집, 콘크리트로 시공한 후 벽체(4)와 상부슬래브(5)를 철근, 거푸집, 콘크리트로 시공하고, 되메우기, 포장 공정을 거친 후 차량을 통행시키는 상태를 도시한 도면이다.1 is an exemplary view showing a state of constructing a conventional underground structure, in order to secure a space for the installation of the construction of the temporary earth wall (1), the foundation pile (2) through the excavation process, After installing the lower slab 3 on the foundation pile 2 with reinforcing bars, formwork, and concrete, the wall 4 and the upper slab 5 are reinforced with reinforcing bars, formwork, and concrete. It is a figure which shows the state which passes through.

이 도면에 도시된 바와 같이, 건설공사에 있어서 대부분의 지하 구조체는 구조물을 형성하기 위한 가설토류벽(1) 공정, 구조물의 지지력 확보를 위한 기초말뚝(2) 공정, 지하 구조체를 형성하기 위한 철근조립 및 거푸집 조립공정, 콘크리트 타설 및 양생공정, 거푸집제거 공정, 되메우기 및 포장공정 등을 통하여 시공하여 왔다.As shown in this figure, most of the underground structures in construction work, the temporary earth wall (1) process for forming the structure, the foundation pile (2) process for securing the bearing capacity of the structure, the reinforcing bars to form the underground structure And formwork assembly, concrete pouring and curing, formwork removal, backfilling and packaging.

따라서, 상기한 바와 같은 종래의 지하 구조체를 위한 모든 공정의 공정관리가 까다롭고 공사기간이 매우 길어 장시간 교통혼잡을 유발시키는 문제가 있다. Therefore, the process management of all processes for the conventional underground structure as described above is difficult, and the construction period is very long, causing a long time traffic congestion.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, 지하 구조체 형성시 자주 사용되는 강널말뚝을 이용하여 지하 구조체를 시공하되, 현장타설 콘크리트를 강널말뚝 부위에 합성 설치하여 강널말뚝과 현장타설 콘크리트가 수평력과 수직력을 모두 분담하는 방법으로 시공이 간편하고 경제성이 뛰어난 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 및 그의 시공방법을 제공하는데 그 목적이 있다.Thus, the present invention was devised to solve the problems as described above, while constructing the underground structure using the steel sheet piles that are frequently used in the formation of the underground structure, by installing the cast-in-place concrete on the steel sheet piles, the steel sheet pile The purpose of this study is to provide the underground structure using the steel sheet pile and the cast-in-place concrete, and its construction method, which is easy to construct and economical by the method of sharing both horizontal and vertical forces.

상기한 목적을 달성하기 위한 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체는 지면에서 지중으로 소정의 깊이로 삽입되는 강널말뚝과; 상기 강널말뚝의 사이로 삽입되는 철근 조립망과; 상기 강널말뚝과 철근 조립망에 콘크리트가 타설 양생된 벽체 또는 기둥과; 상기 강널말뚝 상에 철근 배근 및 콘크리트가 타설 양생된 상부 바닥판과; 상기 벽체 또는 기둥의 하부에 철근 배근 및 콘크리트를 타설 양생된 하부 바닥판으로 구성됨을 특징으로 한다.Underground structure using a steel sheet pile and cast-in-place concrete according to the present invention for achieving the above object is a steel sheet pile inserted into the ground from the ground to a predetermined depth; A rebar assembly network inserted between the steel sheet piles; A wall or column in which concrete is poured into the steel sheet pile and the reinforcing steel assembly network; An upper bottom plate on which steel reinforcement and concrete are poured on the steel sheet pile; Characterized in that it consists of a lower bottom plate cured by reinforcing reinforcement and concrete in the lower portion of the wall or pillar.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 시공방법은 지면을 종방향 또는 횡방향으로 일정한 폭과 깊이로 굴착하여 굴착공을 형성하는 단계; 상기 굴착공에 소정의 길이를 갖는 강널말뚝을 연결하여 삽입하는 단계; 상기 강널말뚝 사이로 철근 조립망을 삽입하고, 그 내에 콘크리트를 타설 양생시켜 벽체 또는 기둥을 형성하는 단계; 상기 벽체 또는 기둥의 상부 지면을 폭방향으로 일정한 깊이를 굴착하는 단계; 상기 굴착공에 기설치된 강널말뚝의 두부를 정리하고, 상기 강널말뚝 두부상에 철근배근 및 콘크리트를 타설 양생시켜 상부 바닥판을 형성하는 단계; 상기 상부 바닥판상에 교통을 소통시키면서 벽체 또는 기둥의 지하를 굴착하는 단계; 상기 벽체 또는 기둥의 지하 굴착공의 하부에 철근배근 및 콘크리트를 타설 양생시켜 하부 바닥판을 형성하는 단계; 상기 벽체 또는 기둥을 미장정리함과 동시에 하부 바닥판상으로 교통을 소통시키는 단계로 이루어짐을 특징으로 한다.In addition, the underground structure construction method using a steel sheet pile and cast-in-place concrete according to the present invention for achieving the above object comprises the steps of excavating the ground to a predetermined width and depth in the longitudinal or transverse direction to form an excavation hole; Connecting and inserting a steel sheet pile having a predetermined length to the excavation hole; Inserting a reinforcing bar assembly network between the steel sheet piles and pouring concrete therein to form walls or columns; Excavating a predetermined depth in the width direction of the upper surface of the wall or column; Arranging the head of the steel sheet pile pre-installed in the excavation hole, and curing the reinforcement and concrete on the steel sheet pile head to form an upper bottom plate; Excavating the basement of the wall or column while communicating traffic on the upper floor plate; Forming a bottom base plate by curing reinforcing reinforcement and concrete in a lower portion of the underground excavation hole of the wall or column; Placing the wall or column and at the same time characterized in that the traffic made on the lower floor plate communication.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 2a 내지 2g는 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체를 시공하는 과정을 도시한 공정도이다.2a to 2g is a process diagram showing the process of constructing the underground structure using the steel sheet pile and cast-in-place concrete according to the present invention.

이들 도면에 도시된 바와 같이 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체는 지면에서 지중으로 소정의 깊이로 삽입되는 강널말뚝(10)과; 상기 강널말뚝(10)의 사이로 삽입되는 철근 조립망(20)과; 상기 강널말뚝(10)과 철근 조립망(20)에 콘크리트(C)가 타설 양생된 벽체(30) 또는 기둥(40)과; 상기 강널말뚝(10) 상에 철근 배근 및 콘크리트(C)가 타설 양생된 상부 바닥판(50)과; 상기 벽체(30) 또는 기둥(40)의 하부에 철근 배근 및 콘크리트(C)를 타설 양생된 하부 바닥판(60)으로 구성된다.As shown in these drawings, the underground structure using the steel sheet pile and cast-in-place concrete according to the present invention includes: a steel sheet pile 10 inserted into the ground at a predetermined depth; A rebar assembly network 20 inserted between the steel sheet piles 10; A wall 30 or a pillar 40 in which concrete (C) is poured into the steel sheet pile 10 and the rebar assembly network 20; An upper bottom plate 50 in which reinforcement and concrete C are poured onto the steel sheet pile 10; The bottom 30 of the reinforcement and concrete (C) in the lower portion of the wall 30 or the pillar 40 is cast.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 시공방법은 지면을 종방향 또는 횡방향으로 일정한 폭과 깊이로 굴착하여 연속적으로 굴착공(H)을 형성하는 단계; 상기 굴착공(H)에 소정의 길이를 갖는 강널말뚝(10)을 연결하여 삽입하는 단계; 상기 강널말뚝(10) 사이로 철근 조립망(20)을 삽입하고, 그 내에 콘크리트(C)를 타설하되,Underground structure construction method using the steel sheet pile and cast-in-place concrete according to the present invention having the configuration as described above is the step of excavating the ground to a predetermined width and depth in the longitudinal or transverse direction to continuously form the excavation hole (H) ; Connecting and inserting a steel sheet pile (10) having a predetermined length into the excavation hole (H); Insert the reinforcing bar assembly network 20 between the steel sheet pile 10, and cast concrete (C) therein,

굴착공(H) ①,③에 해당되는 벽체(30)는 굴착시 지반(G) 쪽에 철근 조립망(20)을 삽입하고, 콘크리트(C)를 타설하며, 굴착공(H)②에 해당되는 벽체(30)는 강널말뚝(10) 양측면 내측 공간부(12)에 철근 조립망(20)을 삽입하고, 그 내에 콘크리트(C)를 타설하여 벽체(30) 또는 기둥(40)을 형성하는 단계; The wall 30 corresponding to the excavation hole (H) ①, ③ insert the reinforcing bar assembly network 20 into the ground (G) side during the excavation, cast concrete (C), corresponding to the excavation hole (H) ② The wall 30 inserts the reinforcing bar assembly 20 into the inner space 12 of both sides of the steel sheet pile 10, and casts concrete C therein to form the wall 30 or the pillar 40. ;

상기 벽체(30) 또는 기둥(40)의 상부 지면을 폭방향으로 일정한 깊이를 굴착하는 단계; Excavating a predetermined depth in the width direction of the upper surface of the wall (30) or the pillar (40);

상기 굴착공(H)에 기설치된 강널말뚝(10)의 두부를 정리하되, 두부정리시 현장타설 콘크리트(C)의 철근부분이 후에 시공하는 상부 바닥판(50)과의 연결을 위해 강널말뚝(10) 보다 길게 위치시키고, 상기 강널말뚝(10) 두부 상에 철근을 배근하고 거푸집을 설치한 후, 콘크리트(C)를 타설 양생시켜 일정한 두께의 상부 바닥판(50)을 형성하는 단계; Arrange the head of the steel sheet pile (10) pre-installed in the excavation hole (H), the reinforcement portion of the site-pouring concrete (C) at the time of arranging the steel sheet pile (for connection with the upper floor plate 50) 10) placing longer and placing the reinforcing bar on the steel sheet pile 10 and installing the formwork, and then curing the concrete (C) to form an upper bottom plate (50) of a constant thickness;

상기한 바와 같은 단계를 지하 구조체(S)의 전 구간에 걸쳐 시공한다.The step as described above is constructed over the entire section of the underground structure (S).

이어서, 상기 상부 바닥판(50)상에 교통을 소통시키면서 벽체(30) 또는 기둥(40)의 시종점부 토사를 굴착, 반출하는 단계; Next, excavating and carrying out starting point soils of the wall 30 or the pillar 40 while communicating traffic on the upper bottom plate 50;

상기 벽체(30) 또는 기둥(40)의 지하 굴착공(H)의 하부에 철근배근 및 콘크리트(C)를 타설 양생시켜 하부 바닥판(60)을 형성하는 단계;Placing a reinforcement bar and concrete (C) in the lower portion of the underground excavation hole (H) of the wall (30) or the pillar (40) to form a lower bottom plate (60);

이어서, 상기한 강널말뚝(10)에 설치된 거푸집을 해체하고, 상기 벽체(30) 또는 기둥(40)을 미장정리함과 동시에 하부 바닥판(60)상으로 교통을 소통시키는 단계를 순차적으로 시행하여 지하 구조체(S)를 시공하는 것이다.Subsequently, the formwork installed in the steel sheet pile 10 is dismantled, the wall 30 or the pillar 40 is trimmed, and at the same time, the step of communicating traffic on the lower floor plate 60 is performed sequentially. It is to construct the structure (S).

여기서, 상기 강널말뚝(10)에는 콘크리트(C)가 타설되는 부분과 접하는 면에는 전단연결재를 부착시켜 콘크리트(C)와의 부착력을 높이도록 한다.Here, the steel sheet pile 10 is attached to the shear contact member on the surface in contact with the portion where the concrete (C) is placed to increase the adhesion to the concrete (C).

즉, 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 및 그의 시공방법은 지하 구조체(S) 형성시 자주 사용되는 강널말뚝(10)에 현장타설 콘크리트(C)를 합성 설치하여 강널말뚝(10)과 현장타설 콘크리트(C)가 수평력과 수직력을 모두 분담하는 구조 및 방법을 특징으로 한다.That is, the underground structure and the construction method using the steel sheet pile and cast-in-place concrete according to the present invention by installing the cast-in-place concrete (C) on the steel sheet pile (10) which is often used in the formation of the underground structure (S) 10) and cast-in-place concrete (C) are characterized by the structure and method of sharing both horizontal and vertical forces.

도 3a 내지 3e는 본 발명에 따른 지하구조체의 시공중 지반(G)과 접하는 벽체(30)를 시공하는 과정을 도시한 공정도이다.3A to 3E are process diagrams illustrating a process of constructing a wall 30 in contact with the ground G during construction of the underground structure according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체(S)의 벽체(30)는 지반(G)과 접하는 강널말뚝(10)의 일면 부분 내측 공간부(12)에만 철근 조립망(20)이 삽입되고, 그 철근 조립망(20)에 콘크리트(C)가 타설 양생된 구조이다.As shown in these drawings, the wall 30 of the underground structure (S) using the steel sheet pile and cast-in-place concrete according to the present invention is the inner space portion 12 of one side of the steel sheet pile 10 in contact with the ground (G) Only the reinforcing bar assembly network 20 is inserted, and the concrete (C) is poured into the reinforcing bar assembly network 20 is a structure.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 벽체(30) 시공은 지면을 종방향 또는 횡방향으로 일정한 폭과 깊이로 굴착하여 굴착공(H)을 형성하는 단계; 상기 굴착공(H)에 강널말뚝(10)을 연결하여 삽입하는 단계; 상기 강널말뚝(10)의 지반(G) 쪽 내측 공간부(12)에 철근 조립망(20)을 삽입하고, 그 내에 콘크리트(C)를 타설하여 벽체(30)를 형성하는 단계; 상기 강널말뚝(10)의 벽체(30) 쪽 지반(G)을 굴착함과 동시에 벽체(30)를 완성하는 단계를 순차적으로 시행하여 벽체(30)를 시공하는 것이다.Wall 30 construction according to the present invention made of a configuration as described above is the step of excavating the ground to a predetermined width and depth in the longitudinal or transverse direction to form an excavation hole (H); Inserting the steel sheet pile (10) into the excavation hole (H); Inserting the reinforcing bar assembly network 20 into the inner space portion 12 of the ground (G) side of the steel sheet pile (10), and pouring concrete (C) therein to form a wall (30); Excavating the ground (G) side of the wall 30 of the steel sheet pile (10) and at the same time to perform the step of completing the wall 30 to construct the wall (30).

여기서, 상기 벽체(30)는 지반(G)과 접하는 강널말뚝(10)의 일면 부분만 철근 조립망(20)을 삽입하고 콘크리트(C)를 타설 및 양생시켜 형성한다.Here, the wall 30 is formed by inserting the reinforcing bar assembly 20 only one side of the steel sheet pile 10 in contact with the ground (G) and placing and curing the concrete (C).

도 4a 내지 4e는 본 발명에 따른 지하구조체의 시공중 지반과 접하지 않는 벽체(30)의 양쪽 공간이 되는 부분을 시공하는 과정을 도시한 공정도이다.4A to 4E are process diagrams illustrating a process of constructing portions that become both spaces of the wall 30 that do not contact the ground during construction of the underground structure according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체(S)의 벽체(30)는 지반(G)과 접하지 않는 부분은 강널말뚝(10)의 양면 내측 공간부(12)에 철근 조립망(20)이 삽입되고, 그 철근 조립망(20)에 콘크리트(C)가 타설 양생된 구조이다.As shown in these drawings, the wall 30 of the underground structure (S) using the steel sheet pile and cast-in-place concrete according to the present invention is not in contact with the ground (G) is a double-sided inner space of the steel sheet pile (10) The reinforcing bar assembly network 20 is inserted into the part 12, and the concrete (C) is poured into the reinforcing bar assembly network 20, the structure.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 벽체(30) 시공은 지면을 종방향 또는 횡방향으로 일정한 폭과 깊이로 굴착하여 굴착공(H)을 형성하는 단계; 상기 굴착공(H)에 강널말뚝(10)을 연결하여 삽입하는 단계; 상기 강널말뚝(10)의 양측 내측 공간부(12)에 철근 조립망(20)을 삽입하고, 그 내에 콘크리트(C)를 타설하여 벽체(30)를 형성하는 단계; 상기 강널말뚝(10)의 벽체(30) 쪽 지반(G)을 굴착함과 동시에 벽체(30)를 완성하는 단계를 순차적으로 시행하여 지반(G)과 접하지 않는 양쪽이 공간이 되는 부분을 시공하는 것이다.Wall 30 construction according to the present invention made of a configuration as described above is the step of excavating the ground to a predetermined width and depth in the longitudinal or transverse direction to form an excavation hole (H); Inserting the steel sheet pile (10) into the excavation hole (H); Inserting reinforcing bars 20 into both side inner space portions 12 of the steel sheet piles 10 and pouring concrete therein to form walls 30; Excavating the ground (G) on the wall 30 side of the steel sheet pile (10) and at the same time perform the step of completing the wall 30 in order to construct a part where both sides do not contact the ground (G) becomes a space It is.

여기서, 상기 벽체(30)는 지반(G)과 접하지 않는 벽체(30)의 양측 내측 공간부(12)에만 철근 조립망(20)을 삽입하고 콘크리트(C)를 타설 및 양생시켜 형성한다.Here, the wall 30 is formed by inserting the reinforcing bar assembly 20 only in both inner space portion 12 of the wall 30 that is not in contact with the ground (G) and placing and curing the concrete (C).

도 5a는 본 발명에 따른 지하 구조체의 중앙부 기둥을 도시한 평면도이며, 도 5b는 본 발명에 따른 지하 구조체의 측벽부 기둥을 도시한 평면도이다,Figure 5a is a plan view showing a central pillar of the underground structure according to the present invention, Figure 5b is a plan view showing a side wall pillar of the underground structure according to the present invention,

이들 도면에 도시된 바와 같이 본 발명에 따른 지하 구조체(S)의 기둥(40)은 크게 중앙부 기둥(40a)과 측벽부 기둥(40b)으로 구분되게 시공하되, 상기 중앙부 기둥(40a)은 지반(G)의 굴착공(H)에 강널말뚝(10) 한 쌍을 서로 마주보는 상태로 육각형 단면 형상으로 하여 설치되고, 상기 한 쌍의 강널말뚝(10)의 내측과 각 강널말뚝(10)의 내측 공간부(12)의 양측 벽체(30) 쪽에 철근 조립망(20)이 설치되며, 그 내에 콘크리트(C)가 타설 양생된 구조이다.As shown in these drawings, the pillar 40 of the underground structure S according to the present invention is constructed to be largely divided into the central pillar 40a and the side wall pillar 40b, and the central pillar 40a is the ground ( G) Excavation hole (H) is installed in a hexagonal cross-sectional shape in a state in which a pair of steel sheet pile (10) facing each other, the inner side of the pair of steel sheet pile (10) and the inner side of each steel sheet pile (10) Reinforcing bar assembly network 20 is installed on both side walls 30 of the space portion 12, the concrete (C) is poured in the structure of the curing.

즉, 상기한 바와 같은 구조로 이루어진 지하 구조체(S)의 중앙부 기둥(40a)은 지반(G)의 굴착공(H)에 강널말뚝(10) 한 쌍을 서로 마주보는 상태로 하여 육각형 단면형상으로 하여 시공하고, 상기 한 쌍의 강널말뚝(10)의 내측과 각 강널말뚝(10)의 내측 공간부(12) 양측 벽체(30)에 철근 조립망(20)을 설치하고, 그 내에 콘크리트(C)를 타설하여 양생시켜 시공한다.That is, the central column (40a) of the underground structure (S) having the structure as described above is a hexagonal cross-sectional shape in a state in which a pair of steel pile piles (10) facing each other in the excavation hole (H) of the ground (G) The construction of the steel sheet piles 10, and the reinforcing bar assembly network 20 is installed in the inner space portion 12 both side walls 30 of each of the steel sheet pile 10, the concrete (C) ) And put it into curing.

또한, 상기 측벽부 기둥(40b)은 지반(G)의 굴착공(H)에 강널말뚝(10) 한 쌍을 서로 마주보는 상태로 하여 육각형 단면형상으로 하여 설치되고, 상기 한 쌍의 강널말뚝(10)의 내측과 각 강널말뚝(10)의 내측 공간부(12) 일측 지반(G)에 철근 조립망(20)이 설치되며, 그 내에 콘크리트(C)가 타설 양생된 구조이다.In addition, the side wall portion pillar (40b) is installed in a hexagonal cross-sectional shape in a state in which a pair of steel sheet piles 10 face each other in the excavation hole (H) of the ground (G), the pair of steel sheet piles ( 10) and the reinforcing bar assembly network 20 is installed in one side ground (G) of the inner space portion 12 of each steel sheet pile 10, the concrete (C) is poured in the structure.

즉, 상기한 바와 같은 구조로 이루어진 지하 구조체(S)의 측벽부 기둥(40b)은 지반(G)의 굴착공(H)에 강널말뚝(10) 한 쌍을 서로 마주보는 상태로 하여 육각형 단면형상으로 하여 시공하고, 상기 한 쌍의 강널말뚝(10)의 내측과 각 강널말뚝(10)의 내측 공간부(12) 일측 지반(G)에 철근 조립망(20)을 설치하고, 그 내에 콘크리트(C)를 타설 양생시켜 측벽부 기둥(40b)을 시공하는 것이다.That is, the side wall pillar 40b of the underground structure S having the structure as described above has a hexagonal cross-sectional shape in a state in which a pair of steel sheet piles 10 face each other in the excavation hole H of the ground G. In the construction, the reinforcing bar assembly network 20 is installed on the inner side of the pair of steel sheet piles 10 and the inner side space portion 12 of each steel sheet pile 10, and therein concrete ( C) is cast and cured to construct the side wall pillar 40b.

도 6a는 본 발명에 따른 지하 구조체의 기둥과 바닥판과의 연결상태를 도시한 정단면도이며, 도 6b는 본 발명에 따른 지하 구조체의 기둥과 바닥판과의 연결상태를 도시한 평단면도이다.Figure 6a is a front sectional view showing a connection state of the column and the bottom plate of the underground structure according to the present invention, Figure 6b is a plan sectional view showing a connection state of the column and the bottom plate of the underground structure according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 지하 구조체(S)는 가운데 부분에 중앙부 기둥(40a)이 위치되고, 상기 중앙부 기둥(40a)을 기준으로 좌우 측벽에 측벽부 기둥(40b)이 위치되며, 상기 중앙부 기둥(40a)과 측벽부 기둥(40b)을 가로질러 상부와 하부에 철근 배근 및 콘크리트(C)가 타설 양생된 상부 바닥판(50)과 하부 바닥판(60)으로 이루어진 구조이다.As shown in these figures, in the underground structure S according to the present invention, the central pillar 40a is located at the center portion, and the side wall pillar 40b is positioned at the left and right side walls based on the central pillar 40a. The upper bottom plate 50 and the lower bottom plate 60 are formed by reinforcing reinforcement and concrete C on the upper and lower sides of the central pillar 40a and the side wall pillar 40b. .

상기한 바와 같은 구조로 이루어진 본 발명에 따른 지하 구조체(S)는 강널말뚝과 현장타설 콘크리트를 이용하여 벽체(30) 또는 기둥(40)을 형성하고, 상기 벽체(30) 또는 기둥(40)의 상부 지면을 폭방향으로 일정한 깊이를 굴착한 후, 상기 굴착공(H)에 기설치된 강널말뚝(10)의 두부를 정리하고, 상기 강널말뚝(10) 두부상에 철근배근 및 콘크리트(C)를 타설 양생시켜 상부 바닥판(50)을 형성한 후, 상기 상부 바닥판(50)상에 교통을 소통시키면서 벽체(30) 또는 기둥(40)의 지하를 굴착하고, 상기 벽체(30) 또는 기둥(40)의 지하 굴착공(H)의 하부에 철근배근 및 콘크리트(C)를 타설 양생시켜 하부 바닥판(60)을 형성한 것이다.Underground structure (S) according to the present invention made of a structure as described above forms a wall 30 or a pillar 40 by using a steel sheet pile and cast-in-place concrete, of the wall 30 or the pillar 40 After excavating a predetermined depth in the width direction of the upper surface, arrange the head of the steel sheet pile (10) pre-installed in the excavation hole (H), reinforcement and concrete (C) on the head of the steel sheet pile (10) After pouring curing to form the upper bottom plate 50, while drilling traffic on the upper bottom plate 50 to excavate the basement of the wall 30 or pillar 40, the wall 30 or pillar ( Reinforcement of the reinforcement and concrete (C) in the lower portion of the underground excavation hole (H) of 40) is to form a lower bottom plate (60).

이상에서 설명한 바와 같이, 본 발명에 따른 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 및 그의 시공방법은 지하 구조체 형성시 자주 사용되는 강널말뚝과 현장타설 콘크리트를 이용하여 지하 구조체를 형성함으로써, 공사비가 저렴할 뿐만 아니라 구조적으로 강널말뚝과 현장타설 콘크리트가 지하 구조체에 가해지는 수평력과 수직력을 분담함으로써 구조적으로도 안정성을 기할 수 있는 이점이 있다.As described above, the underground structure using the steel sheet pile and cast-in-place concrete and its construction method according to the present invention by forming the underground structure using the steel sheet pile and cast-in-place concrete often used in the formation of the underground structure, construction cost will be low In addition, structurally, steel sheet piles and cast-in-place concrete share the horizontal and vertical forces applied to the underground structure, thereby providing structural stability.

Claims (12)

지면에서 지중으로 소정의 깊이로 삽입되는 강널말뚝(10)과; 상기 강널말뚝(10)의 사이로 삽입되는 철근 조립망(20)과; 상기 강널말뚝(10)과 철근 조립망(20)에 콘크리트(C)가 타설 양생된 벽체(30) 또는 기둥(40)과; 상기 강널말뚝(10) 상에 철근 배근 및 콘크리트(C)가 타설 양생된 상부 바닥판(50)과; 상기 벽체(30) 또는 기둥(40)의 하부에 철근 배근 및 콘크리트(C)를 타설 양생된 하부 바닥판(60)으로 구성되는 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체에 있어서,A steel sheet pile 10 inserted into the ground from the ground to a predetermined depth; A rebar assembly network 20 inserted between the steel sheet piles 10; A wall 30 or a pillar 40 in which concrete (C) is poured into the steel sheet pile 10 and the rebar assembly network 20; An upper bottom plate 50 in which reinforcement and concrete C are poured onto the steel sheet pile 10; In the underground structure using the steel sheet pile and the cast-in-place concrete composed of the bottom plate 60 is cured by reinforcing reinforcement and concrete (C) in the lower portion of the wall 30 or pillar 40, 상기 벽체(30)는 지반(G)과 접하는 부분은 강널말뚝(10)의 일면 부분 내측 공간부(12)에만 철근 조립망(20)이 삽입되고, 그 철근 조립망(20)에 콘크리트(C)가 타설 및 양생되며,The wall 30 is in contact with the ground (G), the reinforcing bar assembling 20 is inserted only in the inner space portion 12 of the one surface portion of the steel sheet pile 10, the concrete (C) in the rebar assembling network (20) ) Is poured and cured, 상기 벽체(30)는 지반(G)과 접하지 않는 부분에는 강널말뚝(10)의 양면 내측 공간부(12)에 철근 조립망(20)이 삽입되고, 그 철근 조립망(20)에 콘크리트(C)가 타설 및 양생되며,Wherein the wall 30 is not in contact with the ground (G), the reinforcing wire mesh 20 is inserted into both sides of the inner space portion 12 of the steel sheet pile 10, the concrete ( C) is poured and cured, 상기 강널말뚝(10)에는 그 표면에 전단연결재가 용접 결합되며,The steel sheet pile 10 is a shear connector is welded to its surface, 상기 기둥(40)은 지반(G)의 굴착공(H)에 강널말뚝(10) 한 쌍을 서로 마주보는 상태로 하여 육각형 단면형상으로 하여 설치되고, 상기 한 쌍의 강널말뚝(10)의 내측과 각 강널말뚝(10)의 내측 공간부(12)의 양측 벽체(30) 쪽에 철근 조립망(20)이 설치되며, 그 내에 콘크리트(C)를 타설 양생시켜 중앙부 기둥(40a)이 형성되며,The pillar 40 is installed in a hexagonal cross-sectional shape in a state in which a pair of steel sheet piles 10 face each other in the excavation hole H of the ground G, and is installed inside the pair of steel sheet piles 10. And the reinforcing bars 20 are installed on both side walls 30 of the inner space 12 of each steel sheet pile 10, in which the concrete (C) is poured and cured to form a central column (40a), 상기 기둥(40)은 지반(G)의 굴착공(H)에 강널말뚝(10) 한 쌍을 서로 마주보는 상태로 하여 육각형 단면형상으로 하여 설치되고, 상기 한 쌍의 강널말뚝(10)의 내측과 각 강널말뚝(10)의 내측 공간부(12) 일측 지반(G)에 철근 조립망(20)을 설치되며, 그 내에 콘크리트(C)를 타설 양생시켜 측벽부 기둥(40b)이 형성된 것을 특징으로 하는 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체. The pillar 40 is installed in a hexagonal cross-sectional shape in a state in which a pair of steel sheet piles 10 face each other in the excavation hole H of the ground G, and is installed inside the pair of steel sheet piles 10. And the reinforcing bar assembly network 20 is installed in one side ground (G) of the inner space part 12 of each steel sheet pile 10, and the concrete (C) is cast in it, characterized in that the side wall portion pillar (40b) is formed Underground structure using steel sheet pile and cast-in-place concrete. 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete 지면을 종방향 또는 횡방향으로 일정한 폭과 깊이로 굴착하여 굴착공(H)을 형성하는 단계; 상기 굴착공(H)에 소정의 길이를 갖는 강널말뚝(10)을 연결하여 삽입하는 단계; 상기 강널말뚝(10) 사이로 철근 조립망(20)을 삽입하고, 그 내에 콘크리트(C)를 타설 양생시켜 벽체(30) 또는 기둥(40)을 형성하는 단계; 상기 벽체(30) 또는 기둥(40)의 상부 지면을 폭방향으로 일정한 깊이를 굴착하는 단계; 상기 굴착공(H)에 기설치된 강널말뚝(10)의 두부를 정리하고, 상기 강널말뚝(10) 두부상에 철근배근 및 콘크리트(C)를 타설 양생시켜 상부 바닥판(50)을 형성하는 단계; 상기 상부 바닥판(50)상에 교통을 소통시키면서 벽체(30) 또는 기둥(40)의 지하를 굴착하는 단계; 상기 벽체(30) 또는 기둥(40)의 지하 굴착공(H)의 하부에 철근배근 및 콘크리트(C)를 타설 양생시켜 하부 바닥판(60)을 형성하는 단계; 상기 벽체(30) 또는 기둥(40)을 미장정리함과 동시에 하부 바닥판(60)상으로 교통을 소통시키는 단계로 이루어지는 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 시공방법에 있어서,Excavating the ground to a predetermined width and depth in the longitudinal or transverse direction to form an excavation hole (H); Connecting and inserting a steel sheet pile (10) having a predetermined length into the excavation hole (H); Inserting the reinforcing bar assembly network 20 between the steel sheet piles 10 and pouring concrete (C) therein to form walls 30 or pillars 40; Excavating a predetermined depth in the width direction of the upper surface of the wall (30) or the pillar (40); Arranging the head of the steel sheet pile (10) pre-installed in the excavation hole (H), and curing the reinforcement and concrete (C) on the steel sheet pile (10) head to form an upper bottom plate (50) ; Digging the basement of the wall (30) or the pillar (40) while communicating traffic on the upper base plate (50); Placing a reinforcement bar and concrete (C) in the lower portion of the underground excavation hole (H) of the wall (30) or the pillar (40) to form a lower bottom plate (60); In the construction method of the underground structure using the steel sheet piles and cast-in-place concrete, which comprises the step of tidying the wall 30 or the column 40 and communicating traffic on the bottom plate 60, 상기 벽체(30)를 형성하는 경우에는 지반(G)과 접하는 강널말뚝(10)의 일면 부분만 철근 조립망(20)을 삽입하고, 그 내에 콘크리트(C)를 타설 및 양생시켜 지반(G)과 접하는 벽체(30)를 시공하며,When the wall 30 is formed, the reinforcing bar assembly 20 is inserted into only one surface portion of the steel sheet pile 10 in contact with the ground G, and the concrete C is poured and cured thereinto the ground G. Constructing the wall (30) in contact with, 상기 벽체(30)를 형성하는 경우에는 강널말뚝(10)의 양면 내측 공간부(12)에 철근 조립망(20)을 삽입하고, 그 내에 콘크리트(C)가 타설 양생시켜 지반(G)과 접하지 않는 양쪽이 공간이 되는 부분을 시공하며,In the case of forming the wall 30, the reinforcing bar assembly 20 is inserted into the double-sided inner space 12 of the steel sheet pile 10, and concrete (C) is poured and cured in contact with the ground (G). Construct the part where both sides do not become space, 상기 강널말뚝(10)은 콘크리트(C)가 타설되는 부분에 전단연결재를 부착 설치하며,The steel sheet pile 10 is installed by attaching a shear connector to the portion where the concrete (C) is poured, 상기 기둥(40)은 지반(G)의 굴착공(H)에 강널말뚝(10) 한 쌍을 서로 마주보는 상태로 하여 육각형 단면형상으로 하여 시공하고, 상기 한 쌍의 강널말뚝(10)의 내측과 각 강널말뚝(10)의 내측 공간부(12) 양측 벽체(30)에 철근 조립망(20)을 설치하고, 그 내에 콘크리트(C)를 타설 양생시켜 중앙부 기둥(40a)을 시공하며,The pillar 40 is constructed in a hexagonal cross-sectional shape in a state in which a pair of steel sheet piles 10 face each other in the excavation hole H of the ground G, and is constructed inside the pair of steel sheet piles 10. And installing the reinforcing bar assembly network 20 in the inner space 12 of each of the steel sheet piles 10 on both side walls 30, and casting the concrete (C) therein to construct the central column 40a, 상기 기둥(40)은 지반(G)의 굴착공(H)에 강널말뚝(10) 한 쌍을 서로 마주보는 상태로 하여 육각형 단면형상으로 하여 시공하고, 상기 한 쌍의 강널말뚝(10)의 내측과 각 강널말뚝(10)의 내측 공간부(12) 일측 지반(G)에 철근 조립망(20)을 설치하고, 그 내에 콘크리트(C)를 타설 양생시켜 측벽부 기둥(40b)을 시공함을 특징으로 하는 강널말뚝과 현장타설 콘크리트를 이용한 지하 구조체 시공방법. The pillar 40 is constructed in a hexagonal cross-sectional shape in a state in which a pair of steel sheet piles 10 face each other in the excavation hole H of the ground G, and is constructed inside the pair of steel sheet piles 10. In addition, the reinforcing bar assembly network 20 is installed in one side ground G of the inner space 12 of each steel sheet pile 10, and the concrete C is poured therein to construct the side wall pillar 40b. Underground structure construction method using steel sheet pile and cast-in-place concrete. 삭제delete 삭제delete 삭제delete 삭제delete 삭제delete
KR1020050081508A 2005-09-02 2005-09-02 The underground structure and it's construction method is using sheet pile and cast in a place concrete KR100562686B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050081508A KR100562686B1 (en) 2005-09-02 2005-09-02 The underground structure and it's construction method is using sheet pile and cast in a place concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050081508A KR100562686B1 (en) 2005-09-02 2005-09-02 The underground structure and it's construction method is using sheet pile and cast in a place concrete

Publications (1)

Publication Number Publication Date
KR100562686B1 true KR100562686B1 (en) 2006-03-23

Family

ID=37179864

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050081508A KR100562686B1 (en) 2005-09-02 2005-09-02 The underground structure and it's construction method is using sheet pile and cast in a place concrete

Country Status (1)

Country Link
KR (1) KR100562686B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118564A (en) * 2017-12-01 2018-06-05 中铁二院工程集团有限责任公司 A kind of pressure type box High Speed Railway Subgrade and construction method
KR101902786B1 (en) * 2017-03-29 2018-10-01 유병훈 Under ground structure construction method using composite sheet pile and under ground structure therewith
CN109338986A (en) * 2018-11-21 2019-02-15 交通运输部天津水运工程科学研究所 Cross sheet pile ecotype groynes

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101902786B1 (en) * 2017-03-29 2018-10-01 유병훈 Under ground structure construction method using composite sheet pile and under ground structure therewith
CN108118564A (en) * 2017-12-01 2018-06-05 中铁二院工程集团有限责任公司 A kind of pressure type box High Speed Railway Subgrade and construction method
CN108118564B (en) * 2017-12-01 2023-09-22 中铁二院工程集团有限责任公司 Pressure type box type high-speed railway roadbed structure and construction method
CN109338986A (en) * 2018-11-21 2019-02-15 交通运输部天津水运工程科学研究所 Cross sheet pile ecotype groynes

Similar Documents

Publication Publication Date Title
KR102102919B1 (en) Retaining wall and construction method thereof
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
KR20080077721A (en) The method of constructing bloclk for wall
KR100562686B1 (en) The underground structure and it's construction method is using sheet pile and cast in a place concrete
KR20110096339A (en) Construction method of undergroud structure using phc pile
KR100673475B1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
KR100824713B1 (en) Ledge type revetment using a pc wall plate and construction method thereof
KR20130021952A (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
KR101282770B1 (en) Precast straight wall foundation and construction method therefor
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
JP3760304B2 (en) Building foundation construction method
KR20120122024A (en) Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts.
KR101159097B1 (en) Precast abutment for longitudinal continuous connection and construction method therefor
JP2012031678A (en) Foundation for structure and method for constructing the same
KR200420394Y1 (en) Precast concrete block for cantilever retaining wall
JP6860895B2 (en) Retaining wall and its construction method
KR20090042395A (en) Retainning wall and its construction method
KR101306626B1 (en) Retaining wall using block and constructing method thereof
KR20110034831A (en) Method for non excavated excavating construction using steel pipe and steel pipe with hole
KR101524302B1 (en) Construction method for underground structure without temporary structure
JPH0657768A (en) Retaining wall structure and working method thereof
KR101516746B1 (en) Construction method for girder and construction method for underground structure without temporary structure using the same
KR20150004996A (en) Construction Method of Underground Structure using Composite Wale
KR102426192B1 (en) File fof retaining wall and construction method using file
JP5480745B2 (en) Reinforcement method for existing foundations for structures

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee