KR102426192B1 - File fof retaining wall and construction method using file - Google Patents

File fof retaining wall and construction method using file Download PDF

Info

Publication number
KR102426192B1
KR102426192B1 KR1020210178395A KR20210178395A KR102426192B1 KR 102426192 B1 KR102426192 B1 KR 102426192B1 KR 1020210178395 A KR1020210178395 A KR 1020210178395A KR 20210178395 A KR20210178395 A KR 20210178395A KR 102426192 B1 KR102426192 B1 KR 102426192B1
Authority
KR
South Korea
Prior art keywords
core beam
wall
core
concrete
walls
Prior art date
Application number
KR1020210178395A
Other languages
Korean (ko)
Inventor
남궁부학
Original Assignee
남궁부학
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 남궁부학 filed Critical 남궁부학
Priority to KR1020210178395A priority Critical patent/KR102426192B1/en
Application granted granted Critical
Publication of KR102426192B1 publication Critical patent/KR102426192B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Retaining Walls (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a construction method of a retaining wall installed to prevent collapse of the ground when constructing an underground structure of architectural and civil engineering structures, and to a new type of pile used when constructing such retaining wall. According to the present invention, provided are a pile for a retaining wall and a construction method thereof, which can build strong and stable retaining walls, such as allowing concrete to be filled without material separation due to groundwater, by realizing a new construction method of inserting a hollow core beam into a casing and then lowering a tremie pipe of a mobile concrete pump into the core beam to the bottom of the casing so that the concrete rises up both inside and outside the core beam from the bottom of the casing.

Description

흙막이 벽체 파일 및 시공방법{FILE FOF RETAINING WALL AND CONSTRUCTION METHOD USING FILE}Retaining wall file and construction method {FILE FOF RETAINING WALL AND CONSTRUCTION METHOD USING FILE}

본 발명은 흙막이 벽체 파일 및 시공방법에 관한 것으로서, 더욱 상세하게는 건축 및 토목 구조물의 지하 구조체 구축 시 지반의 붕괴를 방지하기 위해 설치되는 흙막이 벽체를 시공하는 방법과 이러한 흙막이 벽체 시공 시에 사용되는 새로운 형태의 파일에 관한 것이다. The present invention relates to a retaining wall pile and a construction method, and more particularly, to a method for constructing a retaining wall installed to prevent the collapse of the ground when constructing an underground structure of a building and civil engineering structure, and a method for constructing such a retaining wall. It's about a new type of file.

일반적으로 흙막이 벽체는 건축 및 토목 구조물의 지하 구조체 시공 시 지반의 붕괴를 방지하기 위해 설치되는 임시 구조물로서, 이러한 흙막이 벽체는 토압과 수압 등의 측압에 대해 저항하고 주변의 지반 침하를 방지함과 더불어 인접 구조물을 보호하는 역할을 한다. In general, retaining walls are temporary structures installed to prevent the collapse of the ground during the construction of underground structures of buildings and civil engineering structures. These retaining walls resist lateral pressures such as earth pressure and water pressure and prevent subsidence of the surrounding ground. It serves to protect adjacent structures.

즉, 흙막이 벽체는 지반굴착 시 공사현장 주변의 토사나 지하수의 유입을 막으면서 토압 및 수압 등의 측압에 저항하는 가설 구조물이다.That is, the retaining wall is a temporary structure that resists lateral pressure such as earth pressure and water pressure while preventing the inflow of soil or groundwater around the construction site during excavation.

이와 같은 흙막이 벽체는 각종 지보공 등을 포함하고, 흙막이 벽체는 굴착공사에 있어서 토사의 붕괴를 막기 위해 굴착면에 설치된다. Such a retaining wall includes various support holes and the like, and the retaining wall is installed on the excavation surface to prevent the collapse of soil in the excavation work.

최근 도심지에서 시공되는 건축물들은 높은 지가와 주차 공간 확보 등의 이유로 지하구조물의 깊이와 규모가 점점 대형화되고 있다.In recent years, the depth and scale of underground structures for buildings constructed in downtown areas are increasing due to high land prices and securing parking spaces.

이에 따라, 대규모 지반굴착 및 흙막이 벽체의 중요성이 커지게 되었다.Accordingly, the importance of large-scale excavation and retaining walls has grown.

보통 흙막이 벽체는 벽체를 구성하는 재료와 지보공의 형식 등에 따라 크게 엄지말뚝 및 토류판, 널말뚝, 주열식벽, 지하연속벽식 흙막이 공법들로 구분된다.In general, retaining walls are largely divided into thumb piles, earth plates, board piles, columnar walls, and underground continuous wall retaining methods according to the materials constituting the wall and the type of support hole.

최근에는 흙막이 공법 중 H-빔과 철근을 콘크리트의 보강재로 사용하여 주열식 벽체를 형성하는 Cast-In-Place Concrete Pile(CIP) 공법이 주로 사용된다. Recently, among the retaining methods, the Cast-In-Place Concrete Pile (CIP) method is mainly used to form a cast-in-place wall using H-beams and reinforcing bars as reinforcing materials for concrete.

이렇게 CIP 공법으로 형성된 벽체는 보강재의 사용으로 인해 측압에 대한 강성이 확보됨에 따라 벽체 내에 발생하는 변위가 크지 않아 주변지반에 미치는 영향이 작다. The wall formed by the CIP method has a small effect on the surrounding ground because the displacement generated in the wall is not large as rigidity against lateral pressure is secured due to the use of the reinforcing material.

따라서, 인접대지까지 근접시공이 가능하고 특수장비가 필요 없으며 소음과 진동이 작아 도심지에 적합한 장점이 있는 등 현재 대부분의 굴착 시공 시에 CIP 공법을 적용하고 있는 추세이다. Therefore, the CIP method is currently being applied to most of the excavation works, as it is possible to construct close to the adjacent site, does not require special equipment, and has the advantage of being suitable for urban areas due to its low noise and vibration.

이와 같은 CIP 공법은 가설 흙막이 공법으로 케이싱을 설치한 후, H-빔이나 철근망을 삽입하고, 콘크리트를 타설하는 방법으로 시공되는데, 현장에서 콘크리트를 타설하기 전에 케이싱 속에 많은 지하수가 유입되어 콘크리트 타설에 어려움이 있다. This CIP method is constructed by installing a casing as a temporary retaining method, then inserting an H-beam or rebar mesh, and pouring concrete. there are difficulties in

즉, 기존에는 케이싱 안에 지하수가 많이 유입되어 있음에도 불구하고 H-빔 또는 철근망의 간섭으로 인해 레미콘 트래미관을 케이싱 하단까지 내리지 못하고 케이싱 상단에 위치시킨 상태에서 위에서부터 아래로 콘크리트를 떨어뜨려서 케이싱 내부에 채울 수 밖에 없고, 이로 인해 콘크리트가 지하수에 희석되어 시멘트와 모래 및 자갈이 분리되면서 시멘트는 케이싱 밖으로 흘러나가고 모래, 자갈만 케이싱 속에 남게 되면서 흙막이 벽체가 부실해지는 문제점이 있다. That is, despite the fact that a lot of groundwater flows into the casing in the past, the ready-mixed concrete trampoline could not be lowered to the bottom of the casing due to the interference of the H-beam or reinforcing bar. As the concrete is diluted with groundwater and the cement, sand and gravel are separated, the cement flows out of the casing and only the sand and gravel remain in the casing, resulting in poor retaining wall.

공개특허공보 제10-2016-0025242호Laid-Open Patent Publication No. 10-2016-0025242 등록특허공보 제10-2075939호Registered Patent Publication No. 10-2075939 등록특허공보 제10-2228553호Registered Patent Publication No. 10-2228553 등록특허공보 제10-2325623호Registered Patent Publication No. 10-2325623

따라서, 본 발명은 이와 같은 점을 감안하여 안출한 것으로서, 케이싱의 내부에 중공의 코어빔을 삽입한 후에 코어빔 안으로 펌프카의 트래미관을 케이싱 하단까지 내린 상태에서 케이싱 하단부터 콘크리트나 몰탈이 코어빔 내측과 외측에 함께 위로 차오르도록 하는 새로운 시공방법을 구현함으로써, 지하수로 인한 재료 분리없이 콘크리트나 몰탈이 채워지도록 할 수 있는 등 견고하고 안정적인 흙막이 벽체를 구축할 수 있는 흙막이 벽체 파일 및 시공방법을 제공하는데 그 목적이 있다. Therefore, the present invention has been devised in view of this point, and after inserting the hollow core beam into the casing, the tramway pipe of the pump car is lowered to the bottom of the casing into the core beam, and the concrete or mortar core beam is removed from the bottom of the casing. By implementing a new construction method that fills up both the inside and the outside, concrete or mortar can be filled without material separation due to groundwater. Its purpose is to provide

상기 목적을 달성하기 위하여 본 발명에서 제공하는 흙막이 벽체 파일은 다음과 같은 특징이 있다. In order to achieve the above object, the retaining wall pile provided by the present invention has the following characteristics.

상기 흙막이 벽체 파일은 흙막이 벽체의 시공 시 케이싱 내부에 삽입되어 콘크리트와 함께 벽체로 구축되는 것으로서, 내부가 비어 있는 관 형태의 코어빔으로 이루어지게 되고, 상기 코어빔의 코어빔 벽체에는 코어빔 내측에 채워지는 콘크리트가 코어빔 외측으로 빠져나갈 수 있도록 하는 다수 개의 관통홀이 형성되어, 코어빔의 내부에 채워지는 콘크리트가 관통홀을 통해 코어빔의 외부로 빠져나가도록 함으로써 케이싱의 하단에서부터 위로 콘크리트가 차오르면서 채워지도록 한 것이 특징이다. The retaining wall pile is inserted into the casing during construction of the retaining wall and constructed as a wall together with concrete, and is made of a hollow tube-shaped core beam, and the core beam wall of the core beam has a core beam inside. A plurality of through-holes are formed to allow the concrete to be filled out to the outside of the core beam, and the concrete to be filled in the core beam passes through the through hole to the outside of the core beam. It is characterized by filling as it fills.

여기서, 상기 코어빔은 4개의 코어빔 벽체를 가지는 사각단면 형태의 관으로 이루어질 수 있다. Here, the core beam may be formed of a tube having a rectangular cross-section having four core beam walls.

그리고, 상기 코어빔의 코어빔 벽체에 형성되는 관통홀은 4개의 코어빔 벽체 중 보강빔측과 접하는 앞쪽 1개의 코어빔 벽체를 제외한 나머지 3개의 코어빔 벽체에 형성될 수 있고, 이때의 관통홀은 코어빔의 길이 방향을 따라 일정간격으로 배치되고, 양쪽 코어빔 벽체에 형성되는 관통홀과 뒷쪽 코어빔 벽체에 형성되는 관통홀은 서로 위아래로 엇갈리게 배치될 수 있다. In addition, the through-holes formed in the core beam wall of the core beam may be formed in the remaining three core beam walls except for the front one core beam wall in contact with the reinforcing beam side among the four core beam walls. They are arranged at regular intervals along the longitudinal direction of the core beam, and the through-holes formed in both the core-beam walls and the through-holes formed in the rear core-beam wall may be alternately arranged up and down.

이러한 코어빔이 가지는 4개의 코어빔 벽체 중 앞쪽의 코어빔 벽체는 나머지 3개의 코어빔 벽체에 비해 상대적으로 두꺼운 두께를 가질 수 있다. Among the four core beam walls of such a core beam, the front core beam wall may have a relatively thicker thickness than the other three core beam walls.

바람직한 실시예로서, 상기 코어빔에는 앞쪽 코어빔 벽체의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되거나, 또는 앞쪽과 뒷쪽 코어빔 벽체의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되는 플랜지부가 형성될 수 있다. As a preferred embodiment, the core beam may be provided with flange portions extending sideways with a predetermined width along the edge of the front core beam wall, or extending sideways with a predetermined width along the edges of the front and rear core beam walls.

한편, 상기 목적을 달성하기 위하여 본 발명에서 제공하는 흙막이 벽체 시공방법은 다음과 같은 특징이 있다. On the other hand, the retaining wall construction method provided in the present invention in order to achieve the above object has the following characteristics.

상기 흙막이 벽체 시공방법은 CIP 공법으로 흙막이 벽체를 시공하는 방법으로서, 지반 천공 후 케이싱을 삽입하는 제1단계와, 상기 케이싱의 내부에 속이 비어 있는 관 형태로 이루어짐과 더불어 코어빔 벽체에는 다수 개의 관통홀이 형성되어 있는 코어빔을 삽입하는 제2단계와, 상기 코어빔이 삽입되어 있는 케이싱의 내부에 콘크리트를 타설하는 제3단계를 포함한다. The retaining wall construction method is a method of constructing a retaining wall by the CIP method, a first step of inserting a casing after drilling the ground, and a hollow tube shape inside the casing, and a plurality of penetrations in the core beam wall A second step of inserting a core beam having a hole formed therein, and a third step of pouring concrete into the casing into which the core beam is inserted.

특히, 상기 제3단계에서는 펌프카의 트래미관을 코어빔의 내부를 통해 케이싱의 하단까지 내린 상태에서 트래미관을 단계적으로 위로 올리면서 콘크리트를 타설하여, 콘크리트가 아래쪽에서부터 윗쪽으로 차오르도록 하면서 콘크리트를 타설하되, 코어빔의 내부에 채워지는 콘크리트가 관통홀을 통해 코어빔의 외부로 빠져나가도록 하여 케이싱의 하단에서부터 위로 콘크리트가 차오르면서 채워지도록 하면서 타설하는 것이 특징이다. In particular, in the third step, in a state in which the tramway pipe of the pump car is lowered to the lower end of the casing through the inside of the core beam, concrete is poured while raising the tramway pipe upward step by step, and the concrete is poured from the bottom to the top. However, it is characterized by pouring while allowing the concrete to be filled inside the core beam to escape to the outside of the core beam through the through hole so that the concrete fills up from the bottom of the casing to the top.

여기서, 상기 제2단계에서 사용하는 코어빔은 4개의 코어빔 벽체를 가지는 사각단면 형태의 관으로 이루어질 수 있다. Here, the core beam used in the second step may be made of a tube having a rectangular cross-section having four core beam walls.

그리고, 상기 제2단계에서 사용하는 코어빔의 코어빔 벽체에 형성되는 관통홀은 4개의 코어빔 벽체 중 보강빔측과 접하는 앞쪽 1개의 코어빔 벽체를 제외한 나머지 3개의 코어빔 벽체에 형성될 수 있으며, 이렇게 제2단계에서 사용하는 코어빔의 코어빔 벽체에 형성되는 관통홀은 관통홀은 코어빔의 길이 방향을 따라 일정간격으로 배치되고, 양쪽 코어빔 벽체에 형성되는 관통홀과 뒷쪽 코어빔 벽체에 형성되는 관통홀은 서로 위아래로 엇갈리게 배치될 수 있다. And, the through hole formed in the core beam wall of the core beam used in the second step may be formed in the remaining three core beam walls except for the front one core beam wall in contact with the reinforcing beam side among the four core beam walls, , In this way, the through holes formed in the core beam wall of the core beam used in the second step are arranged at regular intervals along the length direction of the core beam, and the through holes formed in both core beam walls and the rear core beam wall The through-holes formed in the may be alternately disposed above and below each other.

이러한 제2단계에서 사용하는 코어빔이 가지는 4개의 코어빔 벽체 중 앞쪽의 코어빔 벽체는 나머지 3개의 코어빔 벽체에 비해 상대적으로 두꺼운 두께를 가질 수 있다. Among the four core beam walls of the core beam used in this second step, the front core beam wall may have a relatively thicker thickness than the remaining three core beam walls.

바람직한 실시예로서, 상기 제2단계에서 사용하는 코어빔에는 앞쪽 코어빔 벽체의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되거나, 또는 앞쪽과 뒷쪽 코어빔 벽체의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되는 플랜지부가 형성될 수 있다. As a preferred embodiment, the core beam used in the second step has flanges extending sideways with a predetermined width along the edge of the front core beam wall, or extending sideways with a predetermined width along the edges of the front and rear core beam walls. An addition may be formed.

본 발명에서 제공하는 흙막이 벽체 파일 및 시공방법은 다음과 같은 효과가 있다. The retaining wall pile and construction method provided by the present invention has the following effects.

첫째, 케이싱의 내부에 중공의 코어빔을 삽입하고, 코어빔 안으로 펌프카의 트래미관을 케이싱 하단까지 내린 후, 케이싱 하단에서부터 콘크리트가 위로 차오르도록 하는 새로운 시공방법과 새로운 형태의 파일(코어빔)을 적용함으로써, 지하수로 인한 재료 분리없이 콘크리트가 채워지도록 할 수 있는 등 견고하고 안정적인 흙막이 벽체를 구축할 수 있는 효과가 있다. First, a new construction method and a new type of pile (core beam) that inserts a hollow core beam into the casing, lowers the tramway tube of the pump car into the core beam to the bottom of the casing, and allows the concrete to fill up from the bottom of the casing By applying this, there is an effect that it is possible to build a solid and stable retaining wall, such as allowing concrete to be filled without separation of materials due to groundwater.

둘째, 흙막이 벽체의 안쪽으로 설치되는 보강빔측과 연결되는 부분의 두께를 보강한 코어빔을 적용함으로써, 보강빔이 견고한 지지력을 발휘할 수 있는 등 보강빔과 흙막이 벽체를 포함하는 가설 구조물의 전체적인 안정화를 확보할 수 있는 효과가 있다. Second, by applying a core beam that reinforces the thickness of the part connected to the reinforcing beam installed inside the retaining wall, the reinforcing beam can exert a strong bearing capacity. There is an achievable effect.

셋째, 기존의 철근망을 대신하여 코어빔으로 대체 적용함으로써, 시공이 용이할 뿐만 아니라 공기 단축이 가능하고, 현장에서의 작업성을 향상시킬 수 있는 효과가 있다. Third, by replacing the existing reinforcing bar network with a core beam, not only construction is easy, but also the construction period can be shortened, and workability in the field can be improved.

도 1 내지 도 4는 본 발명의 다양한 실시예에 따른 흙막이 벽체 파일을 나타내는 사시도
도 5 내지 도 7은 본 발명의 다양한 실시예에 따른 흙막이 벽체 파일의 시공상태를 나타내는 사시도
1 to 4 are perspective views showing a retaining wall pile according to various embodiments of the present invention;
5 to 7 are perspective views showing the construction state of the retaining wall pile according to various embodiments of the present invention;

이하, 첨부한 도면을 참조하여 본 발명을 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 4는 본 발명의 다양한 실시예에 따른 흙막이 벽체 파일을 나타내는 사시도이다. 1 to 4 is a perspective view showing a retaining wall pile according to various embodiments of the present invention.

도 1 내지 도 3에 도시한 바와 같이, 상기 흙막이 벽체 파일은 흙막이 벽체의 시공 시 케이싱(10)의 내부에 삽입되어 콘크리트(11)와 함께 벽체(12)로 시공되는 코어빔(13)을 포함한다. 1 to 3, the retaining wall pile is inserted into the inside of the casing 10 when the retaining wall is constructed and constructed as a wall 12 together with the concrete 11. It includes a core beam 13. do.

상기 코어빔(13)은 내부가 비어 있는 관 형태를 이루는 금속 소재의 코어빔(13)으로 이루어지게 된다. The core beam 13 is made of a core beam 13 made of a metal material having a hollow tube shape.

예를 들면, 상기 코어빔(13)은 4개의 코어빔 벽체(14)를 가지는 사각단면 형태의 사각관으로 이루어질 수 있게 된다. For example, the core beam 13 may be formed of a rectangular tube having a rectangular cross-section having four core beam walls 14 .

여기서, 상기 코어빔(13)은 사각관 형태 뿐만 아니라 원형, 다각형 등의 형태로도 이루어질 수 있음은 물론이다. Here, of course, the core beam 13 may be formed not only in the shape of a square tube, but also in the shape of a circle, a polygon, or the like.

이러한 코어빔(13)은 금형을 이용하여 일체형으로 제작할 수 있거나, 사출 또는 압출 방식으로 제작할 수 있거나, 여러 개의 길다란 철판을 용접으로 이어 붙힌 형태로 제작할 수 있거나, 1개의 길다란 철판과 1개의 절곡형 철판을 용접으로 이어 붙힌 형태로 제작할 수 있다. Such a core beam 13 may be manufactured integrally using a mold, may be manufactured by injection or extrusion, may be manufactured in the form of several long iron plates connected by welding, or one long iron plate and one bent type It can be manufactured in the form of connecting steel plates by welding.

이렇게 코어빔(13)의 내부가 비어있게 되므로서 펌프카의 트래미관이 아무런 간섭을 받지 않고 코어빔(13)의 내측을 통해 코어빔 하단부, 즉 케이싱(10)의 하단부까지 들어갈 수 있게 되며, 결국 트래미관을 이용하여 콘크리트(11)를 타설할 때 케이싱(10)의 하단쪽에서부터 콘크리트(11)를 주입하게 되면, 이때의 콘크리트(11)는 케이싱(10)의 바닥쪽에서부터 윗쪽으로 차오르면서 채워질 수 있게 된다. As the inside of the core beam 13 becomes empty in this way, the tramway tube of the pump car can enter through the inner side of the core beam 13 to the lower end of the core beam, that is, the lower end of the casing 10 without any interference. When the concrete 11 is poured using the tramway pipe, when the concrete 11 is poured from the lower end of the casing 10, the concrete 11 at this time is filled up from the bottom of the casing 10 to the top. can be filled.

특히, 상기 코어빔(13)의 코어빔 벽체(14)에는 코어빔 내측에 채워지는 콘크리트(11)가 코어빔 외측으로 빠져나갈 수 있도록 하는 다수 개의 관통홀(15)이 형성된다. In particular, a plurality of through holes 15 are formed in the core beam wall 14 of the core beam 13 through which the concrete 11 filled inside the core beam can escape to the outside of the core beam.

이때, 상기 관통홀(15)은 원형의 홀 형태 등으로 이루어질 수 있게 된다. At this time, the through hole 15 may be formed in a circular hole shape or the like.

이에 따라, 상기 코어빔(13)의 내부에 채워지는 콘크리트(11)가 관통홀(15)을 통해 코어빔(13)의 외부, 즉 코어빔(13)의 외면과 케이싱(10)의 내면 사이의 공간으로 빠져나갈 수 있게 되고, 결국 케이싱(10)의 내부에는 케이싱 하단에서부터 위로 콘크리트(11)가 차오르면서 채워질 수 있게 된다. Accordingly, the concrete 11 filled in the inside of the core beam 13 passes through the through hole 15 to the outside of the core beam 13 , that is, between the outer surface of the core beam 13 and the inner surface of the casing 10 . It is possible to escape into the space of the , and eventually the inside of the casing 10 can be filled with the concrete 11 from the bottom of the casing to the top.

그리고, 상기 코어빔(13)의 코어빔 벽체(14)에 형성되는 관통홀(15)은 4개의 코어빔 벽체(14) 중 보강빔측과 접하는 앞쪽 1개의 코어빔 벽체(14)를 제외한 나머지 3개의 코어빔 벽체(14)에 형성될 수 있게 된다. In addition, the through-holes 15 formed in the core beam wall 14 of the core beam 13 are the remaining three except for the front one core beam wall 14 in contact with the reinforcing beam side among the four core beam walls 14 . It can be formed in the core beam wall 14 .

즉, 상기 관통홀(15)은 앞쪽을 제외한 양옆쪽과 뒷쪽의 코어빔 벽체(14)에 형성될 수 있게 된다. That is, the through hole 15 can be formed in the core beam wall 14 on both sides and the rear side except for the front side.

바람직한 실시예로서, 상기 관통홀(15)은 코어빔(13)의 길이 방향을 따라 일정간격으로 배치될 수 있게 된다.As a preferred embodiment, the through-holes 15 may be disposed at regular intervals along the longitudinal direction of the core beam 13 .

이때, 양쪽 코어빔 벽체(14)에 형성되는 관통홀(15)과 뒷쪽 코어빔 벽체(14)에 형성되는 관통홀(15)은 서로 위아래로 엇갈리게 배치될 수 있게 된다. At this time, the through-holes 15 formed in both core beam walls 14 and the through-holes 15 formed in the rear core beam wall 14 can be alternately arranged up and down.

예를 들면, 양쪽의 코어빔 벽체(14)에 형성되는 관통홀(15)은 서로 마주보는 위치에 배치될 수 있게 되고, 뒷쪽의 코어빔 벽체(14)에 형성되는 관통홀(15)은 양쪽의 코어빔 벽체(14)에 있는 위아래 관통홀(15)의 사이의 위치에 배치될 수 있게 된다. For example, the through-holes 15 formed in the core beam wall 14 on both sides can be disposed at positions facing each other, and the through-holes 15 formed in the core beam wall 14 at the rear side are formed on both sides. It can be arranged at a position between the upper and lower through-holes 15 in the core beam wall 14 of the

이렇게 양쪽의 코어빔 벽체(14)에 형성되는 관통홀(15)과 뒷쪽의 코어빔 벽체(14)에 형성되는 관통홀(15)을 지그재그 형태로 어긋나게 배치함으로써, 홀 형성으로 인해 코어빔(13)의 강도가 약해지는 것을 효과적으로 막을 수 있게 된다. By displacing the through-holes 15 formed in the core beam wall 14 on both sides and the through-hole 15 formed in the rear core beam wall 14 in a zigzag form, the core beam 13 due to hole formation ) can be effectively prevented from weakening.

바람직한 실시예로서, 상기 코어빔(13)이 가지는 4개의 코어빔 벽체(14) 중 앞쪽의 코어빔 벽체(14)는 나머지 3개의 코어빔 벽체(14)에 비해 상대적으로 두꺼운 두께를 갖도록 할 수 있다. As a preferred embodiment, the front core beam wall 14 among the four core beam walls 14 of the core beam 13 may have a relatively thicker thickness than the other three core beam walls 14 . have.

이렇게 두꺼운 두께로 이루어진 앞쪽 코어빔 벽체(14)를 이용하여 보강빔(미도시)을 지지하는 구조를 채택함으로써, 코어빔(13)과 보강빔 간의 견고한 결속관계를 확보할 수 있는 이점이 있다. By adopting a structure for supporting a reinforcing beam (not shown) using the front core beam wall 14 made of such a thick thickness, there is an advantage in that a strong binding relationship between the core beam 13 and the reinforcing beam can be secured.

즉, 코어빔(13)의 전반적인 두께를 설계 기준에 맞춰 최대한 얇게 설정하면서 보강빔의 지지력 확보가 필요한 앞쪽만 두껍게 함으로써, 흙막이 벽체의 전체적인 구조적 강성은 설계 기준에 맞게 유지하면서도 코어빔의 두께를 줄일 수 있는 등 비용적인 측면은 물론 시공성 측면에서 유리한 점이 있다. That is, by setting the overall thickness of the core beam 13 as thin as possible in accordance with the design standard and thickening only the front side, which requires securing the support force of the reinforcing beam, the overall structural rigidity of the retaining wall can be reduced while maintaining the design standard. It has advantages in terms of cost as well as constructability.

일 실시예로서, 상기 코어빔(13)에는 앞쪽 코어빔 벽체(14)의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되는 형태의 플랜지부(16)가 형성되며(도 1 참조), 이때의 플랜지부(16)는 보강빔과 브라켓(미도시)을 거치할 수 있는 충분한 면적을 제공하는 역할을 하게 된다. As an embodiment, the core beam 13 is formed with a flange portion 16 extending sideways with a predetermined width along the edge of the front core beam wall 14 (see FIG. 1 ), at this time the flange portion (16) serves to provide a sufficient area to mount the reinforcing beam and the bracket (not shown).

다른 실시예로서, 상기 코어빔(13)에는 앞쪽과 뒷쪽 코어빔 벽체(14)의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되는 플랜지부(16)가 형성되며(도 3 참조), 이때에도 플랜지부(16)는 보강빔과 브라켓(미도시)을 거치할 수 있는 충분한 면적을 제공하는 역할을 하게 된다. As another embodiment, flange portions 16 extending from both sides of a predetermined width along the edges of the front and rear core beam walls 14 are formed on the core beam 13 (see FIG. 3 ), and even at this time, the flange portions (16) serves to provide a sufficient area to mount the reinforcing beam and the bracket (not shown).

한편, 본 발명에서는 전체 흙막이 벽체 중 코어빔이 들어가는 흙막이 벽체 사이에 철근망이 들어가는 흙막이 벽체의 시공 시, 철근망을 대신하여 사용되는 철근망 대체용도의 코어빔(13-1)을 제공한다. On the other hand, in the present invention, a core beam 13-1 is provided as a substitute for a reinforcing bar network, which is used instead of a reinforcing bar network when constructing a retaining wall in which a reinforcing bar network enters between the retaining walls into which the core beam enters among all retaining walls.

이를 위하여, 도 4에 도시한 바와 같이, 상기 흙막이 벽체 파일은 흙막이 벽체의 시공 시 케이싱(10)의 내부에 삽입되어 콘크리트(11)와 함께 벽체(12)로 시공되는 코어빔(13-1)을 포함한다. To this end, as shown in FIG. 4, the retaining wall pile is inserted into the inside of the casing 10 during construction of the retaining wall and constructed as a wall 12 together with the concrete 11 (13-1). includes

상기 코어빔(13-1)은 내부가 비어 있는 관 형태를 이루는 금속 소재의 코어빔(13-1)으로 이루어지게 된다. The core beam 13-1 is made of a core beam 13-1 made of a metal material having a hollow tube shape.

예를 들면, 상기 코어빔(13-1)은 4개의 코어빔 벽체(14)를 가지는 사각단면 형태의 사각관으로 이루어질 수 있게 된다. For example, the core beam 13 - 1 may be formed of a rectangular tube having a rectangular cross-section having four core beam walls 14 .

여기서, 상기 코어빔(13-1)은 사각관 형태 뿐만 아니라 원형, 다각형 등의 형태로도 이루어질 수 있음은 물론이다. Here, it goes without saying that the core beam 13-1 may be formed not only in the shape of a square tube, but also in a shape of a circle, a polygon, or the like.

이러한 코어빔(13-1)은 금형을 이용하여 일체형으로 제작할 수 있거나, 사출 또는 압출 방식으로 제작할 수 있거나, 여러 개의 길다란 철판을 용접으로 이어 붙힌 형태로 제작할 수 있거나, 1개의 길다란 철판과 1개의 절곡형 철판을 용접으로 이어 붙힌 형태로 제작할 수 있다. Such a core beam 13-1 may be manufactured integrally using a mold, may be manufactured by injection or extrusion, may be manufactured in the form of several long iron plates connected by welding, or may be manufactured in the form of one long iron plate and one It can be manufactured in the form of welded and glued bent steel plates.

이렇게 코어빔(13-1)의 내부가 비어있게 되므로서 펌프카의 트래미관이 아무런 간섭을 받지 않고 코어빔(13)의 내측을 통해 코어빔 하단부, 즉 케이싱(10)의 하단부까지 들어갈 수 있게 되며, 결국 트래미관을 이용하여 콘크리트(11)를 타설할 때 케이싱(10)의 하단쪽에서부터 콘크리트(11)를 주입하게 되면, 이때의 콘크리트(11)는 케이싱(10)의 바닥쪽에서부터 윗쪽으로 차오르면서 채워질 수 있게 된다. As the inside of the core beam 13-1 becomes empty in this way, the tramway tube of the pump car can enter through the inside of the core beam 13 to the lower end of the core beam, that is, the lower end of the casing 10 without any interference. , eventually, when pouring the concrete 11 using the tramway pipe, if the concrete 11 is injected from the lower end of the casing 10, the concrete 11 at this time is driven upward from the bottom of the casing 10. It can be filled as you go up.

특히, 상기 코어빔(13-1)의 코어빔 벽체(14)에는 코어빔 내측에 채워지는 콘크리트(11)가 코어빔 외측으로 빠져나갈 수 있도록 하는 다수 개의 관통홀(15)이 형성된다. In particular, a plurality of through holes 15 are formed in the core beam wall 14 of the core beam 13-1 to allow the concrete 11 filled inside the core beam to escape to the outside of the core beam.

이때, 상기 관통홀(15)은 원형의 홀 형태 등으로 이루어질 수 있게 된다. At this time, the through hole 15 may be formed in a circular hole shape or the like.

이에 따라, 상기 코어빔(13-1)의 내부에 채워지는 콘크리트(11)가 관통홀(15)을 통해 코어빔(13-1)의 외부, 즉 코어빔(13-1)의 외면과 케이싱(10)의 내면 사이의 공간으로 빠져나갈 수 있게 되고, 결국 케이싱(10)의 내부에는 케이싱 하단에서부터 위로 콘크리트(11)가 차오르면서 채워질 수 있게 된다. Accordingly, the concrete 11 filled inside the core beam 13-1 passes through the through hole 15 to the outside of the core beam 13-1, that is, the outer surface of the core beam 13-1 and the casing. It is possible to escape into the space between the inner surfaces of the 10 , and eventually the inside of the casing 10 can be filled with the concrete 11 from the bottom of the casing to the top.

그리고, 상기 코어빔(13-1)의 코어빔 벽체(14)에 형성되는 관통홀(15)은 4개의 코어빔 벽체(14)에 모두 형성될 수 있게 된다. In addition, the through-holes 15 formed in the core beam wall 14 of the core beam 13-1 can be formed in all four core beam walls 14 .

바람직한 실시예로서, 상기 관통홀(15)은 코어빔(13-1)의 길이 방향을 따라 일정간격으로 배치될 수 있게 된다.As a preferred embodiment, the through-holes 15 can be arranged at regular intervals along the longitudinal direction of the core beam 13-1.

이때, 양쪽 코어빔 벽체(14)에 형성되는 관통홀(15)과 뒷쪽 코어빔 벽체(14)에 형성되는 관통홀(15)은 서로 위아래로 엇갈리게 배치될 수 있게 된다. At this time, the through-holes 15 formed in both core beam walls 14 and the through-holes 15 formed in the rear core beam wall 14 can be alternately arranged up and down.

예를 들면, 양쪽의 코어빔 벽체(14)에 형성되는 관통홀(15)은 서로 마주보는 위치에 배치될 수 있게 되고, 앞쪽과 뒷쪽의 코어빔 벽체(14)에 형성되는 관통홀(15)은 서로 마주보는 위치에 배치될 수 있는 동시에 양쪽의 코어빔 벽체(14)에 있는 위아래 관통홀(15)의 사이의 위치에 배치될 수 있게 된다. For example, the through-holes 15 formed in the core-beam walls 14 on both sides can be disposed at positions facing each other, and the through-holes 15 formed in the front and rear core-beam walls 14 are formed. can be arranged at positions facing each other, and at the same time arranged at positions between the upper and lower through-holes 15 in the core beam wall 14 on both sides.

이렇게 양쪽의 코어빔 벽체(14)에 형성되는 관통홀(15)과 뒷쪽의 코어빔 벽체(14)에 형성되는 관통홀(15)을 지그재그 형태로 어긋나게 배치함으로써, 홀 형성으로 인해 코어빔(13-1)의 강도가 약해지는 것을 효과적으로 막을 수 있게 된다. By displacing the through-holes 15 formed in the core beam wall 14 on both sides and the through-hole 15 formed in the rear core beam wall 14 in a zigzag form, the core beam 13 due to hole formation -1) can be effectively prevented from weakening.

바람직한 실시예로서, 상기 코어빔(13-1)이 가지는 4개의 코어빔 벽체(14)는 동일한 두께로 이루어질 수 있게 된다. As a preferred embodiment, the four core beam walls 14 of the core beam 13-1 may have the same thickness.

도 5 내지 도 7은 본 발명의 다양한 실시예에 따른 흙막이 벽체 파일의 시공상태를 나타내는 사시도이다. 5 to 7 are perspective views showing the construction state of the retaining wall pile according to various embodiments of the present invention.

도 5 내지 도 7에 도시한 바와 같이, 여기서는 코어빔(13), 즉 관통홀(15)을 가지는 코어빔(13)을 이용하여 CIP 공법 등으로 흙막이 벽체(100)를 구축하는 방법을 보여준다. As shown in FIGS. 5 to 7 , here, a method of constructing the retaining wall 100 by the CIP method using the core beam 13 , that is, the core beam 13 having the through hole 15 , is shown.

먼저, 제1단계로서, 지반 천공 후 케이싱(10)을 삽입하는 단계를 실시한다.First, as a first step, the step of inserting the casing 10 after drilling the ground is carried out.

다음, 제2단계로서, 천공한 홀 속에 들어가 있는 케이싱(10)의 내부에 속이 비어 있는 관 형태로 이루어짐과 더불어 코어빔 벽체(14)에는 다수 개의 관통홀(15)이 형성되어 있는 코어빔(13)을 삽입하는 단계를 실시한다. Next, as a second step, a core beam having a plurality of through holes 15 formed in the core beam wall 14 as well as in the form of a hollow tube inside the casing 10 contained in the perforated hole ( 13) is inserted.

이러한 제2단계에서 사용하는 코어빔(13)은 4개의 코어빔 벽체(14)를 가지는 사각단면 형태의 관으로 이루어질 수 있다. The core beam 13 used in this second step may be made of a tube having a rectangular cross-section having four core beam walls 14 .

또한, 상기 코어빔(13)의 코어빔 벽체(14)에 형성되는 관통홀(15)은 4개의 코어빔 벽체(14) 중 보강빔측과 접하는 앞쪽 1개의 코어빔 벽체(14)를 제외한 나머지 3개의 코어빔 벽체(14)에 형성될 수 있다. In addition, the through-holes 15 formed in the core beam wall 14 of the core beam 13 have three remaining core beam walls 14 excluding the front one core beam wall 14 in contact with the reinforcing beam side among the four core beam walls 14 . It may be formed on the core beam wall 14 .

그리고, 상기 제2단계에서 사용하는 코어빔(13)의 코어빔 벽체(14)에 형성되는 관통홀(15)은 관통홀(15)은 코어빔(13)의 길이 방향을 따라 일정간격으로 배치되고, 양쪽 코어빔 벽체(14)에 형성되는 관통홀(15)과 뒷쪽 코어빔 벽체(14)에 형성되는 관통홀(15)은 서로 위아래로 엇갈리게 배치될 수 있다. In addition, the through holes 15 formed in the core beam wall 14 of the core beam 13 used in the second step are arranged at regular intervals along the longitudinal direction of the core beam 13 . and the through-holes 15 formed in both core beam walls 14 and the through-holes 15 formed in the rear core beam wall 14 may be alternately arranged up and down.

또한, 상기 제2단계에서 사용하는 코어빔(13)이 가지는 4개의 코어빔 벽체(14) 중 앞쪽의 코어빔 벽체(14)는 나머지 3개의 코어빔 벽체(14)에 비해 상대적으로 두꺼운 두께를 가질 수 있으며, 이러한 제2단계에서 사용하는 코어빔(13)에는 앞쪽 코어빔 벽체(14)의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되거나, 또는 앞쪽과 뒷쪽 코어빔 벽체(14)의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되는 플랜지부(16)가 형성될 수 있다. In addition, the front core beam wall 14 among the four core beam walls 14 of the core beam 13 used in the second step has a relatively thicker thickness than the other three core beam walls 14 . It may have, and the core beam 13 used in this second step has a predetermined width along the edge of the front core beam wall 14 and extends sideways, or along the edges of the front and rear core beam walls 14 . A flange portion 16 extending laterally with a predetermined width may be formed.

다음, 제3단계로서, 상기 코어빔(13)이 삽입되어 있는 케이싱(10)의 내부에 콘크리트(11)를 타설하는 단계를 포함한다. Next, as a third step, it includes the step of pouring the concrete 11 into the casing 10 in which the core beam 13 is inserted.

즉, 펌프카의 트래미관을 코어빔(13)의 내부를 통해 케이싱(14)의 하단까지 내린 상태에서 트래미관을 단계적으로 위로 올리면서 콘크리트를 타설한다.That is, in a state in which the tramway tube of the pump car is lowered to the lower end of the casing 14 through the inside of the core beam 13, the concrete is poured while raising the tramway tube upward step by step.

계속해서, 콘크리트가 아래쪽에서부터 윗쪽으로 차오르도록 하면서 콘크리트를 타설하면, 코어빔(13)의 내부에 채워지는 콘크리트(11)는 관통홀(15)을 통해 코어빔 바깥쪽으로 빠져나가 코어빔(13)의 외부, 즉 케이싱(10)의 내부 공간에도 함께 채워지게 되고, 결국 케이싱(10)의 하단에서부터 위로 콘크리트(11)가 차오르면서 채워지게 된다. If the concrete is poured while allowing the concrete to fill up from the bottom to the top, the concrete 11 filled in the core beam 13 passes through the through hole 15 to the outside of the core beam 13 ), that is, the inner space of the casing 10 is also filled together, and eventually the concrete 11 is filled from the bottom of the casing 10 to the top.

이때, 천공 시에 스며들어온 케이싱 내부의 지하수는 콘트리트(11)에 의해 윗쪽으로 밀려나면서 콘크리트(11)와 섞이지 않게 되고, 콘크리트(11)가 케이싱(10)의 상단까지 채워지게 되면, 이때의 지하수는 케이싱 외부로 배출된다.At this time, the groundwater inside the casing seeped during the drilling is pushed upward by the concrete 11 and does not mix with the concrete 11, and when the concrete 11 is filled up to the upper end of the casing 10, groundwater at this time is discharged to the outside of the casing.

따라서, 콘크리트 타설 시 지하수로 인한 콘크리트의 재료 분리가 일어나지 않게 되고, 결국 견고하고 안정적인 흙막이 벽체를 구축할 수 있게 된다. Therefore, the material separation of the concrete due to groundwater does not occur during concrete pouring, and it is possible to construct a strong and stable retaining wall in the end.

그리고, 일반적인 CIP 공법과 마찬가지로 콘크리트 양생 전에 케이싱을 빼낸 후, 콘크리트 양생과 함께 일부 콘크리트층을 제거한 다음 코어빔 앞쪽에 보강빔 등을 설치하면 흙막이 벽체의 시공을 완료할 수 있게 된다. And, like the general CIP method, after removing the casing before curing the concrete, removing some concrete layers along with curing the concrete, and then installing a reinforcement beam in front of the core beam, the retaining wall construction can be completed.

이와 같이, 본 발명에서는 케이싱의 내부에 중공의 코어빔을 삽입한 후 코어빔 안으로 펌프카의 트래미관을 케이싱 하단까지 내린 상태에서 케이싱 하단부터 콘크리트가 코어빔 내측과 외측에 함께 위로 차오르도록 하는 새로운 흙막이 벽체 시공방법을 제공함으로써, 콘크리트 타설 시 지하수로 인한 재료 분리없이 콘크리트가 채워지도록 할 수 있는 등 견고하고 안정적인 흙막이 벽체를 구축할 수 있다.As described above, in the present invention, after inserting the hollow core beam into the casing, the concrete is filled up together on the inside and outside of the core beam from the bottom of the casing in a state that the tramway tube of the pump car is lowered to the bottom of the casing into the core beam. By providing a retaining wall construction method, it is possible to construct a solid and stable retaining wall, such as allowing concrete to be filled without separation of materials due to groundwater during concrete pouring.

10 : 케이싱
11 : 콘크리트
12 : 벽체
13 : 코어빔
14 : 코어빔 벽체
15 : 관통홀
16 : 플랜지부
10: casing
11: Concrete
12 : wall
13: core beam
14: core beam wall
15: through hole
16: flange part

Claims (12)

흙막이 벽체의 시공 시 케이싱(10)의 내부에 삽입되어 콘크리트(11)와 함께 벽체(12)로 구축되는 것으로서,
내부가 비어 있는 관 형태의 코어빔(13)으로 이루어지게 되고, 상기 코어빔(13)의 코어빔 벽체(14)에는 코어빔 내측에 채워지는 콘크리트(11)가 코어빔 외측으로 빠져나갈 수 있도록 하는 다수 개의 관통홀(15)이 형성되어, 코어빔(13)의 내부에 채워지는 콘크리트(11)가 관통홀(15)을 통해 코어빔(13)의 외부로 빠져나가도록 함으로써 케이싱(10)의 하단에서부터 위로 콘크리트(11)가 차오르면서 채워지도록 하고,
상기 코어빔(13)은 4개의 코어빔 벽체(14)를 가지는 사각단면 형태의 관으로 이루어지고,
상기 코어빔(13)의 코어빔 벽체(14)에 형성되는 관통홀(15)은 4개의 코어빔 벽체(14) 중 보강빔측과 접하는 앞쪽 1개의 코어빔 벽체(14)를 제외한 나머지 3개의 코어빔 벽체(14)에 형성되고,
상기 코어빔(13)이 가지는 4개의 코어빔 벽체(14) 중 앞쪽의 코어빔 벽체(14)는 나머지 3개의 코어빔 벽체(14)에 비해 상대적으로 두꺼운 두께를 가짐으로써, 코어빔(13)과 보강빔 간의 견고한 결속관계를 확보할 수 있고, 코어빔(13)의 전반적인 두께를 설계 기준에 맞춰 최대한 얇게 설정하면서 보강빔의 지지력 확보가 필요한 앞쪽만 두껍게 하여 흙막이 벽체의 전체적인 구조적 강성은 설계 기준에 맞게 유지하면서도 코어빔의 두께를 줄일 수 있어 비용적인 측면 및 시공성 측면에서 유리한 점이 있는 것을 특징으로 하는 흙막이 벽체 파일.
As being inserted into the inside of the casing (10) when constructing the retaining wall and constructed as a wall (12) together with the concrete (11),
It is made of a core beam 13 in the form of an empty tube, and the core beam wall 14 of the core beam 13 has concrete 11 filled inside the core beam to escape to the outside of the core beam. A plurality of through-holes 15 are formed to allow the concrete 11 to be filled in the core beam 13 to escape to the outside of the core beam 13 through the through-hole 15 , thereby forming the casing 10 . Let the concrete 11 fill up from the bottom of the
The core beam 13 is made of a tube in the form of a square cross-section having four core beam walls 14,
The through-holes 15 formed in the core beam wall 14 of the core beam 13 have three cores except for the front one core beam wall 14 in contact with the reinforcing beam side among the four core beam walls 14 . formed on the beam wall 14,
The front core beam wall 14 among the four core beam walls 14 of the core beam 13 has a relatively thicker thickness than the other three core beam walls 14, so that the core beam 13 It is possible to secure a strong bonding relationship between Retaining wall pile, characterized in that it has advantages in terms of cost and constructability as it can reduce the thickness of the core beam while maintaining it in accordance with the requirements.
삭제delete 삭제delete 청구항 1에 있어서,
상기 관통홀(15)은 코어빔(13)의 길이 방향을 따라 일정간격으로 배치되고, 양쪽 코어빔 벽체(14)에 형성되는 관통홀(15)과 뒷쪽 코어빔 벽체(14)에 형성되는 관통홀(15)은 서로 위아래로 엇갈리게 배치되는 것을 특징으로 하는 흙막이 벽체 파일.
The method according to claim 1,
The through-holes 15 are arranged at regular intervals along the longitudinal direction of the core beam 13, and the through-holes 15 formed in both core beam walls 14 and the through-holes 15 formed in the rear core beam wall 14 are The hole 15 is a retaining wall pile, characterized in that it is arranged alternately above and below each other.
삭제delete 청구항 1에 있어서,
상기 코어빔(13)에는 앞쪽 코어빔 벽체(14)의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되거나, 또는 앞쪽과 뒷쪽 코어빔 벽체(14)의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되는 플랜지부(16)가 형성되는 것을 특징으로 하는 흙막이 벽체 파일.
The method according to claim 1,
Flange portions ( 16) is a retaining wall pile, characterized in that it is formed.
CIP 공법으로 흙막이 벽체를 시공하는 방법으로서,
지반 천공 후 케이싱(10)을 삽입하는 제1단계;
상기 케이싱(10)의 내부에 속이 비어 있는 관 형태로 이루어짐과 더불어 코어빔 벽체(14)에는 다수 개의 관통홀(15)이 형성되어 있는 코어빔(13)을 삽입하는 제2단계;
상기 코어빔(13)이 삽입되어 있는 케이싱(10)의 내부에 콘크리트(11)를 타설하는 제3단계;
를 포함하며, 상기 제3단계에서는 펌프카의 트래미관을 코어빔(13)의 내부를 통해 케이싱(14)의 하단까지 내린 상태에서 트래미관을 단계적으로 위로 올리면서 콘크리트를 타설하여, 콘크리트가 아래쪽에서부터 윗쪽으로 차오르도록 하면서 콘크리트를 타설하되, 코어빔(13)의 내부에 채워지는 콘크리트(11)가 관통홀(15)을 통해 코어빔(13)의 외부로 빠져나가도록 하여 케이싱(10)의 하단에서부터 위로 콘크리트(11)가 차오르면서 채워지도록 하면서 타설하고,
상기 코어빔(13)은 4개의 코어빔 벽체(14)를 가지는 사각단면 형태의 관으로 이루어지고,
상기 코어빔(13)의 코어빔 벽체(14)에 형성되는 관통홀(15)은 4개의 코어빔 벽체(14) 중 보강빔측과 접하는 앞쪽 1개의 코어빔 벽체(14)를 제외한 나머지 3개의 코어빔 벽체(14)에 형성되고,
상기 코어빔(13)이 가지는 4개의 코어빔 벽체(14) 중 앞쪽의 코어빔 벽체(14)는 나머지 3개의 코어빔 벽체(14)에 비해 상대적으로 두꺼운 두께를 가짐으로써, 코어빔(13)과 보강빔 간의 견고한 결속관계를 확보할 수 있고, 코어빔(13)의 전반적인 두께를 설계 기준에 맞춰 최대한 얇게 설정하면서 보강빔의 지지력 확보가 필요한 앞쪽만 두껍게 하여 흙막이 벽체의 전체적인 구조적 강성은 설계 기준에 맞게 유지하면서도 코어빔의 두께를 줄일 수 있어 비용적인 측면 및 시공성 측면에서 유리한 점이 있는 것을 특징으로 하는 흙막이 벽체 시공방법.
As a method of constructing a retaining wall by the CIP method,
A first step of inserting the casing 10 after drilling the ground;
a second step of inserting a core beam 13 having a plurality of through-holes 15 formed in the core beam wall 14 while having a hollow tube shape inside the casing 10;
a third step of pouring concrete 11 into the casing 10 into which the core beam 13 is inserted;
In the third step, concrete is poured while raising the tramway pipe step by step while lowering the tramway pipe of the pump car through the inside of the core beam 13 to the lower end of the casing 14, and the concrete is removed from the bottom. The concrete is poured while filling upward, but the concrete 11 filled in the core beam 13 is passed through the through hole 15 to the outside of the core beam 13 to the outside of the casing (10). Pouring while filling the concrete 11 from the bottom to the top,
The core beam 13 is made of a tube in the form of a square cross-section having four core beam walls 14,
The through-holes 15 formed in the core beam wall 14 of the core beam 13 have three cores except for the front one core beam wall 14 in contact with the reinforcing beam side among the four core beam walls 14 . formed on the beam wall 14,
The front core beam wall 14 among the four core beam walls 14 of the core beam 13 has a relatively thicker thickness than the other three core beam walls 14, so that the core beam 13 It is possible to secure a strong bonding relationship between A retaining wall construction method, characterized in that it has advantages in terms of cost and constructability as it can reduce the thickness of the core beam while maintaining it in accordance with the requirements.
삭제delete 삭제delete 청구항 7에 있어서,
상기 제2단계에서 사용하는 코어빔(13)의 코어빔 벽체(14)에 형성되는 관통홀(15)은 관통홀(15)은 코어빔(13)의 길이 방향을 따라 일정간격으로 배치되고, 양쪽 코어빔 벽체(14)에 형성되는 관통홀(15)과 뒷쪽 코어빔 벽체(14)에 형성되는 관통홀(15)은 서로 위아래로 엇갈리게 배치되는 것을 특징으로 하는 흙막이 벽체 시공방법.
8. The method of claim 7,
The through-holes 15 formed in the core beam wall 14 of the core beam 13 used in the second step are arranged at regular intervals along the longitudinal direction of the core beam 13, A retaining wall construction method, characterized in that the through-holes (15) formed in both core beam walls (14) and the through-holes (15) formed in the rear core beam wall (14) are alternately arranged above and below each other.
삭제delete 청구항 7에 있어서,
상기 제2단계에서 사용하는 코어빔(13)에는 앞쪽 코어빔 벽체(14)의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되거나, 또는 앞쪽과 뒷쪽 코어빔 벽체(14)의 가장자리를 따라 가면서 일정 폭 양옆으로 연장되는 플랜지부(16)가 형성되는 것을 특징으로 하는 흙막이 벽체 시공방법.
8. The method of claim 7,
The core beam 13 used in the second step has a predetermined width extending sideways along the edge of the front core beam wall 14, or both sides of a predetermined width along the edges of the front and rear core beam walls 14 Retaining wall construction method, characterized in that the flange portion 16 extending to the formed.
KR1020210178395A 2021-12-14 2021-12-14 File fof retaining wall and construction method using file KR102426192B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210178395A KR102426192B1 (en) 2021-12-14 2021-12-14 File fof retaining wall and construction method using file

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210178395A KR102426192B1 (en) 2021-12-14 2021-12-14 File fof retaining wall and construction method using file

Publications (1)

Publication Number Publication Date
KR102426192B1 true KR102426192B1 (en) 2022-07-27

Family

ID=82701184

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210178395A KR102426192B1 (en) 2021-12-14 2021-12-14 File fof retaining wall and construction method using file

Country Status (1)

Country Link
KR (1) KR102426192B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160025242A (en) 2014-08-27 2016-03-08 (주)백경지앤씨 The Earth Retaining Wall using the Hybrid-CIP(Cast-In place concrete Pile) method, and thereof Construction Method
KR101742812B1 (en) * 2016-08-29 2017-06-01 김사문 Construction casing for concrete piles
KR102075939B1 (en) 2019-03-06 2020-02-11 강문기 H shaped steel reinforcing structure for CIP retaining wall and permanent wall using the same
KR20200125277A (en) * 2019-04-26 2020-11-04 주식회사 포스코 Composite column and composite column structure
KR102228553B1 (en) 2020-07-13 2021-03-16 (주)서아건설 Ground hole guide member for retaining wall
KR102325623B1 (en) 2021-02-17 2021-11-15 (주)서아건설 Construction method of retaining wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160025242A (en) 2014-08-27 2016-03-08 (주)백경지앤씨 The Earth Retaining Wall using the Hybrid-CIP(Cast-In place concrete Pile) method, and thereof Construction Method
KR101742812B1 (en) * 2016-08-29 2017-06-01 김사문 Construction casing for concrete piles
KR102075939B1 (en) 2019-03-06 2020-02-11 강문기 H shaped steel reinforcing structure for CIP retaining wall and permanent wall using the same
KR20200125277A (en) * 2019-04-26 2020-11-04 주식회사 포스코 Composite column and composite column structure
KR102228553B1 (en) 2020-07-13 2021-03-16 (주)서아건설 Ground hole guide member for retaining wall
KR102325623B1 (en) 2021-02-17 2021-11-15 (주)서아건설 Construction method of retaining wall

Similar Documents

Publication Publication Date Title
KR101274974B1 (en) Earth retaining wall and construction method thereof
US20110142550A1 (en) Method for constructing a chair-type, self-supported earth retaining wall
KR102009077B1 (en) Earth retaining wall construction method using castinplace concrete pile of impermeable peristyle type
KR102195504B1 (en) Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method
KR20140055639A (en) A execution method of architecture beam
KR101324231B1 (en) Soil cement wall structure and method for constructing thereof
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
KR100673475B1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
KR100824713B1 (en) Ledge type revetment using a pc wall plate and construction method thereof
KR101296856B1 (en) Reinforcement structure for wall of underground structure and construction method of underground structure using the same
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
KR102021496B1 (en) Retaining wall construction method and retaining wall structure by the method
KR102426192B1 (en) File fof retaining wall and construction method using file
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
JP6860895B2 (en) Retaining wall and its construction method
JP7115923B2 (en) Foundation structure reinforcement method and foundation structure reinforcement structure
KR101151052B1 (en) The deepened sheet plate made of an iron reinforcing rod and the method of installation
JP7230312B2 (en) Foundation structure and foundation construction method
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same
KR102098141B1 (en) A method of constructing an underground wall structure using an earth retaining wall and an underground wall structure
KR100654973B1 (en) Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof
JP5360659B2 (en) Retaining wall made of precast concrete
KR101077242B1 (en) Construction method of basement structure using retaining wall and steel column
KR20200088659A (en) Top-down type underground structure construction method using earth support plate
KR102249603B1 (en) Retaining wall construction method

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right