CN110512635A CN201910801827.5A CN201910801827A CN110512635A CN 110512635 A CN110512635 A CN 110512635A CN 201910801827 A CN201910801827 A CN 201910801827A CN 110512635 A CN110512635 A CN 110512635A
Authority
CN
China
Prior art keywords
regularization
rigging
cushion cap
mixture
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910801827.5A
Other languages
Chinese (zh)
Inventor
高洪锋
张�荣
石语国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910801827.5A priority Critical patent/CN110512635A/en
Publication of CN110512635A publication Critical patent/CN110512635A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Abstract

The invention discloses a kind of regularization templates in lower pier base support device and its construction method, belongs to technical field of building construction.The present invention includes regularization rigging and mixture, the mixture is laid on the surface of original soil, the surface of mixture is equipped with regularization rigging, the support of template inner cross is provided between opposed regularization rigging, the bottom end of regularization rigging is provided with timber wedge.The present invention proposes to replace brick fetal membrane using regularization rigging, and it backbreaks to foundation pit and partially fills out cementing sand material, after mix initial set, regularization rigging is removed, plastering processing is carried out to side wall mixture, after the completion of cushion construction, it is unified to carry out ground library waterproof roll, reinforcing bar and cushion cap concrete construction, effectively solve big, long in time limit, the at high cost problem of basement cushion cap brick fetal membrane masonry project amount.

Description

A kind of regularization template is in lower pier base support device and its construction method
Technical field
The present invention relates to technical field of building construction, more specifically to a kind of regularization template in lower pier base Support device and its construction method.
Background technique
After stub has excavated under cushion cap, to ensure cushion cap foundation size, and rock-soil layer is isolated with cushion cap, is facilitated subsequent anti- Water construction mostly uses brick fetal membrane to build plastering according to conventional method.But brick mold masonry project amount is larger, spend the time compared with It is more, more manpower, higher cost need to be put into, and traditional plank sheathing dismounting is difficult, turnover trouble, the low problem of utilization rate.
Summary of the invention
1. technical problems to be solved by the inivention
In view of the defects existing in the prior art with deficiency, the present invention provides a kind of regularization templates in lower pier base branch Support arrangement and its construction method, the present invention replace brick fetal membrane using regularization rigging, effectively solve basement cushion cap brick tire Film masonry project amount is big, long in time limit, problem at high cost, and reasonable composite assembly is synchronous to solve to pass at regularization rigging Plank sheathing dismounting of uniting is difficult, turnover trouble, the low problem of utilization rate.
2. technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
A kind of regularization template of the invention is in lower pier base support device, including regularization rigging and mixing Material, the mixture are laid on the surface of original soil, and the surface of mixture is equipped with regularization rigging, opposed sizing Change and be provided with the support of template inner cross between rigging, the both ends of the template inner cross support and regularization rigging are mutual Against the bottom end of regularization rigging is provided with timber wedge, and regularization rigging is assembled by multiple subtemplates, subtemplate Connection edge joint position be provided with nail, bound between adjacent subtemplate by nail.
Further, the timber wedge is arranged in the bottom interval of regularization rigging, and foundation trench, base are excavated in original soil surface The inner bottom surface of slot pours bed course, and bed course is inserted into the bottom end of timber wedge, and the height dimension that timber wedge exposes native face is less than the thickness gauge of bed course It is very little.
A kind of regularization template the steps include: in the construction method of lower pier base support device
Step 1: stub bed course under casting cushion cap excavates cushion cap foundation trench according to construction drawing, and the foundation trench size of excavation is greater than The sectional dimension on basis carries out bed course casting to the cushion cap of excavation after the completion of test slot of foundation;
Step 2: line setting, cushion cap after being cast is interior to release regularization rigging inner edge line position, as sizing Change the installation site line of rigging;
Step 3: the design of regularization rigging, processing, production;
Step 4: the installation of regularization rigging is fixed;
A) steel bar end or timber wedge positioning
It is fixed on the inside of regularization rigging installation site line with timber wedge, timber wedge exposes native face height and is less than bed course thickness Degree;
B) regularization rigging installation is fixed
According to basic depth of beam, length dimension, subtemplate is cut out in advance, and the regularization rigging cut out is mounted on wood On the outside of wedge, the connection edge joint position of two pieces of subtemplates is fixed using template leftover pieces or the short flitch of 50 × 100mm with nail on the outside, Fixed bit is set to along piece short transverse upper, middle and lower each one, and corner subtemplate piece nails;
C) the reinforced cementitious plate of flitch
The regularization rigging installed is reinforced, does template using the lumps of wood on the inside of regularization rigging Inner cross support is cut into two-sided inverse u shape mouth according to the span width of foundation beam using the short flitch of 50 × 100mm, and U-typed mouth nail system exists On regularization rigging, supporting square timber is fixed in U-typed mouth;
Step 5: mixture backfill, compacting, maintenance are prepared mixed by the match ratio of scene excavation natural sand stone and cement 3:1 Material is closed, part of backbreaking on the outside of regularization rigging is backfilled, is compacted, design requirement intensity and compactness requirement are met;
Step 6: side plastering, after side form is removed, press to side form side: cement mortar, which is smeared, to be flattened;
Step 7: bed course is poured at non-cushion cap, and after plastering in cushion cap, non-cushion cap region passes through through test slot of foundation Afterwards, non-cushion cap region cushion construction is disposably carried out;
Step 8: ground house bottom plate waterproof, reinforcing bar, concrete construction require to carry out waterproof, reinforcing bar binding according to construction drawing And ground bottom storehouse board concrete casting.
Further, the step three: regularization rigging is trapezoidal module, and regularization rigging customizes bottom 2000~4000mm of side length, a length of 3000~5000mm of upper edge.
3. beneficial effect
Using technical solution provided by the invention, compared with prior art, have the following beneficial effects:
The present invention proposes to replace brick fetal membrane using regularization rigging, and backbreaks to foundation pit and partially fill out argillaceous sand stone of pouring water Regularization rigging is removed after mix initial set, carries out plastering processing to side wall mixture by material, complete to cushion construction Cheng Hou, it is unified to carry out ground library waterproof roll, reinforcing bar and cushion cap concrete construction, it effectively solves basement cushion cap brick fetal membrane and builds work Journey amount is big, long in time limit, problem at high cost, and reasonable composite assembly effectively solves traditional plank sheathing at regularization rigging Dismounting is difficult, turnover trouble, the low problem of utilization rate.
Detailed description of the invention
Fig. 1 is structure chart of the invention;
Fig. 2 is subtemplate connection effect figure of the invention;
Fig. 3 is subtemplate angular position connection structure diagram of the invention.
In figure: 1, regularization rigging;2, mixture;3, template inner cross supports;4, timber wedge;5, nail;6, subtemplate.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples:
Embodiment 1
From Fig. 1-3 as can be seen that a kind of regularization template of the present embodiment is in lower pier base support device, including sizing Change rigging 1 and mixture 2, mixture 2 are laid on the surface of original soil, it is die-filling that the surface of mixture 2 is equipped with regularization group Plate 1 is provided with template inner cross support 3, the both ends of template inner cross support 3 and sizing between opposed regularization rigging 1 Change rigging 1 and abut each other that the bottom end of regularization rigging 1 is provided with timber wedge 4, regularization rigging 1 installs It afterwards, can be by supportting 3 in inside installation template inner cross, and inside bottom to ensure not shift in sandstone backfilling process Portion hammers into timber wedge 4 or reinforcing bar carries out dual fixation, and timber wedge 4 is arranged in the bottom interval of regularization rigging 1, and original soil surface is opened Foundation trench is dug, the inner bottom surface of foundation trench pours bed course, and bed course is inserted into the bottom end of timber wedge 4, and the height dimension that timber wedge 4 exposes native face is less than pad The thickness of layer, regularization rigging 1 is assembled by multiple subtemplates 6, and the connection edge joint position of subtemplate 6 is provided with nail Son 5 is bound by nail 5 between adjacent subtemplate 6.
A kind of regularization template the steps include: in the construction method of lower pier base support device
Step 1: stub bed course under casting cushion cap excavates cushion cap foundation trench according to construction drawing, and the foundation trench size of excavation is greater than The sectional dimension on basis carries out bed course casting to the cushion cap of excavation after the completion of test slot of foundation;
Step 2: line setting, cushion cap after being cast is interior to release 1 inner edge line position of regularization rigging, as fixed The installation site line of type rigging 1;
Step 3: the design of regularization rigging 1, processing, production, regularization rigging 1 are trapezoidal module, regularization Rigging 1 customizes 2000~4000mm of bottom side length, and a length of 3000~5000mm of upper edge, reasonable composite assembly is at " returning " Font regularization rigging 1;
Step 4: the installation of regularization rigging 1 is fixed;
A) steel bar end or timber wedge 4 position
It is fixed with timber wedge 4 on the inside of 1 installation site line of regularization rigging, installation timber wedge 4 be in order to prevent the later period return The side pressure for filling out 1 outside soil of regularization rigging caused by mixture 2 moves inward regularization rigging 1, and timber wedge 4 reveals Face height of being unearthed is less than cushion thickness;
B) installation of regularization rigging 1 is fixed
According to basic depth of beam, length dimension, subtemplate 6 is cut out in advance, and the regularization rigging 1 cut out is mounted on The outside of timber wedge 4, the connection edge joint positions of two pieces of subtemplates 6 using template leftover pieces or the short flitch of 50 × 100mm with nail 5 on the outside Fixed, fixed bit is set to each together along piece short transverse upper, middle and lower, to there is fissure of displacement phenomenon after preventing casting concrete, turns Virgin's template 6 piece in angle is fixed with nail 5;
C) the reinforced cementitious plate of flitch
The regularization rigging 1 installed is reinforced, does mould using the lumps of wood on the inside of regularization rigging 1 Plate inner cross support 3 is cut into two-sided inverse u shape mouth, U-typed mouth nail according to the span width of foundation beam using the short flitch of 50 × 100mm On regularization rigging 1, supporting square timber fixes in U-typed mouth system, easy to dismantle;
The mixtures 2 such as striking time need to be controlled, and one side needs have certain intensity, collapse after being not demoulding, another Aspect due to admixed in mixture 2 cement should not equal strength cause very much demoulding difficult greatly, waste regularization rigging 1 is timely Between, by full size field test, it was preferred with 2~3 hours;
Step 5: the backfill of mixture 2, compacting, maintenance are prepared by the match ratio of scene excavation natural sand stone and cement 3:1 Mixture 2 backfills part of backbreaking on the outside of regularization rigging 1, is compacted, meets design requirement intensity and want with compactness Ask, engineering library -3m~-6m be sand stone layer, therefore can gather materials on the spot, reduce sandstone outward transport and the later period backfills cost;
Step 6: side plastering is smeared side form side by 1:2 cement mortar and flattened, it is ensured that backfill after side form is removed 2 surface smoothness of mixture and density reach later period waterproof requirement;
Step 7: bed course is poured at non-cushion cap, and after plastering in cushion cap, non-cushion cap region passes through through test slot of foundation Afterwards, non-cushion cap region cushion construction is disposably carried out;
Step 8: ground house bottom plate waterproof, reinforcing bar, concrete construction require to carry out waterproof, reinforcing bar binding according to construction drawing And ground bottom storehouse board concrete casting.
The present invention proposes to replace brick fetal membrane using regularization rigging 1, and backbreaks to foundation pit and partially fill out argillaceous sand stone of pouring water Regularization rigging 1 is removed after mix initial set, plastering processing is carried out to side wall mixture 2, to cushion construction by material After the completion, unified to carry out ground library waterproof roll, reinforcing bar and cushion cap concrete construction, it effectively solves basement cushion cap brick fetal membrane and builds Project amount is big, long in time limit, problem at high cost, and reasonable composite assembly effectively solves traditional wooden model at regularization rigging 1 Plate dismounting is difficult, turnover trouble, the low problem of utilization rate.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution Similar frame mode and embodiment, are within the scope of protection of the invention.

Claims (4)

1. a kind of regularization template is in lower pier base support device, including regularization rigging (1) and mixture (2), Be characterized in that: the mixture (2) is laid on the surface of original soil, and the surface of mixture (2) is equipped with regularization rigging (1), template inner cross support (3) is provided between opposed regularization rigging (1), the template inner cross supports (3) Both ends abut each other that the bottom end of regularization rigging (1) is provided with timber wedge (4), regularization with regularization rigging (1) Rigging (1) is assembled by multiple subtemplates (6), and the connection edge joint position of subtemplate (6) is provided with nail (5), adjacent It is bound between subtemplate (6) by nail (5).
2. a kind of regularization template according to claim 1 is in lower pier base support device, it is characterised in that: described Timber wedge (4) is arranged in the bottom interval of regularization rigging (1), and foundation trench is excavated on original soil surface, and the inner bottom surface of foundation trench pours pad Bed course is inserted into layer, the bottom end of timber wedge (4), and the height dimension that timber wedge (4) exposes native face is less than the thickness of bed course.
3. a kind of regularization template is in the construction method of lower pier base support device, it is characterised in that: the steps include:
Step 1: stub bed course under casting cushion cap excavates cushion cap foundation trench according to construction drawing, and the foundation trench size of excavation is greater than basis Sectional dimension bed course casting is carried out to the cushion cap of excavation after the completion of test slot of foundation;
Step 2: line setting, cushion cap after being cast is interior to release regularization rigging (1) inner edge line position, as sizing Change the installation site line of rigging (1);
Step 3: regularization rigging (1) design, processing, production;
Step 4: regularization rigging (1) installation is fixed;
A) steel bar end or timber wedge (4) positioning
Fixed with timber wedge (4) on the inside of regularization rigging (1) installation site line, timber wedge (4) exposes native face height and is less than pad Thickness degree;
B) regularization rigging (1) installation is fixed
According to basic depth of beam, length dimension, subtemplate (6) are cut out in advance, and the regularization rigging (1) cut out is mounted on On the outside of timber wedge (4), the connection edge joint position of two pieces of subtemplates (6) uses template leftover pieces or the short flitch of 50 × 100mm with nail (5) It fixes on the outside, fixed bit is set to, corner subtemplate (6) piece nail each together along piece short transverse upper, middle and lower (5) fixed;
C) the reinforced cementitious plate of flitch
The regularization rigging (1) installed is reinforced, does mould using the lumps of wood on the inside of regularization rigging (1) Plate inner cross supports (3), is cut into two-sided inverse u shape mouth, U-typed mouth according to the span width of foundation beam using the short flitch of 50 × 100mm On regularization rigging (1), supporting square timber fixes in U-typed mouth nail system;
Step 5: mixture (2) backfill, compacting, maintenance are prepared mixed by the match ratio of scene excavation natural sand stone and cement 3:1 Material (2) is closed, part of backbreaking on the outside of regularization rigging (1) is backfilled, is compacted, design requirement intensity and compactness are met It is required that;
Step 6: side plastering is smeared side form side by 1:2 cement mortar and flattened after side form is removed;
Step 7: bed course is poured at non-cushion cap, and after plastering in cushion cap, non-cushion cap region is after test slot of foundation passes through, and one Secondary property carries out non-cushion cap region cushion construction;
Step 8: ground house bottom plate waterproof, reinforcing bar, concrete construction require to carry out waterproof, reinforcing bar binding and ground according to construction drawing The casting of bottom storehouse board concrete.
4. a kind of regularization template according to claim 3 is in lower pier base support device and its construction method, spy Sign is: the step three: regularization rigging (1) is trapezoidal module, and regularization rigging (1) customizes bottom side length 2000~4000mm, a length of 3000~5000mm of upper edge.
CN201910801827.5A 2019-08-28 2019-08-28 A kind of regularization template is in lower pier base support device and its construction method Pending CN110512635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910801827.5A CN110512635A (en) 2019-08-28 2019-08-28 A kind of regularization template is in lower pier base support device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910801827.5A CN110512635A (en) 2019-08-28 2019-08-28 A kind of regularization template is in lower pier base support device and its construction method

Publications (1)

Publication Number Publication Date
CN110512635A true CN110512635A (en) 2019-11-29

Family

ID=68628640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910801827.5A Pending CN110512635A (en) 2019-08-28 2019-08-28 A kind of regularization template is in lower pier base support device and its construction method

Country Status (1)

Country Link
CN (1) CN110512635A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074924A (en) * 2019-12-31 2020-04-28 广西建工集团第五建筑工程有限责任公司 Supporting template for foundation bearing platform under column and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660956A (en) * 2012-05-25 2012-09-12 薛忠群 Concrete moulding bed structure and pouring method
JP2015048647A (en) * 2013-09-02 2015-03-16 株式会社基礎工業 Buttress construction method
CN105369826A (en) * 2015-12-08 2016-03-02 中国一冶集团有限公司 Basement bearing platform side mold construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660956A (en) * 2012-05-25 2012-09-12 薛忠群 Concrete moulding bed structure and pouring method
JP2015048647A (en) * 2013-09-02 2015-03-16 株式会社基礎工業 Buttress construction method
CN105369826A (en) * 2015-12-08 2016-03-02 中国一冶集团有限公司 Basement bearing platform side mold construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074924A (en) * 2019-12-31 2020-04-28 广西建工集团第五建筑工程有限责任公司 Supporting template for foundation bearing platform under column and construction method thereof

Similar Documents

Publication Publication Date Title
CN102116061B (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN109209389B (en) Construction method for entering semi-open and semi-closed tunnel
CN110258848A (en) A kind of construction method of building energy conservation CL composite shear wall
CN106592426A (en) Prefabricated template system for transverse pre-stress overall width reinforced concrete bridge deck and construction method
CN105780976B (en) Compound concrete shear wall structure and its concreting method
CN101787701B (en) Construction method for supporting pine pile in elevator shaft foundation pit
CN112227759B (en) Repair, reinforcement and migration method for historic building clean water wall
CN110273436A (en) Open trench tunnel utilizes support pile and bear down on one float Structure and its construction method of crown beam
CN106121035A (en) A kind of overlapping assembled integral basement of flat slab system
CN105780992A (en) Construction method of orthogonal and ortho-laid steel concrete vierendeel sandwich plate floor
CN108385612B (en) Construction method of concrete protective panel with good stability
CN106088320A (en) A kind of overlapping assembled integral basement of superstructure post and lintel system
CN110512635A (en) A kind of regularization template is in lower pier base support device and its construction method
CN105951842A (en) Raft lower reversed beam polystyrene board caul construction method
CN210117716U (en) Trapezoidal foundation ditch lateral wall concrete typical forms of elevartor shaft
CN203096762U (en) Anti-frost ground beam
CN112112295A (en) Reinforcing construction method for post-cast strip of post-sealed outer wall
CN209353381U (en) A kind of grouting behind shaft or drift lining steel plate for sealing water structure
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN112761158A (en) Green construction method for integral outer wall (three-in-one) of reverse construction underground engineering steel concrete key pin occlusive row pile
KR100444838B1 (en) A fiber reinforced earth retaining wall, a constructing method thereof, and a composite underground wall structure using thereof
CN107237330A (en) A kind of reinforced concrete inner support beam construction method without bed die
CN114809000B (en) Rapid construction method of prefabricated plate brick moulding bed
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191129

RJ01 Rejection of invention patent application after publication