JP2022135012A - 橋りょうの桁の扛上方法 - Google Patents
橋りょうの桁の扛上方法 Download PDFInfo
- Publication number
- JP2022135012A JP2022135012A JP2021034568A JP2021034568A JP2022135012A JP 2022135012 A JP2022135012 A JP 2022135012A JP 2021034568 A JP2021034568 A JP 2021034568A JP 2021034568 A JP2021034568 A JP 2021034568A JP 2022135012 A JP2022135012 A JP 2022135012A
- Authority
- JP
- Japan
- Prior art keywords
- cut
- bridge
- pier
- jack
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Landscapes
- Foundations (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
先ず、図1(a)に示すように、対象とする既設の橋脚1の、上下方向中間部の2か所を、それぞれ水平方向に切断する。2か所のうち先に切断する方は、断面の一部、例えば中心部を残して切断することが好ましい。残す部分は、後で切断する際の水平抵抗を確保できる程度の面積であればよい。後で切断する方は、全断面を切断する。図1の例では、上側の切断面11は全断面を切断し、下側の切断面12は中心部を残して切断するものとする。なお、切断時の水平抵抗を得る手段が他にあれば、2か所とも全断面を切断してもよい。高さ方向の切断位置は、水面10よりも上方とし、作業用足場が設置しやすいことや、後述するジャッキの能力に応じて決められる。切断する2か所の切断面11,12の間隔dは、後述するジャッキ3が設置可能な寸法であればよい。
次に、2か所の切断面11、12の間の、外周から適宜範囲のコンクリートを、はつり用ハンマードリル等で削り取る。このとき、例えば、切断工程の一回目で切断せずに残した部分を除いて削ればよい(図1(b))。
橋脚1の天端から、桁9の位置を避けて、少なくとも切断工程で切断された下側の切断面12よりも下方に到達するまで、補強材4を打ち込む(図1(d))。補強材4は、後述するジャッキアップの際に橋脚1の上下がずれるのを防ぐとともに、施工後に新たに構築された橋脚1を構造的に補強するものである。さらに、地盤に対し橋脚1の基礎14を安定させることが好ましく、そのためには、補強材4は、図1(d)に示すように橋脚1の天端から基礎14を貫通し、硬質の支持層20内において、補強材4の径の寸法以上の深さに到達するまで打ち込むことが好ましい。補強材4としては、例えば鋼管やマイクロパイル等が好適であり、H形鋼などの形鋼でも構わない。補強材4は、例えば一般的なコンクリートのコア抜き方法によってコア抜きをした後に打ち込まれ、長さ方向に適宜溶接して連結しながら打ち込めばよい。あるいは、鋼管杭を補強材4として用いてもよい。補強材4を所定位置まで打ち込んだ後、補強材4の外周とコア抜きした孔との隙間や、補強材4の断面内部の隙間は、モルタルで埋め固められる。
はつり工程で形成された隙間13に設置されたジャッキ3により、上側の切断面11よりも上部を持ち上げるジャッキアップを行い、桁9を所定の高さまで扛上する。ジャッキアップした後、はつり工程後にはめ込んだ仮受材2を取り除き、広がった隙間13の高さを維持するための仮受材5を、隙間13の適宜位置にはめ込んでおく(図1(e))。
ジャッキ3を取り外し、上下の切断面11、12の間の隙間13にコンクリート6を充填して塞ぐ(図1(f))。ジャッキアップ工程後に配置した仮受材5は、そのまま埋め込めばよい。
先ず、図3(a)に示すように、対象とする既設の橋脚1の、上下方向中間部の1か所を、例えばワイヤソー等で水平方向に切断する。切断する位置は、図1の例と同様に、水面10よりも上方とし、作業用足場が設置しやすいことや後述するジャッキの能力に応じて決められる。
次に、橋脚1の天端から、少なくとも切断工程で切断された切断面15よりも下方に到達するまで、補強材4を打ち込む(図3(b))。補強材4は、前述の実施形態と同様、図3(b)に示すように橋脚1の天端から基礎14を貫通し、硬質の支持層20内に到達するまで打ち込むことが好ましい。補強材4の材質や形状、打ち込み方法も、前述の実施形態と同様である。
本実施形態では、図3(b)に示すように、橋脚の外周側において、切断面15の上下を跨いでジャッキ8を取り付ける。このジャッキ8により、橋脚1の切断面15よりも上部を持ち上げるジャッキアップを行い、桁9を所定の高さまで扛上する(図3(c))。そして、ジャッキアップした後、切断面15の上部と下部との間に形成された隙間13の高さを維持するための仮受材5を、隙間13の適宜位置にはめ込んでおく。
その後、ジャッキ8を取り外し、隙間13にコンクリート6を充填して塞ぐ(図3(d))。ジャッキアップ工程後に配置した仮受材5は、そのまま埋め込めばよい。
2,5 仮受材
3、8 ジャッキ
4 補強材
9 桁
10 水面
11、12、15 切断面
13 隙間
20 支持層
Claims (5)
- 既存の橋りょうの桁を扛上させる方法であって、
水面よりも上方の橋脚の中間部において、間隔をあけた上下2か所をそれぞれ水平方向に切断する切断工程と、
前記切断工程により切断された上下2か所の切断面の間の外周部を削り取るはつり工程と、
前記橋脚の天端から、少なくとも下側の前記切断面よりも下方まで補強材を打ち込む補強材打設工程と、
前記はつり工程で形成された隙間にジャッキを設置し、上側の前記切断面よりも上部を持ち上げるジャッキアップ工程と、
前記ジャッキアップ工程後、上下2か所の前記切断面の間を塞ぐ充填工程と、
を有することを特徴とする、橋りょうの桁の扛上方法。 - 前記切断工程において、上下2か所のうち、先に切断する方は断面の中心部を残して切断し、後で切断する方は断面全面を切断することを特徴とする、請求項1に記載の橋りょうの桁の扛上方法。
- 前記はつり工程の後、上下の前記切断面の間に仮受材を設置することを特徴とする、請求項1または2のいずれか一項に記載の橋りょうの桁の扛上方法。
- 既存の橋りょうの桁を扛上させる方法であって、
水面よりも上方の橋脚の中間部の1か所を水平方向に切断する切断工程と、
前記橋脚の天端から、少なくとも前記切断工程により切断された切断面よりも下方まで補強材を打ち込む補強材打設工程と、
前記切断面を跨いで前記橋脚の外周にジャッキを設置し、前記切断面の上部を持ち上げるジャッキアップ工程と、
前記ジャッキアップ工程後、前記切断面の上部と下部との間に形成された隙間を塞ぐ充填工程と、
を有することを特徴とする、橋りょうの桁の扛上方法。 - 前記補強材は、前記橋脚の支持層の内部まで到達させることを特徴とする、請求項1~4のいずれか一項に記載の橋りょうの桁の扛上方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2021034568A JP7350797B2 (ja) | 2021-03-04 | 2021-03-04 | 橋りょうの桁の扛上方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2021034568A JP7350797B2 (ja) | 2021-03-04 | 2021-03-04 | 橋りょうの桁の扛上方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2022135012A true JP2022135012A (ja) | 2022-09-15 |
JP7350797B2 JP7350797B2 (ja) | 2023-09-26 |
Family
ID=83231397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2021034568A Active JP7350797B2 (ja) | 2021-03-04 | 2021-03-04 | 橋りょうの桁の扛上方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7350797B2 (ja) |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3523849B2 (ja) | 2001-06-14 | 2004-04-26 | 富士男 板垣 | 建築物の沈下修正方法 |
JP2003074196A (ja) | 2001-09-03 | 2003-03-12 | Ohbayashi Corp | 鉄筋コンクリート構造物の水平切断方法 |
JP2005016106A (ja) | 2003-06-25 | 2005-01-20 | Ohbayashi Corp | 高架橋の沈下防止方法 |
JP5015049B2 (ja) | 2008-03-24 | 2012-08-29 | 前田建設工業株式会社 | 橋脚の延伸工法 |
JP5247648B2 (ja) | 2009-10-06 | 2013-07-24 | 株式会社ジェイアール総研エンジニアリング | 既設コンクリート構造物の補強方法 |
JP2013245450A (ja) | 2012-05-24 | 2013-12-09 | Mase Kensetsu Kk | 既設杭支持力再生および沈下修正工法 |
TWI545077B (zh) | 2013-10-03 | 2016-08-11 | qing-long Liao | Three - axis parallel mechanism for bridge jacking application |
JP6637264B2 (ja) | 2015-07-31 | 2020-01-29 | 株式会社横河ブリッジ | 薄型ジャッキ及びこの薄型ジャッキを用いた免震装置又は支承装置の設置方法 |
-
2021
- 2021-03-04 JP JP2021034568A patent/JP7350797B2/ja active Active
Also Published As
Publication number | Publication date |
---|---|
JP7350797B2 (ja) | 2023-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108316368B (zh) | 一种对于独柱独桩的桥梁桩基主动托换方法 | |
CN107044142B (zh) | 用于减小房屋不均匀沉降的可调节式加固纠偏方法和结构 | |
CN111236241B (zh) | 基于半盖挖法的软弱富水地层地铁基坑加固开挖方法 | |
CN113502828B (zh) | 一种深基坑预警的处理方法 | |
CN104264683A (zh) | 三面环绕文保建筑凹字形超深基坑分区支护方法 | |
CN114000459B (zh) | 一种高桩码头灌注桩施工用平台的搭设方法 | |
KR200445795Y1 (ko) | 지표면에서의 콘크리트 블록 보강을 이용한 교량의 단일 현장타설말뚝 기초 | |
CN108797323B (zh) | 一种适用于硬质地层的钢栈桥 | |
CN109056710B (zh) | 一种硬质地层钢管桩及其施工方法 | |
CN114215096A (zh) | 一种塔吊格构柱桩基承台 | |
CN108179759B (zh) | 导向井水下钻芯掏槽无封底方法 | |
CN206902783U (zh) | 用于减小房屋不均匀沉降的可调节式加固纠偏结构 | |
CN112681340A (zh) | 大面积深基坑分区施工斜抛撑支护装置及其施工方法 | |
JP7350797B2 (ja) | 橋りょうの桁の扛上方法 | |
JP3075813B2 (ja) | 不等沈下対策型建造物 | |
AU2016102393A4 (en) | A Method of constructing a column, a tunnel, and a tunnel made from the method | |
CN112681333A (zh) | 临水桥梁墩台基础的基坑支护结构及其施工方法 | |
RU2807350C1 (ru) | Конструктивно-технологическое решение фундамента промежуточной опоры по типу «высокий свайный ростверк», сооружаемого во временном ограждающем сооружении | |
JP3905021B2 (ja) | 高架橋橋脚の構築方法 | |
CN219992483U (zh) | 一种对顶式河道桥台基坑支挡结构 | |
CN106836247B (zh) | 组合式围堰及其施工方法 | |
CN116988513B (zh) | 一种超大基坑盖挖逆作施工方法 | |
CN112982200B (zh) | 一种既有连续桥梁的托换方法 | |
CN113802545B (zh) | 一种护筒防护限位装置及其施工方法 | |
CN220035392U (zh) | 一种大吨位钢管桩支架整体吊装精调定位结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210317 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230206 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20230824 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20230905 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20230913 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7350797 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |