JP2021136745A - 状態推定装置、状態推定プログラム、状態推定方法 - Google Patents
状態推定装置、状態推定プログラム、状態推定方法 Download PDFInfo
- Publication number
- JP2021136745A JP2021136745A JP2020030114A JP2020030114A JP2021136745A JP 2021136745 A JP2021136745 A JP 2021136745A JP 2020030114 A JP2020030114 A JP 2020030114A JP 2020030114 A JP2020030114 A JP 2020030114A JP 2021136745 A JP2021136745 A JP 2021136745A
- Authority
- JP
- Japan
- Prior art keywords
- nodes
- state
- value
- total value
- tidal current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 46
- 238000012545 processing Methods 0.000 claims abstract description 23
- 238000005259 measurement Methods 0.000 claims abstract description 21
- 230000010365 information processing Effects 0.000 description 21
- 239000011159 matrix material Substances 0.000 description 19
- 230000006870 function Effects 0.000 description 16
- 230000009466 transformation Effects 0.000 description 11
- 238000004364 calculation method Methods 0.000 description 8
- 238000004891 communication Methods 0.000 description 3
- 238000012937 correction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000011156 evaluation Methods 0.000 description 3
- 238000010248 power generation Methods 0.000 description 3
- 238000007476 Maximum Likelihood Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Images
Abstract
Description
<<<情報処理装置10の構成>>>
図1は、本発明の一実施形態である情報処理装置10の構成を示す図である。情報処理装置10は、例えば、図2に示す電力系統30後述の状態を推定する装置であり、CPU(Central Processing Unit)20、メモリ21、記憶装置22、入力装置23、表示装置24、及び通信装置25を含むコンピュータである。なお、情報処理装置10は、「状態推定装置」に相当する。
図2は、情報処理装置10が状態推定を行う電力系統30の一例を示す図である。電力系統30は、例えば、6.6kV系の配電線系統であり、変圧器40、配電線41、ノードN1〜N4、各センサ付き開閉器S1〜S2を含む。各センサ付き開閉器S1、S2は、電力系統30の一つの区間31の両端部に配置される。センサ付き開閉器S1、S2は、配電線41のこれは電圧および電流、または電圧および潮流を計測する計測器である。なお、一般的な電力系統には、他にも配電線、需要家、センサ等が含まれているが、便宜上、ここでは簡素化した電力系統30を一例として図示している。また以下では、センサ付き開閉器S1、S2によって測定された電圧および電流、または電圧および潮流を、包括的に「潮流測定値」または「潮流の測定値」と称する。
図3は、情報処理装置10の第1実施形態である、情報処理装置10の機能ブロック等を示す図である。情報処理装置10の記憶装置22には、系統モデル60が記憶されている。また、CPU20が所定のプログラムを実行することにより、情報処理装置10には、状態推定部70が実現される。
状態推定部70は、各センサ付き開閉器S1、S2より取得した潮流測定値を用いて、電力系統30の状態を推定する機能、すなわち状態推定処理機能を備える。状態推定部70は、取得部71、合計負荷定義部72、推定処理部73、立式部74、及び状態取得部75を備える。
情報処理装置10の実行する状態推定処理の具体例として、電力系統30の区間31における状態推定処理について、図4の処理フローを用いて説明する。状態推定処理においては、ある時刻tにおけるノードN1〜N4それぞれの負荷推定値を取得する。ノードN1〜N4それぞれにおける負荷電力推定値(状態値)は、(1)式のように表され、ノードN1〜N4の有効電力及び無効電力を推定することにより得られる。以下の状態推定処理では、ノードN1〜N4において推定すべき状態値を、状態値ベクトルとして(2A)式に定義し、この状態値ベクトルを取得することを目的とする。状態値ベクトルは(2A)式に示すように、ノードN1〜N4それぞれにおける有効電力及び無効電力を要素として持つ。
本実施形態による電力系統30(図1)に対し、従来技術を適用した場合の課題について以下に説明する。取得すべき状態値ベクトル、及び、時刻tにおけるセンサ付き開閉器S1、S2の潮流測定値より得られる測定値ベクトルは、(11)式、(12)式のように表される。これらは、(2A)式及び(2B)式と同様である。
従来技術と異なり、本実施形態の情報処理装置10においては、行列Mを用いて潮流方程式を立式し、合計値ベクトルを求めている。その結果として状態値ベクトルを得ている。合計値ベクトルの次元数は2であるため、本実施形態の情報処理装置10では、解を一意に得ることができる。センサ数が少ない場合や、一部のセンサからの測定値が得られなかった場合などにおいても、状態値を可観測化し、常に解を安定して得ることができる。また、負荷修正型の状態推定手法においても、解が一意に得られる。そのため、変換行列Mが一定とした場合、測定値に大きな変化がない場合には、状態値には時刻間での大きな変動が起きない。また従来の状態推定手法と異なり、本発明では、変換行列の作成のみが追加され、状態推定自体の処理は大きく変化しない。そのため、状態推定を行うために、各時間断面での潮流計算を複数回行い、収束計算を行うような処理が発生せず、状態推定を行うためのシステム管理・保守が容易である。
20 CPU
21 メモリ
22 記憶装置
23 入力装置
24 表示装置
25 通信装置
30 電力系統
40 変圧器
41 配電線
60 系統モデル
70 状態推定部
S1〜S2 センサ付き開閉器
Claims (6)
- 配電系統において、複数のノードと接続した区間における状態推定を行う状態推定装置であって、
前記区間における潮流測定値を取得する取得部と、
前記複数のノードにおける各負荷の合計値に対する相対量を推定し、前記複数のノードにおける各重み量として取得する推定処理部と、
前記各重み量及び前記潮流測定値を用いて、前記合計値に関する潮流方程式を立式する立式部と、
前記潮流方程式の解を得ることにより前記合計値を求め、前記合計値及び前記各重み量を用いて前記複数のノードにおける各状態値を取得する状態取得部と、を備えることを特徴とする状態推定装置。 - 前記推定処理部は、
前記複数のノードそれぞれにおける前記各重み量を、前記複数のノードそれぞれに接続される設備の設備容量に比例するように計算する処理、を実行する請求項1に記載の状態推定装置。 - 前記推定処理部は、
前記複数のノードそれぞれにおける前記各重み量を、前記複数のノードのうち隣接するノードとの間の線路長に比例するように計算する処理、を実行する請求項1に記載の状態推定装置。 - 配電系統において、複数のノードと接続した区間における状態推定を行う方法であって、
前記区間における潮流測定値を取得する処理と、
前記複数のノードにおける各負荷の合計値に対する相対量を推定し、前記複数のノードにおける各重み量として取得する処理と、
前記各重み量及び前記潮流測定値を用いて、前記合計値に関する潮流方程式を立式する処理と、
前記潮流方程式の解を得ることにより前記合計値を求め、前記合計値及び前記各重み量を用いて前記複数のノードにおける各状態値を取得する処理と、を含む状態推定方法。 - 配電系統において、複数のノードと接続した区間における状態推定を行うプログラムであって、
前記区間における潮流測定値を取得する処理と、
前記複数のノードにおける各負荷の合計値に対する相対量を推定し、前記複数のノードにおける各重み量として取得する推定処理と、
前記各重み量及び前記潮流測定値を用いて、前記合計値に関する潮流方程式を立式する処理と、
前記潮流方程式の解を得ることにより前記合計値を求め、前記合計値及び前記各重み量を用いて前記複数のノードにおける各状態値を取得する処理と、をコンピュータに実行させる状態推定プログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020030114A JP7480523B2 (ja) | 2020-02-26 | 2020-02-26 | 状態推定装置、状態推定プログラム、状態推定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2020030114A JP7480523B2 (ja) | 2020-02-26 | 2020-02-26 | 状態推定装置、状態推定プログラム、状態推定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2021136745A true JP2021136745A (ja) | 2021-09-13 |
JP7480523B2 JP7480523B2 (ja) | 2024-05-10 |
Family
ID=77661784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020030114A Active JP7480523B2 (ja) | 2020-02-26 | 2020-02-26 | 状態推定装置、状態推定プログラム、状態推定方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7480523B2 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021180987A (ja) * | 2017-07-07 | 2021-11-25 | 株式会社三洋物産 | 遊技機 |
JP2021180989A (ja) * | 2017-07-07 | 2021-11-25 | 株式会社三洋物産 | 遊技機 |
JP2021180986A (ja) * | 2017-07-07 | 2021-11-25 | 株式会社三洋物産 | 遊技機 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004064969A (ja) | 2002-07-31 | 2004-02-26 | Kansai Electric Power Co Inc:The | 配電線の区間負荷算出方法、配電線の負荷監視制御システム及びプログラム |
JP2006246683A (ja) | 2005-03-07 | 2006-09-14 | Toshiba Corp | 配電線自動制御方法およびプログラム、ならびにそれを搭載した配電線自動制御システム |
JP5159695B2 (ja) | 2009-05-11 | 2013-03-06 | 中国電力株式会社 | 配電系統状態推定方法及び配電系統状態推定装置 |
JP5615785B2 (ja) | 2011-09-26 | 2014-10-29 | 株式会社日立製作所 | 電力系統状態推定装置およびそれを用いた電力系統システム |
JP6144611B2 (ja) | 2013-12-03 | 2017-06-07 | 株式会社日立製作所 | 配電系統の状態推定装置、状態推定方法、および状態推定プログラム |
-
2020
- 2020-02-26 JP JP2020030114A patent/JP7480523B2/ja active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021180987A (ja) * | 2017-07-07 | 2021-11-25 | 株式会社三洋物産 | 遊技機 |
JP2021180989A (ja) * | 2017-07-07 | 2021-11-25 | 株式会社三洋物産 | 遊技機 |
JP2021180986A (ja) * | 2017-07-07 | 2021-11-25 | 株式会社三洋物産 | 遊技機 |
Also Published As
Publication number | Publication date |
---|---|
JP7480523B2 (ja) | 2024-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4705563B2 (ja) | 配電系統の状態推定装置、状態推定方法及びそのプログラム | |
JP2021136745A (ja) | 状態推定装置、状態推定プログラム、状態推定方法 | |
JP5159695B2 (ja) | 配電系統状態推定方法及び配電系統状態推定装置 | |
JP4972623B2 (ja) | 配電系統状態推定装置、方法及びプログラム | |
NO325888B1 (no) | Stabilitetsprediksjon for et elektrisk kraftnett | |
JP2016224022A (ja) | 蓄電池パラメータ推定装置および蓄電池パラメータ推定方法 | |
JP4148208B2 (ja) | 配電系統の状態推定装置,方法及びプログラム | |
JP5915342B2 (ja) | 電力系統の状態推定方法 | |
JP6144611B2 (ja) | 配電系統の状態推定装置、状態推定方法、および状態推定プログラム | |
Kumar et al. | Genetic algorithm-based meter placement for static estimation of harmonic sources | |
Onwuachumba et al. | New reduced model approach for power system state estimation using artificial neural networks and principal component analysis | |
US20220292232A1 (en) | Method and Apparatus for the State Estimation of an Electrical Grid | |
Lin et al. | Hpt-rl: Calibrating power system models based on hierarchical parameter tuning and reinforcement learning | |
JP6727156B2 (ja) | 電力系統状態推定装置 | |
Menon et al. | Towards a commercial-grade tool for disturbance-based model validation and calibration | |
Ortega et al. | Distributed slack bus model formulation for the holomorphic embedding load flow method | |
Florez et al. | Distflow based state estimation for power distribution networks | |
JP7355333B2 (ja) | 情報処理装置、情報処理方法、プログラム | |
KR102523551B1 (ko) | 부하분배계수 기반 배전운영시스템의 실시간 전압/구간부하 관리방법 및 그 운영장치 | |
AU2020406229B2 (en) | Data exchange and processing synchronization in distributed systems | |
CN113381397B (zh) | 获取直流电力系统最小状态潮流的节点级分散方法 | |
Haesen et al. | Stochastic, computational and convergence aspects of distribution power flow algorithms | |
JP2023068976A (ja) | 状態推定装置、状態推定方法及び状態推定プログラム | |
JP2023010452A (ja) | 電力推定装置、電力推定装置の制御方法及びプログラム | |
JP2023143319A (ja) | 情報処理装置、情報処理方法及び情報処理プログラム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230116 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20231024 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20231128 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240119 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240326 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240408 |