JP2017068408A5 - - Google Patents

Download PDF

Info

Publication number
JP2017068408A5
JP2017068408A5 JP2015190951A JP2015190951A JP2017068408A5 JP 2017068408 A5 JP2017068408 A5 JP 2017068408A5 JP 2015190951 A JP2015190951 A JP 2015190951A JP 2015190951 A JP2015190951 A JP 2015190951A JP 2017068408 A5 JP2017068408 A5 JP 2017068408A5
Authority
JP
Japan
Prior art keywords
unit
power plant
operation data
profit amount
period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015190951A
Other languages
English (en)
Japanese (ja)
Other versions
JP2017068408A (ja
JP6635253B2 (ja
Filing date
Publication date
Application filed filed Critical
Priority claimed from JP2015190951A external-priority patent/JP6635253B2/ja
Priority to JP2015190951A priority Critical patent/JP6635253B2/ja
Priority to KR1020187008649A priority patent/KR102111918B1/ko
Priority to US15/763,300 priority patent/US10890902B2/en
Priority to PCT/JP2016/078561 priority patent/WO2017057425A1/ja
Priority to CN201680053318.3A priority patent/CN108027947B/zh
Priority to MX2018003526A priority patent/MX387240B/es
Publication of JP2017068408A publication Critical patent/JP2017068408A/ja
Publication of JP2017068408A5 publication Critical patent/JP2017068408A5/ja
Publication of JP6635253B2 publication Critical patent/JP6635253B2/ja
Application granted granted Critical
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2015190951A 2015-09-29 2015-09-29 発電プラント分析装置、発電プラントの分析方法、およびプログラム Active JP6635253B2 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP2015190951A JP6635253B2 (ja) 2015-09-29 2015-09-29 発電プラント分析装置、発電プラントの分析方法、およびプログラム
CN201680053318.3A CN108027947B (zh) 2015-09-29 2016-09-28 发电厂分析装置、发电厂的分析方法以及计算机可读记录介质
US15/763,300 US10890902B2 (en) 2015-09-29 2016-09-28 Power plant analysis device, power plant analysis method, and program
PCT/JP2016/078561 WO2017057425A1 (ja) 2015-09-29 2016-09-28 発電プラント分析装置、発電プラントの分析方法、およびプログラム
KR1020187008649A KR102111918B1 (ko) 2015-09-29 2016-09-28 발전 플랜트 분석 장치, 발전 플랜트의 분석 방법, 및 프로그램
MX2018003526A MX387240B (es) 2015-09-29 2016-09-28 Dispositivo de análisis de planta de energía, método de análisis de planta de energía y programa.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015190951A JP6635253B2 (ja) 2015-09-29 2015-09-29 発電プラント分析装置、発電プラントの分析方法、およびプログラム

Publications (3)

Publication Number Publication Date
JP2017068408A JP2017068408A (ja) 2017-04-06
JP2017068408A5 true JP2017068408A5 (enExample) 2018-08-30
JP6635253B2 JP6635253B2 (ja) 2020-01-22

Family

ID=58427746

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015190951A Active JP6635253B2 (ja) 2015-09-29 2015-09-29 発電プラント分析装置、発電プラントの分析方法、およびプログラム

Country Status (6)

Country Link
US (1) US10890902B2 (enExample)
JP (1) JP6635253B2 (enExample)
KR (1) KR102111918B1 (enExample)
CN (1) CN108027947B (enExample)
MX (1) MX387240B (enExample)
WO (1) WO2017057425A1 (enExample)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111263949A (zh) * 2017-10-25 2020-06-09 皇家飞利浦有限公司 从利用情况数据中提取销售和升级机会
JP7373927B2 (ja) * 2019-06-27 2023-11-06 三菱重工業株式会社 演算装置、プラント、演算方法及びプログラム
CN111882146B (zh) * 2020-06-10 2023-12-22 国家电网公司华北分部 火电机组改造的费用分摊方法及计算设备
WO2025074532A1 (ja) * 2023-10-04 2025-04-10 日立Geニュークリア・エナジー株式会社 最適運用分析装置、最適運用分析システム及び最適運用分析方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2227240T3 (es) * 2000-06-26 2005-04-01 Siemens Aktiengesellschaft Procedimiento universal para el calculo previo de parametros de procesos industriales.
JP2003288474A (ja) * 2002-03-27 2003-10-10 Toshiba Corp 資産管理装置、資産管理方法、および資産管理委託契約方法
US20040102872A1 (en) * 2002-11-26 2004-05-27 Schick Louis Andrew Method and tool for power plant operational optimization
JP3845396B2 (ja) * 2003-07-28 2006-11-15 株式会社日立製作所 発電設備の改造案支援方法および装置、発電設備改造による性能向上評価方法および装置
CN101893877A (zh) * 2009-05-20 2010-11-24 中国国电集团公司九江发电厂 一种发电厂基于能耗分析的优化运行方法及其系统
US8874242B2 (en) * 2011-03-18 2014-10-28 Rockwell Automation Technologies, Inc. Graphical language for optimization and use
JP5979669B2 (ja) * 2012-11-09 2016-08-24 三菱日立パワーシステムズ株式会社 ガスタービンアップグレードによる顧客経済性の簡易評価システム
JP6071471B2 (ja) * 2012-11-26 2017-02-01 三菱日立パワーシステムズ株式会社 アップグレード計画支援装置
JP2015158750A (ja) * 2014-02-21 2015-09-03 株式会社東芝 電源運用計画策定装置、方法及びプログラム

Similar Documents

Publication Publication Date Title
JP2017068408A5 (enExample)
JP2018169759A5 (enExample)
JP2011163345A5 (enExample)
JP2008032011A (ja) 複合サイクル発電プラントに対する圧縮機汚損の影響を推定するための方法
JP2015522895A5 (enExample)
CN104504509A (zh) 采用动态基准值的火电厂耗差分析系统及其方法
JP2013510365A (ja) 発電プラントの熱効率を最大化するシステム及び方法
JP6416610B2 (ja) プラント機器の保守計画システム及び方法
Oliver et al. Variational approach to relaxed topological optimization: Closed form solutions for structural problems in a sequential pseudo-time framework
JP7059129B2 (ja) 情報表示装置、情報表示プログラム及び情報表示方法
RU2013104504A (ru) Система и способ тестирования показателя работы паровой турбины
JP6635253B2 (ja) 発電プラント分析装置、発電プラントの分析方法、およびプログラム
JP2017082681A5 (enExample)
Nabavieh et al. Dynamic changes in CO2 emission performance of different types of Iranian fossil-fuel power plants
EP3373233A1 (en) Scheduling maintenance to reduce degradation of a power generation system
JP2019108881A (ja) 発電プラント性能評価方法及び発電プラント性能評価プログラム
WO2020031532A1 (ja) 性能評価装置、性能評価方法及び性能影響度出力方法
JP2015038345A (ja) 蒸気タービンクラッチ付き複合サイクル発電プラント用ベース負荷推定
JP6652481B2 (ja) 運転計画作成装置、運転計画作成方法およびプログラム
EP3519680B1 (en) System, method, and computer-readable medium for controlling flow valves in a turbine
KR20160137336A (ko) 신 재생 에너지 발전설비의 유지보수 관리 장치 및 그 방법
JP2018207669A (ja) 発電量予測装置、発電量予測方法、プログラム
Ceseña et al. Integrated energy-water model for interdependent storage, run-of-river and pump hydropower
JP2018207668A (ja) 発電量予測装置、発電量予測方法
Kim et al. Gas turbine blade stress and temperature sensitivity to turbine inlet profile and cooling flow