JP2017068408A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2017068408A5 JP2017068408A5 JP2015190951A JP2015190951A JP2017068408A5 JP 2017068408 A5 JP2017068408 A5 JP 2017068408A5 JP 2015190951 A JP2015190951 A JP 2015190951A JP 2015190951 A JP2015190951 A JP 2015190951A JP 2017068408 A5 JP2017068408 A5 JP 2017068408A5
- Authority
- JP
- Japan
- Prior art keywords
- unit
- power plant
- operation data
- profit amount
- period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004069 plant analysis Substances 0.000 claims 9
- 238000007634 remodeling Methods 0.000 claims 2
- 239000000446 fuel Substances 0.000 claims 1
- 238000011084 recovery Methods 0.000 claims 1
- 238000010248 power generation Methods 0.000 description 1
Description
本発明の第1の態様によれば、発電プラント分析装置は、顧客が所有する発電プラントから第1期間毎に収集される運転データを記憶する運転データ記憶部から、第1期間より長い直近の第2期間の間に収集された前記運転データを取得する運転データ取得部と、取得された前記運転データに基づいて前記発電プラントの利用率を算出する利用率算出部と、前記利用率に基づいて前記発電プラントの単位性能向上量に対する単位時間あたりの平均利益額を算出する単位利益額算出部とを備える。
本発明の第12の態様によれば、顧客が所有する発電プラントから第1期間毎に収集される運転データのうち、第1期間より長い直近の第2期間の間に収集された前記運転データを取得する取得ステップと、取得された前記運転データに基づいて前記発電プラントの利用率を算出するステップと、前記利用率に基づいて前記発電プラントの単位性能向上量に対する単位時間あたりの平均利益額を算出する単位利益額算出ステップとを有する。
本発明の第13の態様によれば、プログラムは、コンピュータを、顧客が所有する発電プラントから第1期間毎に収集される運転データを記憶する運転データ記憶部から、第1期間より長い直近の第2期間の間に収集された前記運転データを取得する運転データ取得部、取得された前記運転データに基づいて前記発電プラントの利用率を算出する利用率算出部、前記利用率に基づいて前記発電プラントの単位性能向上量に対する単位時間あたりの平均利益額を算出する単位利益額算出部として機能させる。
Claims (12)
- 顧客が所有する発電プラントから第1期間毎に収集される運転データを記憶する運転データ記憶部から、第1期間より長い直近の第2期間の間に収集された前記運転データを取得する運転データ取得部と、
取得された前記運転データに基づいて前記発電プラントの利用率を算出する利用率算出部と、
前記利用率に基づいて前記発電プラントの単位性能向上量に対する単位時間あたりの平均利益額を算出する単位利益額算出部と
を備える発電プラント分析装置。 - 前記単位性能向上量が、単位出力向上量であって、
前記利用率算出部が、取得された前記運転データに基づいて、第2期間における所定負荷以上の運転の継続期間の割合を、前記発電プラントの前記利用率として算出する
請求項1に記載の発電プラント分析装置。 - 前記単位性能向上量が、単位効率向上量であって、
前記利用率算出部が、取得された前記運転データに基づいて、第2期間における運転の負荷率の平均値を、前記発電プラントの前記利用率として算出する
請求項1に記載の発電プラント分析装置。 - 前記発電プラントのアップグレードメニューごとに、前記アップグレードメニューの価格と前記アップグレードメニューの適用による前記発電プラントの性能向上量とを関連付けて記憶するアップグレード情報記憶部と、
前記単位利益額算出部が算出した前記平均利益額および前記アップグレードメニューの前記価格に基づく情報を出力する出力部と
を備える請求項1から請求項3の何れか1項に記載の発電プラント分析装置。 - 前記アップグレード情報記憶部が、前記アップグレードメニューに関連付けて前記アップグレードメニューの償却期間に関する償却情報を記憶し、
前記出力部が、前記単位利益額算出部が算出した前記平均利益額、前記アップグレードメニューの前記価格、および前記償却情報に基づく情報を出力する
請求項4に記載の発電プラント分析装置。 - 前記アップグレードメニューが、1以上のアップグレードパーツの組み合わせである
請求項4または請求項5に記載の発電プラント分析装置。 - 前記出力部が、前記単位利益額算出部が算出した前記平均利益額、前記アップグレードメニューの前記価格、および前記アップグレードメニューによる前記発電プラントの改造に要する改造期間に基づく情報を出力する
請求項4から請求項6の何れか1項に記載の発電プラント分析装置。 - 前記単位利益額算出部が算出した前記平均利益額に基づいて、前記アップグレードメニューの適用による性能向上により増加する単位時間あたりの平均利益額を算出する利益額算出部をさらに備え、
前記出力部が、前記利益額算出部が算出した前記平均利益額および前記アップグレードメニューの前記価格に基づく情報を出力する
請求項4から請求項6の何れか1項に記載の発電プラント分析装置。 - 直近の売電価格および直近の燃料価格の少なくとも一方を取得する価格取得部をさらに備え、
前記単位利益額算出部が、取得された前記価格、および取得された前記運転データに基づいて前記発電プラントの単位性能向上量に対する単位時間あたりの平均利益額を算出する
請求項1から請求項8の何れか1項に記載の発電プラント分析装置。 - 前記発電プラントが、ガスタービン、蒸気タービン、および排熱回収ボイラの少なくとも1つを備える
請求項1から請求項9の何れか1項に記載の発電プラント分析装置。 - 顧客が所有する発電プラントから第1期間毎に収集される運転データのうち、第1期間より長い直近の第2期間の間に収集された前記運転データを取得する取得ステップと、
取得された前記運転データに基づいて前記発電プラントの利用率を算出するステップと、
前記利用率に基づいて前記発電プラントの単位性能向上量に対する単位時間あたりの平均利益額を算出する単位利益額算出ステップと
を有する発電プラントの分析方法。 - コンピュータを、
顧客が所有する発電プラントから第1期間毎に収集される運転データを記憶する運転データ記憶部から、第1期間より長い直近の第2期間の間に収集された前記運転データを取得する運転データ取得部、
取得された前記運転データに基づいて前記発電プラントの利用率を算出する利用率算出部、
前記利用率に基づいて前記発電プラントの単位性能向上量に対する単位時間あたりの平均利益額を算出する単位利益額算出部
として機能させるためのプログラム。
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015190951A JP6635253B2 (ja) | 2015-09-29 | 2015-09-29 | 発電プラント分析装置、発電プラントの分析方法、およびプログラム |
MX2018003526A MX2018003526A (es) | 2015-09-29 | 2016-09-28 | Dispositivo de analisis de planta de energia, metodo de analisis de planta de energia y programa. |
KR1020187008649A KR102111918B1 (ko) | 2015-09-29 | 2016-09-28 | 발전 플랜트 분석 장치, 발전 플랜트의 분석 방법, 및 프로그램 |
US15/763,300 US10890902B2 (en) | 2015-09-29 | 2016-09-28 | Power plant analysis device, power plant analysis method, and program |
CN201680053318.3A CN108027947B (zh) | 2015-09-29 | 2016-09-28 | 发电厂分析装置、发电厂的分析方法以及计算机可读记录介质 |
PCT/JP2016/078561 WO2017057425A1 (ja) | 2015-09-29 | 2016-09-28 | 発電プラント分析装置、発電プラントの分析方法、およびプログラム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015190951A JP6635253B2 (ja) | 2015-09-29 | 2015-09-29 | 発電プラント分析装置、発電プラントの分析方法、およびプログラム |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2017068408A JP2017068408A (ja) | 2017-04-06 |
JP2017068408A5 true JP2017068408A5 (ja) | 2018-08-30 |
JP6635253B2 JP6635253B2 (ja) | 2020-01-22 |
Family
ID=58427746
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015190951A Active JP6635253B2 (ja) | 2015-09-29 | 2015-09-29 | 発電プラント分析装置、発電プラントの分析方法、およびプログラム |
Country Status (6)
Country | Link |
---|---|
US (1) | US10890902B2 (ja) |
JP (1) | JP6635253B2 (ja) |
KR (1) | KR102111918B1 (ja) |
CN (1) | CN108027947B (ja) |
MX (1) | MX2018003526A (ja) |
WO (1) | WO2017057425A1 (ja) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3701477A1 (en) * | 2017-10-25 | 2020-09-02 | Koninklijke Philips N.V. | Extracting sales and upgrade opportunities from utilization data |
JP7373927B2 (ja) * | 2019-06-27 | 2023-11-06 | 三菱重工業株式会社 | 演算装置、プラント、演算方法及びプログラム |
CN111882146B (zh) * | 2020-06-10 | 2023-12-22 | 国家电网公司华北分部 | 火电机组改造的费用分摊方法及计算设备 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1295184B1 (de) * | 2000-06-26 | 2004-08-25 | Siemens Aktiengesellschaft | Universelles verfahren zur vorausberechnung von parametern industrieller prozesse |
JP2003288474A (ja) * | 2002-03-27 | 2003-10-10 | Toshiba Corp | 資産管理装置、資産管理方法、および資産管理委託契約方法 |
US20040102872A1 (en) * | 2002-11-26 | 2004-05-27 | Schick Louis Andrew | Method and tool for power plant operational optimization |
JP3845396B2 (ja) * | 2003-07-28 | 2006-11-15 | 株式会社日立製作所 | 発電設備の改造案支援方法および装置、発電設備改造による性能向上評価方法および装置 |
CN101893877A (zh) * | 2009-05-20 | 2010-11-24 | 中国国电集团公司九江发电厂 | 一种发电厂基于能耗分析的优化运行方法及其系统 |
US8874242B2 (en) * | 2011-03-18 | 2014-10-28 | Rockwell Automation Technologies, Inc. | Graphical language for optimization and use |
JP5979669B2 (ja) * | 2012-11-09 | 2016-08-24 | 三菱日立パワーシステムズ株式会社 | ガスタービンアップグレードによる顧客経済性の簡易評価システム |
JP6071471B2 (ja) * | 2012-11-26 | 2017-02-01 | 三菱日立パワーシステムズ株式会社 | アップグレード計画支援装置 |
JP2015158750A (ja) * | 2014-02-21 | 2015-09-03 | 株式会社東芝 | 電源運用計画策定装置、方法及びプログラム |
-
2015
- 2015-09-29 JP JP2015190951A patent/JP6635253B2/ja active Active
-
2016
- 2016-09-28 US US15/763,300 patent/US10890902B2/en active Active
- 2016-09-28 CN CN201680053318.3A patent/CN108027947B/zh active Active
- 2016-09-28 KR KR1020187008649A patent/KR102111918B1/ko active IP Right Grant
- 2016-09-28 WO PCT/JP2016/078561 patent/WO2017057425A1/ja active Application Filing
- 2016-09-28 MX MX2018003526A patent/MX2018003526A/es unknown
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2018169759A5 (ja) | ||
JP2011163345A5 (ja) | ||
JP2015011722A5 (ja) | ||
JP2008032011A (ja) | 複合サイクル発電プラントに対する圧縮機汚損の影響を推定するための方法 | |
JP2017068408A5 (ja) | ||
CN104504509A (zh) | 采用动态基准值的火电厂耗差分析系统及其方法 | |
JP7059129B2 (ja) | 情報表示装置、情報表示プログラム及び情報表示方法 | |
JP2013510365A (ja) | 発電プラントの熱効率を最大化するシステム及び方法 | |
Nabavieh et al. | Dynamic changes in CO2 emission performance of different types of Iranian fossil-fuel power plants | |
RU2013104504A (ru) | Система и способ тестирования показателя работы паровой турбины | |
JP6635253B2 (ja) | 発電プラント分析装置、発電プラントの分析方法、およびプログラム | |
EP3373233A1 (en) | Scheduling maintenance to reduce degradation of a power generation system | |
JP2015038345A (ja) | 蒸気タービンクラッチ付き複合サイクル発電プラント用ベース負荷推定 | |
WO2020031532A1 (ja) | 性能評価装置、性能評価方法及び性能影響度出力方法 | |
JP6652481B2 (ja) | 運転計画作成装置、運転計画作成方法およびプログラム | |
KR20160137336A (ko) | 신 재생 에너지 발전설비의 유지보수 관리 장치 및 그 방법 | |
JP2017082681A5 (ja) | ||
JP2019108881A (ja) | 発電プラント性能評価方法及び発電プラント性能評価プログラム | |
Ceseña et al. | Integrated energy-water model for interdependent storage, run-of-river and pump hydropower | |
Kim et al. | Gas turbine blade stress and temperature sensitivity to turbine inlet profile and cooling flow | |
JP2013205970A (ja) | 実行時間推定装置、プログラム、及び、実行時間推定方法 | |
BENSI | Off-design exergy analysis of combined cycle power plants: the case study of La Casella | |
EP3519680B1 (en) | System, method, and computer-readable medium for controlling flow valves in a turbine | |
Kim et al. | Development of a Performance Improvement Verification Simulator for Large Steam Turbines | |
Wouden et al. | Detecting Unsteady Blade Row Interaction in a Francis Turbine using a Phase-Lag Boundary Condition |