JP2015095922A - エネルギー管理装置およびエネルギー管理方法 - Google Patents
エネルギー管理装置およびエネルギー管理方法 Download PDFInfo
- Publication number
- JP2015095922A JP2015095922A JP2013232801A JP2013232801A JP2015095922A JP 2015095922 A JP2015095922 A JP 2015095922A JP 2013232801 A JP2013232801 A JP 2013232801A JP 2013232801 A JP2013232801 A JP 2013232801A JP 2015095922 A JP2015095922 A JP 2015095922A
- Authority
- JP
- Japan
- Prior art keywords
- energy
- demand
- amount
- facility
- supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
Description
Claims (8)
- エネルギーの供給設備および需要設備を含む分散型エネルギー網のエネルギー需給を管理するエネルギー管理装置であって、
ユーザにより設定される要求時間と、前記供給設備により利用されることができる残エネルギー量の測定値とを記憶する記憶部と、
前記分散型エネルギー網に対して外部から供給される外部エネルギーの使用が制限された場合、前記制限の開始時刻から前記要求時間が経過した後の終了時刻における残エネルギー量が予め定められた終了エネルギー量以上になることを条件として、前記残エネルギー量の測定値に基づき前記需要設備による需要の抑制が必要であるか否かを判定し、前記判定の結果に基づいて、前記供給設備または前記需要設備に対する指令値を算出する演算部と、
を備えるエネルギー管理装置。 - 前記演算部は、前記残エネルギーの測定値と要求時間と前記終了エネルギー量とに基づいて、前記開始時刻から前記終了時刻の間の特定時刻における前記残エネルギー量の目標値を算出し、前記残エネルギーの測定値に基づいて、前記特定時刻における残エネルギー量の予測値を算出し、前記残エネルギー量の予測値が前記目標値を下回るか否かを判定し、前記残エネルギー量の予測値が前記目標値を下回る場合、前記目標値から前記残エネルギー量の予測値を減ずることにより需要エネルギー量の抑制の必要量を算出し、前記需要設備に対し前記必要量以上の需要エネルギー量の抑制を指示する指令値を算出する、
請求項1に記載のエネルギー管理装置。 - 前記演算部は、予め定められた時間間隔で、前記特定時刻を決定し、前記供給設備または前記需要設備に対する指令値を算出する、
請求項2に記載のエネルギー管理装置。 - 前記分散型エネルギー網は、複数の需要設備を含み、
前記記憶部は、前記複数の需要設備のそれぞれに対して設定された優先順位を記憶し、
前記演算部は、前記優先順位に従って、前記複数の需要設備の中から制御される需要設備を選択し、前記選択された需要設備に対する指令値を算出する、
請求項1乃至3の何れか一項に記載のエネルギー管理装置。 - 前記分散型エネルギー網は、複数の供給設備を含み、
前記記憶部は、前記複数の供給設備のそれぞれに対して設定された制御シーケンスを記憶し、
前記演算部は、前記制御シーケンスに従って、前記複数の供給設備の中から制御される供給設備を選択し、前記選択された供給設備に対する指令値を算出する、
請求項1乃至4の何れか一項に記載のエネルギー管理装置。 - 前記分散型エネルギー網は、電気エネルギーを供給する電気エネルギー供給設備と熱エネルギーを供給する熱エネルギー供給設備とを含み、
前記演算部は、前記残エネルギー量を電気エネルギーで表す、
請求項1乃至5の何れか一項に記載のエネルギー管理装置。 - 前記供給設備または前記需要設備に対する指令値を送信する送信部を更に備える、
請求項1乃至6の何れか一項に記載のエネルギー管理装置。 - エネルギーの供給設備および需要設備を含む分散型エネルギー網のエネルギー需給を管理するエネルギー管理方法であって、
コンピュータが、ユーザにより設定される要求時間と、前記供給設備により利用されることができる残エネルギー量の測定値とを記憶し、
前記分散型エネルギー網に対して外部から供給される外部エネルギーの使用が制限された場合、前記コンピュータが、前記制限の開始時刻から前記要求時間が経過した後の終了時刻における残エネルギー量が予め定められた終了エネルギー量以上になることを条件として、前記残エネルギー量の測定値に基づき前記需要設備による需要の抑制が必要であるか否かを判定し、前記判定の結果に基づいて、前記供給設備または前記需要設備に対する指令値を算出する、
ことを備えるエネルギー管理方法
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013232801A JP2015095922A (ja) | 2013-11-11 | 2013-11-11 | エネルギー管理装置およびエネルギー管理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013232801A JP2015095922A (ja) | 2013-11-11 | 2013-11-11 | エネルギー管理装置およびエネルギー管理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2015095922A true JP2015095922A (ja) | 2015-05-18 |
Family
ID=53198007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013232801A Ceased JP2015095922A (ja) | 2013-11-11 | 2013-11-11 | エネルギー管理装置およびエネルギー管理方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2015095922A (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116151206A (zh) * | 2023-04-19 | 2023-05-23 | 广东电网有限责任公司佛山供电局 | 一种配网线路事故限电序位表智能编制方法、装置及设备 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012228043A (ja) * | 2011-04-18 | 2012-11-15 | Kyocera Corp | 制御装置、電力制御システム、及び電力制御方法 |
JP2013031283A (ja) * | 2011-07-28 | 2013-02-07 | Sanyo Electric Co Ltd | デマンド制御装置 |
JP2013074689A (ja) * | 2011-09-27 | 2013-04-22 | Panasonic Corp | エネルギー管理システム、およびエネルギー管理装置 |
-
2013
- 2013-11-11 JP JP2013232801A patent/JP2015095922A/ja not_active Ceased
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012228043A (ja) * | 2011-04-18 | 2012-11-15 | Kyocera Corp | 制御装置、電力制御システム、及び電力制御方法 |
JP2013031283A (ja) * | 2011-07-28 | 2013-02-07 | Sanyo Electric Co Ltd | デマンド制御装置 |
JP2013074689A (ja) * | 2011-09-27 | 2013-04-22 | Panasonic Corp | エネルギー管理システム、およびエネルギー管理装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116151206A (zh) * | 2023-04-19 | 2023-05-23 | 广东电网有限责任公司佛山供电局 | 一种配网线路事故限电序位表智能编制方法、装置及设备 |
CN116151206B (zh) * | 2023-04-19 | 2023-07-04 | 广东电网有限责任公司佛山供电局 | 一种配网线路事故限电序位表智能编制方法、装置及设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6001712B2 (ja) | パワーコンディショナ、電力システム及び制御方法 | |
JP5372724B2 (ja) | 自然エネルギを用いた発電システム | |
JP5481080B2 (ja) | 電力融通システム | |
JP5799228B2 (ja) | 電力供給システム | |
WO2015064641A1 (ja) | 電力制御システム、電力制御方法および記録媒体 | |
JP6202674B2 (ja) | 電力管理システム | |
JP2014050233A (ja) | 電力潮流制御システム、管理装置、プログラム | |
JP2017017779A (ja) | 電力供給システムおよび電力供給方法 | |
JP5845066B2 (ja) | 電力供給システム | |
JP2012147621A (ja) | 停電救済システム | |
JP5934041B2 (ja) | 電力システム、装置及び方法 | |
US20140236368A1 (en) | Energy control system, energy control device, and energy control method | |
WO2016158900A1 (ja) | 制御装置、機器制御装置、制御システム、制御方法およびプログラム | |
JP5752069B2 (ja) | 電力制御システム | |
JP5940263B2 (ja) | 電力制御装置及び電力制御方法 | |
JP5785265B2 (ja) | 電力管理システム、電力管理装置及び表示制御方法 | |
JP6055198B2 (ja) | 電力制御システム | |
JP2014086367A (ja) | 集合住宅における燃料電池の稼動制御方法および稼動制御システム | |
JP2017050903A (ja) | エネルギ管理システム、エネルギ管理装置およびエネルギ管理方法 | |
JP2015095922A (ja) | エネルギー管理装置およびエネルギー管理方法 | |
JP5995804B2 (ja) | 蓄電システムの管理装置及び制御目標値決定方法 | |
JP2016173689A (ja) | エネルギー管理システム | |
JP7146938B2 (ja) | エネルギーマネジメントシステム、独立システム、及び独立システムの運用方法 | |
JP2008113523A (ja) | 電力供給システム、需用家群設備、およびその監視制御方法 | |
JP2010112247A (ja) | 分散型創エネルギー装置の制御システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160616 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170213 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170221 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170310 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170425 |
|
A045 | Written measure of dismissal of application [lapsed due to lack of payment] |
Free format text: JAPANESE INTERMEDIATE CODE: A045 Effective date: 20170829 |