JP2009199143A - 生産計画作成装置および該方法 - Google Patents
生産計画作成装置および該方法 Download PDFInfo
- Publication number
- JP2009199143A JP2009199143A JP2008037286A JP2008037286A JP2009199143A JP 2009199143 A JP2009199143 A JP 2009199143A JP 2008037286 A JP2008037286 A JP 2008037286A JP 2008037286 A JP2008037286 A JP 2008037286A JP 2009199143 A JP2009199143 A JP 2009199143A
- Authority
- JP
- Japan
- Prior art keywords
- production
- production plan
- amount
- shortage
- request
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
【解決手段】本発明は、複数設備で複数工程を経て製造される複数種類の製品における生産計画を作成する生産計画作成装置Sであって、工程毎に設けられ当該工程の生産計画を作成する複数の工程スケジューラ装置2と、この生産計画と生産実績とから工程毎に製品種類毎の各仕掛量を算出し、この各仕掛量と各最少必要仕掛量とから各過不足仕掛量を求め、不足仕掛量に対応する工程の前工程の工程スケジュール装置へ不足発生時期を納期として不足仕掛量の不足要求を要求し、新規受注の場合に新規受注に対応する種類の製品の最終工程の工程スケジューラ装置へ新規受注の生産要求を要求する全体統合装置1とを備え、各工程スケジューラ装置2は、不足要求の場合に不足要求を充足すべく、そして、生産要求の場合に新規受注を充足すべく、生産計画を作成する。
【選択図】図1
Description
(実施形態の構成)
図1は、実施形態における生産計画作成装置の構成を示すブロック図である。図2は、実施形態における全体統合装置の構成を示すブロック図である。なお、図1には、説明の便宜上、複数の工程6(設備7)から成る生産ラインも記載されている。
(実施形態の動作)
図3は、実施形態における生産計画作成装置の動作を示すフローチャートである。図4は、初期の生産計画を示す図である。図5ないし図9は、初期の生産計画における第1ないし第5工程の仕掛量の予測を示す図である。
1 全体統合装置
2 工程スケジューラ
3 マスタ記憶装置
11 仕掛予測部
12 過不足調整要求作成部
13 新規要求作成部
Claims (4)
- 複数の設備で複数の工程を経て製造される複数種類の製品における生産計画を作成する生産計画作成装置であって、
前記複数の工程に対応してそれぞれ設けられ、当該工程における生産計画を作成する複数の工程スケジューラ装置と、
前記複数の工程スケジューラ装置によって作成された生産計画と生産実績とに基づいて前記複数の工程ごとに前記複数種類の製品における各仕掛量をそれぞれ算出する仕掛予測部と、
前記仕掛予測部で算出した前記複数の工程ごとの前記複数種類の製品における各仕掛量と前記複数の工程ごとに前記複数種類の製品のそれぞれに定められた各最少必要仕掛量とに基づいて前記複数の工程ごとに前記複数種類の製品における各過不足仕掛量を求め、不足仕掛量に対応する工程の1つ前の工程の工程スケジュール装置へ不足が発生する時期を納期として前記不足仕掛量に対応する種類の製品の生産を不足要求として要求する過不足調整要求作成部と、
新規受注を受け付けた場合に、前記新規受注に対応する種類の製品における最終工程の工程スケジューラ装置へ前記新規受注に対応する種類の製品の生産を生産要求として要求する新規生産要求作成部とを備える全体統合装置とを備え、
前記複数の工程スケジューラ装置のそれぞれは、前記過不足調整要求作成部から前記不足要求を要求された場合に、前記不足が発生する時期を納期として前記不足仕掛量を充足すべく当該工程における生産計画を作成すると共に、前記新規生産要求作成部から前記生産要求を要求された場合に、前記新規受注を充足すべく当該工程における生産計画を作成すること
を特徴とする生産計画作成装置。 - 前記新規生産要求作成部は、新規受注を受け付けた場合に、前記新規受注が仕掛量で充足可能であるか否かを判断し、前記新規受注が仕掛量で充足可能である場合には、前記生産要求を要求しないこと
を特徴とする請求項1に記載の生産計画作成装置。 - 前記複数の工程スケジューラ装置のそれぞれは、前記過不足調整要求作成部から前記不足要求を要求された場合に、前記不足が発生する時期を納期として前記不足仕掛量を充足すべく、前記納期に最も近くて前記不足仕掛量を充足するように生産可能な時間帯に計画することによって当該工程における生産計画を作成すると共に、前記新規生産要求作成部から前記生産要求を要求された場合に、前記新規受注を充足すべく、前記新規受注の納期に最も近くて前記新規受注の受注量を充足するように生産可能な時間帯に計画することによって当該工程における生産計画を作成すること
を特徴とする請求項1または請求項2に記載の生産計画作成装置。 - 複数の設備で複数の工程を経て製造される複数種類の製品における生産計画を作成する生産計画作成方法であって、
前記複数の工程に対応してそれぞれ実行され、当該工程における生産計画を作成する複数の工程スケジューラステップと、
前記複数の工程スケジューラステップによって作成された生産計画と生産実績とに基づいて前記複数の工程ごとに前記複数種類の製品における各仕掛量をそれぞれ算出する仕掛予測ステップと、
前記仕掛予測ステップで算出した前記複数の工程ごとの前記複数種類の製品における各仕掛量と前記複数の工程ごとに前記複数種類の製品のそれぞれに定められた各最少必要仕掛量とに基づいて前記複数の工程ごとに前記複数種類の製品における各過不足仕掛量を求め、不足仕掛量に対応する工程の1つ前の工程の工程スケジュールステップへ不足が発生する時期を納期として前記不足仕掛量に対応する種類の製品の生産を不足要求として要求する過不足調整要求作成ステップと、
新規受注を受け付けた場合に、前記新規受注に対応する種類の製品における最終工程の工程スケジューラステップへ前記新規受注に対応する種類の製品の生産を生産要求として要求する新規生産要求作成ステップとを備え、
前記複数の工程スケジューラステップのそれぞれは、前記過不足調整要求作成ステップから前記不足要求を要求された場合に、前記不足が発生する時期を納期として前記不足仕掛量を充足すべく当該工程における生産計画を作成すると共に、前記新規生産要求作成ステップから前記生産要求を要求された場合に、前記新規受注を充足すべく当該工程における生産計画を作成すること
を特徴とする生産計画作成方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008037286A JP5171301B2 (ja) | 2008-02-19 | 2008-02-19 | 生産計画作成装置および該方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2008037286A JP5171301B2 (ja) | 2008-02-19 | 2008-02-19 | 生産計画作成装置および該方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2009199143A true JP2009199143A (ja) | 2009-09-03 |
JP5171301B2 JP5171301B2 (ja) | 2013-03-27 |
Family
ID=41142605
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2008037286A Expired - Fee Related JP5171301B2 (ja) | 2008-02-19 | 2008-02-19 | 生産計画作成装置および該方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5171301B2 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011233061A (ja) * | 2010-04-30 | 2011-11-17 | Jfe Steel Corp | 生産対象範囲設定装置および生産対象範囲設定方法 |
JP2015032200A (ja) * | 2013-08-05 | 2015-02-16 | 株式会社神戸製鋼所 | 仕掛量算出装置、仕掛量算出方法、及び、仕掛量算出プログラム |
JP2020197901A (ja) * | 2019-06-03 | 2020-12-10 | 株式会社神戸製鋼所 | システム、方法、及びプログラム |
JP6880343B1 (ja) * | 2020-07-17 | 2021-06-02 | 三菱電機株式会社 | スケジューラシステム、スケジューラ管理装置および機械学習装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0580651U (ja) * | 1992-04-03 | 1993-11-02 | エヌオーケー株式会社 | 生産計画作成装置 |
JPH1148102A (ja) * | 1997-08-08 | 1999-02-23 | Fujitsu Ltd | 生産管理システム |
JP2003337613A (ja) * | 2002-05-21 | 2003-11-28 | Jfe Steel Kk | 生産計画作成システム及び生産計画作成方法 |
-
2008
- 2008-02-19 JP JP2008037286A patent/JP5171301B2/ja not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0580651U (ja) * | 1992-04-03 | 1993-11-02 | エヌオーケー株式会社 | 生産計画作成装置 |
JPH1148102A (ja) * | 1997-08-08 | 1999-02-23 | Fujitsu Ltd | 生産管理システム |
JP2003337613A (ja) * | 2002-05-21 | 2003-11-28 | Jfe Steel Kk | 生産計画作成システム及び生産計画作成方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011233061A (ja) * | 2010-04-30 | 2011-11-17 | Jfe Steel Corp | 生産対象範囲設定装置および生産対象範囲設定方法 |
JP2015032200A (ja) * | 2013-08-05 | 2015-02-16 | 株式会社神戸製鋼所 | 仕掛量算出装置、仕掛量算出方法、及び、仕掛量算出プログラム |
JP2020197901A (ja) * | 2019-06-03 | 2020-12-10 | 株式会社神戸製鋼所 | システム、方法、及びプログラム |
JP7221139B2 (ja) | 2019-06-03 | 2023-02-13 | 株式会社神戸製鋼所 | システム、方法、及びプログラム |
JP6880343B1 (ja) * | 2020-07-17 | 2021-06-02 | 三菱電機株式会社 | スケジューラシステム、スケジューラ管理装置および機械学習装置 |
Also Published As
Publication number | Publication date |
---|---|
JP5171301B2 (ja) | 2013-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5643502B2 (ja) | 複数工場の生産スケジュール作成方法 | |
JP2002140110A (ja) | 生産管理システム及び生産管理方法 | |
JP5646108B1 (ja) | 木材プレカット工場用業務支援システム | |
JP5171301B2 (ja) | 生産計画作成装置および該方法 | |
JP2007140785A (ja) | 在庫管理システム | |
JP5028991B2 (ja) | 製造計画作成システムおよび製造計画作成方法 | |
JP2003228410A (ja) | 着工管理システム | |
EP3154005A1 (en) | Plan generating device and plan generating method | |
WO2011121703A1 (ja) | 生産管理装置、生産管理プログラムおよび生産管理方法 | |
JP2007115169A (ja) | 生産計画作成装置及び生産計画作成方法、並びにプログラム | |
JP2007026046A (ja) | 生産計画作成方法及び生産計画作成装置、並びにプログラム | |
JP5089352B2 (ja) | 販売生産計画システム、販売生産計画システムの動作方法及びコンピュータプログラム | |
JP5606613B1 (ja) | 木材プレカット工場用業務支援システム | |
JP2008217653A (ja) | 資材調達・生産プロセスの効率的管理支援方法 | |
JP4648013B2 (ja) | 生産スケジューリングシステム | |
JP2014002428A (ja) | 生産計画調整装置 | |
JP2009104399A (ja) | 製品の製造支援システム、製品の製造システム、製品の製造支援方法及び製品の製造方法 | |
US7123976B2 (en) | Capacity management system and method | |
JP2003176029A (ja) | 在庫管理装置 | |
JP2022131618A (ja) | 生産計画システム | |
JP2018169674A (ja) | 発注制御装置 | |
Goel | Capacity Requirement Planning | |
Goel | Repetitive Manufacturing | |
JP2000322483A (ja) | 工場管理方法及びその装置 | |
JP2000190177A (ja) | 生産計画作成方法、生産計画作成装置、及び生産計画作成プログラムを記憶した記録媒体 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20110204 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20120313 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120315 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120514 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20121204 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20121225 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5171301 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
LAPS | Cancellation because of no payment of annual fees |