JP2004227207A - System, terminal, program, and method for managing bus travelling - Google Patents
System, terminal, program, and method for managing bus travelling Download PDFInfo
- Publication number
- JP2004227207A JP2004227207A JP2003013008A JP2003013008A JP2004227207A JP 2004227207 A JP2004227207 A JP 2004227207A JP 2003013008 A JP2003013008 A JP 2003013008A JP 2003013008 A JP2003013008 A JP 2003013008A JP 2004227207 A JP2004227207 A JP 2004227207A
- Authority
- JP
- Japan
- Prior art keywords
- bus
- data
- contents
- actual
- operation management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title abstract description 11
- 238000004364 calculation method Methods 0.000 claims abstract description 25
- 238000007726 management method Methods 0.000 claims description 171
- 238000004891 communication Methods 0.000 claims description 26
- 238000001514 detection method Methods 0.000 claims description 20
- 238000013500 data storage Methods 0.000 claims description 15
- 230000006870 function Effects 0.000 description 17
- 238000010586 diagram Methods 0.000 description 7
- 238000012790 confirmation Methods 0.000 description 5
- 238000007639 printing Methods 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000004397 blinking Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 229910003460 diamond Inorganic materials 0.000 description 1
- 239000010432 diamond Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
Images
Landscapes
- Traffic Control Systems (AREA)
- Mobile Radio Communication Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
本発明は、バスの運行を管理するバス運行管理システム、バス運行管理端末、バス運行管理プログラム及びバス運行管理方法に関する。
【0002】
【従来の技術】
従来、路線バスなどの交通機関の運行管理は、毎日の運行業務開始前に各運転手に配布される運行予定表に基づいて行われる。この運行予定表は紙などに印刷されたものであり、運転手が業務中に携帯するものである。さらに、運転手は実際の運行実績(実際に各停留所を通過した時間など)を所定の記録用紙に記録し、業務終了後、所属営業所に当該運行実績表を提出する。この運行実績表は、以後の運行予定作成の際の参考にされる。
【0003】
近時、運行予定内容と運行実績内容との差異を容易に表示可能な技術が開示されている(例えば、特許文献1参照。)。さらに、GPS(Global PositioningSystem)によるGPS現在位置データを用いてバスダイヤ編成、運転手勤怠実績管理およびバス車両管理を行う技術が開示されている(例えば、特許文献2参照。)。
【0004】
【特許文献1】
特開平6−52494号公報
【特許文献2】
特開2002−63692号公報
【0005】
【発明が解決しようとする課題】
しかしながら、上記従来の運行管理には、以下のような問題点がある。
すなわち、運行予定表には一日の運行内容の全てが記載されているため、全運行内容のうち運転手が必要な特定個所を即座に確認するのが困難である。
また、運行予定と実際の運行との差(遅れ進み時間)が即座に確認しづらいため、運行実績の記録に時間がかかると共に正確に記録されない可能性が生じる。更に、運転手は運行実績をいちいち紙に記録しなければならず、面倒である。更に、営業所内では運行実績のデータ入力が別途必要となり、面倒である。
また、特許文献1に開示された技術では、運行実績を運転手が所定記録用紙に記入しなければならず、面倒であり、さらに、特許文献2に開示された技術は、GPS現在位置データを運行予定(ダイヤ)編成など運行時以外の業務のために利用するものであり、運転手の運行時における業務軽減化をはかるまでには到っていない。
【0006】
本発明の課題は、バスの運行を管理するバス運行管理システム、バス運行管理端末、バス運行管理プログラム及びバス運行管理方法において、運転手が行う運行業務中の作業を軽減化することである。
【0007】
【課題を解決するための手段】
本発明は、上記課題を解決するために、次のような特徴を備えている。
【0008】
請求項1に記載の発明は、バス営業所内に設けられたバス運行管理サーバと、該バス営業所により管理されるバスに搭載され、前記バス運行管理サーバとの間でデータの送受信が可能なバス運行管理端末および当該バスの現在位置を検出する位置検出装置とを備えたバス運行管理システムであって、前記バス運行管理サーバは、前記バスの運行予定データと、該バスの実際の運行内容を示す運行実績データとを格納するデータ格納部と、前記運行予定データを前記バス運行管理端末に送信すると共に、該バス運行管理端末から送信された前記運行実績データを受信するサーバ通信装置とを備え、前記バス運行管理端末は、前記運行予定データを前記バス運行管理サーバから受信すると共に、前記運行実績データを当該バス運行管理サーバに送信する端末通信装置と、前記位置検出装置により検出された前記現在位置データに基づき前記端末通信装置により受信された前記運行予定データの内容を前記バスの運行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該運行内容とを前記運行実績データとして記憶するよう制御する制御手段とを備えたことを特徴とする。
【0009】
請求項1に記載の発明によれば、バス営業所内に設けられたバス運行管理サーバと、該バス営業所により管理されるバスに搭載され、前記バス運行管理サーバとの間でデータの送受信が可能なバス運行管理端末および当該バスの現在位置を検出する位置検出装置とを備えたバス運行管理システムであって、前記バス運行管理サーバでは、データ格納部は、前記バスの運行予定データと、該バスの実際の運行内容を示す運行実績データとを格納し、サーバ通信装置は、前記運行予定データを前記バス運行管理端末に送信すると共に、該バス運行管理端末から送信された前記運行実績データを受信し、前記バス運行管理端末では、端末通信装置は、前記運行予定データを前記バス運行管理サーバから受信すると共に、前記運行実績データを当該バス運行管理サーバに送信し、制御手段は、前記位置検出装置により検出された前記現在位置データに基づき前記端末通信装置により受信された前記運行予定データの内容を前記バスの運行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該運行内容とを前記運行実績データとして記憶するよう制御する。
【0010】
さらに、請求項2に記載の発明のように、請求項1に記載の発明において、前記制御手段は、前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示するよう制御するのが好ましい。
【0011】
さらに、請求項3に記載の発明のように、請求項1または2に記載の発明において、前記制御手段は、バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力するのが好ましい。
【0012】
また、請求項4に記載の発明は、バスに搭載され、該バスを管理するバス営業所内に設けられたバス運行管理サーバとの間でデータの送受信が可能であると共に当該バスの現在位置を検出するための位置検出装置から当該現在位置データを取得可能なバス運行管理端末であって、前記バスの運行予定データを前記バス運行管理サーバから受信すると共に、当該バスの実際の運行内容を示す運行実績データを前記バス運行管理サーバに送信する端末通信装置と、前記バスの現在位置データに基づき前記端末通信装置により受信された前記運行予定データの内容を当該バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該運行内容とを前記運行実績データとして記憶するよう制御する制御手段とを備えたことを特徴とする。
【0013】
請求項4に記載の発明によれば、バスに搭載され、該バスを管理するバス営業所内に設けられたバス運行管理サーバとの間でデータの送受信が可能であると共に当該バスの現在位置を検出するための位置検出装置から当該現在位置データを取得可能なバス運行管理端末であって、端末通信装置は、前記バスの運行予定データを前記バス運行管理サーバから受信すると共に、当該バスの実際の運行内容を示す運行実績データを前記バス運行管理サーバに送信し、制御手段は、前記バスの現在位置データに基づき前記端末通信装置により受信された前記運行予定データの内容を当該バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該運行内容とを前記運行実績データとして記憶するよう制御する。
【0014】
さらに、請求項5に記載の発明のように、請求項4に記載の発明において、前記制御手段は、前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示するよう制御するのが好ましい。
【0015】
さらに、請求項6に記載の発明のように、請求項4または5に記載の発明において、前記制御手段は、バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力するのが好ましい。
【0016】
また、請求項7に記載の発明は、バスに搭載され、該バスの運行を管理するコンピュータに、前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信する機能と、前記バスの現在位置データを取得する機能と、前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶する機能と、前記運行実績データを前記バス運行管理サーバに送信する機能とを実現させる。
【0017】
また、請求項8に記載の発明は、バスに搭載され、該バスの運行を管理するコンピュータに、前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信する機能と、前記バスの現在位置データを取得する機能と、前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶する機能と、バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力する機能と、前記運行実績データを前記バス運行管理サーバに送信する機能とを実現させる。
【0018】
また、請求項9に記載の発明は、バスに搭載され、該バスの運行を管理するコンピュータに、前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信する機能と、前記バスの現在位置データを取得する機能と、前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶する機能と、前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示する機能と、前記運行実績データを前記バス運行管理サーバに送信する機能とを実現させる。
【0019】
また、請求項10に記載の発明は、バスに搭載され、該バスの運行を管理するコンピュータに、前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信する機能と、前記バスの現在位置データを取得する機能と、前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶する機能と、前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示する機能と、バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力する機能と、前記運行実績データを前記バス運行管理サーバに送信する機能とを実現させる。
【0020】
また、請求項11に記載の発明は、バスの運行を管理するバス運行管理方法において、前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信するステップと、前記バスの現在位置データを取得するステップと、前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶するステップと、前記運行実績データを前記バス運行管理サーバに送信するステップとを含んだことを特徴とする。
【0021】
また、請求項12に記載の発明は、バスの運行を管理するバス運行管理方法において、前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信するステップと、前記バスの現在位置データを取得するステップと、前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶するステップと、バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力するステップと、
前記運行実績データを前記バス運行管理サーバに送信するステップとを含んだことを特徴とする。
【0022】
また、請求項13に記載の発明は、バスの運行を管理するバス運行管理方法において、前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信するステップと、前記バスの現在位置データを取得するステップと、前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶するステップと、前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示するステップと、前記運行実績データを前記バス運行管理サーバに送信するステップと、を含んだことを特徴とする。
【0023】
また、請求項14に記載の発明は、バスの運行を管理するバス運行管理方法において、前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信するステップと、前記バスの現在位置データを取得するステップと、前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶するステップと、前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示するステップと、バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力するステップと、前記運行実績データを前記バス運行管理サーバに送信するステップとを含んだことを特徴とする。
【0024】
したがって、運行予定データの内容を必要な個所だけリアルタイムに確認できるので、運転手による運行予定内容の確認作業を軽減化できる。
また、停留所の通過予定時刻と実際の通過時間との時間差がリアルタイムに運転手に通知可能となるので、運行予定データの内容に十分沿ったバスの運行が実現できると共に、運転手による当該時間差の確認作業を軽減化できる。
また、バスの現在位置データに基づいて運行予定案内装置に制御信号(トリガー信号)をかけるので、運転手が運行予定案内装置の案内開始ボタンを押し忘れるといった事態が回避できると共に、運転手による運行予定案内装置に係る作業を軽減化できる。
【0025】
【発明の実施の形態】
以下、図1〜図8を参照して、本発明を適用した一実施の形態について説明する。
【0026】
図1に、バス運行管理システム100の概略構成を示す。図1に示すように、バス運行管理システム100は、バス営業所1に設置されるバス運行管理サーバ10と、バス2に設けられるバス運行管理端末20(例えば、PDA(PersonalDigital Assistant)。)および位置検出装置20aとにより構成される。なお、図1には、図示簡略化のため、一つのバス運行管理サーバ10に対し一台のバス2(すなわち、一対のバス運行管理端末20および位置検出装置20a。)のみが示されているが、これに限らない。
【0027】
バス運行管理サーバ10は、バス運行業務開始前には、予め作成された当日分の運行予定データ11d(図4参照。)をバス運行管理端末20に送信する。運行予定データ11dを受信したバス運行管理端末20は、位置検出装置20aにより検出されたGPS現在位置データを参照しながらバス2の進行状況に応じて停留所表示を順次切り替えるなどの運行管理を行う。さらに、バス運行管理端末20は、バス運行中に運行実績データ11e(図5参照。)を記録し、バス運行業務終了時には、当該運行実績データ(図5に示す運行実績データ11eを参照。)をバス運行管理サーバ10に送信する。
なお、バス運行管理端末20が運行予定データ11dに基づいて行うバス2の運行管理処理については後に詳述する。
【0028】
次に、図2〜図6を参照してバス運行管理サーバ10およびバス運行管理端末20の構成について詳細に説明する。
【0029】
まず、バス運行管理サーバ10の構成を説明する。図2に、バス運行管理サーバ10の概略構成を示す。
図2に示すように、バス運行管理サーバ10は、データ格納部11、サーバ通信装置12、印刷装置13、PC(Personal Computer)14などを備えて構成される。
【0030】
データ格納部11は、書き込み/読み出し可能なメモリであり、予め入力(作成)されたバス営業所1に所属する運転手およびバス(例えば、バス2。)に係る運転手データ11aおよび車両データ11b、さらに路線データ11cを格納する(図3参照。)。
【0031】
さらに、データ格納部11は、上記各種データに基づき日々作成されるバス営業所1に所属するバス(例えば、バス2。)あるいは運転手に対する運行予定データ11d(図4参照。)と、一日の運行業務終了時にバス運行管理端末20から送信される運行実績データ11e(図5参照。)とを格納する。
【0032】
サーバ通信装置12は、無線LAN(Local Erea Network)を介してバス運行管理端末20との間でデータの送受信を行うためのインターフェースを備える。なお、サーバ通信装置12は、有線LANや他の通信方式に基づいてデータの送受信が可能な構成であっても良い。
【0033】
印刷装置13は、データ格納部11に格納される各種データのうち、PC14を介して指定されたデータをプリントする。
【0034】
PC14は、CPU、表示装置、入力装置(何れも図示略。)などを備えるパーソナルコンピュータである。
【0035】
PC14は、バス運行管理端末20からバス2の車両IDデータを受信すると、この車両IDデータおよび当日の日付けに関連付けられて成る運行予定データ11dをデータ格納部11の中から検索して当該車両IDのバス2の運転手IDおよび運転手名の各データを特定する。PC14は、当該特定した運転手IDおよび運転手名の各データを当該バス運行管理端末20に送信する。
ここで、バス運行管理端末20にはバス2の車両IDデータ(あるいは、さらに車両名データ。)が予め記憶されている。
【0036】
PC14は、バス運行管理端末20から運行実績データ11eを受信すると、当該運行実績データ11eをデータ格納部11に格納する。
【0037】
PC14は、データ格納部11に格納される各種データのうち指定されたデータを印刷装置13にプリントしたり、表示装置に表示したりする。
【0038】
ここで、上記したデータ格納部11に格納される各種データ内容について図3〜図5を参照して説明する。図3に、上記運転手データ11a、車両データ11b、路線データ11cの一例を示し、図4に、上記運行予定データ11dの一例を示し、図5に、上記運行実績データ11eの一例を示す。なお、図3〜図5のデータ内容は一例であり、これに限らない。また、図3〜図5には、図示簡略化のため、各データ内容の一部のみが示されている。
【0039】
図3に示すように、運転手データ11aは、「運転手ID」データと「運転手名」データとが関連付けられて成り、車両データ11bは、各バスの「車両ID」データと「車両名」データとが関連付けられて成り、路線データ11cは、「路線番号」データ、「路線名」データ、各路線の「停留所数」データ、各路線に設けられている停留所の「停留所名」データ、各停留所の「位置(緯度(度・分・秒)、経度(度・分・秒))」データ、複数通りに設定された各停留所の「通過予定時刻」データが互いに関連付けられて成る。
【0040】
また、運行予定データ11dは、図4に示すように、「日付」データ、「運転手ID]データ、「運転手名」データ、「車両ID」データ、「車両名」データ、「運行順」データが互いに関連付けられ、さらに、運行順毎に「路線番号」データ、「路線名」データ、「停留所数」データ、「停留所名」データが互いに関連付けられ、さらに、停留所毎に各停留所の「位置(緯度(度・分・秒)、経度(度・分・秒))」データ、「通過予定時刻」データが関連付けられて成る。
【0041】
また、運行実績データ11eは、図5に示すように、「日付」データ、「運転手ID」データ、「車両ID]データ、「路線番号」データが互いに関連付けられ、さらに、路線番号毎に「路線名」データ、「停留所名」データが関連付けられ、さらに、停留所毎に各停留所を実際に通過した際の「通過時刻」データ、通過予定時間(図4の運行予定データ11d参照。)に対する「遅れ(−)/進み(+)時間」データが関連付けられて成る。
【0042】
次に、バス運行管理端末20の構成を説明する。図6に、バス運行管理端末20の概略構成を示す。
図6に示すように、バス運行管理端末20は、制御手段21、RAM22、入力手段23、端末通信装置24、表示手段25、記憶手段26などを備えて構成され、これら各部はバス27によって相互に接続されている。
【0043】
制御手段21は、図示しないCPU(Central Processing Unit)を備え、記憶手段26に格納された制御用プログラムなどの各種プログラムを読み出し、入力手段23を介して入力される各種指示データ等と共にRAM22の図示しないメモリエリア内に格納する。
【0044】
制御手段21は、上記指示データ等に応じて上記メモリエリア内に格納した各種プログラムに従って各種処理を実行し、その処理結果を上記メモリエリア内に記憶したり表示手段25に表示する。
【0045】
制御手段21は、記憶手段26に格納されたバス運行管理プログラムを実行することによって後に詳述する図7のフローチャートに示す運行管理処理を行う。
【0046】
RAM(Random Access Memory)22は、制御手段21により実行される制御用プログラムなどの各種プログラムを展開して格納すると共に、入力手段23を介して入力された指示データや各種処理結果等を一時格納するメモリエリアを有する。
【0047】
入力手段23は、各種機能ボタンや、タブレットあるいはタッチパネル等のポインティングデバイスを具備し、当該機能ボタンの押下信号や当該タブレットあるいはタッチパネルによるキー入力信号をCPU11に出力する。
【0048】
端末通信装置24は、無線LANを介してバス運行管理サーバ10との間でデータの送受信を行うためのインターフェースを備えると共に、位置検出装置20aから送信されるGPS現在位置データを受信するためのインターフェースを具備する。
【0049】
ここで、上記位置検出装置20aは、GPSアンテナ(図示略。)などを備え、図示しないGPS衛星から送信されるGPS信号を受信し、その受信したGPS信号に基づいてバス2の絶対的なGPS現在位置(緯度、経度)データを取得する。なお、バス運行管理端末20は、上記位置検出装置20aを予め具備するような構成であっても良い。
【0050】
なお、端末通信装置24は、有線LANを介してバス運行管理サーバ10との間でデータの送受信を行うためのインターフェースを備えるような構成であっても良い。さらに、端末通信装置24は、図示しないモデム(MODEM:MOdulator/DEModulator)等を備えても良く、この場合、電話回線等を介してネットワークに接続することが可能となる。
【0051】
表示手段25は、液晶表示画面(LCD:Liquid Crystal Display)等の表示画面を有し、制御手段21から入力される各種表示情報に従って、入力手段23からの入力データや記憶手段26に格納された各種データ等を上記表示画面上に表示する。
【0052】
記憶手段26は、制御手段21によって実行される制御用プログラムなどの各種プログラムや、これらプログラムで用いられる各種データが予め記憶されている。また、記憶手段26は、磁気的記録媒体、光学的記録媒体もしくは半導体メモリ等を着脱自在に備えるような構成であっても良い。
【0053】
記憶手段26は、バス運行管理サーバ10から受信した運行予定データ11dを格納すると共に運行実績データ11eを格納する。さらに、バス運行管理端末20は、バス2の車両IDデータ(あるいは、さらに車両名データ)を予め記憶する。
【0054】
記憶装置17は、図7のフローチャートに示す運行管理処理を行うためのバス運行管理プログラムを格納する。
【0055】
次に、図7、図8を参照し、バス運行管理端末20による運行管理処理について説明する。この運行管理処理は、制御手段21がバス運行管理プログラムを実行することにより行われる。
【0056】
まず、一日の業務開始時にバス運行管理端末20が起動される。その際、制御手段21は、内蔵メモリ(図示略。)やRAM22のデータを消去した後にバス運行管理端末20の制御用プログラムを立ち上げるなどの処理を行い、バス運行管理端末20を実行可能な状態にする(ステップS11)。この際、制御手段21は、図8に示す表示画面25aを表示手段25に表示させて当該運行管理処理を行うか否かの確認要求を行う。
【0057】
表示画面25a上で当該運行管理処理を行う旨の指示が入力されると、制御手段21は、記憶手段26に格納された車両IDデータをバス運行管理サーバ10に送信し、その後、当該送信された車両IDの車両(バス2)を当日運転する運転手IDデータおよび運転手名データをバス運行管理サーバ10から受信すると(ステップS12)、当該受信した運転手IDおよび運転手名が、実際にバス2を運転しようとしている運転手であるか否かの確認要求を行う(ステップS13)。この場合、制御手段21は、図8に示す表示画面25bを表示手段25に表示させて当該確認要求を行う。
【0058】
表示画面25bには、運転者IDが「001」で運転者名が「野々村健一郎」と表示されている。
【0059】
上記表示された運転手IDおよび運転手名が実際にバス2を運転しようとしている運転手であるとの確認が表示画面25b上でなされると(ステップS13;Yes)、制御手段21は、バス2の当日分の運行予定データ11dをバス運行管理サーバ10から取得する(ステップS14)。この際、制御手段21は、位置検出装置20aからバス2のGPS現在位置データの取得を開始すると共に、当該取得した運行予定データ11dに基づき当日の運行路線の選択要求を行うための路線選択画面を図8に示す表示画面25cのように表示手段25に表示させる。
【0060】
制御手段21は、運行予定データ11dに含まれている複数の路線のうち出発時間の早いものから順に三つずつ表示画面25cに一度に表示していき、表示画面25cの「進む」ボタンがタッチされる度に残りの路線が三つずつ順次表示されていく。
【0061】
すなわち、表示画面25cには、路線番号が「001」(すなわち、路線名は西野方面行き。)で出発時刻が「7:00」の路線と、路線番号が「002」(すなわち、路線名は札幌方面行き。)で出発時刻が「7:30」の路線と、路線番号が「001」で出発時刻が「8:00」の路線が表示されている。表示画面25cの「進む」ボタンがタッチされると、残りの路線が順次三つずつ表示されていく。
なお、路線選択画面において路線が三つずつ一度に表示されるとしたが、これに限らず、一度に一つの路線を表示するようにしても良いし、また一度に路線を四つずつ表示しても良いし、自由である。
【0062】
制御手段21は、上記路線選択画面上で路線が選択されたか否かを監視し(ステップS15)、路線(この場合、表示画面25cに示す路線番号が「001」で出発時刻が「7:00」の路線。)が選択された場合(ステップS15;Yes)、当該選択された路線の運行予定画面を図8に示す表示画面25dのように表示手段25に表示させる(ステップS16)。
【0063】
制御手段21は、運行予定データ11dに含まれている当該選択された路線の停留所のうち、停車順に三つずつ表示画面25dに一度に表示していく。すなわち、表示画面25dには、「中央ターミナル」、「西5丁目」、「病院前」の三つの停留所が表示されている。
【0064】
ここで、表示画面25dには、次の通過停留所(この場合、始発停留所。)が「中央ターミナル」であることが強調表示(例えば、網掛け、強調色あるいは点滅など。)により示されていると共に、この停留所の予定通過時刻(この場合、始発時刻。)が「7:00」であることが示されている。
【0065】
制御手段21は、位置検出装置20aから取得したGPS現在位置データを参照してバス2が次の停留所(西5丁目)に向かって出発したか否かを監視し(ステップS17)、バス2が次の停留所(西5丁目)に向かって出発した場合(ステップS17;Yes)、図示しない運行予定案内装置(以下、AGS(Auto Guide System)という)にトリガ信号を送信して当該次停留所(西5丁目)の案内放送を行う(ステップS18)。
【0066】
制御手段21は、ステップS18の後、表示画面25dの「通過」ボタンがタッチされて次停留所(西5丁目)の通過指示が入力されたか否かを判定する(ステップS19)。
【0067】
次停留所(西5丁目)の通過指示が入力された場合(ステップS19;Yes)、制御手段21は、表示画面25dの運行予定画面を更新して当該次停留所(西5丁目)を通過後の停留所名(病院前)を強調表示すると共に、当該通過後の停留場(病院前)の通過予定時刻(7:03)を表示する(ステップS20)。その後、制御手段21は、ステップS18に戻り、AGSにトリガ信号を送信してこの停留所(病院前)の案内放送を行う。
【0068】
ステップS19において、次停留所(西5丁目)の通過指示が入力されない場合(ステップS19;No)、制御手段21は、位置検出装置20aから取得したGPS現在位置データと運行予定データ11dに含まれる次停留所(西5丁目)の位置データとを比較してバス2が当該次停留所(西5丁目)に到って停車したか否かを監視する(ステップS21)。
【0069】
バス2が次停留所(西5丁目)に到って停車した場合(ステップS21;Yes)、制御手段21は、当該停留所(西5丁目)を出発する出発時間と運行予定データ11dに含まれる当該停留所(西5丁目)の通過時刻データとを比較して遅れ/進み時間を算出し、当該算出結果と実際の出発時間とを運行実績データ11eに記録する(ステップS22)。
この際、制御手段21は、当該算出した遅れ/進み時間を表示手段25の表示画面に表示する。
【0070】
次に、制御手段21は、バス2が運行予定データ11dに含まれる全停留所を通過したか否かを判定し(ステップS23)、バス2が運行予定データ11dに含まれる全停留所を通過していない場合には(ステップS23;No)、ステップS17に移行し、バス2が運行予定データ11dに含まれる全停留所を通過した場合(ステップS23;Yes)、バス2がバス営業所1に戻った際に、運行実績データ11eをバス運行管理サーバ10に送信する(ステップS24)。
【0071】
以上説明したように、バス運行管理システム100では、バス運行管理端末20がバス運行管理サーバ10から運行予定データ11dを取得し、当該運行予定データ11dに基づいてバス2の運行管理を行う。バス運行管理端末20は、位置検出装置20aから取得したGPS現在位置データを参照して運行予定データ11dに含まれる運行予定の停留所名をバス2の進行に合わせて順次表示し、各停留所を出発した実際の時間と、運行予定データ11dに含まれる通過予定時間との差を算出し、当該算出結果と当該実際の出発時間とを運行実績データ11eに記録する。バス2がバス営業所1に戻ったら、バス運行管理端末20は、運行実績データ11eをバス運行管理サーバ10に送信する。バス運行管理サーバ10は、当該運行実績データ11eをデータ格納部11に格納する。
【0072】
従って、運行予定データ11dの内容を必要な個所だけリアルタイムに確認できるので、運転手による運行予定内容の確認作業を軽減化できる。
また、停留所の通過予定時刻と実際の通過時間との時間差がリアルタイムに運転手に通知可能となるので、運行予定データ11dの内容に十分沿ったバスの運行が実現できると共に、運転手による当該時間差の確認作業を軽減化できる。
また、GPS現在位置データに基づいてAGSにトリガー信号をかけるので、運転手がAGSの案内開始ボタンを押し忘れるといった事態が回避できると共に、運転手によるAGSに係る作業を軽減化できる。
また、運行予定データ11dの内容を所定の紙に印刷する必要がなく、効率的である。
また、運行実績データ11eを参照することにより、より現実的な路線データ11cおよび運行予定データ11dの作成が可能になる。
また、最終的な遅れ時分を記録・表示できるので、運転手の時間外管理に役立てることができる。
【0073】
なお、本実施の形態における記述は、本発明に係るバス運行管理システム、バス運行管理端末、バス運行管理プログラム及びバス運行管理方法の一例を示すものであり、これに限定されるものではない。本実施の形態におけるバス運行管理システム100の細部構成、各種数値および詳細動作に関しては、本発明の趣旨を逸脱しない範囲で適宜変更可能である。
【0074】
例えば、本実施の形態においては、位置検出装置20aとバス運行管理端末20とを別体として構成したが、これに限らず、両者一体の構成であっても良い。
【0075】
また、工事中や迂回路など路線に係る付加情報を運行予定データ11dに予め入力しても良く、この場合、当該付加情報が運転中に容易に利用可能となり、バスの円滑な運行が実現できる。
【0076】
また、図7のステップS19において通過指示された停留所の通過時間は特に運行実績データ11eに記録されないものとしたが、これに限らず、通過指示された停留所の通過時間も運行実績データ11eに記録されるようにしても良い。
【0077】
【発明の効果】
本発明によれば、運行予定データの内容を必要な個所だけリアルタイムに確認できるので、運転手による運行予定内容の確認作業を軽減化できる。
また、停留所の通過予定時刻と実際の通過時間との時間差がリアルタイムに運転手に通知可能となるので、運行予定データの内容に十分沿ったバスの運行が実現できると共に、運転手による当該時間差の確認作業を軽減化できる。
また、バスの現在位置データに基づいて運行予定案内装置に制御信号(トリガー信号)をかけるので、運転手が運行予定案内装置の案内開始ボタンを押し忘れるといった事態が回避できると共に、運転手による運行予定案内装置に係る作業を軽減化できる。
【図面の簡単な説明】
【図1】本発明を適用したバス運行管理システムの概略構成を示すブロック図である。
【図2】図1に示すバス運行管理サーバの概略構成を示すブロック図である。
【図3】図2に示すデータ格納部に格納されたデータ内容の一例を示す図である。
【図4】図2に示すデータ格納部に格納されたデータ内容の一例を示す図である。
【図5】図2に示すデータ格納部に格納されたデータ内容の一例を示す図である。
【図6】図1に示すバス運行管理端末の概略構成を示すブロック図である。
【図7】運行管理処理を説明するフローチャートである。
【図8】図6に示す表示手段による表示画面の一例を示す図である。
【符号の説明】
1 バス営業所
2 バス
10 バス運行管理サーバ
11 データ格納部
12 サーバ通信装置
13 印刷装置
14 PC
20 バス運行管理端末
20a 位置検出装置
21 制御手段
22 RAM
23 入力手段
24 端末通信装置
25 表示手段
26 記憶手段
27 バス
100 バス運行管理システム[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a bus operation management system for managing bus operations, a bus operation management terminal, a bus operation management program, and a bus operation management method.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, operation management of transportation such as a route bus is performed based on an operation schedule distributed to each driver before the start of daily operation. This operation schedule is printed on paper or the like, and is carried by the driver during work. Furthermore, the driver records the actual operation results (such as the time actually passing through each stop) on a predetermined recording sheet, and submits the operation result table to the office to which the driver belongs after the operation is completed. This operation result table is used as a reference when preparing an operation schedule thereafter.
[0003]
2. Description of the Related Art Recently, there has been disclosed a technique capable of easily displaying a difference between an operation schedule content and an operation result content (for example, see Patent Literature 1). Furthermore, there is disclosed a technique for performing bus schedule formation, driver attendance record management, and bus vehicle management using GPS current position data by GPS (Global Positioning System) (for example, see Patent Document 2).
[0004]
[Patent Document 1]
JP-A-6-52494
[Patent Document 2]
JP-A-2002-63692
[0005]
[Problems to be solved by the invention]
However, the conventional operation management described above has the following problems.
That is, since the operation schedule contains all of the operation details of the day, it is difficult for the driver to immediately confirm a specific location that is necessary in all the operation contents.
Further, it is difficult to immediately confirm the difference (delay advance time) between the operation schedule and the actual operation, so that it takes time to record the operation results and there is a possibility that the operation results may not be accurately recorded. Further, the driver must record the operation results on paper, which is troublesome. Furthermore, the operation results data must be separately input in the sales office, which is troublesome.
Further, in the technology disclosed in
[0006]
An object of the present invention is to reduce the number of operations performed by a driver in a bus operation management system, a bus operation management terminal, a bus operation management program, and a bus operation management method for managing bus operations.
[0007]
[Means for Solving the Problems]
The present invention has the following features to solve the above problems.
[0008]
The invention according to
[0009]
According to the first aspect of the present invention, a bus operation management server provided in a bus office and a bus which is mounted on the bus managed by the bus office and transmit / receive data to / from the bus operation management server. A bus operation management system including a possible bus operation management terminal and a position detection device that detects a current position of the bus, wherein in the bus operation management server, a data storage unit includes operation schedule data of the bus, The server communication device transmits the operation schedule data to the bus operation management terminal, and stores the operation result data transmitted from the bus operation management terminal. In the bus operation management terminal, the terminal communication device receives the operation schedule data from the bus operation management server and stores the operation result data in the bus operation management terminal. The control means transmits the operation schedule data to the operation management server, and displays the contents of the operation schedule data received by the terminal communication device based on the current position data detected by the position detection device in accordance with the operation status of the bus. At the same time, the difference between the actual operation content of the bus and the content of the operation schedule data is calculated, and the calculation result and the operation content are controlled to be stored as the operation result data.
[0010]
Further, as in the invention according to
[0011]
Further, as in the invention according to the third aspect, in the invention according to the first or second aspect, the control means transmits the current position to the operation schedule guide device for notifying a passenger of a bus operation schedule. It is preferable to output a control signal for controlling to give a guidance notification according to the actual operation status of the bus based on the data and the operation schedule data.
[0012]
Further, the invention according to claim 4 is capable of transmitting and receiving data to and from a bus operation management server provided in a bus office that manages the bus, which is mounted on the bus, and determines the current position of the bus. A bus operation management terminal capable of acquiring the current position data from a position detection device for detecting, while receiving operation schedule data of the bus from the bus operation management server and indicating an actual operation content of the bus. A terminal communication device for transmitting operation result data to the bus operation management server; and displaying the content of the operation schedule data received by the terminal communication device based on the current position data of the bus in accordance with the progress of the bus. At the same time, a difference between the actual operation content of the bus and the content of the operation schedule data is calculated, and the calculation result and the operation content are used as the operation result data. Characterized in that a control means for controlling so as to 憶.
[0013]
According to the invention described in claim 4, data can be transmitted and received to and from the bus operation management server provided in the bus office which is mounted on the bus and manages the bus, and the current position of the bus is determined. A bus operation management terminal capable of acquiring the current position data from a position detection device for detecting, wherein the terminal communication device receives operation schedule data of the bus from the bus operation management server, The operation result data indicating the operation content of the bus is transmitted to the bus operation management server, and the control means calculates the content of the operation schedule data received by the terminal communication device based on the current position data of the bus and the progress status of the bus. And the difference between the actual operation content of the bus and the content of the operation schedule data is calculated, and the calculation result and the operation content are used as the operation results. Controlling to store as over data.
[0014]
Further, as in the invention according to a fifth aspect, in the invention according to the fourth aspect, the control means calculates a difference between the actual operation content of the bus and the content of the scheduled operation data. It is preferable to control so that the result is displayed according to the operation status of the bus.
[0015]
Furthermore, as in the invention according to claim 6, in the invention according to claim 4 or 5, the control means transmits the current position to the operation schedule guide device for notifying a passenger of a bus operation schedule. It is preferable to output a control signal for controlling to give a guidance notification according to the actual operation status of the bus based on the data and the operation schedule data.
[0016]
The invention according to claim 7 is a bus operation management server provided in a bus office which manages the bus operation schedule data on a computer which is mounted on a bus and manages the operation of the bus. , A function of acquiring the current position data of the bus, and displaying the contents of the scheduled operation data based on the current position data according to the progress of the bus, and the actual operation contents of the bus. And a function of calculating the difference between the contents of the scheduled operation data and storing the calculation result and the actual operation contents as operation result data, and a function of transmitting the operation result data to the bus operation management server And realize.
[0017]
A bus operation management server provided in a bus office that manages the bus operation schedule data in a computer that is mounted on the bus and manages the operation of the bus, according to an embodiment of the present invention. , A function of acquiring the current position data of the bus, and displaying the contents of the scheduled operation data based on the current position data according to the progress of the bus, and the actual operation contents of the bus. And a function of calculating a difference between the content of the operation schedule data and the calculated result and the actual operation content as operation result data, and an operation schedule guide for notifying passengers of a bus operation schedule. A function of outputting, to the device, a control signal for performing control notification based on the current position data and the scheduled operation data in accordance with the actual operation status of the bus; The achievements data to realize the function of transmitting to the bus service management server.
[0018]
A bus operation management server provided in a bus office which manages the bus operation schedule data in a computer which is mounted on a bus and manages the operation of the bus. , A function of acquiring the current position data of the bus, and displaying the contents of the scheduled operation data based on the current position data according to the progress of the bus, and the actual operation contents of the bus. And a function of calculating a difference between the contents of the bus operation data and the calculation result and the actual operation contents as operation result data, and the actual operation contents of the bus and the contents of the operation plan data And a function of displaying a calculation result obtained by calculating a difference between the bus operation status and the operation result data to the bus operation management server.
[0019]
A bus operation management server provided in a bus office that manages the bus operation schedule data on a computer that is mounted on a bus and manages the operation of the bus. , A function of acquiring the current position data of the bus, and displaying the contents of the scheduled operation data based on the current position data according to the progress of the bus, and the actual operation contents of the bus. And a function of calculating a difference between the contents of the bus operation data and the calculation result and the actual operation contents as operation result data, and the actual operation contents of the bus and the contents of the operation plan data The function of displaying the calculation result of calculating the difference between the current position and the operation status of the bus in accordance with the operation status of the bus, and the operation schedule guide device for notifying the passenger of the bus operation schedule are provided with the current position. A function of outputting a control signal for controlling to provide a guidance notification according to the actual operation status of the bus based on the data and the operation schedule data, and a function of transmitting the operation result data to the bus operation management server. make it happen.
[0020]
According to an eleventh aspect of the present invention, in the bus operation management method for managing bus operation, the bus operation schedule data is received from a bus operation management server provided in a bus office that manages the bus. Obtaining the current position data of the bus, displaying the contents of the scheduled operation data based on the current position data in accordance with the progress of the bus, and displaying the actual operation contents of the bus and the operation Calculating the difference between the contents of the scheduled data and storing the calculation result and the actual operation contents as operation result data; and transmitting the operation result data to the bus operation management server. It is characterized by.
[0021]
According to a twelfth aspect of the present invention, in the bus operation management method for managing bus operation, the bus operation schedule data is received from a bus operation management server provided in a bus office that manages the bus. Obtaining the current position data of the bus, displaying the contents of the scheduled operation data based on the current position data in accordance with the progress of the bus, and displaying the actual operation contents of the bus and the operation A step of calculating a difference between the contents of the schedule data and storing the calculation result and the actual operation contents as operation result data, and an operation schedule guidance device for notifying passengers of a bus operation schedule. Outputting a control signal for controlling to give a guidance notification according to the actual operation status of the bus based on the current position data and the operation schedule data;
Transmitting the operation result data to the bus operation management server.
[0022]
According to a thirteenth aspect of the present invention, in the bus operation management method for managing bus operation, the bus operation schedule data is received from a bus operation management server provided in a bus office that manages the bus. Obtaining the current position data of the bus, displaying the contents of the scheduled operation data based on the current position data in accordance with the progress of the bus, and displaying the actual operation contents of the bus and the operation Calculating a difference between the contents of the scheduled data and storing the calculation result and the actual operation contents as operation result data; anda step of calculating a difference between the actual operation contents of the bus and the contents of the operation scheduled data. Displaying the calculation result of calculating the difference according to the operation status of the bus, and transmitting the operation result data to the bus operation management server. Characterized in that it contains.
[0023]
According to a fourteenth aspect of the present invention, in the bus operation management method for managing bus operation, the bus operation schedule data is received from a bus operation management server provided in a bus office that manages the bus. Obtaining the current position data of the bus, displaying the contents of the scheduled operation data based on the current position data in accordance with the progress of the bus, and displaying the actual operation contents of the bus and the operation Calculating a difference between the contents of the scheduled data and storing the calculation result and the actual operation contents as operation result data; anda step of calculating a difference between the actual operation contents of the bus and the contents of the operation scheduled data. Displaying the calculation result of the difference of the bus according to the operation status of the bus, and an operation schedule guidance device for notifying passengers of the bus operation schedule. A step of outputting a control signal for controlling to give a guidance notification according to an actual bus operation state based on the current position data and the operation schedule data, and a step of transmitting the operation result data to the bus operation management server And characterized in that:
[0024]
Therefore, the contents of the operation schedule data can be checked only in necessary places in real time, so that the operation of confirming the operation schedule contents by the driver can be reduced.
In addition, the time difference between the scheduled passage time of the stop and the actual passage time can be notified to the driver in real time, so that the bus operation can be sufficiently performed in accordance with the contents of the operation schedule data, and the difference of the time difference by the driver can be realized. Confirmation work can be reduced.
In addition, since a control signal (trigger signal) is applied to the scheduled operation guide device based on the current position data of the bus, it is possible to avoid a situation in which the driver forgets to press the guidance start button of the scheduled operation guide device, and the operation by the driver. Work related to the schedule guide device can be reduced.
[0025]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment of the present invention will be described with reference to FIGS.
[0026]
FIG. 1 shows a schematic configuration of a bus
[0027]
Before starting the bus operation business, the bus
The operation management processing of the
[0028]
Next, the configurations of the bus
[0029]
First, the configuration of the bus
As shown in FIG. 2, the bus
[0030]
The
[0031]
Further, the
[0032]
The
[0033]
The
[0034]
The
[0035]
When the
Here, the bus
[0036]
When receiving the
[0037]
The
[0038]
Here, various data contents stored in the
[0039]
As shown in FIG. 3, the driver data 11 a is formed by associating “driver ID” data and “driver name” data, and the vehicle data 11 b includes “vehicle ID” data and “vehicle name” of each bus. The
[0040]
As shown in FIG. 4, the
[0041]
As shown in FIG. 5, the
[0042]
Next, the configuration of the bus
As shown in FIG. 6, the bus
[0043]
The
[0044]
The control means 21 executes various processes according to various programs stored in the memory area according to the instruction data and the like, and stores the processing results in the memory area or displays the result on the display means 25.
[0045]
The control means 21 executes the bus operation management program stored in the storage means 26 to perform the operation management processing shown in the flowchart of FIG.
[0046]
A RAM (Random Access Memory) 22 expands and stores various programs such as a control program executed by the
[0047]
The
[0048]
The
[0049]
Here, the
[0050]
Note that the
[0051]
The display means 25 has a display screen such as a liquid crystal display screen (LCD: Liquid Crystal Display), and is stored in the input data from the input means 23 and the storage means 26 according to various display information input from the control means 21. Various data and the like are displayed on the display screen.
[0052]
The
[0053]
The
[0054]
The
[0055]
Next, an operation management process performed by the bus
[0056]
First, the bus
[0057]
When an instruction to perform the operation management processing is input on the
[0058]
The
[0059]
When it is confirmed on the
[0060]
The control means 21 displays three lines at a time on the
[0061]
In other words, on the
In the route selection screen, three routes are displayed at a time, but the present invention is not limited to this. One route may be displayed at a time, or four routes may be displayed at a time. You may be free.
[0062]
The control means 21 monitors whether or not a route is selected on the route selection screen (step S15), and the route (in this case, the route number shown on the
[0063]
The control means 21 displays three stops at a time on the
[0064]
Here, on the
[0065]
The control means 21 monitors whether or not the
[0066]
After step S18, the control means 21 determines whether or not the "pass" button on the
[0067]
When a pass instruction for the next stop (Nishi 5-Chome) is input (Step S19; Yes), the
[0068]
In step S19, when the passage instruction of the next stop (Nishi 5-chome) is not input (step S19; No), the
[0069]
When the
At this time, the control means 21 displays the calculated delay / advance time on the display screen of the display means 25.
[0070]
Next, the
[0071]
As described above, in the bus
[0072]
Therefore, since the contents of the
Further, the time difference between the scheduled passage time of the stop and the actual passage time can be notified to the driver in real time, so that the bus operation can be sufficiently performed in accordance with the contents of the
Further, since a trigger signal is sent to the AGS based on the GPS current position data, it is possible to avoid a situation where the driver forgets to press the guidance start button of the AGS and to reduce the work related to the AGS by the driver.
In addition, it is not necessary to print the contents of the
Further, by referring to the
In addition, since the final delay time can be recorded and displayed, it can be used for overtime management of the driver.
[0073]
The description in the present embodiment shows an example of the bus operation management system, the bus operation management terminal, the bus operation management program, and the bus operation management method according to the present invention, and the present invention is not limited thereto. The detailed configuration, various numerical values, and detailed operations of the bus
[0074]
For example, in the present embodiment, the
[0075]
Further, additional information relating to the route such as during construction or a detour may be input in advance to the
[0076]
In addition, the passing time of the stop point instructed to pass in step S19 of FIG. 7 is not particularly recorded in the
[0077]
【The invention's effect】
According to the present invention, it is possible to check the contents of the operation schedule data only in necessary places in real time, so that the operation of confirming the operation schedule contents by the driver can be reduced.
In addition, the time difference between the scheduled passage time of the stop and the actual passage time can be notified to the driver in real time, so that the bus operation can be sufficiently performed in accordance with the contents of the operation schedule data, and the difference of the time difference by the driver can be realized. Confirmation work can be reduced.
In addition, since a control signal (trigger signal) is applied to the scheduled operation guide device based on the current position data of the bus, it is possible to avoid a situation in which the driver forgets to press the guidance start button of the scheduled operation guide device, and the operation by the driver. Work related to the schedule guide device can be reduced.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a schematic configuration of a bus operation management system to which the present invention is applied.
FIG. 2 is a block diagram showing a schematic configuration of a bus operation management server shown in FIG.
FIG. 3 is a diagram illustrating an example of data content stored in a data storage unit illustrated in FIG. 2;
4 is a diagram showing an example of data contents stored in a data storage unit shown in FIG.
FIG. 5 is a diagram illustrating an example of data content stored in a data storage unit illustrated in FIG. 2;
FIG. 6 is a block diagram showing a schematic configuration of a bus operation management terminal shown in FIG. 1;
FIG. 7 is a flowchart illustrating an operation management process.
8 is a diagram showing an example of a display screen by the display means shown in FIG.
[Explanation of symbols]
1 bus office
2 bus
10 Bus operation management server
11 Data storage unit
12 Server communication device
13 Printing device
14 PC
20 Bus operation management terminal
20a Position detection device
21 Control means
22 RAM
23 Input means
24 Terminal communication device
25 Display means
26 storage means
27 bus
100 Bus operation management system
Claims (14)
前記バス運行管理サーバは、
前記バスの運行予定データと、該バスの実際の運行内容を示す運行実績データとを格納するデータ格納部と、
前記運行予定データを前記バス運行管理端末に送信すると共に、該バス運行管理端末から送信された前記運行実績データを受信するサーバ通信装置と、
を備え、
前記バス運行管理端末は、
前記運行予定データを前記バス運行管理サーバから受信すると共に、前記運行実績データを当該バス運行管理サーバに送信する端末通信装置と、
前記位置検出装置により検出された前記現在位置データに基づき前記端末通信装置により受信された前記運行予定データの内容を前記バスの運行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該運行内容とを前記運行実績データとして記憶するよう制御する制御手段と、
を備えたことを特徴とするバス運行管理システム。A bus operation management server provided in the bus office, a bus operation management terminal mounted on a bus managed by the bus office and capable of transmitting and receiving data to and from the bus operation management server; A bus operation management system including a position detection device that detects a position,
The bus operation management server includes:
A data storage unit for storing operation schedule data of the bus and operation result data indicating actual operation contents of the bus;
A server communication device that transmits the operation schedule data to the bus operation management terminal, and receives the operation result data transmitted from the bus operation management terminal,
With
The bus operation management terminal,
A terminal communication device that receives the operation schedule data from the bus operation management server and transmits the operation result data to the bus operation management server;
Based on the current position data detected by the position detection device, the content of the operation schedule data received by the terminal communication device is displayed according to the operation status of the bus, and the actual operation content of the bus and Control means for calculating a difference between the contents of the operation schedule data and controlling the calculation result and the operation contents to be stored as the operation result data;
A bus operation management system comprising:
前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示するよう制御することを特徴とする請求項1に記載のバス運行管理システム。The control means,
2. The bus according to claim 1, wherein a control is performed so that a calculation result obtained by calculating a difference between the actual operation content of the bus and the content of the scheduled operation data is displayed in accordance with the operation status of the bus. Operation management system.
バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力することを特徴とする請求項1または2に記載のバス運行管理システム。The control means,
A control signal for controlling the operation schedule guide device for notifying the bus operation schedule to the passengers based on the current position data and the operation schedule data so as to perform a guide notification in accordance with an actual bus operation status. The bus operation management system according to claim 1, wherein the bus operation management system outputs the information.
前記バスの運行予定データを前記バス運行管理サーバから受信すると共に、当該バスの実際の運行内容を示す運行実績データを前記バス運行管理サーバに送信する端末通信装置と、
前記バスの現在位置データに基づき前記端末通信装置により受信された前記運行予定データの内容を当該バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該運行内容とを前記運行実績データとして記憶するよう制御する制御手段と、
を備えたことを特徴とするバス運行管理端末。The current position can be transmitted / received to / from a bus operation management server provided in a bus office which is mounted on the bus and manages the bus, and a current position of the bus is detected by a position detecting device for detecting the current position of the bus. A bus operation management terminal capable of acquiring data,
A terminal communication device that receives the bus operation schedule data from the bus operation management server and transmits operation result data indicating the actual operation contents of the bus to the bus operation management server;
The content of the operation schedule data received by the terminal communication device based on the current position data of the bus is displayed according to the progress of the bus, and the actual operation content of the bus and the content of the operation schedule data are displayed. Control means for calculating a difference between the two, and controlling to store the calculation result and the operation content as the operation result data,
A bus operation management terminal comprising:
前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示するよう制御することを特徴とする請求項4に記載のバス運行管理端末。The control means,
The bus according to claim 4, wherein a control is performed so that a calculation result obtained by calculating a difference between the actual operation content of the bus and the content of the operation schedule data is displayed according to the operation status of the bus. Operation management terminal.
バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力することを特徴とする請求項4または5に記載のバス運行管理端末。The control means,
A control signal for controlling the operation schedule guide device for notifying the bus operation schedule to the passengers based on the current position data and the operation schedule data so as to perform a guide notification in accordance with an actual bus operation status. The bus operation management terminal according to claim 4, wherein the terminal is output.
前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信する機能と、
前記バスの現在位置データを取得する機能と、
前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶する機能と、
前記運行実績データを前記バス運行管理サーバに送信する機能と、
を実現させるためのバス運行管理プログラム。A computer mounted on the bus and managing the operation of the bus,
A function of receiving the bus operation schedule data from a bus operation management server provided in a bus office that manages the bus,
A function of acquiring current position data of the bus;
Based on the current position data, the contents of the scheduled operation data are displayed according to the progress of the bus, and the difference between the actual operation contents of the bus and the contents of the scheduled operation data is calculated. A function of storing the result and the actual operation content as operation result data;
A function of transmitting the operation result data to the bus operation management server;
A bus operation management program for realizing.
前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信する機能と、
前記バスの現在位置データを取得する機能と、
前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶する機能と、
バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力する機能と、
前記運行実績データを前記バス運行管理サーバに送信する機能と、
を実現させるためのバス運行管理プログラム。A computer mounted on the bus and managing the operation of the bus,
A function of receiving the bus operation schedule data from a bus operation management server provided in a bus office that manages the bus,
A function of acquiring current position data of the bus;
Based on the current position data, the contents of the scheduled operation data are displayed according to the progress of the bus, and the difference between the actual operation contents of the bus and the contents of the scheduled operation data is calculated. A function of storing the result and the actual operation content as operation result data;
A control signal for controlling the operation schedule guide device for notifying the bus operation schedule to the passengers based on the current position data and the operation schedule data so as to perform a guide notification in accordance with an actual bus operation status. Output function,
A function of transmitting the operation result data to the bus operation management server;
A bus operation management program for realizing.
前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信する機能と、
前記バスの現在位置データを取得する機能と、
前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶する機能と、
前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示する機能と、
前記運行実績データを前記バス運行管理サーバに送信する機能と、
を実現させるためのバス運行管理プログラム。A computer mounted on the bus and managing the operation of the bus,
A function of receiving the bus operation schedule data from a bus operation management server provided in a bus office that manages the bus,
A function of acquiring current position data of the bus;
Based on the current position data, the contents of the scheduled operation data are displayed according to the progress of the bus, and the difference between the actual operation contents of the bus and the contents of the scheduled operation data is calculated. A function of storing the result and the actual operation content as operation result data;
A function of displaying a calculation result obtained by calculating a difference between the actual operation content of the bus and the content of the operation schedule data in accordance with the operation status of the bus,
A function of transmitting the operation result data to the bus operation management server;
A bus operation management program for realizing.
前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信する機能と、
前記バスの現在位置データを取得する機能と、
前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶する機能と、
前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示する機能と、
バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力する機能と、
前記運行実績データを前記バス運行管理サーバに送信する機能と、
を実現させるためのバス運行管理プログラム。A computer mounted on the bus and managing the operation of the bus,
A function of receiving the bus operation schedule data from a bus operation management server provided in a bus office that manages the bus,
A function of acquiring current position data of the bus;
Based on the current position data, the contents of the scheduled operation data are displayed according to the progress of the bus, and the difference between the actual operation contents of the bus and the contents of the scheduled operation data is calculated. A function of storing the result and the actual operation content as operation result data;
A function of displaying a calculation result obtained by calculating a difference between the actual operation content of the bus and the content of the operation schedule data in accordance with the operation status of the bus,
A control signal for controlling the operation schedule guide device for notifying the bus operation schedule to the passengers based on the current position data and the operation schedule data so as to perform a guide notification in accordance with an actual bus operation status. Output function,
A function of transmitting the operation result data to the bus operation management server;
A bus operation management program for realizing.
前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信するステップと、
前記バスの現在位置データを取得するステップと、
前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶するステップと、
前記運行実績データを前記バス運行管理サーバに送信するステップと、
を含んだことを特徴とするバス運行管理方法。In a bus operation management method for managing bus operations,
Receiving the bus operation schedule data from a bus operation management server provided in a bus office that manages the bus;
Obtaining current position data of the bus;
Based on the current position data, the contents of the scheduled operation data are displayed according to the progress of the bus, and the difference between the actual operation contents of the bus and the contents of the scheduled operation data is calculated. Storing the result and the actual operation content as operation result data;
Transmitting the operation result data to the bus operation management server;
A bus operation management method characterized by including:
前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信するステップと、
前記バスの現在位置データを取得するステップと、
前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶するステップと、
バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力するステップと、
前記運行実績データを前記バス運行管理サーバに送信するステップと、
を含んだことを特徴とするバス運行管理方法。In a bus operation management method for managing bus operations,
Receiving the bus operation schedule data from a bus operation management server provided in a bus office that manages the bus;
Obtaining current position data of the bus;
Based on the current position data, the contents of the scheduled operation data are displayed according to the progress of the bus, and the difference between the actual operation contents of the bus and the contents of the scheduled operation data is calculated. Storing the result and the actual operation content as operation result data;
A control signal for controlling the operation schedule guide device for notifying the bus operation schedule to the passengers based on the current position data and the operation schedule data so as to perform a guide notification in accordance with an actual bus operation status. Outputting,
Transmitting the operation result data to the bus operation management server;
A bus operation management method characterized by including:
前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信するステップと、
前記バスの現在位置データを取得するステップと、
前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶するステップと、
前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示するステップと、
前記運行実績データを前記バス運行管理サーバに送信するステップと、
を含んだことを特徴とするバス運行管理方法。In a bus operation management method for managing bus operations,
Receiving the bus operation schedule data from a bus operation management server provided in a bus office that manages the bus;
Obtaining current position data of the bus;
Based on the current position data, the contents of the scheduled operation data are displayed according to the progress of the bus, and the difference between the actual operation contents of the bus and the contents of the scheduled operation data is calculated. Storing the result and the actual operation content as operation result data;
Displaying a calculation result of calculating a difference between the actual operation content of the bus and the content of the scheduled operation data in accordance with the operation status of the bus;
Transmitting the operation result data to the bus operation management server;
A bus operation management method characterized by including:
前記バスの運行予定データを、当該バスを管理するバス営業所内に設けられたバス運行管理サーバから受信するステップと、
前記バスの現在位置データを取得するステップと、
前記現在位置データに基づき前記運行予定データの内容を前記バスの進行状況に応じて表示すると共に、該バスの実際の運行内容と該運行予定データの内容との間の差異を算出して当該算出結果と当該実際の運行内容とを運行実績データとして記憶するステップと、
前記バスの実際の運行内容と前記運行予定データの内容との間の差異を算出した算出結果を当該バスの運行状況に合わせて表示するステップと、
バスの運行予定を乗客に通知するための運行予定案内装置に対し、前記現在位置データと前記運行予定データとに基づいてバスの実際の運行状況に応じて案内通知を行うよう制御する制御信号を出力するステップと、
前記運行実績データを前記バス運行管理サーバに送信するステップと、
を含んだことを特徴とするバス運行管理方法。In a bus operation management method for managing bus operations,
Receiving the bus operation schedule data from a bus operation management server provided in a bus office that manages the bus;
Obtaining current position data of the bus;
Based on the current position data, the contents of the scheduled operation data are displayed according to the progress of the bus, and the difference between the actual operation contents of the bus and the contents of the scheduled operation data is calculated. Storing the result and the actual operation content as operation result data;
Displaying a calculation result of calculating a difference between the actual operation content of the bus and the content of the scheduled operation data in accordance with the operation status of the bus;
A control signal for controlling the operation schedule guide device for notifying the bus operation schedule to the passengers based on the current position data and the operation schedule data so as to perform a guide notification in accordance with an actual bus operation status. Outputting,
Transmitting the operation result data to the bus operation management server;
A bus operation management method characterized by including:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003013008A JP2004227207A (en) | 2003-01-22 | 2003-01-22 | System, terminal, program, and method for managing bus travelling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003013008A JP2004227207A (en) | 2003-01-22 | 2003-01-22 | System, terminal, program, and method for managing bus travelling |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2004227207A true JP2004227207A (en) | 2004-08-12 |
Family
ID=32901453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003013008A Pending JP2004227207A (en) | 2003-01-22 | 2003-01-22 | System, terminal, program, and method for managing bus travelling |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2004227207A (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008081775A1 (en) * | 2006-12-26 | 2008-07-10 | Toyota Jidosha Kabushiki Kaisha | Driving assistance device |
CN101483009B (en) * | 2008-01-11 | 2011-08-24 | 上海邮电设计咨询研究院有限公司 | Public transport pre-broadcasting system based on A-GPS and 3G networks |
JP2013114535A (en) * | 2011-11-30 | 2013-06-10 | Lecip Holdings Corp | Traffic information provision device |
CN103413430A (en) * | 2013-07-22 | 2013-11-27 | 浙江工业大学 | Bus multimedia playing, scheduling and managing method based on DaVinci platform |
CN103426296A (en) * | 2012-05-18 | 2013-12-04 | 李志恒 | System and method using windscreen projection to increase accuracy of bus rapid transit scheduling |
CN104574942A (en) * | 2014-08-11 | 2015-04-29 | 北京易华录信息技术股份有限公司 | Method and system for controlling leader car to run exactly by second in emergencies |
CN104575059A (en) * | 2014-08-19 | 2015-04-29 | 北京易华录信息技术股份有限公司 | Method and system capable of guiding BRT to run accurately according to timetable |
CN104574945A (en) * | 2014-09-04 | 2015-04-29 | 北京易华录信息技术股份有限公司 | Commanding and dispatching system and method for rapid public traffic vehicles during station dwell time variation |
CN104680829A (en) * | 2015-01-21 | 2015-06-03 | 东北大学 | Bus arrival time prediction system and method based on multi-user cooperation |
JP2015176376A (en) * | 2014-03-14 | 2015-10-05 | 株式会社バイタルリード | Count related information management server and count related information management program |
CN105023231A (en) * | 2015-07-23 | 2015-11-04 | 四川数智通软件有限责任公司 | Bus data acquisition method based on video recognition and cell phone GPS |
KR101658825B1 (en) * | 2015-12-01 | 2016-09-30 | 이승호 | System and method of managing driving in commuter bus |
KR101782098B1 (en) | 2017-04-13 | 2017-09-26 | 주식회사 코어시스템즈 | System and Method for Determining Bus Routes |
JP2019008364A (en) * | 2017-06-20 | 2019-01-17 | みなと観光バス株式会社 | Driver guidance system |
JP2019200635A (en) * | 2018-05-17 | 2019-11-21 | クラリオン株式会社 | Broadcast control device, and information display method |
CN110556014A (en) * | 2019-09-11 | 2019-12-10 | 湖北公众信息产业有限责任公司 | intelligent bus dispatching platform system |
CN112700671A (en) * | 2020-12-01 | 2021-04-23 | 华录智达科技有限公司 | Real-time bus monitoring method and system based on class chart |
-
2003
- 2003-01-22 JP JP2003013008A patent/JP2004227207A/en active Pending
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008081775A1 (en) * | 2006-12-26 | 2008-07-10 | Toyota Jidosha Kabushiki Kaisha | Driving assistance device |
CN101483009B (en) * | 2008-01-11 | 2011-08-24 | 上海邮电设计咨询研究院有限公司 | Public transport pre-broadcasting system based on A-GPS and 3G networks |
JP2013114535A (en) * | 2011-11-30 | 2013-06-10 | Lecip Holdings Corp | Traffic information provision device |
CN103426296A (en) * | 2012-05-18 | 2013-12-04 | 李志恒 | System and method using windscreen projection to increase accuracy of bus rapid transit scheduling |
CN103413430A (en) * | 2013-07-22 | 2013-11-27 | 浙江工业大学 | Bus multimedia playing, scheduling and managing method based on DaVinci platform |
CN103413430B (en) * | 2013-07-22 | 2015-10-07 | 浙江工业大学 | Based on public transport multimedia and the schedule management method of davinci platform |
JP2015176376A (en) * | 2014-03-14 | 2015-10-05 | 株式会社バイタルリード | Count related information management server and count related information management program |
CN104574942A (en) * | 2014-08-11 | 2015-04-29 | 北京易华录信息技术股份有限公司 | Method and system for controlling leader car to run exactly by second in emergencies |
CN104575059A (en) * | 2014-08-19 | 2015-04-29 | 北京易华录信息技术股份有限公司 | Method and system capable of guiding BRT to run accurately according to timetable |
CN104575059B (en) * | 2014-08-19 | 2016-09-14 | 北京易华录信息技术股份有限公司 | A kind of method and system that BRT can be guided precisely to run according to timetable |
CN104574945A (en) * | 2014-09-04 | 2015-04-29 | 北京易华录信息技术股份有限公司 | Commanding and dispatching system and method for rapid public traffic vehicles during station dwell time variation |
CN104574945B (en) * | 2014-09-04 | 2016-08-17 | 北京易华录信息技术股份有限公司 | The quick public transport vehicle command dispatching system when the dwell time changes and method |
CN104680829A (en) * | 2015-01-21 | 2015-06-03 | 东北大学 | Bus arrival time prediction system and method based on multi-user cooperation |
CN105023231B (en) * | 2015-07-23 | 2018-07-17 | 四川数智通软件有限责任公司 | Public transport data capture method based on video identification and cellphone GPS |
CN105023231A (en) * | 2015-07-23 | 2015-11-04 | 四川数智通软件有限责任公司 | Bus data acquisition method based on video recognition and cell phone GPS |
KR101658825B1 (en) * | 2015-12-01 | 2016-09-30 | 이승호 | System and method of managing driving in commuter bus |
KR101782098B1 (en) | 2017-04-13 | 2017-09-26 | 주식회사 코어시스템즈 | System and Method for Determining Bus Routes |
JP2019008364A (en) * | 2017-06-20 | 2019-01-17 | みなと観光バス株式会社 | Driver guidance system |
JP2019200635A (en) * | 2018-05-17 | 2019-11-21 | クラリオン株式会社 | Broadcast control device, and information display method |
JP7068922B2 (en) | 2018-05-17 | 2022-05-17 | フォルシアクラリオン・エレクトロニクス株式会社 | Broadcast control device and information display method |
CN110556014A (en) * | 2019-09-11 | 2019-12-10 | 湖北公众信息产业有限责任公司 | intelligent bus dispatching platform system |
CN110556014B (en) * | 2019-09-11 | 2020-07-03 | 湖北公众信息产业有限责任公司 | Intelligent bus dispatching platform system |
CN112700671A (en) * | 2020-12-01 | 2021-04-23 | 华录智达科技有限公司 | Real-time bus monitoring method and system based on class chart |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2004227207A (en) | System, terminal, program, and method for managing bus travelling | |
JP2020102246A (en) | Labor state management device, labor state management system and computer program | |
JPH10191453A (en) | Data transfer output system and information processing unit | |
JPH1063728A (en) | Method and device for linking up with operation schedule by portable information terminal | |
JP2010113510A (en) | Onboard display device | |
JP2001291192A (en) | Information processor and recording medium | |
JP2004354149A (en) | Map data delivery method | |
JP2004078674A (en) | Information providing device and method, and computer program | |
JP2019105516A (en) | Destination estimation device, destination estimation system and destination estimation method | |
JP6749359B2 (en) | Vehicle boarding support system | |
JP2010197168A (en) | Route guide device and program | |
JP3932974B2 (en) | Information system, in-vehicle terminal, information terminal, program | |
JP2008298490A (en) | In-vehicle electronic device | |
JP2003173497A (en) | Method and system for vehicle operating information processing | |
JP2006251514A (en) | Advertisement client apparatus, advertisement server apparatus and advertisement system in mobile vehicle | |
JP2005190001A (en) | Taxi use system, taxi use method, information server and program | |
JP2006318418A (en) | Device, method and program for operation assistance for industrial waste collecting vehicle | |
JP2017013584A (en) | Crew operation support system | |
JP2001297394A (en) | Operation managing system | |
JP2006352759A (en) | Personal digital assistant and remote operation system | |
CN110873574A (en) | Information processing apparatus, information processing method, and recording medium | |
JP2003016171A (en) | Method, program and system for providing map | |
JP2002049715A (en) | Device and method for guiding ride, storage medium and ride guiding system | |
JP2007172555A (en) | Traffic information guide system and method, and program | |
JP2008175655A (en) | Car navigation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051202 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20071227 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080108 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20080507 |