JP2003064624A - Earthquake resistant reinforcing method of existing reinforced concrete elevated bridge - Google Patents
Earthquake resistant reinforcing method of existing reinforced concrete elevated bridgeInfo
- Publication number
- JP2003064624A JP2003064624A JP2001254524A JP2001254524A JP2003064624A JP 2003064624 A JP2003064624 A JP 2003064624A JP 2001254524 A JP2001254524 A JP 2001254524A JP 2001254524 A JP2001254524 A JP 2001254524A JP 2003064624 A JP2003064624 A JP 2003064624A
- Authority
- JP
- Japan
- Prior art keywords
- pier
- girder
- brace
- reinforced concrete
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】この発明は鉄道橋や道路橋と
して使用されている既存の鉄筋コンクリート造高架橋に
耐震安全性を付与しながら、スラブ上を走行する列車や
車両が発生する交通振動の周辺地盤への伝播を抑制する
既存鉄筋コンクリート造高架橋の耐震補強方法に関する
ものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention provides seismic safety to existing reinforced concrete viaducts used as railway bridges and road bridges, while at the same time, the ground around the vibration of traffic generated by trains and vehicles running on slabs. The present invention relates to a seismic retrofitting method for existing reinforced concrete viaducts that suppresses the propagation to the earth.
【0002】[0002]
【従来の技術及び発明が解決しようとする課題】鉄道橋
や道路橋として使用される鉄筋コンクリート造高架橋は
橋軸直角方向に並列する橋脚を梁でつなぎ、橋軸方向に
隣接するを橋脚を桁でつないだ形のラーメン構造で構築
されるが、橋軸直角方向には単スパンであることから、
橋軸方向に比べて剛性が小さいため、揺れを生じ易く、
地震時の耐震安全性に不安がある。2. Description of the Related Art Reinforced concrete viaducts used as railway bridges and road bridges are constructed by connecting bridge piers parallel to each other in the direction perpendicular to the bridge axis with beams and connecting bridge piers adjacent to each other in the bridge axis direction with girders. It is constructed with a connected ramen structure, but since it has a single span in the direction perpendicular to the bridge axis,
Since the rigidity is smaller than in the bridge axis direction, shaking easily occurs,
I am worried about seismic safety during an earthquake.
【0003】特に橋軸直角方向には梁のせん断スパン比
が小さくなる傾向があるため、橋軸直角方向に過大な地
震力を受けたときに、水平力による曲げモーメントによ
って梁がせん断破壊を起こす可能性がある。In particular, since the shear span ratio of the beam tends to decrease in the direction perpendicular to the bridge axis, when an excessive seismic force is applied in the direction perpendicular to the bridge axis, the beam causes shear failure due to a bending moment due to a horizontal force. there is a possibility.
【0004】既存の高架橋を耐震補強する方法としては
橋脚と梁や桁の回りに鋼板やコンクリート、補強繊維等
を巻き、躯体の断面を増す方法と、構面内にブレースを
架設する方法が考えられるが、前者の方法では全橋脚や
梁等を補強する必要があるため、施工が大掛かりにな
る。As a method for seismic strengthening an existing viaduct, a method of winding steel plates, concrete, reinforcing fibers or the like around bridge piers, beams or girders to increase the cross section of the skeleton, and a method of erectioning braces in the surface are considered. However, the former method requires large-scale construction because it is necessary to reinforce all piers and beams.
【0005】ブレースを架設する場合には橋脚の脚部や
頭部、あるいは梁や桁の橋脚との接合部付近にブレース
を受けるガセットプレートを突設することが必要になる
が、通常はガセットプレートに一体化したベースプレー
トや鉄骨枠等を躯体に接合するためにコンクリート中に
定着用のアンカーを打ち込む必要が生ずるため、既存の
躯体を損傷させ、鉄筋を傷める危険性もある。When the brace is erected, it is necessary to project a gusset plate for receiving the brace near the leg or head of the pier or near the joint of the beam or girder with the pier. Since it is necessary to drive an anchor for fixing into concrete in order to join the base plate and the steel frame, etc., which are integrated into the skeleton to the skeleton, there is a risk of damaging the existing skeleton and damaging the reinforcing bars.
【0006】また高架橋において、スラブ上を走行する
列車や車両が発生する交通振動の伝播を抑制する対策が
採られていない場合には振動が橋脚から基礎を通じて地
盤まで伝播するため、周辺の民家に及び、居住性に影響
を与える可能性がある。On the viaduct, if measures are not taken to suppress the propagation of traffic vibrations generated by trains and vehicles traveling on slabs, the vibrations propagate from the piers to the ground through the foundations, and therefore the surrounding private houses will be affected. Also, it may affect the habitability.
【0007】交通振動の周辺地盤への伝播を防止する方
法として地中に防振溝を形成し、高架橋下の地盤と周辺
の地盤を絶縁する方法があるが、振動を効果的に遮断す
るには高架橋に沿い、連続して防振溝を形成する必要が
あるため、効率的な方法ではない。特に上記のように既
存の高架橋の耐震補強と振動の抑制を同時に解決しよう
とする場合には高架橋に対する施工と地盤に対する施工
が必要になるため、施工対象が拡大し、施工が複雑化す
る。As a method of preventing the propagation of traffic vibration to the surrounding ground, there is a method of forming an anti-vibration groove in the ground to insulate the ground under the viaduct from the surrounding ground. Is not an efficient method because it requires continuous formation of vibration isolation grooves along the viaduct. In particular, in order to simultaneously solve the seismic reinforcement of the existing viaduct and the suppression of vibration as described above, construction on the viaduct and construction on the ground are required, so the construction target is expanded and the construction becomes complicated.
【0008】この発明は上記背景より、既存の高架橋の
耐震安全性を確保しながら、交通振動の伝播を抑制する
方法を提案するものである。From the above background, the present invention proposes a method for suppressing the propagation of traffic vibration while ensuring the seismic safety of existing viaducts.
【0009】[0009]
【課題を解決するための手段】本発明では橋脚の脚部
と、橋脚の頭部と、梁の中間部、または桁の中間部等の
いずれかの内、傾斜した方向に対向する少なくとも二箇
所にガセットプレートを突設し、対向するガセットプレ
ート間に、ブレース本体にダンパーを組み込んだブレー
ス型ダンパーを架設し、その両端部をガセットプレート
に連結することにより、既存の高架橋に対するブレース
型ダンパーの架設のみで、高架橋の耐震補強と振動の抑
制を同時に解決する。According to the present invention, at least two portions of the pier legs, the pier head, the middle portion of the beam, the middle portion of the girder, etc. facing each other in the inclined direction are provided. A gusset plate is projected on the gusset plate, and a brace type damper with a damper incorporated in the brace body is installed between the opposing gusset plates, and both ends of the brace type damper are connected to the gusset plate to install the brace type damper for the existing viaduct. With this alone, the seismic reinforcement of the viaduct and the suppression of vibration can be solved simultaneously.
【0010】隣接する橋脚の基礎部分がフーチングで連
結されている場合には請求項2に記載のように橋脚の脚
部と、橋脚の頭部と、フーチングと、梁の中間部、また
は桁の中間部のいずれかの内、傾斜した方向に対向する
少なくとも二箇所にガセットプレートが突設される。フ
ーチングは橋軸直角方向に並列する橋脚を連結する場合
の他、橋軸方向に隣接する橋脚を連結する場合もある。When the foundations of the adjacent piers are connected by footings, the pier legs, the pier head, the footing, the middle part of the beam, or the girders of the pier as claimed in claim 2. Gusset plates are provided so as to project at least at two positions facing each other in the inclined direction in any one of the intermediate portions. As for footing, in addition to connecting piers parallel to each other in the direction orthogonal to the bridge axis, there are also cases where piers adjacent to each other in the bridge axis direction are connected.
【0011】また橋軸直角方向、もしくは橋軸方向に隣
接する橋脚の内、一方の橋脚の脚部と他方の橋脚の頭部
間に単純にブレースを架設しようとする場合、通常は橋
脚の頭部と梁や桁との接合部にガセットプレートを突設
する形になるが、接合部は橋脚の主筋と梁の主筋が混在
する上、地震時のせん断力が大きくなる部分であるた
め、ガセットプレートを接合部に後付けすることは接合
部の耐力を低下させる危険性がある。When a brace is simply installed between the leg portion of one of the piers and the head portion of the other of the piers that are adjacent to each other in the direction perpendicular to the bridge axis or in the bridge axis direction, the head of the pier is usually used. A gusset plate is projected at the joint between the bridge and the beam or girder, but the joint is a part where the main reinforcement of the pier and the main reinforcement of the beam are mixed and the shearing force at the time of an earthquake increases, so the gusset Retrofitting the plate to the joint may reduce the yield strength of the joint.
【0012】これに対し、本発明ではブレース型ダンパ
ーが連結されるガセットプレートを接合部を外した橋脚
の脚部やフーチングと、橋脚の頭部、または梁や桁の中
間部に突設することにより、接合部における配筋への影
響が回避される。特に請求項3に記載のようにガセット
プレートを橋脚を包囲するバンドプレートに接合すれ
ば、橋脚の脚部や頭部を補強する効果が得られる。On the other hand, in the present invention, the gusset plate to which the brace-type damper is connected is provided so as to protrude from the leg or footing of the pier with the joint removed and the head of the pier or the middle of the beam or girder. As a result, the influence on the bar arrangement at the joint is avoided. In particular, if the gusset plate is joined to the band plate surrounding the pier as described in claim 3, the effect of reinforcing the legs and the head of the pier can be obtained.
【0013】スラブ上を走行する列車や車両が発生する
振動数の高い振動はブレース型ダンパーのダンパーが吸
収し、特にダンパーとして粘性系ダンパーを使用するこ
とにより微振動でも有効に振動エネルギを吸収できるた
め、ブレース型ダンパーのダンパーが常に機能する状態
に置かれることで、交通振動が橋脚から基礎を通じて周
辺地盤へ伝播し、周辺の民家に及ぶことは回避される。
列車や車両が発生する振動は橋脚を通じて基礎まで伝播
するため、交通振動を低減する上では橋脚の頭部にブレ
ース型ダンパーの一端を連結することが効果的である。High-frequency vibrations generated by trains and vehicles running on slabs are absorbed by the dampers of the brace-type dampers, and particularly viscous dampers are used as the dampers so that even small vibrations can effectively absorb vibration energy. Therefore, by keeping the brace-type damper in a functioning state at all times, it is possible to prevent traffic vibration from propagating from the pier to the surrounding ground through the foundation and reaching the surrounding private houses.
Since vibrations generated by trains and vehicles propagate to the foundation through the pier, it is effective to connect one end of a brace-type damper to the head of the pier in order to reduce traffic vibration.
【0014】高架橋においては前記の通り、橋軸直角方
向に隣接する橋脚をつなぐ梁にせん断破壊が起こり易い
ことから、梁のせん断破壊を防止する上ではブレース型
ダンパーは主として橋軸直角方向の構面内に架設される
が、橋軸直角方向の構面に加え、橋軸方向の構面内にも
ブレース型ダンパーを架設することで、高架橋の耐震安
全性と、高架橋が発生する振動の抑制効果が向上する。As described above, in the viaduct, since shear failure is likely to occur in the beam connecting the piers adjacent to each other in the direction perpendicular to the bridge axis, in order to prevent the shear failure of the beam, the brace type damper is mainly constructed in the direction perpendicular to the bridge axis. Although it is erected in the plane, the brace-type dampers are installed not only in the construction plane in the direction perpendicular to the bridge axis but also in the construction plane in the bridge axis direction. The effect is improved.
【0015】橋脚の脚部、もしくは頭部に突設されるガ
セットプレートは請求項3に記載のように橋脚を包囲す
るように橋脚に固定されるバンドプレートに接合され
る。バンドプレートは基本的には橋脚を包囲し、橋脚表
面との間に充填されるモルタルや接着剤等の充填材が充
填されることにより橋脚に固定される。The gusset plate projecting from the leg portion or the head portion of the pier is joined to the band plate fixed to the pier so as to surround the pier as claimed in claim 3. The band plate basically surrounds the pier and is fixed to the pier by being filled with a filling material such as mortar or an adhesive which is filled between the pier and the surface of the pier.
【0016】ブレース型ダンパーからの引張力や圧縮力
に対し、充填材によるバンドプレートの固定ではブレー
ス型ダンパーからの引張力や圧縮力の橋脚への伝達が十
分に行われない可能性がある場合は、請求項4に記載の
ように橋脚の脚部においてその回りに構築される根巻き
コンクリートを包囲した状態で根巻きコンクリートに一
体化させられる。In the case where there is a possibility that the tension or compression force from the brace type damper may not be sufficiently transmitted to the pier by the fixing of the band plate with the filling material, in contrast to the tension or compression force from the brace type damper. Is integrated with the wrapping concrete in a state of surrounding the wrapping concrete constructed around the pier legs as described in claim 4.
【0017】この場合、ブレース型ダンパーからの引張
力や圧縮力は根巻きコンクリートを通じて橋脚とフーチ
ングに伝達される。In this case, the tensile force and compressive force from the brace type damper are transmitted to the pier and footing through the root-wrapping concrete.
【0018】高架橋が2層の場合には、下層側の橋脚の
頭部と上層側の橋脚の脚部にバンドプレートが配置さ
れ、各バンドプレートがモルタルや接着剤の充填等によ
り橋脚に接合されながら、請求項5に記載のように両バ
ンドプレートのそれぞれの対向する面に接合されるダイ
ヤフラムが引張材で連結されることにより両バンドプレ
ートが互いに連結される。When the viaduct has two layers, band plates are arranged at the head of the lower pier and the leg of the upper pier, and each band plate is joined to the pier by filling mortar or adhesive. However, the band plates are connected to each other by connecting the diaphragms, which are joined to the respective facing surfaces of the band plates, with a tension member as described in claim 5.
【0019】この場合、ブレース型ダンパーからの引張
力の鉛直成分は引張材を通じて対向するバンドプレート
のダイヤフラムから橋脚と梁や桁に伝達され、水平成分
はバンドプレートから直接橋脚に伝達される。ブレース
型ダンパーからの圧縮力の鉛直成分はダイヤフラムから
梁や桁に伝達され、水平成分はバンドプレートから直接
橋脚に伝達される。In this case, the vertical component of the tensile force from the brace type damper is transmitted to the bridge pier, the beam and the girder from the diaphragm of the band plate which is opposed through the tensile member, and the horizontal component is directly transmitted from the band plate to the bridge pier. The vertical component of the compressive force from the brace damper is transmitted from the diaphragm to the beam or girder, and the horizontal component is transmitted from the band plate directly to the pier.
【0020】請求項3〜請求項5ではガセットプレート
が突設されるバンドプレートが橋脚を包囲するように固
定されることで、ガセットプレートの突設のために既存
の躯体を損傷させることがなく、逆にバンドプレートが
橋脚を包囲することでバンドプレートの軸方向の長さに
相当する区間に、ブレース型ダンパーからの軸力を分散
させて橋脚に伝達することができるため、橋脚の局部的
な損傷も防止される他、コンクリートを拘束し、橋脚の
耐力を高める効果がある。According to the third to fifth aspects, the band plate on which the gusset plate is projected is fixed so as to surround the bridge pier, so that the existing skeleton is not damaged due to the projecting of the gusset plate. On the contrary, since the band plate surrounds the pier, the axial force from the brace-type damper can be dispersed and transmitted to the pier in the section corresponding to the axial length of the band plate. Not only is it prevented from serious damage, but it also has the effect of restraining concrete and increasing the strength of the pier.
【0021】梁の中間部、または桁の中間部に突設され
るガセットプレートは請求項6に記載のように梁、また
は桁の両側に配置され、ガセットプレートと梁、または
桁を貫通する連結材によって梁、または桁に固定され
る。ブレース型ダンパーからの軸力はガセットプレート
と連結材を通じて梁や桁に伝達される。The gusset plates protruding from the middle portion of the beam or the middle portion of the girder are arranged on both sides of the beam or the girder as claimed in claim 6, and the gusset plate is connected to the beam or the girder. It is fixed to the beam or girder by the material. The axial force from the brace damper is transmitted to the beam and girder through the gusset plate and the connecting material.
【0022】この場合、梁や桁とガセットプレートにお
ける連結材の貫通部分を補強し、またはガセットプレー
ト全体を補剛し、ブレース型ダンパーからの軸力の梁や
桁への伝達を確実にしながら、連結材を保護するため
に、必要により請求項7に記載のようにガセットプレー
トのブレース型ダンパーとの連結部分を除き、ガセット
プレートは連結材と共にコンクリートで被覆される。In this case, the beam or girder and the gusset plate are reinforced at the penetrating portion of the connecting material, or the entire gusset plate is stiffened to ensure transmission of the axial force from the brace damper to the beam or girder. In order to protect the connecting member, the gusset plate is covered with concrete together with the connecting member, except for the connecting portion of the gusset plate with the brace type damper as described in claim 7, if necessary.
【0023】請求項6の場合、梁や桁には貫通孔が形成
されるが、請求項7ではガセットプレートが固定される
部分の回りをコンクリートで補強することにより梁や桁
の耐力低下を回避できるため、既存の高架橋が保有する
耐震性能を損なわずに、耐震性能を向上させることが可
能になる。In the case of claim 6, through-holes are formed in the beam or girder, but in claim 7, reinforcement of concrete around the portion where the gusset plate is fixed prevents a decrease in the proof strength of the beam or girder. Therefore, it becomes possible to improve the seismic performance without damaging the seismic performance of the existing viaduct.
【0024】フーチングに突設されるガセットプレート
は請求項8に記載のようにフーチング上に構築され、フ
ーチングに一体化するコンクリートブロック中に埋設さ
れる定着部材に接合される。ブレース型ダンパーからの
軸力はコンクリートブロックを通じてフーチングに伝達
される。A gusset plate projecting from the footing is constructed on the footing as claimed in claim 8 and is joined to a fixing member embedded in a concrete block integral with the footing. The axial force from the brace type damper is transmitted to the footing through the concrete block.
【0025】[0025]
【発明の実施の形態】この発明は図1,図4に示すよう
に橋軸直角方向に並列し、橋軸方向に間隔を隔てて配列
する橋脚1,1と、橋軸直角方向に並列する橋脚1,1
を連結する梁2、及び橋軸方向に隣接する橋脚1,1を
連結する桁3から構成されている既存の鉄筋コンクリー
ト造高架橋に対し、橋軸方向と橋軸直角方向の少なくと
もいずれかの方向に隣接する橋脚1,1間に、またはそ
れらに交差する方向にブレース型ダンパー6を架設し、
高架橋に耐震安全性と振動抑制効果を付与したものであ
る。BEST MODE FOR CARRYING OUT THE INVENTION The present invention, as shown in FIGS. 1 and 4, is arranged in parallel in the direction perpendicular to the bridge axis, and is arranged in parallel in the direction perpendicular to the bridge axis with bridge piers 1, 1 arranged at intervals in the direction of the bridge axis. Pier 1,1
For the existing reinforced concrete viaduct that consists of beams 2 that connect the bridges and girders 3 that connect the bridge piers 1 and 1 that are adjacent to each other in the bridge axis direction, in at least one of the bridge axis direction and the direction orthogonal to the bridge axis. Install a brace-type damper 6 between adjacent piers 1 and 1 or in a direction intersecting with them.
The viaduct has been given seismic safety and vibration control effects.
【0026】高架橋は図1,図4に示す1層の場合と図
2,図3に示す2層の場合があり、最上部に位置する梁
2及び桁3上に、鉄道軌道が敷設される、または道路と
なるスラブ4が構築されている。The viaduct may be a single layer shown in FIGS. 1 and 4 or a double layer shown in FIGS. 2 and 3. A rail track is laid on the beam 2 and the girder 3 located at the top. , Or a slab 4 that serves as a road is constructed.
【0027】橋脚1の基礎部分に構築されるフーチング
5は橋脚1毎に独立する場合と、図示するように連続
し、橋軸直角方向に並列する橋脚1,1、または橋軸方
向に隣接する橋脚1,1を連結する場合もある。The footing 5 constructed on the foundation portion of the pier 1 is independent for each pier 1, continuous as shown in the drawing, and piers 1, 1 arranged in parallel in the direction orthogonal to the pier axis, or adjacent to the pier direction. In some cases, the piers 1 and 1 may be connected.
【0028】ブレース型ダンパー6は軸方向に相対移動
自在なブレース本体61,61と、一方のブレース本体61に
内蔵されるダンパー62からなり、ブレース本体61,61が
その両端間に作用する引張力と圧縮力によって相対移動
するときにダンパー62が減衰力を発生することにより高
架橋の揺れを抑制しながら、高架橋へのブレース本体61
からの抵抗力を低減する。ダンパー62には粘性流体を用
いたオイルダンパー等、ダンパー本体61,61の軸方向の
相対移動によって減衰力を発生する形式のダンパーが使
用される。The brace-type damper 6 is composed of brace bodies 61, 61 which are relatively movable in the axial direction, and a damper 62 incorporated in one of the brace bodies 61. The brace bodies 61, 61 have a tensile force acting between their ends. While the damper 62 generates a damping force when relatively moving with the compression force, the brace body 61 to the viaduct is suppressed while suppressing the sway of the viaduct.
To reduce the resistance from. As the damper 62, there is used a damper such as an oil damper using a viscous fluid that generates a damping force by the relative movement of the damper bodies 61, 61 in the axial direction.
【0029】ブレース型ダンパー6の両端部にはブレー
ス本体61の端部に接続したブラケット63,63が一体化し
ており、ブラケット63,63は自身とガセットプレート
8,9を貫通するピン11等によってガセットプレート
8,9に回転自在に連結される。ブラケット63,63はガ
セットプレート8,9に取り付けられる、後述の自在継
手8b,9bによって任意の方向に回転自在にもなる。Brackets 63, 63 connected to the ends of the brace body 61 are integrated at both ends of the brace-type damper 6, and the brackets 63, 63 are provided with pins 11 penetrating the gusset plates 8 and 9 themselves. It is rotatably connected to the gusset plates 8 and 9. The brackets 63, 63 are attached to the gusset plates 8, 9 and can also be freely rotated in arbitrary directions by universal joints 8b, 9b described later.
【0030】図1は1層の高架橋の橋軸直角方向の構面
内にブレース型ダンパー6を架設した場合を示す。ここ
では両橋脚1,1の脚部と梁2の中間部との間に2本の
ブレース型ダンパー6,6を逆V字形に架設している
が、一方の橋脚1の脚部と他方の橋脚1の頭部との間に
1本のブレース型ダンパー6を架設する場合もある。FIG. 1 shows a case where a brace-type damper 6 is erected in the construction plane of the one-layer viaduct in the direction perpendicular to the bridge axis. Here, two brace-type dampers 6 and 6 are installed in an inverted V-shape between the legs of both piers 1 and the middle of beam 2, but the legs of one pier 1 and the other In some cases, one brace-type damper 6 may be installed between the head of the pier 1 and the head.
【0031】図2は一方の橋脚1の脚部と他方の橋脚1
の頭部との間に2本のブレース型ダンパー6,6をX字
形に交差させて架設した場合を示す。FIG. 2 shows the legs of one pier 1 and the other pier 1.
The case where two brace-type dampers 6 and 6 are crossed in an X shape between the head and the head is shown.
【0032】図3は2層の高架橋の上層側において両橋
脚1,1の脚部と梁2の中間部との間に2本のブレース
型ダンパー6,6を逆V字形に架設し、下層側において
フーチング5上にコンクリートブロック7を構築し、こ
のコンクリートブロック7の中間部と両橋脚1,1の頭
部との間に2本のブレース型ダンパー6,6をV字形に
架設した場合を示す。高架橋が2層の場合、2層の内の
上層側、もしくは下層側にのみブレース型ダンパー6,
6を架設することもある。In FIG. 3, two brace type dampers 6 and 6 are installed in an inverted V shape between the leg portions of both piers 1 and 1 and the middle portion of the beam 2 on the upper layer side of the two-layer viaduct, and the lower layer is constructed. When a concrete block 7 is built on the footing 5 on the side, and two brace type dampers 6, 6 are erected in a V shape between the middle part of the concrete block 7 and the heads of both piers 1, 1. Show. When the viaduct has two layers, the brace-type damper 6, only on the upper layer side or the lower layer side of the two layers 6,
6 may be installed.
【0033】1層と2層のいずれの場合も、橋軸直角方
向の構面内においてはブレース型ダンパー6の一端は橋
脚1の脚部、もしくは頭部に突設されるガセットプレー
ト8に連結され、他端は橋脚1の頭部に突設されるガセ
ットプレート8、または梁2の中間部に、あるいはフー
チング5に突設されるガセットプレート9に連結され
る。ガセットプレート8,9は橋脚1,1と梁2からな
るフレームの内周側を向き、それぞれの表面に突出す
る。橋軸方向の構面内にブレース型ダンパー6を架設す
る場合も同様になる。In both cases of one layer and two layers, one end of the brace type damper 6 is connected to a leg portion of the pier 1 or a gusset plate 8 projecting from the head portion within the construction plane in the direction perpendicular to the bridge axis. The other end is connected to a gusset plate 8 protruding from the head of the pier 1, or an intermediate portion of the beam 2, or a gusset plate 9 protruding from the footing 5. The gusset plates 8 and 9 face the inner peripheral side of the frame composed of the piers 1 and 1 and the beam 2, and project on the respective surfaces. The same applies to the case where the brace-type damper 6 is installed in the construction plane in the bridge axis direction.
【0034】図2に示すようにブレース型ダンパー6が
隣接する橋脚1,1の内の一方の橋脚1の脚部と他方の
橋脚1の頭部との間に架設される場合は、両橋脚1,1
にのみガセットプレート8,8が突設され、梁2にはガ
セットプレート9は突設されない。When the brace type damper 6 is installed between the leg portion of one of the adjacent piers 1 and the head portion of the other pier 1 as shown in FIG. 1,1
The gusset plates 8 and 8 are provided only on the upper portion of the beam 2, and the gusset plate 9 is not provided on the beam 2.
【0035】図4は橋軸方向の構面を構成する橋脚1,
1と桁3からなるフレームにおいて、図1と同様に両橋
脚1,1の脚部と桁3の中間部との間に2本のブレース
型ダンパー6,6を逆V字形に架設した場合を示す。FIG. 4 shows a pier 1, which constitutes a framing surface in the axial direction of the bridge.
In the frame consisting of 1 and girder 3, as in FIG. 1, two brace type dampers 6 and 6 are installed between the leg parts of both piers 1 and the middle part of girder 3 in an inverted V shape. Show.
【0036】橋軸直角方向の構面内に加え、橋軸方向の
構面内にもブレース型ダンパー6を架設する場合には、
橋脚1の脚部や頭部に固定される後述のバンドプレート
10を利用して2方向にガセットプレート8,8を突設す
ることができるため、橋脚1の脚部や頭部の同一箇所に
付き、単一のバンドプレート10の使用によって2方向の
ブレース型ダンパー6,6の架設に対応できる。When the brace damper 6 is installed not only in the construction plane in the direction perpendicular to the bridge axis but also in the construction plane in the bridge axis direction,
A band plate to be described later, which is fixed to the legs and the head of the pier 1.
Since the gusset plates 8 and 8 can be protruded in two directions by using 10, the gusset plates 8 and 8 can be attached to the same position of the leg and the head of the pier 1, and a single band plate 10 can be used to make a brace type in two directions. Applicable to installation of dampers 6 and 6.
【0037】橋脚1の脚部と頭部に突設されるガセット
プレート8は図5,図11に示すように橋脚1を包囲する
バンドプレート10に接合される。The gusset plate 8 projecting from the legs and the head of the pier 1 is joined to a band plate 10 surrounding the pier 1 as shown in FIGS.
【0038】バンドプレート10は橋脚1の断面形状に応
じ、複数枚のプレート10aからなり、橋脚1を包囲する
ように複数枚のプレート10aを配置し、プレート10a,
10aを互いに溶接、またはボルト接合することにより橋
脚1を包囲した状態で組み立てられ、例えば図11に示す
ようにバンドプレート10の内周面と橋脚1の表面との間
にエボキシ樹脂や無収縮モルタル等の充填材10bが充填
されることにより橋脚1に固定される。The band plate 10 is composed of a plurality of plates 10a according to the sectional shape of the pier 1, and the plurality of plates 10a are arranged so as to surround the pier 1, and the plates 10a,
The bridge pier 1 is assembled by welding or bolting the 10a to each other, and for example, as shown in FIG. 11, an epoxy resin or non-shrink mortar is provided between the inner peripheral surface of the band plate 10 and the surface of the bridge pier 1. It is fixed to the pier 1 by being filled with the filling material 10b.
【0039】この場合、バンドプレート10の内周面には
ブレース型ダンパー6から伝達される鉛直方向の力がバ
ンドプレート10から橋脚1に伝達されるよう、凹凸が形
成されるか、スタッドボルト等の定着材が突設される。In this case, unevenness is formed on the inner peripheral surface of the band plate 10 so that the vertical force transmitted from the brace type damper 6 is transmitted from the band plate 10 to the pier 1, or a stud bolt or the like. Fixing material is projected.
【0040】バンドプレート10を構成するプレート10a
の内、隣接する橋脚1側を向くプレート10aの表面に、
ブレース型ダンパー6の一端が連結されるガセットプレ
ート8が溶接等により接合される。図2に示すようにブ
レース型ダンパー6,6が交差して架設される場合、ガ
セットプレート8,8は橋脚1の中心からずれて接合さ
れる。Plate 10a constituting the band plate 10
Of the plate 10a facing the adjacent pier 1 side,
A gusset plate 8 to which one end of the brace type damper 6 is connected is joined by welding or the like. As shown in FIG. 2, when the brace type dampers 6 and 6 are installed so as to cross each other, the gusset plates 8 and 8 are joined while being displaced from the center of the pier 1.
【0041】ガセットプレート8には図11に示すように
ブレース型ダンパー6の端部のブラケット63をピン11等
により連結するための挿通孔8aが明けられる。挿通孔8a
には必要によりガセットプレート8の面外方向のブラケ
ット63の回転も許容し、ブレース型ダンパー6に捩じり
を加えないための自在継手8bが取り付けられる。As shown in FIG. 11, the gusset plate 8 is provided with an insertion hole 8a for connecting the bracket 63 at the end of the brace type damper 6 with the pin 11 or the like. Insertion hole 8a
If necessary, the bracket 63 is allowed to rotate in the out-of-plane direction of the gusset plate 8, and a universal joint 8b is attached so as not to twist the brace type damper 6.
【0042】図5,図6ではブレース型ダンパー6から
の引張力や圧縮力の橋脚1への伝達が確実に行われるよ
うにするために、橋脚1の脚部の回りに根巻きコンクリ
ート12を構築し、根巻きコンクリート12を包囲した状態
でバンドプレート10を根巻きコンクリート12に固定して
いる。図5,図6は図1,図2の橋脚1の脚部部分の詳
細図に該当する。In FIGS. 5 and 6, in order to ensure that the tensile force and the compressive force from the brace type damper 6 are transmitted to the pier 1, a wrapping concrete 12 is provided around the leg of the pier 1. The band plate 10 is constructed and fixed to the root-wrapping concrete 12 while surrounding the root-wrapping concrete 12. 5 and 6 correspond to detailed views of the leg portion of the pier 1 of FIGS. 1 and 2.
【0043】根巻きコンクリート12はフーチング5中に
打ち込まれ、その天端から突出する定着筋13によってフ
ーチング5に一体化し、バンドプレート10はその内周面
に突設されるスタッドボルトやアンカー等の定着材14に
よって根巻きコンクリート12に一体化する。The root-wrapping concrete 12 is driven into the footing 5, and is integrated with the footing 5 by the fixing streak 13 protruding from the top end of the footing 5, and the band plate 10 is provided with stud bolts, anchors, etc. projecting on the inner peripheral surface of the band plate 10. It is integrated with the root-wrapping concrete 12 by the fixing material 14.
【0044】この場合、ブレース型ダンパー6からの引
張力と圧縮力の鉛直成分はバンドプレート10から根巻き
コンクリート12を通じてフーチング5に伝達されるが、
図5,図6ではブレース型ダンパー6からの圧縮力によ
りガセットプレート8が溶接されているプレート10aに
捩じりを加えないよう、ガセットプレート8の下に水平
プレート15を溶接し、水平プレート15からフーチング5
に圧縮力が伝達されるようにしている。In this case, the vertical components of the tensile force and the compressive force from the brace type damper 6 are transmitted from the band plate 10 to the footing 5 through the root wrapping concrete 12,
In FIGS. 5 and 6, the horizontal plate 15 is welded below the gusset plate 8 so that the plate 10a to which the gusset plate 8 is welded is not twisted by the compressive force from the brace type damper 6. From footing 5
The compression force is transmitted to.
【0045】水平プレート15の下にはその補剛のための
垂直プレート16が例えば十字形に組み合わせられて溶接
され、垂直プレート16の下に溶接されるベースプレート
17がアンカーボルト18によってフーチング5に定着され
ることにより水平プレート15がフーチング5に固定され
る。Below the horizontal plate 15, a vertical plate 16 for stiffening the horizontal plate 15 is combined and welded in a cross shape, for example, and a base plate is welded below the vertical plate 16.
The horizontal plate 15 is fixed to the footing 5 by fixing 17 to the footing 5 by the anchor bolt 18.
【0046】図5,図6では水平プレート15の変形に対
する安全性を確保するために水平プレート15の幅の範囲
で、フーチング5上の対向するバンドプレート10,10間
にコンクリートブロック19を構築し、垂直プレート16を
コンクリートブロック19中に埋設している。In FIGS. 5 and 6, in order to secure the safety against the deformation of the horizontal plate 15, a concrete block 19 is constructed between the opposing band plates 10 on the footing 5 within the width of the horizontal plate 15. The vertical plate 16 is embedded in a concrete block 19.
【0047】梁2の中間部、または桁3の中間部に突設
されるガセットプレート9,9は図7,図8に示すよう
に梁2、または桁3の両側に配置され、ガセットプレー
ト9,9と梁2、または桁3を貫通するPC鋼棒やねじ
鉄筋等の連結材20で梁2、または桁3に固定される。図
7,図8は図1,図3,図4の梁2や桁3におけるガセ
ットプレート9部分の詳細図に該当する。The gusset plates 9 and 9 protruding from the middle portion of the beam 2 or the middle portion of the beam 3 are arranged on both sides of the beam 2 or the beam 3 as shown in FIGS. , 9 and the beam 2 or the girder 3 are fixed to the beam 2 or the girder 3 with a connecting member 20 such as a PC steel rod or a screw bar that penetrates the girder 3. 7 and 8 correspond to detailed views of the gusset plate 9 portion of the beam 2 and the girder 3 of FIGS. 1, 3, and 4.
【0048】図7,図8では梁2や桁3を貫通する連結
材20を2段に配置し、ナット21を梁2や桁3の側面とガ
セットプレート9の両面に緊結することにより梁2や桁
3との間に距離をおいてガセットプレート9を梁2や桁
3に固定しているが、図示するようにガセットプレート
9の下端が梁2や桁3の下端より下に位置する場合には
ガセットプレート9の面外変形を拘束するために、梁2
や桁3の下端より下の位置でも両ガセットプレート9,
9が連結材20によって連結され、両者間の間隔が保持さ
れる。In FIGS. 7 and 8, the connecting members 20 penetrating the beam 2 and the girder 3 are arranged in two stages, and the nuts 21 are tightly connected to the side surfaces of the beam 2 and the girder 3 and both surfaces of the gusset plate 9, respectively. The gusset plate 9 is fixed to the beam 2 or the girder 3 with a distance between the gusset plate 3 and the girder 3, but the lower end of the gusset plate 9 is located below the lower end of the beam 2 or the girder 3 as illustrated. In order to restrain the out-of-plane deformation of the gusset plate 9,
Both gusset plates 9, even at the position below the lower end of the girder 3,
9 are connected by the connecting member 20, and the space between them is maintained.
【0049】図7,図8の場合に、連結材20が梁2や桁
3を貫通することによる強度への影響が生ずる場合には
二点鎖線で示すようにガセットプレート9のブレース型
ダンパー6との連結部分を除き、ガセットプレート9の
回りにガセットプレート9と連結材20を覆うようにコン
クリートブロック22が構築される。コンクリートブロッ
ク22は梁2や桁3とガセットプレート9を補強すると共
に、連結材20を保護する役目を持つ。In the case of FIGS. 7 and 8, when the connecting member 20 penetrates the beam 2 or the girder 3 to affect the strength, the brace type damper 6 of the gusset plate 9 is indicated by the chain double-dashed line. A concrete block 22 is constructed around the gusset plate 9 so as to cover the gusset plate 9 and the connecting member 20 except for the connecting portion with. The concrete block 22 has a role of reinforcing the beam 2, the girder 3 and the gusset plate 9 and protecting the connecting member 20.
【0050】図7,図8の場合、梁2や桁3を挟んで両
側にブレース型ダンパー6,6が架設されるため、梁2
や桁3に固定されるガセットプレート9,9に対向す
る、橋脚1の脚部に配置されるガセットプレート8,8
は橋脚1の脚部に固定されるバンドプレート10のプレー
ト10aに並列して接合される。In the case of FIG. 7 and FIG. 8, since the brace type dampers 6 and 6 are installed on both sides of the beam 2 and the girder 3, the beam 2
Gusset plates 8 and 8 arranged on the legs of the pier 1, facing the gusset plates 9 and 9 fixed to the girder 3
Are joined in parallel to the plate 10a of the band plate 10 fixed to the leg portion of the pier 1.
【0051】フーチング5に突設されるガセットプレー
ト9は図9に示すようにフーチング5上に構築され、フ
ーチング5に一体化する前記したコンクリートブロック
7中に埋設される定着部材23に接合される。図9は図3
における下層側のブレース型ダンパー6の下端部分の詳
細図に該当する。The gusset plate 9 protruding from the footing 5 is constructed on the footing 5 as shown in FIG. 9, and is joined to the fixing member 23 embedded in the concrete block 7 integrated with the footing 5. . FIG. 9 shows FIG.
Corresponds to a detailed view of the lower end portion of the lower brace-type damper 6 in FIG.
【0052】定着部材23はコンクリートブロック7の内
部における配筋に影響を与えない形状をしていればよ
く、例えばH形鋼を必要長さで切断した鋼材が使用さ
れ、必要によりブレース型ダンパー6からの軸力の水平
成分がコンクリートブロック7に対して支圧力として伝
達されるよう、鋼材の両端と中央部にプレート23aが接
合される。図示しないが、定着部材23のウェブにはコン
クリートとの一体性を確保するためのスタッドボルト等
が突設される。The fixing member 23 only needs to have a shape that does not affect the bar arrangement inside the concrete block 7. For example, a steel material obtained by cutting an H-shaped steel into a required length is used, and if necessary, the brace-type damper 6 The plates 23a are joined to both ends and the central portion of the steel material so that the horizontal component of the axial force from is transmitted to the concrete block 7 as a bearing force. Although not shown, the web of the fixing member 23 is provided with stud bolts or the like for ensuring the integrity with the concrete.
【0053】ブレース型ダンパー6のガセットプレート
9側のブラケット63も自身とガセットプレート9を貫通
するピン11等によってガセットプレート9に回転自在に
連結される。ガセットプレート9にも図7に示すように
ガセットプレート8と同様にピン11等が貫通する挿通孔
9aが明けられ、その挿通孔9aにブラケット63をガセット
プレート9の面外方向に回転自在に連結するための自在
継手9bが取り付けられる。The bracket 63 on the gusset plate 9 side of the brace type damper 6 is also rotatably connected to the gusset plate 9 by itself and the pin 11 penetrating the gusset plate 9. As shown in FIG. 7, the gusset plate 9 has an insertion hole through which the pins 11 and the like penetrate as in the gusset plate 8.
9a is opened, and a universal joint 9b for connecting the bracket 63 rotatably in the out-of-plane direction of the gusset plate 9 is attached to the insertion hole 9a.
【0054】図10は高架橋が2層の場合で、下層側の橋
脚1の頭部とフーチング5の中間部との間、及び上層側
の橋脚1の脚部と上層側の梁2の中間部との間にブレー
ス型ダンパー6を架設する場合に、梁2と桁3を挟む形
で対にしてバンドプレート10,10を橋脚1に固定した場
合を示す。FIG. 10 shows a case in which the viaduct has two layers, in which the head portion of the pier 1 on the lower layer side and the middle portion of the footing 5 and the middle portion of the leg portion of the pier 1 on the upper layer side and the beam 2 on the upper layer side. The case where the brace type damper 6 is installed between and, and the band 2 and the girder 3 are sandwiched to form a pair and the band plates 10 and 10 are fixed to the pier 1.
【0055】この場合、下層側の橋脚1の頭部に配置さ
れるバンドプレート10と、上層側の橋脚1の脚部に配置
されるバンドプレート10の対向する面にダイヤフラム2
4,24が接合され、双方のダイヤフラム24,24がPC鋼
棒やねじ鉄筋等の引張材25により互いに連結される。In this case, the diaphragm 2 is provided on the opposite surfaces of the band plate 10 arranged on the head of the lower pier 1 and the band plate 10 arranged on the leg of the upper pier 1.
4 and 24 are joined, and both diaphragms 24 and 24 are connected to each other by a tension member 25 such as a PC steel rod or a screw rebar.
【0056】図10のバンドプレート10,10部分の詳細図
である図11に示すようにバンドプレート10は前記の通
り、バンドプレート10の内周面と橋脚1の表面との間に
充填材10bが充填されることにより橋脚1に固定され
る。As shown in FIG. 11, which is a detailed view of the band plates 10 and 10 in FIG. 10, the band plate 10 has a filling material 10b between the inner peripheral surface of the band plate 10 and the surface of the pier 1, as described above. Is fixed to the pier 1 by being filled.
【0057】引張材25は上下に対向するバンドプレート
10,10間で引張力を伝達するためにダイヤフラム24,24
間に架設され、一方のバンドプレート10に作用する引張
力は引張材25を通じて対向するバンドプレート10に接合
されているダイヤフラム24に伝達されるが、そのダイヤ
フラム24からは更に梁2と桁3に支圧力として伝達され
るため、ダイヤフラム24は引張材25からの引張力を梁2
と桁3に伝達できる程度の大きさを持つ。The tension member 25 is a band plate which is vertically opposed.
Diaphragm 24, 24 for transmitting tensile force between 10 and 10
The tensile force acting on one of the band plates 10 installed between them is transmitted to the diaphragm 24 joined to the opposing band plate 10 through the tension member 25. From the diaphragm 24, the beam 2 and the girder 3 are further transmitted. The diaphragm 24 receives the tensile force from the tension member 25 because it is transmitted as a supporting pressure.
And the size that can be transmitted to the girder 3.
【0058】一方のバンドプレート10に作用する圧縮力
はそのバンドプレート10に接合されているダイヤフラム
24から梁2と桁3に直接支圧力として伝達される。The compressive force acting on one band plate 10 is the diaphragm bonded to that band plate 10.
It is transmitted from 24 to beam 2 and girder 3 directly as bearing pressure.
【0059】引張材25は図12に示すようにダイヤフラム
24の四隅等、周方向に均等に配置されるが、橋脚1を挟
んだ梁2の反対側には梁2がないことから、一方のバン
ドプレート10に作用する引張力と圧縮力により、ダイヤ
フラム24の、梁2が不在の部分が変形する可能性がある
ため、図面では梁2が不在の部分にダイヤフラム24,24
間で圧縮力を負担するH形鋼等の間隔保持材26をダイヤ
フラム24,24間に配置し、ボルト27により両ダイヤフラ
ム24,24に接合している。The tension member 25 is a diaphragm as shown in FIG.
Although they are evenly arranged in the circumferential direction such as the four corners of 24, but there is no beam 2 on the opposite side of the beam 2 with the pier 1 in between, the diaphragm is generated by the tensile force and the compressive force acting on one of the band plates 10. Since the part of beam 24 where beam 2 is absent may be deformed, diaphragm 24, 24 is shown in the drawing where beam 2 is absent.
A spacing member 26 such as an H-shaped steel, which bears a compressive force between the diaphragms 24 and 24, is arranged between the diaphragms 24 and 24 by bolts 27.
【0060】[0060]
【発明の効果】橋脚の脚部と、橋脚の頭部と、梁の中間
部、または桁の中間部等のいずれかの内、傾斜した方向
に対向する少なくとも二箇所にガセットプレートを突設
し、対向するガセットプレート間に、ブレース本体にダ
ンパーを組み込んだブレース型ダンパーを架設すること
で、既存の鉄筋コンクリート造高架橋を耐震補強しなが
ら、内蔵したダンパーによって交通振動を遮断するた
め、既存の高架橋に対するブレース型ダンパーの架設の
みで、高架橋の耐震補強と振動の抑制を同時に解決する
ことができる。EFFECTS OF THE INVENTION A gusset plate is projected at at least two positions facing each other in the inclined direction in any of the leg portion of the pier, the head portion of the pier, the middle portion of the beam, the middle portion of the girder, or the like. By installing a brace-type damper that incorporates a damper in the brace body between the opposing gusset plates, the existing reinforced concrete viaduct is reinforced by seismic resistance, while the built-in damper blocks traffic vibrations. Only by installing a brace-type damper, it is possible to simultaneously solve the seismic reinforcement of the viaduct and the suppression of vibration.
【0061】またブレース型ダンパーが連結されるガセ
ットプレートを接合部を外した橋脚の脚部やフーチング
と、橋脚の頭部、または梁や桁の中間部に突設するた
め、接合部における配筋への影響による接合部の耐力低
下が回避される。Further, since the gusset plate to which the brace-type damper is connected is projected at the leg or footing of the pier with the joint removed and the head of the pier, or the middle of the beam or girder, the bar arrangement at the joint is arranged. A decrease in proof stress of the joint due to the influence on
【0062】請求項3では橋脚を包囲するように橋脚に
固定されるバンドプレートに橋脚の脚部や頭部に突設さ
れるガセットプレートを接合するため、既存の橋脚を損
傷させることがなく、またブレース型ダンパーからの軸
力を橋脚に分散させて伝達できる上、コンクリートの拘
束効果によりコンクリートの耐力を高めることもでき
る。According to the third aspect, the band plate fixed to the pier so as to surround the pier is joined to the gusset plate protruding from the leg portion or the head of the pier, so that the existing pier is not damaged. In addition, the axial force from the brace type damper can be dispersed and transmitted to the bridge piers, and the concrete restraining effect can increase the yield strength of concrete.
【0063】請求項4では橋脚の脚部の回りに構築され
る根巻きコンクリートを包囲した状態でバンドプレート
を根巻きコンクリートに一体化させるため、ブレース型
ダンパーからの軸力を根巻きコンクリートを通じて橋脚
に確実に伝達することができる。According to the present invention, since the band plate is integrated with the root wrapping concrete in a state of surrounding the root wrapping concrete constructed around the pier legs, the axial force from the brace type damper is applied through the root wrapping concrete to the bridge pier. Can be reliably transmitted.
【0064】請求項5では下層側の橋脚の頭部と上層側
の橋脚の脚部に配置されるバンドプレートを、それぞれ
の対向する面に接合されるダイヤフラムを引張材で連結
することにより互いに連結するため、ブレース型ダンパ
ーからの引張力の鉛直成分を引張材とダイヤフラムを通
じて橋脚と梁や桁に伝達することができる。According to the present invention, the head portions of the lower piers and the band plates arranged on the upper pier legs are connected to each other by connecting the diaphragms joined to the respective facing surfaces with tension members. Therefore, the vertical component of the tensile force from the brace type damper can be transmitted to the pier, the beam, and the girder through the tensile member and the diaphragm.
【0065】請求項6では梁や桁の中間部に突設される
ガセットプレートを梁や桁の両側に配置し、ガセットプ
レートと梁や桁を貫通する連結材によって梁や桁に固定
するため、ブレース型ダンパーからの軸力をガセットプ
レートと連結材を通じて梁や桁に伝達することができ
る。According to the sixth aspect of the present invention, the gusset plates projecting from the middle portion of the beam or girder are arranged on both sides of the beam or girder, and the gusset plate and the beam or girder are fixed to the beam or girder by a connecting member penetrating the girder or girder. The axial force from the brace type damper can be transmitted to the beam or girder through the gusset plate and the connecting member.
【0066】請求項7ではガセットプレートのブレース
型ダンパーとの連結部分を除き、ガセットプレートを連
結材と共にコンクリートで被覆するため、梁や桁に貫通
孔が形成されながらも、梁や桁の耐力低下を回避でき、
既存の高架橋が保有する耐震性能を損なわずに、耐震性
能を向上させることが可能になる。According to a seventh aspect of the present invention, since the gusset plate is covered with concrete together with the connecting material except for the connecting portion of the gusset plate with the brace type damper, the proof stress of the beam or girder is reduced even though the through holes are formed in the beam or girder. Can be avoided,
It is possible to improve the seismic performance without damaging the seismic performance of the existing viaduct.
【0067】請求項8ではフーチングに突設されるガセ
ットプレートをフーチング上に構築され、フーチングに
一体化するコンクリートブロック中に埋設される定着部
材に接合するため、ブレース型ダンパーからの軸力をコ
ンクリートブロックを通じてフーチングに伝達すること
ができる。According to the eighth aspect of the present invention, the gusset plate protruding from the footing is joined to the fixing member which is built on the footing and is embedded in the concrete block integrated with the footing. Therefore, the axial force from the brace damper is applied to the concrete. It can be transmitted to footings through blocks.
【図1】橋軸直角方向の構面内にブレース型ダンパーを
逆V字形に架設した様子を示した立面図である。FIG. 1 is an elevational view showing a state in which a brace-type damper is installed in an inverted V shape in a construction plane in a direction orthogonal to a bridge axis.
【図2】橋軸直角方向の構面内にブレース型ダンパーを
X字形に架設した様子を示した立面図である。FIG. 2 is an elevational view showing a state in which a brace-type damper is installed in an X shape in a construction plane in a direction perpendicular to the bridge axis.
【図3】高架橋が2層の場合のブレース型ダンパーの架
設例を示した立面図である。FIG. 3 is an elevational view showing an installation example of a brace-type damper in the case where the viaduct has two layers.
【図4】橋軸方向の構面内にブレース型ダンパーを架設
した様子を示した立面図である。FIG. 4 is an elevational view showing a state in which a brace-type damper is installed in a construction plane in the bridge axis direction.
【図5】橋脚の脚部におけるバンドプレートの固定例を
示した立面図である。FIG. 5 is an elevational view showing an example of fixing a band plate to a leg portion of a pier.
【図6】図5の平面図である。FIG. 6 is a plan view of FIG.
【図7】梁へのガセットプレートの固定例を示した断面
図である。FIG. 7 is a cross-sectional view showing an example of fixing a gusset plate to a beam.
【図8】図7のx−x線矢視図である。FIG. 8 is a view taken along the line xx of FIG.
【図9】フーチングへのガセットプレートの固定例を示
した立面図である。FIG. 9 is an elevation view showing an example of fixing the gusset plate to the footing.
【図10】橋脚の頭部と脚部に対になって配置されるバ
ンドプレートの連結例を示した立面図である。FIG. 10 is an elevational view showing an example of connection of band plates arranged in pairs to the head and legs of the pier.
【図11】図10のバンドプレート部分の詳細を示した立
面図である。FIG. 11 is an elevational view showing details of the band plate portion of FIG.
【図12】図11の平面図である。FIG. 12 is a plan view of FIG. 11.
1……橋脚、2……梁、3……桁、4……スラブ、5…
…フーチング、6……ブレース型ダンパー、61……ブレ
ース本体、62……ダンパー、63……ブラケット、7……
コンクリートブロック、8……ガセットプレート、8a…
…挿通孔、8b……自在継手、9……ガセットプレート、
9a……挿通孔、9b……自在継手、10……バンドプレー
ト、10a……プレート、10b……充填材、11……ピン、
12……根巻きコンクリート、13……定着筋、14……定着
材、15……水平プレート、16……鉛直プレート、17……
ベースプレート、18……アンカーボルト、19……コンク
リートブロック、20……連結材、21……ナット、22……
コンクリートブロック、23……定着部材、23a……プレ
ート、24……ダイヤフラム、25……引張材、26……間隔
保持材、27……ボルト。1 ... Bridge pier, 2 ... Beam, 3 ... Girder, 4 ... Slab, 5 ...
… Footing, 6 …… Brace type damper, 61 …… Brace body, 62 …… Damper, 63 …… Bracket, 7 ……
Concrete block, 8 ... Gusset plate, 8a ...
… Insertion hole, 8b… Universal joint, 9… Gusset plate,
9a …… insertion hole, 9b …… universal joint, 10 …… band plate, 10a …… plate, 10b …… filling material, 11 …… pin,
12 …… Negaki concrete, 13 …… Anchorage, 14 …… Anchoring material, 15 …… Horizontal plate, 16 …… Vertical plate, 17 ……
Base plate, 18 …… Anchor bolt, 19 …… Concrete block, 20 …… Connecting material, 21 …… Nut, 22 ……
Concrete block, 23 …… Fixing member, 23a …… Plate, 24 …… Diaphragm, 25 …… Tensile material, 26 …… Spacing material, 27 …… Bolt.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 蓮田 常雄 東京都国分寺市光町二丁目8番地38 財団 法人鉄道総合技術研究所内 (72)発明者 藤井 光治郎 東京都国分寺市光町二丁目8番地38 財団 法人鉄道総合技術研究所内 (72)発明者 武居 泰 東京都国分寺市光町二丁目8番地38 財団 法人鉄道総合技術研究所内 (72)発明者 岡 功治 岡山県岡山市内山下1丁目1番13号 株式 会社大本組内 (72)発明者 上原 昭治 岡山県岡山市内山下1丁目1番13号 株式 会社大本組内 (72)発明者 呼川 秀邦 岡山県岡山市内山下1丁目1番13号 株式 会社大本組内 (72)発明者 山本 一美 東京都中野区本町4丁目38番13号 株式会 社構造計画研究所内 (72)発明者 高橋 治 東京都中野区本町4丁目38番13号 株式会 社構造計画研究所内 Fターム(参考) 2D059 BB37 BB39 GG13 GG40 ─────────────────────────────────────────────────── ─── Continued front page (72) Inventor Tsuneo Hasuda 38-8, Hikarimachi, Kokubunji, Tokyo 38 Foundation Corporate Railway Technical Research Institute (72) Inventor Kojiro Fujii 38-8, Hikarimachi, Kokubunji, Tokyo 38 Foundation Corporate Railway Technical Research Institute (72) Inventor Yasushi Takei 38-8, Hikarimachi, Kokubunji, Tokyo 38 Foundation Corporate Railway Technical Research Institute (72) Inventor Koji Oka 1-13-1 Yamashita, Okayama City, Okayama Stock Company Omotogumi (72) Inventor Shoji Uehara 1-13-1 Yamashita, Okayama City, Okayama Stock Company Omotogumi (72) Inventor Hidekuni Hyokawa 1-13-1 Yamashita, Okayama City, Okayama Stock Company Omotogumi (72) Inventor Kazumi Yamamoto 4-38-13 Honmachi, Nakano-ku, Tokyo Stock market Company structure planning laboratory (72) Inventor Osamu Takahashi 4-38-13 Honmachi, Nakano-ku, Tokyo Stock market Company structure planning laboratory F-term (reference) 2D059 BB37 BB39 GG13 GG40
Claims (8)
を隔てて配列する橋脚と、橋軸直角方向に並列する橋脚
を連結する梁、及び橋軸方向に隣接する橋脚を連結する
桁から構成された既存の鉄筋コンクリート造高架橋にお
いて、橋脚の脚部と、橋脚の頭部と、梁の中間部、また
は桁の中間部のいずれかの内、傾斜した方向に対向する
少なくとも二箇所にガセットプレートを突設し、対向す
るガセットプレート間に、ブレース本体にダンパーを組
み込んだブレース型ダンパーを架設し、その両端部をガ
セットプレートに連結する既存鉄筋コンクリート造高架
橋の耐震補強方法。1. A bridge pier which is arranged in a direction perpendicular to the bridge axis and is arranged at intervals in the bridge axis direction, a beam which connects the bridge piers which are arranged in a direction perpendicular to the bridge axis, and a bridge pier which is adjacent to the bridge axis direction are connected. In existing reinforced concrete viaducts composed of girders, at least two points facing each other in the inclined direction, in either the pier legs, the pier head, the middle of the beam, or the middle of the girder. A seismic reinforcement method for existing reinforced concrete viaducts in which gusset plates are projected, brace-type dampers with dampers built into the brace body are installed between opposing gusset plates, and both ends are connected to the gusset plates.
を隔てて配列する橋脚と、橋軸直角方向に並列する橋脚
を連結する梁と、橋軸方向に隣接する橋脚を連結する
桁、及び隣接する橋脚の基礎部分を連結するフーチング
から構成された既存の鉄筋コンクリート造高架橋におい
て、橋脚の脚部と、橋脚の頭部と、フーチングと、梁の
中間部、または桁の中間部のいずれかの内、傾斜した方
向に対向する少なくとも二箇所にガセットプレートを突
設し、対向するガセットプレート間に、ブレース本体に
ダンパーを組み込んだブレース型ダンパーを架設し、そ
の両端部をガセットプレートに連結する既存鉄筋コンク
リート造高架橋の耐震補強方法。2. The bridge piers that are arranged in the direction perpendicular to the bridge axis and are arranged at intervals in the bridge axis direction, the beams that connect the bridge piers that are arranged in the direction perpendicular to the bridge axis, and the bridge piers that are adjacent in the bridge axis direction are connected. In existing reinforced concrete viaducts composed of girders and footings that connect the foundations of adjacent piers, the pier legs, pier heads, footings, beam midsections, or girder midsections A gusset plate is projected at at least two locations facing each other in the inclined direction, and a brace-type damper incorporating a damper in the brace body is installed between the opposing gusset plates, and both ends of the gusset plate are attached to the gusset plate. Seismic retrofitting method for existing reinforced concrete viaducts to be connected.
セットプレートを、橋脚を包囲するように橋脚に固定さ
れるバンドプレートに接合する請求項1、もしくは請求
項2記載の既存鉄筋コンクリート造高架橋の耐震補強方
法。3. The existing reinforced concrete construction according to claim 1 or 2, wherein a gusset plate arranged on a leg portion or a head portion of the pier is joined to a band plate fixed to the pier so as to surround the pier. Seismic reinforcement method for viaducts.
を、橋脚の脚部の回りに構築される根巻きコンクリート
を包囲した状態で根巻きコンクリートに一体化させる請
求項3記載の既存鉄筋コンクリート造高架橋の耐震補強
方法。4. The existing reinforced concrete construction according to claim 3, wherein the band plate arranged on the leg portion of the pier is integrated with the root wrap concrete in a state of surrounding the root wrap concrete constructed around the leg portion of the pier. Seismic reinforcement method for viaducts.
あり、下層側の橋脚の頭部に配置されるバンドプレート
と、上層側の橋脚の脚部に配置されるバンドプレート
を、それぞれの対向する面に接合されるダイヤフラムを
引張材で連結して互いに連結する請求項3記載の既存鉄
筋コンクリート造高架橋の耐震補強方法。5. The existing reinforced concrete viaduct has two layers, and the band plate arranged on the head of the lower pier and the band plate arranged on the pier of the upper pier face each other. The method for seismic reinforcement of an existing reinforced concrete viaduct according to claim 3, wherein the diaphragms joined to each other are connected with each other by connecting them with a tensile member.
れるガセットプレートを梁、または桁の両側に配置し、
ガセットプレートと梁、または桁を貫通する連結材で
梁、または桁に固定する請求項1、もしくは請求項2記
載の既存鉄筋コンクリート造高架橋の耐震補強方法。6. Arrangement of gusset plates protruding from the middle part of the beam or the middle part of the girder on both sides of the girder or girder,
The seismic strengthening method for an existing reinforced concrete viaduct according to claim 1 or 2, wherein the gusset plate and the beam, or the beam or girder is fixed to the beam or the girder with a connecting material penetrating the girder.
との連結部分を除き、ガセットプレートを連結材と共に
コンクリートで被覆する請求項6記載の既存鉄筋コンク
リート造高架橋の耐震補強方法。7. The seismic retrofitting method for an existing reinforced concrete viaduct according to claim 6, wherein the gusset plate is covered with concrete together with the connecting material, except for the connecting portion of the gusset plate with the brace type damper.
トを、フーチング上に構築され、フーチングに一体化す
るコンクリートブロック中に埋設される定着部材に接合
する請求項1、もしくは請求項2記載の既存鉄筋コンク
リート造高架橋の耐震補強方法。8. The existing reinforced concrete construction according to claim 1 or 2, wherein a gusset plate arranged on the footing is joined to a fixing member which is built on the footing and is embedded in a concrete block integrated with the footing. Seismic reinforcement method for viaducts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001254524A JP3869236B2 (en) | 2001-08-24 | 2001-08-24 | Seismic reinforcement method for existing reinforced concrete viaduct |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001254524A JP3869236B2 (en) | 2001-08-24 | 2001-08-24 | Seismic reinforcement method for existing reinforced concrete viaduct |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003064624A true JP2003064624A (en) | 2003-03-05 |
JP3869236B2 JP3869236B2 (en) | 2007-01-17 |
Family
ID=19082677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001254524A Expired - Fee Related JP3869236B2 (en) | 2001-08-24 | 2001-08-24 | Seismic reinforcement method for existing reinforced concrete viaduct |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3869236B2 (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009068295A (en) * | 2007-09-14 | 2009-04-02 | Nippon Steel Engineering Co Ltd | Elevated structure |
JP2009243091A (en) * | 2008-03-31 | 2009-10-22 | Railway Technical Res Inst | Aseismatic reinforcing structure of viaduct |
JP2009281081A (en) * | 2008-05-23 | 2009-12-03 | Sankyo Oilless Industry Inc | Mounting structure of damping device |
JP2012117364A (en) * | 2012-01-20 | 2012-06-21 | Kajima Corp | Vibration control bridge pier structure |
JP2015045212A (en) * | 2013-07-29 | 2015-03-12 | Jfeシビル株式会社 | Seismic strengthening structure of existing bridge pier, and newly-constructed bridge pier structure |
JP2015105562A (en) * | 2013-12-03 | 2015-06-08 | 公益財団法人鉄道総合技術研究所 | Aseismic reinforcement method for rigid-frame viaduct arranging beams in intermediate layer |
JP2015121092A (en) * | 2015-02-23 | 2015-07-02 | 鹿島建設株式会社 | Vibration control bridge pier structure |
JP2016056677A (en) * | 2014-09-08 | 2016-04-21 | Jfeシビル株式会社 | Bridge pier structure |
JP2020012280A (en) * | 2018-07-17 | 2020-01-23 | 公益財団法人鉄道総合技術研究所 | Vibration isolation structure for rigid-frame viaduct |
CN111395204A (en) * | 2020-04-27 | 2020-07-10 | 浙江交工集团股份有限公司 | Prestressed cantilever support structure of large cantilever bent cap and construction method |
CN113605218A (en) * | 2021-08-06 | 2021-11-05 | 江苏开放大学(江苏城市职业学院) | Swing self-reset rigid frame bridge double-limb thin-wall pier |
-
2001
- 2001-08-24 JP JP2001254524A patent/JP3869236B2/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009068295A (en) * | 2007-09-14 | 2009-04-02 | Nippon Steel Engineering Co Ltd | Elevated structure |
JP2009243091A (en) * | 2008-03-31 | 2009-10-22 | Railway Technical Res Inst | Aseismatic reinforcing structure of viaduct |
JP2009281081A (en) * | 2008-05-23 | 2009-12-03 | Sankyo Oilless Industry Inc | Mounting structure of damping device |
JP2012117364A (en) * | 2012-01-20 | 2012-06-21 | Kajima Corp | Vibration control bridge pier structure |
JP2015045212A (en) * | 2013-07-29 | 2015-03-12 | Jfeシビル株式会社 | Seismic strengthening structure of existing bridge pier, and newly-constructed bridge pier structure |
JP2015105562A (en) * | 2013-12-03 | 2015-06-08 | 公益財団法人鉄道総合技術研究所 | Aseismic reinforcement method for rigid-frame viaduct arranging beams in intermediate layer |
JP2016056677A (en) * | 2014-09-08 | 2016-04-21 | Jfeシビル株式会社 | Bridge pier structure |
JP2015121092A (en) * | 2015-02-23 | 2015-07-02 | 鹿島建設株式会社 | Vibration control bridge pier structure |
JP2020012280A (en) * | 2018-07-17 | 2020-01-23 | 公益財団法人鉄道総合技術研究所 | Vibration isolation structure for rigid-frame viaduct |
CN111395204A (en) * | 2020-04-27 | 2020-07-10 | 浙江交工集团股份有限公司 | Prestressed cantilever support structure of large cantilever bent cap and construction method |
CN113605218A (en) * | 2021-08-06 | 2021-11-05 | 江苏开放大学(江苏城市职业学院) | Swing self-reset rigid frame bridge double-limb thin-wall pier |
CN113605218B (en) * | 2021-08-06 | 2023-03-14 | 江苏开放大学(江苏城市职业学院) | Swing self-reset rigid frame bridge double-limb thin-wall pier |
Also Published As
Publication number | Publication date |
---|---|
JP3869236B2 (en) | 2007-01-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106401018B (en) | A kind of assembled self-resetting swinging steel plate wall structural system | |
JP4834197B2 (en) | Construction method of continuous girder bridge, composite floor slab and continuous girder bridge | |
JP5539554B1 (en) | Girder bridge connection structure and girder bridge structure | |
KR102012883B1 (en) | Aseismatic Reinforcement Steel Frame with Friction Slip Brace and Aseismatic Reinforcement Method using thereof | |
JP4957295B2 (en) | Seismic control pier structure | |
JP3869236B2 (en) | Seismic reinforcement method for existing reinforced concrete viaduct | |
JP3389521B2 (en) | Vibration energy absorber for tension structure and its construction method | |
KR100949828B1 (en) | Steel beam and hybrid beam of steel concrete for slim floor | |
KR102004854B1 (en) | Aseismatic Reinforcement Steel Frame with Anchor Plate and Aseismatic Reinforcement Method using thereof | |
KR100492335B1 (en) | Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus | |
JP3559025B2 (en) | Seismic retrofit method for existing building and brace mounting device used for it | |
JP2978903B1 (en) | Viaduct | |
JP2523447B2 (en) | Floor slab installation structure in bridge | |
KR100492336B1 (en) | Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus | |
JP3869235B2 (en) | Vibration control and vibration control structure of reinforced concrete viaduct | |
JP2004270168A (en) | Earthquake-proof reinforcement structure and method | |
JP4242673B2 (en) | Damping device and damping structure using the same | |
JPH10331436A (en) | Earthquake-resisting reinforcing structure for beam-column in existing structure | |
JP2000145193A (en) | Vibration damper for reinforced-concrete structure | |
JP2001248331A (en) | Installation structure and installation method for vibration control damper | |
JP2002004463A (en) | Aseismatic frame structure and its designing method | |
JP2004156395A (en) | Aseismatic strengthening method for existing building, and aseismatic strengthened structure | |
JP4660810B2 (en) | Boundary beam damper | |
JP2003049405A (en) | Aseismatic frame structure and its design method | |
JP2005188240A (en) | Vibration control structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040401 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060531 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060606 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060807 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20060807 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20061003 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061012 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101020 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111020 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111020 Year of fee payment: 5 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111020 Year of fee payment: 5 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121020 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121020 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131020 Year of fee payment: 7 |
|
LAPS | Cancellation because of no payment of annual fees |