JP2000017656A - 歪計測可能な杭、その製造方法及び歪計測方法 - Google Patents

歪計測可能な杭、その製造方法及び歪計測方法

Info

Publication number
JP2000017656A
JP2000017656A JP10184216A JP18421698A JP2000017656A JP 2000017656 A JP2000017656 A JP 2000017656A JP 10184216 A JP10184216 A JP 10184216A JP 18421698 A JP18421698 A JP 18421698A JP 2000017656 A JP2000017656 A JP 2000017656A
Authority
JP
Japan
Prior art keywords
optical fiber
strain
pile
concrete pile
measuring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10184216A
Other languages
English (en)
Other versions
JP3756673B2 (ja
Inventor
Akira Fukushima
章 福嶋
Madan Karkhi
カルキー・マダン
Yoshitaka Hosokawa
義隆 細川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geotop Corp
Original Assignee
Geotop Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geotop Corp filed Critical Geotop Corp
Priority to JP18421698A priority Critical patent/JP3756673B2/ja
Publication of JP2000017656A publication Critical patent/JP2000017656A/ja
Application granted granted Critical
Publication of JP3756673B2 publication Critical patent/JP3756673B2/ja
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

(57)【要約】 【課題】 地盤中に打設した後のコンクリートパイル1
の歪を、広い範囲に亙って容易に測定できるようにす
る。 【解決手段】 コンクリートパイル1に光ファイバー2
を一体的に取り付けておき、この光ファイバー2の歪を
光学的に計測する。

Description

【発明の詳細な説明】
【0001】
【発明の属する技術分野】本発明は、地盤強化に用いら
れる杭、その製造方法及び歪計測方法に関する。更に詳
しくは、地盤中への打設後に生じる歪を計測可能な杭、
その製造方法及び歪計測方法に関する。
【0002】
【従来の技術】従来、地盤中に打設された杭に生じる歪
を測定するためには、杭と一体に、予め歪ゲージを取り
付けておくことが知られている。
【0003】
【発明が解決しようとする課題】しかしながら、歪ゲー
ジによる歪の測定は、歪ゲージを取り付けた狭い範囲で
しか行うことができない問題がある。従って、長尺物で
ある杭全体に亙って歪を正確に計測するには、長さ方向
に多数の歪ゲージを取り付ける必要がある。多数の歪ゲ
ージの取り付けが必要となることは、単に歪ゲージの取
り付けに要する手間が増大するだけでなく、杭外に引き
出すリード線の数も増えてその配線及び接続に多大な手
間を要することになる。また、微弱電流による測定であ
ることから、防水や絶縁に要する手間も大きなものとな
る。
【0004】本発明は、このような従来の問題点にかん
がみてなされたもので、地盤中に打ち込んだ後の杭の歪
を(及び応力も)、広い範囲に亙って容易に測定できる
ようにすることを目的とする。
【0005】
【課題を解決するための手段】このために本発明は、少
なくとも一端が上部から引き出された光ファイバーが一
体に取り付けられていることを特徴とする歪計測可能な
杭を提供するものである。
【0006】また、本発明は、光ファイバーを取り付け
た籠状鉄筋を型枠内にセットすると共に、この光ファイ
バーの少なくとも一端を杭の上部となる側から型枠外に
延出させた状態で、遠心成形によって杭を成形すること
を特徴とする歪計測可能な杭の製造方法を提供するもの
である。
【0007】更に本発明は、両端が上部から引き出され
た光ファイバーが一体に取り付けられている複数本の杭
について、各杭の光ファイバーを直列に接続し、直列に
接続された光ファイバーの歪を計測することにより、複
数本の杭についての歪の計測を同時に行うことを特徴と
する杭の歪計測方法を提供するものである。
【0008】なお、杭としては、鉄筋コンクリート製の
もの(コンクリートパイル)、鋼管製のもの、鋼管とコ
ンクリートを組み合わせたもの等があるが、以下の説明
は代表的なコンクリートパイルを例に行う。
【0009】
【発明の実施の形態】図1は本発明に係る歪計測可能な
コンクリートパイルの第1の例を示す模式図、図2は第
2の例を示す模式図、図3は第3の例を示す模式図であ
る。
【0010】図示されるように、本コンクリートパイル
1は、一体に取り付けられた光ファイバー2を有するも
のとなっている。この本コンクリートパイル1の歪の計
測は、後述するように、コンクリートパイル1の歪(主
に圧縮歪)に伴って生じる光ファイバー2の歪を光学的
に検知することによって行われる。従って、光ファイバ
ー2を、図1に示されるように、コンクリートパイル1
の長さ方向に直線的に取り付けておくと、光ファイバー
2を取り付けた長さに亙る領域でコンクリートパイル1
の歪を計測することができる。また、図1の場合、コン
クリートパイル1の周方向については、光ファイバー2
が取り付けられた1箇所のみの計測となるが、光ファイ
バー2を、図2及び図3に示されるように、螺旋状に取
り付けると、コンクリートパイル1の長さ方向のみなら
ず、コンクリートパイル1の全周方向における歪の状態
も知ることができ、より正確な計測が可能となる。
【0011】光ファイバー2は、図1及び図2に示され
るように、コンクリートパイル1の上部から一端のみを
外部に引き出しておいてもよいが、図3に示されるよう
に、両端をコンクリートパイル1の上部から外部に引き
出しておくこともできる。いずれを選択するかは、後述
する歪の計測方法に応じて選択すればよい。尚、図1〜
図3における3は、光ファイバー2を計測装置等に接続
するためのコネクターである。
【0012】図1〜図3においては、いずれも光ファイ
バー2がコンクリートパイル1内に埋設されることで一
体に取り付けられているが、コンクリートパイル1の外
面や内面に接着剤で接着することで一体に取り付けるこ
ともできる。しかし、光ファイバー2をコンクリートパ
イル1の内面に接着するのは手間がかかり、また光ファ
イバー2をコンクリートパイル1の外面に接着したので
は、コンクリートパイル1の運搬時や埋設時に光ファイ
バー2が損傷されやすいので、光ファイバー2はコンク
リートパイル1の断面内に埋設一体化しておくことが好
ましい。
【0013】光ファイバー2を埋設一体化したコンクリ
ートパイル1の製造は次のようにして行うことができ
る。
【0014】まず、図4に示されるように、一端が端部
金物4から延出した状態で、主筋5とフープ筋6とで構
成された籠状鉄筋7に光ファイバー2を螺旋状に巻き付
けて取り付ける。この光ファイバー2の巻き付けは、主
筋5の周囲にフープ筋6を巻き付け固定するために用い
る巻線機のような装置を用いて行うことができる。光フ
ァイバー2を図1のような直線状に取り付ける場合に
は、籠状鉄筋6の長さ方向に沿って直線状に取り付けれ
ばよい。また、図3のように光ファイバー2の両端をコ
ンクリートパイル1から引き出しておくためには、光フ
ァイバー2を螺旋状に巻き付けた後、その他端を端部金
物4側に戻して延出させておけばよい。
【0015】光ファイバー2は、できるだけ弛みなく、
安定した状態で籠状鉄筋6に取り付けておくことが好ま
しく、そのためには図5に示されるようなホルダー8を
用いることが好ましい。図5(a)に示されるホルダー
8は、半割管状の台部9と、この台部9に固定された保
持管部10とからなるもので、台部9を主筋5に熔接
し、保持管部10に光ファイバー2を通すことでこれを
保持するものである。図5(b)に示されるホルダー8
は、上記と同様の台部9と、この台部9の両側に取り付
けられた2本一組の保持ピン11とからなるもので、や
はり台部9を主筋5に熔接し、保持ピン11間に光ファ
イバー2を挟み込ませることでこれを保持するものであ
る。
【0016】上記のようにして光ファイバー2を取り付
けた籠状鉄筋6を、コンクリートパイル1を遠心成形す
るための型枠にセットし、光ファイバー2の端部が型枠
外に引き出された状態で型枠にコンクリートを供給して
遠心成形することで、本コンクリートパイル1を製造す
ることができる。このようにして製造されるコンクリー
トパイル1は、その断面内に一体に光ファイバー2が埋
設されたものとなり、運搬や埋設時に光ファイバー2が
損傷されにくいものとなる。
【0017】本コンクリートパイル1の歪計測は、従来
知られている光ファイバーの歪計測技術を用いて行うこ
とができる。即ち、コンクリートパイル1の上部から引
き出されている光ファイバー2の一端をコネクター3を
介してOTDR(Optical time domain reflectmeter)
装置に接続し、光パルスを入射して、光ファイバー2の
途中から戻ってくる後方散乱光中のブリルアン散乱光の
発生波長を測定する。このブルリアン散乱光は、光ファ
イバ2に加わる歪により、媒質固有のブルリアン周波数
シフトが変化するため、これによって歪を計測すること
ができる。また、光パルスを入射してから後方散乱光が
戻ってくるまでの時間を測定することで、歪発生点まで
の距離を計測することができる。
【0018】本コンクリートパイル1の歪計測は1本ず
つ別々に行ってもよいが、図3に示されるような光ファ
イバー2の両端が引き出されたコンクリートパイル1を
用いることによって、複数本について同時に計測するこ
とも可能である。即ち、図6に示されるように、複数本
のコンクリートパイル1の光ファイバー2が直列される
よう、コンクリートパイル1間の光ファイバー2をコネ
クター3を介して接続し、この状態で上記光パルスの入
射による計測を行えば、光ファイバー2を接続した複数
本のコンクリートパイル1の歪発生状態を同時に計測す
ることができ、支持される建物等の全体の荷重分布状況
が判明する。
【0019】
【発明の効果】本発明は、以上説明した通りのものであ
り、地盤中に打設されたコンクリートパイル1につい
て、一体に取り付けられている光ファイバー2を用いて
歪を計測できるようにしたもので、光ファイバー2の取
付位置に沿って歪を計測できるので、長尺な光ファイバ
ー2を1本取り付けておくことで、コンクリートパイル
1の長さ方向の広い範囲に亙って容易に歪を計測でき、
更に光ファイバー2を螺旋状に取り付けておくことで、
長さ方向と共に周方向にも正確な歪の計測を容易に行う
ことができる。コンクリートパイル1は、通常、建物の
基礎構築に用いられるが、本発明によれば、建物構築後
の地盤中のコンクリートパイル1がどのような状態にあ
るか、また地盤中のコンクリートパイル1にどのような
負荷が加わっているかを容易に知ることができる。
【図面の簡単な説明】
【図1】本発明に係る歪計測可能なコンクリートパイル
の第1の例を示す模式図である。
【図2】本発明に係る歪計測可能なコンクリートパイル
の第2の例を示す模式図である。
【図3】本発明に係る歪計測可能なコンクリートパイル
の第3の例を示す模式図である。
【図4】本発明に係る歪計測可能なコンクリートパイル
の製造において、籠状鉄筋に光ファイバーを巻き付ける
工程を示す斜視図である。
【図5】光ファイバーの籠状鉄筋への取り付けに用いる
ホルダーの例を示す斜視図である。
【図6】複数本の本発明に係る歪計測可能なコンクリー
トパイルの歪計測を同時に行う方法の説明図である。
【符号の説明】
1 コンクリートパイル 2 光ファイバー 3 コネクター 4 端部金物 5 主筋 6 フープ筋 7 籠状鉄筋 8 ホルダー 9 台部 10 保持管部 11 保持ピン
───────────────────────────────────────────────────── フロントページの続き (72)発明者 細川 義隆 大阪府大阪市中央区高麗橋2丁目1番10号 株式会社ジオトップ内 Fターム(参考) 2D041 AA02 BA00 DB06 DB14

Claims (7)

    【特許請求の範囲】
  1. 【請求項1】 少なくとも一端が上部から引き出された
    光ファイバーが一体に取り付けられていることを特徴と
    する歪計測可能な杭。
  2. 【請求項2】 光ファイバーが、杭の外面又は内面に接
    着されて取り付けられていることを特徴とする請求項1
    の歪計測可能な杭。
  3. 【請求項3】 光ファイバーが、杭内に埋設されて取り
    付けられていることを特徴とする請求項1の歪計測可能
    な杭。
  4. 【請求項4】 光ファイバーが、螺旋状に取り付けられ
    ていることを特徴とする請求項1〜3いずれかの歪計測
    可能な杭。
  5. 【請求項5】 光ファイバーを取り付けた籠状鉄筋を型
    枠内にセットすると共に、この光ファイバーの少なくと
    も一端を杭の上部となる側から型枠外に延出させた状態
    で、遠心成形によって杭を成形することを特徴とする歪
    計測可能な杭の製造方法。
  6. 【請求項6】 光ファイバーを、螺旋状に巻き付けて籠
    状鉄筋に取り付けることを特徴とする歪計測可能な杭の
    製造方法。
  7. 【請求項7】 両端が上部から引き出された光ファイバ
    ーが一体に取り付けられている複数本の杭について、各
    杭の光ファイバーを直列に接続し、直列に接続された光
    ファイバーの歪を計測することにより、複数本の杭につ
    いての歪の計測を同時に行うことを特徴とする杭の歪計
    測方法。
JP18421698A 1998-06-30 1998-06-30 歪計測可能なコンクリートパイル及びその製造方法 Expired - Fee Related JP3756673B2 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18421698A JP3756673B2 (ja) 1998-06-30 1998-06-30 歪計測可能なコンクリートパイル及びその製造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18421698A JP3756673B2 (ja) 1998-06-30 1998-06-30 歪計測可能なコンクリートパイル及びその製造方法

Publications (2)

Publication Number Publication Date
JP2000017656A true JP2000017656A (ja) 2000-01-18
JP3756673B2 JP3756673B2 (ja) 2006-03-15

Family

ID=16149406

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18421698A Expired - Fee Related JP3756673B2 (ja) 1998-06-30 1998-06-30 歪計測可能なコンクリートパイル及びその製造方法

Country Status (1)

Country Link
JP (1) JP3756673B2 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101066611B1 (ko) * 2009-01-21 2011-09-22 (주)컴퍼지트솔루션코리아 광섬유 센서를 구비한 복합 쉘 파일 및 그 시공 방법
CN108318324A (zh) * 2018-01-27 2018-07-24 大连理工大学 一种相变混凝土能量桩模型实验装置及其实验方法
CN109029338A (zh) * 2018-08-03 2018-12-18 长江勘测规划设计研究有限责任公司 一种埋入式混凝土应变测量装置及其施工方法
JP2019015084A (ja) * 2017-07-06 2019-01-31 株式会社大林組 コンクリートの充填確認方法
CN112502516A (zh) * 2020-10-27 2021-03-16 贵州黔冠鼎盛实业有限公司 一种具有应力和弯矩监测的智能电杆

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499512B (zh) * 2014-12-19 2016-01-27 浙江华东工程安全技术有限公司 基桩桩身三维应变和力参数监测系统及其量测方法
JP6621611B2 (ja) * 2015-03-27 2019-12-18 太平洋セメント株式会社 腐食検出方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101066611B1 (ko) * 2009-01-21 2011-09-22 (주)컴퍼지트솔루션코리아 광섬유 센서를 구비한 복합 쉘 파일 및 그 시공 방법
JP2019015084A (ja) * 2017-07-06 2019-01-31 株式会社大林組 コンクリートの充填確認方法
CN108318324A (zh) * 2018-01-27 2018-07-24 大连理工大学 一种相变混凝土能量桩模型实验装置及其实验方法
CN109029338A (zh) * 2018-08-03 2018-12-18 长江勘测规划设计研究有限责任公司 一种埋入式混凝土应变测量装置及其施工方法
CN109029338B (zh) * 2018-08-03 2024-01-05 长江勘测规划设计研究有限责任公司 一种埋入式混凝土应变测量装置及其施工方法
CN112502516A (zh) * 2020-10-27 2021-03-16 贵州黔冠鼎盛实业有限公司 一种具有应力和弯矩监测的智能电杆

Also Published As

Publication number Publication date
JP3756673B2 (ja) 2006-03-15

Similar Documents

Publication Publication Date Title
JP3668199B2 (ja) トンネルの変形測定方法
CN113740161B (zh) 先张预应力混凝土空心板钢绞线有效预应力检测方法
JP2000017656A (ja) 歪計測可能な杭、その製造方法及び歪計測方法
Mao et al. A novel method of embedding distributed optical fiber sensors for structural health monitoring
CN105672376A (zh) 一种植入光纤光栅传感器的预应力管桩桩身内力装置
JP2004077362A (ja) 軸力計
CN106921126A (zh) 一种一体化缆线埋设机及其施工工法
KR100716725B1 (ko) 복합재 보강형 광섬유센서 구조체의 제조방법
CN109958056A (zh) 智能拉索、智能拉索制备方法以及智能拉索安全状态检测方法
JPH11326149A (ja) コンクリート構造物の補強後における損傷の進行を確認する方法
JP4089850B2 (ja) 光ファイバセンサとこの光ファイバセンサの設置方法およびこの光ファイバセンサを用いたコンクリート構造物の歪み・温度測定方法
CN110397054B (zh) 一种具有温度补偿功能的分布式光纤围堰监测系统及方法
CN218724899U (zh) 一种振弦式钢筋计
JP2019109164A (ja) 応力モニタリングセンサおよび応力モニタリング方法
KR200404652Y1 (ko) 광섬유 브래그 격자 센서를 이용한 콘크리트 구조물 변형률측정장치
JP2002022492A (ja) 歪量の測定方法
CN215374306U (zh) 一种海底隧道复合式衬砌的结构受力测试装置
JP2017211266A (ja) 地盤・岩盤歪み計測装置及び地盤・岩盤歪み計測方法
KR102080496B1 (ko) 광섬유센서 매립형 탄소섬유 플레이트의 제작방법
CN103376066A (zh) 用于监测木结构应变的分布式传感光纤的安装方法
JP3616887B2 (ja) 基礎杭
CN112922049A (zh) 地下连续墙的墙体完整性检测装置及方法
JP7075658B2 (ja) 収縮評価方法およびコンクリート試験体
CN206258205U (zh) 一种单端双出缆的多光栅锚杆应力计
JP2001227994A (ja) 光ファイバセンサの組立方法および光ファイバセンサ

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050711

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050816

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051013

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051220

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051222

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100106

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110106

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130106

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130106

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130106

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140106

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees