IL319587A - A transition point or component with a releasable connection and method and an arrangement for monitoring the releasable connection - Google Patents

A transition point or component with a releasable connection and method and an arrangement for monitoring the releasable connection

Info

Publication number
IL319587A
IL319587A IL319587A IL31958725A IL319587A IL 319587 A IL319587 A IL 319587A IL 319587 A IL319587 A IL 319587A IL 31958725 A IL31958725 A IL 31958725A IL 319587 A IL319587 A IL 319587A
Authority
IL
Israel
Prior art keywords
component
sensor
frog
points
releasable connection
Prior art date
Application number
IL319587A
Other languages
English (en)
Hebrew (he)
Original Assignee
Voestalpine Turnout Tech Germany Gmbh
Voestalpine Railway Systems GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Voestalpine Turnout Tech Germany Gmbh, Voestalpine Railway Systems GmbH filed Critical Voestalpine Turnout Tech Germany Gmbh
Publication of IL319587A publication Critical patent/IL319587A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/04Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
    • B61L23/042Track changes detection
    • B61L23/045Rail wear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/04Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
    • B61L23/042Track changes detection
    • B61L23/047Track or rail movements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades
    • B61L27/53Trackside diagnosis or maintenance, e.g. software upgrades for trackside elements or systems, e.g. trackside supervision of trackside control system conditions
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B7/00Switches; Crossings
    • E01B7/10Frogs
    • E01B7/12Fixed frogs made of one part or composite

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)
  • Railway Tracks (AREA)
IL319587A 2022-09-16 2023-09-15 A transition point or component with a releasable connection and method and an arrangement for monitoring the releasable connection IL319587A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP22196252.5A EP4339067B1 (de) 2022-09-16 2022-09-16 Weichen- oder kreuzungskomponente mit lösbarer verbindung sowie verfahren und anordnung zur überwachung der lösbaren verbindung
PCT/EP2023/075463 WO2024056873A1 (de) 2022-09-16 2023-09-15 Weichen- oder kreuzungskomponente mit lösbarer verbindung sowie verfahren und anordnung zur überwachung der lösbaren verbindung

Publications (1)

Publication Number Publication Date
IL319587A true IL319587A (en) 2025-05-01

Family

ID=83362660

Family Applications (1)

Application Number Title Priority Date Filing Date
IL319587A IL319587A (en) 2022-09-16 2023-09-15 A transition point or component with a releasable connection and method and an arrangement for monitoring the releasable connection

Country Status (12)

Country Link
US (1) US20260001579A1 (es)
EP (2) EP4339067B1 (es)
KR (1) KR20250068654A (es)
CN (1) CN119866294A (es)
AU (1) AU2023342658B2 (es)
DK (1) DK4339067T3 (es)
ES (1) ES3036607T3 (es)
FI (1) FI4339067T3 (es)
IL (1) IL319587A (es)
PL (1) PL4339067T3 (es)
PT (1) PT4339067T (es)
WO (1) WO2024056873A1 (es)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2745543B1 (fr) 1996-02-29 1998-05-22 Cogifer Systeme de telesurveillance pour reseau ferroviaire
DE20016674U1 (de) 2000-09-27 2002-02-14 Hanning & Kahl GmbH & Co., 33813 Oerlinghausen Anordnung zur Messung des Anfahrens einer Herzspitze einer Weiche
DE102004014282C5 (de) 2004-03-22 2008-06-12 Db Netz Ag Diagnose und Zustandsmonitoring im Überlaufbereich von Weichen, starren Herzstücken und Kreuzungen
CZ18503U1 (cs) * 2008-03-18 2008-04-28 DT- Výhybkárna a strojírna a. s. Srdcovka
DE102009033980B4 (de) * 2009-07-16 2013-08-01 Siemens Aktiengesellschaft Spurgebundenes Fahrzeug
DE102010037110A1 (de) 2010-05-12 2011-11-17 Voestalpine Bwg Gmbh & Co. Kg Oberbauvorrichtung
AT521420A1 (de) * 2018-07-11 2020-01-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Verfahren und System zum Überwachen einer Gleisstrecke
NL2027749B1 (en) * 2021-03-12 2022-09-27 Rail 1435 Tech B V A railway monitoring sensor unit

Also Published As

Publication number Publication date
ES3036607T3 (en) 2025-09-22
EP4587312A1 (de) 2025-07-23
DK4339067T3 (da) 2025-08-04
US20260001579A1 (en) 2026-01-01
WO2024056873A1 (de) 2024-03-21
PT4339067T (pt) 2025-07-30
CN119866294A (zh) 2025-04-22
AU2023342658B2 (en) 2025-08-07
EP4339067B1 (de) 2025-04-30
AU2023342658A1 (en) 2025-03-20
FI4339067T3 (fi) 2025-07-15
EP4339067A1 (de) 2024-03-20
PL4339067T3 (pl) 2025-09-08
KR20250068654A (ko) 2025-05-16

Similar Documents

Publication Publication Date Title
RU2013262C1 (ru) Устройство для регистрации состояния стрелочных переводов и их крестовин
CA2847375C (en) Method for detection of a flaw or flaws in a railway track, and a rail vehicle to be used in such a method
RU2458200C2 (ru) Система крепления рельса
EP3253921B1 (en) A rail clamp
US20260001579A1 (en) Points or crossing component with releasable connection and method and arrangement for monitoring the releasable connection
CA2282894C (en) Guide-rail attachment for railroad switch
CA3267039A1 (en) Points or crossing component with releasable connection and method and arrangement for monitoring the releasable connection
DE10304008B4 (de) Vorrichtung zur Messung der Schienenbelastung
WO2016124910A1 (en) A rail clamp
KR20050053733A (ko) 고정 선로의 하부 구조물의 상태를 감시하기 위한 장치 및방법
US20120325921A1 (en) Sleeper for supporting rails
BR112025004732B1 (pt) Componente de pontos ou cruzamento com conexão liberável e método e arranjo para monitoramento da conexão liberável
US20220194448A1 (en) Impact Load Detection
DE10241320A1 (de) Vorrichtung zur Erfassung von Veränderungen an Eisenbahnrädern im Betriebseinsatz
US12151723B2 (en) Monitoring device for monitoring a temporary rail connection of two rail portions of a rail and rail connection system having such a monitoring device
JP3857521B2 (ja) 踏切舗道板締着装置におけるtボルトの保持構造
GB2364124A (en) Load measuring device
GB2437156A (en) Inspection and/or monitoring of points in a points installation
JP2015143456A (ja) レール間幅規定装置
CN106706192B (zh) 轨底弯矩式力传感器
Łomżyńska et al. Application of Point-Based Characteristics of Vibration Signals in the Detection of Railway Rail Damage
AU2017200607A1 (en) Force measuring device for determining the wheel contact forces of rail-mounted vehicles
LT3361B (en) Recording device for condition of switches or crossings