GEP201706653B - Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method - Google Patents

Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method

Info

Publication number
GEP201706653B
GEP201706653B GEAP201413745A GEAP2014013745A GEP201706653B GE P201706653 B GEP201706653 B GE P201706653B GE AP201413745 A GEAP201413745 A GE AP201413745A GE AP2014013745 A GEAP2014013745 A GE AP2014013745A GE P201706653 B GEP201706653 B GE P201706653B
Authority
GE
Georgia
Prior art keywords
tunnel
excavation
standoffs
reinforcing
excavated
Prior art date
Application number
GEAP201413745A
Inventor
Dong-Hyun Seo
Original Assignee
Hyun Eng And Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hyun Eng And Construction Co Ltd filed Critical Hyun Eng And Construction Co Ltd
Publication of GEP201706653B publication Critical patent/GEP201706653B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Abstract

A method provides first tunnel partial exca¬va¬tion so that it would be consist of excavated part 14 and II tunnel unexcavated part 12; perforation the¬rein horizontal direction between parallel tunnels I and II; standoffs insertion into horizontal passing apertures so that ends therebe moved away from II tunnel excavated surface 11; pouring cement grout; II tunnel excavation for standoffs 20 ends denu¬da¬tion, pouring strengthening concrete on II tunnel; forming plate structure 40 on denuded standoffs ends; fastening baseplate with a washer; unexcava¬ted part 12 excavation; pouring strengthening conc¬rete on excavated tunnel surface for creating basep¬late on standoffs ends denuded at I tunnel wholy excavation; and strengthening plate with a nut.
GEAP201413745A 2013-05-09 2014-05-08 Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method GEP201706653B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130052629A KR101353882B1 (en) 2013-05-09 2013-05-09 Method of reinforcement and construction of pillar of neighboring tunnel

Publications (1)

Publication Number Publication Date
GEP201706653B true GEP201706653B (en) 2017-04-10

Family

ID=49631225

Family Applications (1)

Application Number Title Priority Date Filing Date
GEAP201413745A GEP201706653B (en) 2013-05-09 2014-05-08 Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method

Country Status (5)

Country Link
KR (1) KR101353882B1 (en)
CN (1) CN105378222B (en)
EA (1) EA031926B1 (en)
GE (1) GEP201706653B (en)
WO (1) WO2014182074A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899329B (en) * 2014-03-24 2016-03-30 中国矿业大学 A kind of administering method of large deformation breaking surrounding rock tunnel
KR101671123B1 (en) * 2015-11-25 2016-10-31 서민규 Tunnel construction method by using pre-support and post-support, and suitable device therefor
KR101665516B1 (en) * 2016-03-16 2016-10-24 우경기술주식회사 Construction method of duel tunnel using composite capable of bidirectional tensioning, pressure casting and tiebolting, and its duel tunnel
CN106948839A (en) * 2017-04-27 2017-07-14 中铁十六局集团第四工程有限公司 A kind of tunnel benching tunnelling method construction steel diaphragm and construction method
CN108488139B (en) * 2018-03-15 2019-11-05 重庆维庆液压机械有限公司 A kind of hydraulic cylinder
KR102134477B1 (en) 2019-05-13 2020-07-16 (주)하경엔지니어링 Construction method of close parallel tunnel for excavating and reinforcing tunnel pillar portion according to ground conditions
CN110094216A (en) * 2019-05-31 2019-08-06 中铁第四勘察设计院集团有限公司 A kind of separate tunnel stratum compensation and grouting system
CN113591344B (en) * 2021-07-05 2023-08-22 武汉理工大学 Tunnel surrounding rock pressure determining method based on stratum structure method
CN114294016B (en) * 2021-12-29 2024-03-15 国网北京市电力公司 Reinforcing device for cable tunnel, manufacturing method and cable tunnel assembly

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0493498A (en) * 1990-08-09 1992-03-26 Ando Kensetsu Kk Concrete placing device for covering tunnel
KR100418133B1 (en) 2000-10-09 2004-02-14 에스케이건설 주식회사 Small Section Excavating Method of a Tunnel
KR100714380B1 (en) 2006-10-26 2007-05-04 주식회사 하이콘엔지니어링 Reinforcement structure for double tunnel
CN201284654Y (en) * 2008-10-06 2009-08-05 中铁隧道集团有限公司 Arrangement structure for steel form plate trolley and belt conveyer in tunnel construction by drilling explosion method
CN101906976A (en) * 2010-07-12 2010-12-08 中铁四局集团第五工程有限公司 Sandy wall rock grouting strengthening method in subsurface excavation construction
KR101028535B1 (en) 2010-11-09 2011-04-11 주식회사 하이콘엔지니어링 Construction method of double tunnel
CN102758440A (en) * 2011-04-28 2012-10-31 成都中铁隆工程集团有限公司 Open-cut tunnel construction method
KR101096664B1 (en) 2011-06-15 2011-12-23 주식회사 성우사면 Construction method of approaching duel tunnel and pressing unit of pillar using the same
KR101149895B1 (en) * 2011-09-26 2012-05-30 주식회사 성우사면 Reinforcement block for pillar of tunnel
KR101244257B1 (en) * 2012-11-14 2013-03-18 주식회사 성우사면 Method for digging tunnel

Also Published As

Publication number Publication date
CN105378222A (en) 2016-03-02
EA201590327A1 (en) 2015-05-29
KR20130108218A (en) 2013-10-02
KR101353882B1 (en) 2014-01-22
CN105378222B (en) 2017-03-22
WO2014182074A1 (en) 2014-11-13
EA031926B1 (en) 2019-03-29

Similar Documents

Publication Publication Date Title
GEP201706653B (en) Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method
SA518391652B1 (en) Tunnel construction method using pre-support and post-support and apparatus suitable for same
EA201690486A1 (en) METHOD OF DEVELOPMENT OF DEPOSITS
IL281911A (en) Prestressed reinforced concrete pipe pile and a production method thereof
MY173947A (en) Undercut excavation method with continuous concrete floors
GB2557702A (en) Tunnel
JP2014530972A5 (en)
MX358690B (en) Concrete forming systems and methods.
MX2017009030A (en) Interlocking structural block reinforcement means and modular building system.
PL3249105T3 (en) Precast concrete foundation pile, method of grouting and manufacturing
MX363567B (en) Methods for producing fluid migration resistant cement slurries.
WO2016036080A3 (en) Environment-friendly retaining wall and construction method thereof
AR107861A1 (en) SYSTEM AND METHOD FOR DRILLING WITH SAND AND TUNNELING WITH ACID OF WELLS PUNCHED
WO2015019017A3 (en) Sealing device
MX2015011223A (en) Reinforcement, structure and method for underground reinforced concrete constructions.
PL122655U1 (en) Prefabricated concrete element to form a fencing wall
JP2018178641A5 (en)
CN103680288A (en) Tunnel micro-step method technology teaching simulation body
AR088174A1 (en) PROCEDURE TO PRODUCE A CONSTRUCTION MATERIAL
EA201491367A1 (en) NET STRUCTURE AND METHOD OF ITS CONSTRUCTION
CN104695966A (en) Construction method of underground arch roof plate
CN103758539A (en) Steel belt for bolt-grouting supporting
EP4273344A3 (en) Reinforcing framework and slab design
SG11201903020QA (en) Structure provided with composite underground wall and method for constructing structure provided with composite underground wall
CN205804205U (en) A kind of positioning installation apparatus grouting arch form skeleton for side slope