SG11201903020QA - Structure provided with composite underground wall and method for constructing structure provided with composite underground wall - Google Patents
Structure provided with composite underground wall and method for constructing structure provided with composite underground wallInfo
- Publication number
- SG11201903020QA SG11201903020QA SG11201903020QA SG11201903020QA SG11201903020QA SG 11201903020Q A SG11201903020Q A SG 11201903020QA SG 11201903020Q A SG11201903020Q A SG 11201903020QA SG 11201903020Q A SG11201903020Q A SG 11201903020QA SG 11201903020Q A SG11201903020Q A SG 11201903020QA
- Authority
- SG
- Singapore
- Prior art keywords
- structure provided
- underground wall
- composite underground
- core material
- composite
- Prior art date
Links
- 239000002131 composite material Substances 0.000 title abstract 5
- 239000011162 core material Substances 0.000 abstract 4
- 239000004568 cement Substances 0.000 abstract 2
- 239000002689 soil Substances 0.000 abstract 2
- 239000011150 reinforced concrete Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D13/00—Large underground chambers; Methods or apparatus for making them
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
According to the present invention, a stud for a permanent work pile (7) is installed in a web (1b) of an H-beam serving as a core material (1) in an area deeper than a subgrade (4), the area being located below a composite wall section (5) in an area 5 shallower than the subgrade (4) where an earth retaining wall (2) and a reinforced concrete wall (3) are integrated with each other. The stud for the permanent work pile (7) is also installed in the web (1b) of the core material (1) of the composite wall section (5). Then, in addition to the core material (1) and a soil cement in the area deeper than the subgrade (4), the core material (1) and the soil cement in the composite wall section 10 (5) in which the stud for the permanent work pile (7) is installed are configured to function as a support pile of permanent work.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016200276A JP2018062744A (en) | 2016-10-11 | 2016-10-11 | Structure with composite underground wall and construction method for constructing structure with composite underground wall |
PCT/JP2017/036259 WO2018070333A1 (en) | 2016-10-11 | 2017-10-05 | Structure provided with composite underground wall and method for constructing structure provided with composite underground wall |
Publications (1)
Publication Number | Publication Date |
---|---|
SG11201903020QA true SG11201903020QA (en) | 2019-05-30 |
Family
ID=61905548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SG11201903020QA SG11201903020QA (en) | 2016-10-11 | 2017-10-05 | Structure provided with composite underground wall and method for constructing structure provided with composite underground wall |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP2018062744A (en) |
SG (1) | SG11201903020QA (en) |
WO (1) | WO2018070333A1 (en) |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5829922A (en) * | 1981-08-14 | 1983-02-22 | Takenaka Komuten Co Ltd | Constructing method for underground outer wall |
JPS63247423A (en) * | 1987-04-02 | 1988-10-14 | Seiko Kogyo Kk | Underground continuous wall usable as structure base and its construction |
JPH0336315A (en) * | 1989-06-30 | 1991-02-18 | Kajima Corp | Pile for concurrently serving as earth anchor |
JP3146396B2 (en) * | 1993-03-25 | 2001-03-12 | 株式会社竹中工務店 | Construction method of composite underground structure using soil cement column wall |
JP2001020301A (en) * | 1999-07-12 | 2001-01-23 | Taisei Corp | Pile foundation structure |
JP2007070807A (en) * | 2005-09-05 | 2007-03-22 | Takenaka Komuten Co Ltd | Vibration-proof composite underground wall using soil-cement continuous underground wall, and its construction method |
JP5092705B2 (en) * | 2007-11-14 | 2012-12-05 | 株式会社大林組 | Support structure of structure, construction method of underground structure, replacement method of foundation load |
JP2012046979A (en) * | 2010-08-27 | 2012-03-08 | Kumagai Gumi Co Ltd | Building foundation using earth retaining wall |
JP5728301B2 (en) * | 2011-06-14 | 2015-06-03 | 株式会社竹中工務店 | Foundation structure |
JP5737757B2 (en) * | 2011-08-10 | 2015-06-17 | 株式会社熊谷組 | Evaluation method of bending moment borne by connecting means for connecting retaining wall and foundation slab. |
JP5782356B2 (en) * | 2011-10-13 | 2015-09-24 | 株式会社リアス | Foundation method |
-
2016
- 2016-10-11 JP JP2016200276A patent/JP2018062744A/en active Pending
-
2017
- 2017-10-05 SG SG11201903020QA patent/SG11201903020QA/en unknown
- 2017-10-05 WO PCT/JP2017/036259 patent/WO2018070333A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
JP2018062744A (en) | 2018-04-19 |
WO2018070333A1 (en) | 2018-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2557702A (en) | Tunnel | |
EA201791540A1 (en) | REINFORCEMENT TOOL FOR CONSTRUCTION BLOC WITH LOCKING CONNECTION AND MODULAR CONSTRUCTION SYSTEM | |
KR20180084411A (en) | Construction method of lower pier casion footing using PCC structure | |
MX358690B (en) | Concrete forming systems and methods. | |
MX2018006004A (en) | Method for forming a stable foundation ground. | |
EA201491443A1 (en) | WALL BLOCK ELEMENT | |
PL3249105T3 (en) | Precast concrete foundation pile, method of grouting and manufacturing | |
WO2016036080A3 (en) | Environment-friendly retaining wall and construction method thereof | |
MX366797B (en) | Prefabricated footing for wind turbines. | |
MY191648A (en) | Geosynthetic reinforced wall panels comprising soil reinforcing members and retaining wall system formed therewith | |
PH12017501962B1 (en) | Scour protection for an underwater bottom alongside a quay wall, and method for providing the same | |
SG11201903020QA (en) | Structure provided with composite underground wall and method for constructing structure provided with composite underground wall | |
EA201600052A1 (en) | METHOD OF CONSTRUCTION OF PILES WITH EXTENSION | |
KR101039341B1 (en) | Pile structure and construction method for foundation using the same | |
UA117078U (en) | METHOD OF CONSTRUCTION OF THE SAFETY STRUCTURE | |
GB2542289A8 (en) | Load Transmission device | |
NZ728889A (en) | Subsurface compacted rubble raft | |
UA115199U (en) | METHOD OF REDUCING TECHNOLOGICAL EQUIPMENT AND THE ENVIRONMENT | |
Sin et al. | Study on the Application of Press in Steel Pipe Pile for Restoring Building of different settlement | |
GEP20197002B (en) | Method for bases of roads and ground structures building | |
Toueg | Ramla, Ester Ha-Malka Street | |
KR101604658B1 (en) | Joint plate controlling length of rebar on drilled shaft | |
TR2021002993U4 (en) | GEOPLUS FABRIC CONCRETE PRODUCTION SYSTEM | |
RU150469U1 (en) | Foundation for low-rise buildings on anti-slip pillow | |
CR20190506A (en) | PYRAMIDAL ANCHORING SYSTEM OF VIBROCOMPACTED CONCRETE PARTS WITH A SPECIAL SHAPE, FOR THE CONSTRUCTION OF SUPPORT AND RETENTION STRUCTURES |