EA201590327A1 - METHOD OF STRENGTHENING A PART IN THE FORM OF A SUPPORT OF PASSING NEXT PARALLEL TUNNELS BY ARMATURE RODS AND METHOD OF DEVELOPMENT - Google Patents
METHOD OF STRENGTHENING A PART IN THE FORM OF A SUPPORT OF PASSING NEXT PARALLEL TUNNELS BY ARMATURE RODS AND METHOD OF DEVELOPMENTInfo
- Publication number
- EA201590327A1 EA201590327A1 EA201590327A EA201590327A EA201590327A1 EA 201590327 A1 EA201590327 A1 EA 201590327A1 EA 201590327 A EA201590327 A EA 201590327A EA 201590327 A EA201590327 A EA 201590327A EA 201590327 A1 EA201590327 A1 EA 201590327A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- support
- strengthening
- tunnels
- development
- adjacent tunnels
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 4
- 238000005728 strengthening Methods 0.000 title abstract 3
- 238000009412 basement excavation Methods 0.000 abstract 2
- 238000010276 construction Methods 0.000 abstract 1
- 239000011440 grout Substances 0.000 abstract 1
- 238000005065 mining Methods 0.000 abstract 1
- 230000003014 reinforcing effect Effects 0.000 abstract 1
- 239000002689 soil Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Раскрыт способ усиления и строительства опоры с производством земляных работ, чтобы использовать грунт между соседними туннелями в качестве замены опоры во время производства работ по строительству закрытым способом по меньшей мере двух туннелей. Способ усиления и строительства опор расположенных рядом туннелей с производством земляных работ включает разработку части за исключением ослабленной в результате разработки области, чтобы предотвратить деформацию опоры до усиления опор расположенных рядом туннелей во время разработки расположенных рядом туннелей, выполнение в опоре отверстий, включая неразработанную часть со стороны опоры, являющуюся ослабленной областью, для вставки гвоздя или анкера в опору заранее, усиление опоры и заливку ее цементным раствором для усиления опоры и дополнительно разработку неразработанной части со стороны опоры, являющейся неразработанной частью.Disclosed is a method for strengthening and building a support with excavation to use soil between adjacent tunnels as a support replacement during closed construction of at least two tunnels. A method of strengthening and constructing supports for adjacent tunnels with excavation involves developing a portion excluding the area weakened by mining to prevent deformation of the support prior to reinforcing the supports of adjacent tunnels during the development of adjacent tunnels, making holes in the support including the undeveloped part from the side the support, which is the weakened area, to insert a nail or anchor into the support in advance, reinforce the support and grout it to strengthen the support, and additionally develop the undeveloped part on the side of the support, which is the undeveloped part.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130052629A KR101353882B1 (en) | 2013-05-09 | 2013-05-09 | Method of reinforcement and construction of pillar of neighboring tunnel |
PCT/KR2014/004063 WO2014182074A1 (en) | 2013-05-09 | 2014-05-08 | Method for reinforcing pillar part of adjacently constructed parallel tunnels with reinforcing rods and excavation method |
Publications (2)
Publication Number | Publication Date |
---|---|
EA201590327A1 true EA201590327A1 (en) | 2015-05-29 |
EA031926B1 EA031926B1 (en) | 2019-03-29 |
Family
ID=49631225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA201590327A EA031926B1 (en) | 2013-05-09 | 2014-05-08 | Method for forming a pillar part and reinforcing adjacently constructed parallel tunnels with reinforcing rods |
Country Status (5)
Country | Link |
---|---|
KR (1) | KR101353882B1 (en) |
CN (1) | CN105378222B (en) |
EA (1) | EA031926B1 (en) |
GE (1) | GEP201706653B (en) |
WO (1) | WO2014182074A1 (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103899329B (en) * | 2014-03-24 | 2016-03-30 | 中国矿业大学 | A kind of administering method of large deformation breaking surrounding rock tunnel |
KR101671123B1 (en) * | 2015-11-25 | 2016-10-31 | 서민규 | Tunnel construction method by using pre-support and post-support, and suitable device therefor |
KR101665516B1 (en) * | 2016-03-16 | 2016-10-24 | 우경기술주식회사 | Construction method of duel tunnel using composite capable of bidirectional tensioning, pressure casting and tiebolting, and its duel tunnel |
CN106948839A (en) * | 2017-04-27 | 2017-07-14 | 中铁十六局集团第四工程有限公司 | A kind of tunnel benching tunnelling method construction steel diaphragm and construction method |
CN108488139B (en) * | 2018-03-15 | 2019-11-05 | 重庆维庆液压机械有限公司 | A kind of hydraulic cylinder |
KR102134477B1 (en) | 2019-05-13 | 2020-07-16 | (주)하경엔지니어링 | Construction method of close parallel tunnel for excavating and reinforcing tunnel pillar portion according to ground conditions |
CN110094216B (en) * | 2019-05-31 | 2024-05-03 | 中铁第四勘察设计院集团有限公司 | Separated tunnel stratum compensation grouting system |
CN113591344B (en) * | 2021-07-05 | 2023-08-22 | 武汉理工大学 | Tunnel surrounding rock pressure determining method based on stratum structure method |
CN114294016B (en) * | 2021-12-29 | 2024-03-15 | 国网北京市电力公司 | Reinforcing device for cable tunnel, manufacturing method and cable tunnel assembly |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0493498A (en) * | 1990-08-09 | 1992-03-26 | Ando Kensetsu Kk | Concrete placing device for covering tunnel |
KR100418133B1 (en) | 2000-10-09 | 2004-02-14 | 에스케이건설 주식회사 | Small Section Excavating Method of a Tunnel |
KR100714380B1 (en) | 2006-10-26 | 2007-05-04 | 주식회사 하이콘엔지니어링 | Reinforcement structure for double tunnel |
CN201284654Y (en) * | 2008-10-06 | 2009-08-05 | 中铁隧道集团有限公司 | Arrangement structure for steel form plate trolley and belt conveyer in tunnel construction by drilling explosion method |
CN101906976A (en) * | 2010-07-12 | 2010-12-08 | 中铁四局集团第五工程有限公司 | Sandy wall rock grouting strengthening method in subsurface excavation construction |
KR101028535B1 (en) | 2010-11-09 | 2011-04-11 | 주식회사 하이콘엔지니어링 | Construction method of double tunnel |
CN102758440A (en) * | 2011-04-28 | 2012-10-31 | 成都中铁隆工程集团有限公司 | Open-cut tunnel construction method |
KR101096664B1 (en) | 2011-06-15 | 2011-12-23 | 주식회사 성우사면 | Construction method of approaching duel tunnel and pressing unit of pillar using the same |
KR101149895B1 (en) * | 2011-09-26 | 2012-05-30 | 주식회사 성우사면 | Reinforcement block for pillar of tunnel |
KR101244257B1 (en) * | 2012-11-14 | 2013-03-18 | 주식회사 성우사면 | Method for digging tunnel |
-
2013
- 2013-05-09 KR KR1020130052629A patent/KR101353882B1/en active IP Right Grant
-
2014
- 2014-05-08 WO PCT/KR2014/004063 patent/WO2014182074A1/en active Application Filing
- 2014-05-08 CN CN201480026214.4A patent/CN105378222B/en active Active
- 2014-05-08 GE GEAP201413745A patent/GEP201706653B/en unknown
- 2014-05-08 EA EA201590327A patent/EA031926B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
CN105378222A (en) | 2016-03-02 |
GEP201706653B (en) | 2017-04-10 |
KR101353882B1 (en) | 2014-01-22 |
CN105378222B (en) | 2017-03-22 |
KR20130108218A (en) | 2013-10-02 |
WO2014182074A1 (en) | 2014-11-13 |
EA031926B1 (en) | 2019-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201590327A1 (en) | METHOD OF STRENGTHENING A PART IN THE FORM OF A SUPPORT OF PASSING NEXT PARALLEL TUNNELS BY ARMATURE RODS AND METHOD OF DEVELOPMENT | |
GEP20207062B (en) | Tunnel construction method using pre-support and post-support | |
SG11202102769TA (en) | Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor | |
EA201690486A1 (en) | METHOD OF DEVELOPMENT OF DEPOSITS | |
PH12018500126A1 (en) | Frame structure and method of constructing frame structure | |
AR081461A1 (en) | PREFABRICATED METHOD AND MODULE FOR BUILDING CONSTRUCTION | |
GB2557702A (en) | Tunnel | |
MX2014003249A (en) | Concrete forming systems and methods. | |
EA201790900A1 (en) | STRUCTURE FOR REINFORCING ROAD COVERINGS | |
MX366797B (en) | Prefabricated footing for wind turbines. | |
CO7400889A2 (en) | Method to produce a reinforced floor structure | |
SG10201709478RA (en) | Reinforcement, structure and method for underground reinforced concrete constructions | |
PE20181430A1 (en) | FOAMING ADDITIVE FOR SOIL CONDITIONING IN THE PRESENCE OF MECHANICAL EXCAVATION FOR CONSTRUCTION OF TUNNELS | |
AR088174A1 (en) | PROCEDURE TO PRODUCE A CONSTRUCTION MATERIAL | |
FR2998905B1 (en) | METHOD AND KIT FOR CONSTRUCTING UNDERGROUND WORK WITH SUSPENDED FORMWORK | |
UA93883U (en) | METHOD OF STRENGTHENING TAPE FOUNDATIONS OF WALLS WITH REINFORCED CONCRETE FOUNDATION | |
UA100829U (en) | METHOD OF CONTROLLING MINING PRODUCTION SOIL | |
UA61335U (en) | Method of demolition rubbles of destroyed buildings at elimination of consequences of natural disasters | |
PL399324A3 (en) | System of casing grids to protect the mine workings | |
RU2377409C1 (en) | Method for fixation of acute-angled couplings of mine tunnels | |
PL419224A1 (en) | Foundation prefabricated permanent formwork | |
PL423289A1 (en) | Method for protecting of a wooden building structure against the effects of strong wind | |
EA201891522A1 (en) | METHOD OF CONSTRUCTION OF THE MINE FURNACE AND KNOT | |
UA105353U (en) | Method of building the cast strip | |
PL420499A1 (en) | Method for producing a segment of a curtain wall using the permanent formwork, the segment of the curtain wall and application of the curtain wall segment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): AM AZ BY KG TJ TM |