Інститут Геотехнічної Механіки Ім. М.С. Полякова Нан України
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Інститут Геотехнічної Механіки Ім. М.С. Полякова Нан УкраїниfiledCriticalІнститут Геотехнічної Механіки Ім. М.С. Полякова Нан України
Priority to UAU201510210UpriorityCriticalpatent/UA105353U/en
Publication of UA105353UpublicationCriticalpatent/UA105353U/en
On-Site Construction Work That Accompanies The Preparation And Application Of Concrete
(AREA)
Abstract
The method of building the cast strip includes the casting of concrete strip in the formwork between the soil and the roof. Before its casting the inclined holes to the sides beyond the lateral boundaries of the future concrete strip are made on the ground from the zone of the future concrete strip; the rods are inserted in the holes; the ends of rods are left in the zone of the future concrete strip and while casting the concrete strip the said ends of rods are poured with concrete inside the concrete strip.
UAU201510210U2015-10-192015-10-19Method of building the cast strip
UA105353U
(en)