Інститут Геотехнічної Механіки Ім. М.С. Полякова Нан України
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Інститут Геотехнічної Механіки Ім. М.С. Полякова Нан УкраїниfiledCriticalІнститут Геотехнічної Механіки Ім. М.С. Полякова Нан України
Priority to UAU201511342UpriorityCriticalpatent/UA105379U/en
Publication of UA105379UpublicationCriticalpatent/UA105379U/en
On-Site Construction Work That Accompanies The Preparation And Application Of Concrete
(AREA)
Abstract
The method of building the cast strip includes the casting of concrete security strip in the formwork between the soil and the roof from the excavation. Before the casting of concrete strip in the area of the future concrete strip on the side of excavation the gap is cut from along the excavation, in which the concrete slabs are set with protruding reinforcement at the top, which is left in the zone of the future concrete strip. The protruding reinforcement is directed into the future concrete runway, while casting the concrete strip the upper part of the reinforced concrete slabs with protruding reinforcement is poured with concrete inside the concrete strip.
UAU201511342U2015-11-172015-11-17A method of building the cast strip
UA105379U
(en)