GB850599A GB8056/57A GB805657A GB850599A GB 850599 A GB850599 A GB 850599A GB 8056/57 A GB8056/57 A GB 8056/57A GB 805657 A GB805657 A GB 805657A GB 850599 A GB850599 A GB 850599A
Authority
GB
United Kingdom
Prior art keywords
blocks
members
parts
block
grouted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
GB8056/57A
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ERICH LUEBBERT
REINHARD JECHT
EUGEN SCHULZ
Original Assignee
ERICH LUEBBERT
REINHARD JECHT
EUGEN SCHULZ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ERICH LUEBBERT, REINHARD JECHT, EUGEN SCHULZ filed Critical ERICH LUEBBERT
Publication of GB850599A publication Critical patent/GB850599A/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/04Provisional protective covers for working space for use in drifting galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

850,599. Tunnels. LUBBERT, E., SCHULZ, E., FINSTERWALDER, U., JECHT, R., and RUF, E. March 12, 1957. [March 12, 1956], No. 8056/57. Class 85. A shield driven tunnel is lined with concrete which is stressed by axial and peripheral tension members embedded in the tunnel cross-section. The lining shown is built in sections formed by pre-cast concrete blocks 2,-7. After drain pipes 16 are laid and covered with cement the blocks 2 are set in position. A block 3 is placed on the blocks 2 and parts of peripheral tension members 13 anchored at 17 are threaded through the blocks 2, 3. Blocks 4 are placed adjacent the blocks 2 after the parts of the members 13 threaded therethrough are joined to the parts protruding from the blocks 2. Packing 15 is introduced at the joints of the blocks and the parts of axial tension members 14 are tensioned, and grouted into the blocks. Pressure bags 8 are placed in cavities 10 in the blocks 3, 4. The blocks 5, 6, 7 are positioned to complete the section, projections 9 on the blocks 5, 6 engaging the bags and the parts of the members 13 in the blocks 5, 7 being joined to the parts protruding from the sections 4. The tension members 13 are tensioned and anchored at 17 on the block 7 and the shield is advanced by the pressure of rams 1. After sand has been blown into the space between the tunnel opening and the lining, liquid cement is supplied to the bags to lift the block 5,-7 and to finally tension the members 13. The members 13 are grouted into the block, the remaining members 14 are fitted, tensioned and grouted into the blocks, liquid cement is injected into the sand, and the inside of the. lining section is covered with a layer of water tight material. Some or all of the blocks may be cast in situ.
GB8056/57A 1956-03-12 1957-03-12 Improvements in or relating to the construction of galleries, tunnels or the like Expired GB850599A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE850599X 1956-03-12

Publications (1)

Publication Number Publication Date
GB850599A true GB850599A (en) 1960-10-05

Family

ID=6778086

Family Applications (1)

Application Number Title Priority Date Filing Date
GB8056/57A Expired GB850599A (en) 1956-03-12 1957-03-12 Improvements in or relating to the construction of galleries, tunnels or the like

Country Status (1)

Country Link
GB (1) GB850599A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1215088B (en) * 1961-02-04 1966-04-28 Wayss & Freytag Ag Process for producing a pressure-resistant joint seal between manhole or tunnel rings
CN110005432A (en) * 2019-04-18 2019-07-12 西南交通大学 Double-shielded TBM development machine passes through the synchronous grouting construction method of fractured weak zone
CN110331994A (en) * 2019-04-30 2019-10-15 宁夏久威矿山安全工程有限责任公司 A kind of digging laneway absciss layer breaking roof water drenching control method
CN110714788A (en) * 2019-11-14 2020-01-21 重庆国翔新材料有限公司 Grouting repair method for secondary lining crack of tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1215088B (en) * 1961-02-04 1966-04-28 Wayss & Freytag Ag Process for producing a pressure-resistant joint seal between manhole or tunnel rings
CN110005432A (en) * 2019-04-18 2019-07-12 西南交通大学 Double-shielded TBM development machine passes through the synchronous grouting construction method of fractured weak zone
CN110331994A (en) * 2019-04-30 2019-10-15 宁夏久威矿山安全工程有限责任公司 A kind of digging laneway absciss layer breaking roof water drenching control method
CN110331994B (en) * 2019-04-30 2023-08-15 宁夏久威矿山安全工程有限责任公司 Method for preventing and controlling water spraying of separation broken roof of tunneling roadway
CN110714788A (en) * 2019-11-14 2020-01-21 重庆国翔新材料有限公司 Grouting repair method for secondary lining crack of tunnel

Similar Documents

Publication Publication Date Title
CN209430219U (en) Emergency type water-impervious airbag apparatus in tunnel
GB850599A (en) Improvements in or relating to the construction of galleries, tunnels or the like
JPS55159099A (en) Method and device for setting up concrete lining in excavating underground cavity such as tunnel* adit or other pit by shield excavation method
GB1048704A (en) A method of and apparatus for inducing hardening or cementing in a mass of back-fill in a mine opening
GB511080A (en) Improvements relating to the construction of tunnels
JPH0788759B2 (en) Tunnel lining method
ES401060A1 (en) A procedure and its corresponding formwork for concrete hollow construction elements. (Machine-translation by Google Translate, not legally binding)
GB954595A (en) Improvements in or relating to prefabricated concrete tunnel or like shaft linings
SU969900A1 (en) Method of erecting prestressed tunnel lining
JPS6421124A (en) Formation of lining pipe
SU954549A1 (en) Lining for underground pressure pipeline
GB506917A (en) Improvements in the formation of linings for tunnels and the like
SU110692A1 (en) Lining of metropolitan distillation tunnels, made up of rectangular reinforced concrete blocks
SU62331A1 (en) Concreting method of facing tunnel pressure
CN209129630U (en) A kind of tunnel double-lining steel plate water stopper end socket mold mechanism
FR2430514A1 (en) Tunnel concrete lining system - uses heating formwork and insulating material applied to casing
ATE299228T1 (en) SUSTAINABLE SEALING Vault FOR SEALING UNDERGROUND TUNNEL CONSTRUCTIONS
GB873248A (en) Ring linings for mine galleries
GB623703A (en) Improvements in and relating to the construction of tunnels
JPS57169127A (en) Construction of inverted lining concrete structure
SU968160A1 (en) Water-retaining plug and method of producing same
GB1436849A (en) Method of making a rigid joint for constructing precast reinforced concrete and prestressed concrete structures
FR2252012A5 (en) Panel for underground chamber construction - comprises inner and outer concrete layers sandwiching waterproof membrane
SU1112090A1 (en) Pressure tunnel liner
JPS60192020A (en) Water stopping method for construction joint of underground continuous wall