FR3049964B1 - METHOD FOR MAKING OR RENOVATING A BUNKER FOR GOLF COURSE AND THE BUNKER RESULTING FROM THE PROCESS - Google Patents

METHOD FOR MAKING OR RENOVATING A BUNKER FOR GOLF COURSE AND THE BUNKER RESULTING FROM THE PROCESS Download PDF

Info

Publication number
FR3049964B1
FR3049964B1 FR1653080A FR1653080A FR3049964B1 FR 3049964 B1 FR3049964 B1 FR 3049964B1 FR 1653080 A FR1653080 A FR 1653080A FR 1653080 A FR1653080 A FR 1653080A FR 3049964 B1 FR3049964 B1 FR 3049964B1
Authority
FR
France
Prior art keywords
layer
bunker
sand
golf course
permeable layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
FR1653080A
Other languages
French (fr)
Other versions
FR3049964A1 (en
Inventor
Denis Joandel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FR1653080A priority Critical patent/FR3049964B1/en
Publication of FR3049964A1 publication Critical patent/FR3049964A1/en
Application granted granted Critical
Publication of FR3049964B1 publication Critical patent/FR3049964B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/02Foundations, e.g. with drainage or heating arrangements
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B69/00Training appliances or apparatus for special sports
    • A63B69/36Training appliances or apparatus for special sports for golf
    • A63B69/3691Golf courses; Golf practising terrains having a plurality of driving areas, fairways, greens
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/06Pavings made in situ, e.g. for sand grounds, clay courts E01C13/003

Abstract

Selon l'invention, après avoir réalisé sur ledit terrain une dépression équipée en partie basse d'un système de drainage : - on dispose dans le fond de ladite dépression une couche d'un mélange de granulats et d'un liant afin de constituer une couche perméable (4), - après séchage de ladite couche perméable (4), on dispose sur cette dernière une couche de sable (5).According to the invention, after having made on said ground a depression equipped in the lower part of a drainage system: - there is in the bottom of said depression a layer of a mixture of aggregates and a binder to form a permeable layer (4), - after drying of said permeable layer (4), there is placed on the latter a layer of sand (5).

Description

L’invention concerne un procédé de réalisation ou de rénovation d’un bunker pour terrain de golf, et le bunker résultant du procédé.The invention relates to a method for producing or renovating a golf course bunker, and the bunker resulting from the method.

De manière parfaitement connue, un bunker constitue un obstacle sur un parcours de golf, et est généralement constitué par une dépression remplie de sable. La dépression, de forme géométrique, de dimensions et de profondeur variable, est équipée en partie basse, au niveau de son fond, d’un système de drainage constitué, par exemple, par des gravillons concassés enrobant un drain annelé. Selon l’état de la technique, la totalité de la cavité est remplie de sable, tout en délimitant une aire non plane, mais de profil généralement creux, afin de constituer un obstacle.In a well-known manner, a bunker is an obstacle on a golf course, and is generally constituted by a depression filled with sand. The depression, of geometric shape, dimensions and variable depth, is equipped at the bottom, at its bottom, a drainage system consisting, for example, by crushed gravel coating a corrugated drain. According to the state of the art, the entire cavity is filled with sand, while defining a non-planar area, but generally hollow profile, to constitute an obstacle.

Ce mode de réalisation de bunker ne donne pas totalement satisfaction, et présente certains inconvénients.This embodiment of bunker is not completely satisfactory, and has certain disadvantages.

En effet, en cas de forte pluie, en considérant la densité du sable, l’eau de pluie ne peut pas être totalement évacuée, et a donc tendance à stagner en constituant une flaque, qu’il est nécessaire d’évacuer au moyen d’un engin de pompage.Indeed, in case of heavy rain, considering the density of the sand, the rainwater can not be totally evacuated, and therefore has a tendency to stagnate by constituting a puddle, that it is necessary to evacuate by means of 'a pumping machine.

Par ailleurs, étant donné que la couche de sable est directement en contact avec la nature du terrain où est formé le bunker, des difficultés peuvent apparaître pour le remplacement du sable. On observe également une pollution du sable et des risques d’obturation ou de colmatage du système de drainage. L’invention s’est fixée pour but de remédier à ces inconvénients d’une manière simple, sûre, efficace et rationnelle.Moreover, since the sand layer is directly in contact with the nature of the terrain where the bunker is formed, difficulties may arise for the replacement of the sand. There is also sand pollution and risks of clogging or clogging of the drainage system. The object of the invention is to remedy these disadvantages in a simple, safe, effective and rational manner.

Le problème que se propose de résoudre l’invention est, notamment, d’éviter la formation d’une flaque en cas de forte pluie, avec pour objectif de faciliter l’entretien du bunker.The problem to be solved by the invention is, in particular, to avoid the formation of a puddle in case of heavy rain, with the aim of facilitating the maintenance of the bunker.

Pour résoudre un tel problème selon l’invention, il a été conçu et mis au point un procédé de réalisation ou de rénovation d’un bunker pour terrain de golf selon lequel, après avoir réalisé sur ledit terrain une dépression équipée en partie basse d’un système de drainage, - on dispose dans le fond de ladite dépression une couche d’un mélange de granulats et d’un liant adapté de type résine polymère, afin de constituer une couche perméable, - après séchage de ladite couche perméable, on dispose sur cette dernière, une couche de sable.To solve such a problem according to the invention, it has been designed and developed a method of making or renovating a golf course bunker according to which, after having made on said ground a depression equipped in the lower part of a drainage system is provided in the bottom of said depression a layer of a mixture of aggregates and a suitable binder of the polymer resin type, to form a permeable layer, - after drying of said permeable layer is available on the latter, a layer of sand.

Il résulte de ces caractéristiques que l’on obtient une totale perméabilité à l’eau, avec par ailleurs, une réduction significative de l’épaisseur de la couche de sable, qui peut être d’environ de 10 cm, au lieu de 15 à 20 cm, selon l’état de la technique.It follows from these characteristics that a total permeability to water is obtained, with, moreover, a significant reduction in the thickness of the sand layer, which can be about 10 cm, instead of 15 to 20 cm, according to the state of the art.

En outre, la couche perméable présente une dureté suffisante permettant la circulation d’engins motorisés pour l’entretien et le remplacement du sable.In addition, the permeable layer has sufficient hardness to allow the movement of motorized equipment for the maintenance and replacement of sand.

Enfin, les risques d’obturation et/ou de colmatage du système de drainage sont supprimés, la couche de revêtement perméable jouant un rôle essentiel dans l’isolation du sable vis-à-vis du drain situé en dessous, tout en préservant une totale perméabilité.Finally, the risks of clogging and / or clogging of the drainage system are eliminated, the permeable coating layer playing a key role in isolating the sand from the drain underneath, while preserving a total permeability.

Selon une autre caractéristique, on dispose et on répartit la couche perméable au moyen d’une pelle mécanique, ladite couche étant égalisée manuellement au moyen d’un outil. L’invention concerne également le bunker pour terrain de golf résultant d’une cavité réalisée sur ledit terrain, le fond de ladite cavité étant équipée en partie basse, d’un système de drainage. Selon l’invention, le fond de la cavité comprend une couche d’un mélange de granulats et d’un liant réparti dans le fond de la dépression afin de constituer une couche perméable apte à recevoir une couche de sable.According to another characteristic, the permeable layer is disposed and distributed by means of a mechanical shovel, said layer being manually equalized by means of a tool. The invention also relates to the golf course bunker resulting from a cavity made on said ground, the bottom of said cavity being equipped in the lower part, a drainage system. According to the invention, the bottom of the cavity comprises a layer of a mixture of aggregates and a binder distributed in the bottom of the depression to form a permeable layer capable of receiving a layer of sand.

Suite à des essais réalisés à titre expérimental et confidentiel, des résultats avantageux sont obtenus lorsque le mélange des granulats et du liant est du type de celui connu sous la marque HydroWay®.Following tests carried out on an experimental and confidential basis, advantageous results are obtained when the mixture of the aggregates and the binder is of the type known under the HydroWay® brand.

Selon une autre caractéristique, l’épaisseur de la couche perméable est d’environ 3 cm, tandis que l’épaisseur de la couche de sable est d’environ 10 cm. L’invention est exposée ci-après plus en détail à l’aide des figures des dessins annexés dans lesquels : - la figure 1 est une vue en perspective, d’une forme de réalisation nullement limitative, d’un bunker, - la figure 2 est une vue en coupe d’un bunker, selon les caractéristiques de l’invention, - la figure 3 est une vue en perspective, montrant l’application de la couche drainante, - la figure 4 montre la mise en place du sable sur la couche drainante. L’invention s’applique à tous types de bunker, quelles que soient ses dimensions et sa profondeur. D’une manière classique, le bunker est réalisé à partir d’une cavité (la), formée par tous moyens connus et appropriés, dans le terrain de golf (1). La cavité (la) présente en partie basse, au niveau d’une zone considérée la plus profonde, un système de drainage. A titre d’exemple, de manière connue, le système de drainage peut être constitué par des gravillons drainants concassés (2) enrobant un drain annelé (3).According to another feature, the thickness of the permeable layer is about 3 cm, while the thickness of the sand layer is about 10 cm. The invention is explained below in more detail with the help of the figures of the accompanying drawings in which: - Figure 1 is a perspective view of a non-limiting embodiment of a bunker, - the figure 2 is a sectional view of a bunker, according to the features of the invention; FIG. 3 is a perspective view showing the application of the draining layer; FIG. 4 shows the placement of the sand on the draining layer. The invention applies to all types of bunker, regardless of its size and depth. In a conventional manner, the bunker is made from a cavity (1a), formed by any known and appropriate means, in the golf course (1). The cavity (la) has at the bottom, at a zone considered the deepest, a drainage system. For example, in a known manner, the drainage system may consist of crushed draining grit (2) coating a corrugated drain (3).

Selon une caractéristique à la base de l’invention, on dispose dans le fond de ladite dépression (la) une couche (4) d’un mélange de granulats et d’un liant afin de constituer une couche perméable. Ce mélange de granulats et de liant est avantageusement du type de celui connu sous la marque HydroWay®. Le mélange est réalisé dans un malaxeur à axe vertical.According to a feature underlying the invention, there is disposed in the bottom of said depression (la) a layer (4) of a mixture of aggregates and a binder to form a permeable layer. This mixture of aggregates and binder is advantageously of the type known under the trademark HydroWay®. The mixture is made in a vertical axis mixer.

Après séchage de la couche perméable (4), on dispose sur ladite couche une couche de sable (5). L’épaisseur de la couche perméable (4) est d’environ 3 cm, tandis que l’épaisseur de la couche de sable est d’environ 10 cm. Il résulte donc une diminution significative de l’épaisseur de la couche de sable, par rapport à un bunker réalisé d’une façon classique.After drying of the permeable layer (4), a layer of sand (5) is placed on the said layer. The thickness of the permeable layer (4) is about 3 cm, while the thickness of the sand layer is about 10 cm. This results in a significant decrease in the thickness of the sand layer, compared to a bunker made in a conventional manner.

Comme le montre la figure 3, l’application du mélange de granulats et du liant, afin de constituer la couche perméable (4), est effectuée d’une manière mécanique, au moyen par exemple d’une mini-pelle, qui répartit le mélange dans la cavité. La mise en forme et l’égalisation du mélange, est ensuite réalisée manuellement, au moyen d’un outil approprié, du type râteau.As shown in FIG. 3, the application of the mixture of aggregates and of the binder, in order to form the permeable layer (4), is carried out in a mechanical manner, for example by means of a mini-shovel, which distributes the mixture in the cavity. The shaping and equalization of the mixture is then performed manually, using a suitable tool, the rake type.

Comme indiqué, la couche de sable (5) est disposée sur la couche perméable (4), après séchage de cette dernière. Ce temps de séchage est de l’ordre de 8 heures, à une température d’environ 15 °C. Après séchage du mélange de granulats et de liant, on obtient une couche perméable (4) présentant une dureté suffisante, permettant la circulation d’engins motorisés, par exemple pour la mise en place du sable (figure 4), ainsi que pour son remplacement.As indicated, the sand layer (5) is disposed on the permeable layer (4), after drying of the latter. This drying time is of the order of 8 hours, at a temperature of about 15 ° C. After drying the mixture of aggregates and binder, there is obtained a permeable layer (4) having sufficient hardness, allowing the circulation of motorized vehicles, for example for the introduction of sand (Figure 4), and for its replacement .

Il résulte des caractéristiques du procédé de l’invention, que le bunker obtenu est constitué d’une couche d’un mélange de granulats et d’un liant réparti dans le fond de la dépression, afin de constituer une couche perméable (4), apte à recevoir une couche de sable (5).It follows from the characteristics of the process of the invention that the bunker obtained consists of a layer of a mixture of aggregates and a binder distributed in the bottom of the depression, so as to form a permeable layer (4), able to receive a layer of sand (5).

Comme indiqué, l’invention s’applique à la réalisation de bunkers ou à la rénovation de bunkers existant, après avoir enlevé le sable.As indicated, the invention applies to the realization of bunkers or the renovation of existing bunkers, after removing the sand.

Les avantages ressortent bien de la description, en particulier, on souligne et on rappelle : - une totale perméabilité à l’eau, - une réduction significative de l’épaisseur du sable, - la couche perméable permet la circulation d’engins motorisés, - la possibilité de remplacement du sable, au moyen d’engins mécaniques du type mini-pelle, - évite la pollution du sable et l’obturation ou le colmatage du drain.The advantages are apparent from the description, in particular, it emphasizes and recalls: - a total permeability to water, - a significant reduction in the thickness of the sand, - the permeable layer allows the movement of motorized vehicles, - the possibility of replacing the sand, with the help of mechanical devices of the mini-excavator type, - avoids sand pollution and clogging or clogging of the drain.

Enfin, le procédé de réalisation ou de rénovation du bunker, selon l’invention, est rapide et efficace, tout en étant inerte pour l’environnement.Finally, the method of making or renovating the bunker according to the invention is fast and efficient, while being inert to the environment.

Claims (1)

REVENDICATIONS -1- Procédé de réalisation ou de rénovation d’un bunker pour terrain de golf selon lequel, après avoir réalisé sur ledit terrain une dépression équipée en partie basse d’un système de drainage, - on dispose dans le fond de ladite dépression une couche d’un mélange de granulats et d’un liant du type de celui connu sous la marque HydroWay afin de constituer une couche perméable (4), dont l’épaisseur est d’environ 3 cm, - après séchage de ladite couche perméable (4), on dispose sur cette dernière, une couche de sable (5), dont l’épaisseur est d’environ 10 cm. -2- Procédé selon la revendication 1, caractérisé en ce qu’on dispose et qu’on répartit la couche perméable (4) au moyen d’une pelle mécanique, ladite couche (4) étant égalisée manuellement au moyen d’un outil. -3- Bunker pour terrain de golf (1) résultant d’une cavité (la) réalisée sur ledit terrain, le fond de ladite cavité (la) étant équipée en partie basse, d’un système de drainage (2) (3), caractérisé en ce qu’il comprend une couche d’un mélange de granulats et d’un liant du type de celui connu sous la marque HydroWay réparti dans le fond de la dépression afin de constituer une couche perméable (4) d’épaisseur d’environ 3 cm apte à recevoir une couche de sable (5) d’épaisseur d’environ 10 cm.CLAIMS -1- A method of making or renovating a golf course bunker according to which, after having made on said ground a depression equipped in the lower part of a drainage system, - it has in the bottom of said depression a layer of a mixture of aggregates and a binder of the type known under the trademark HydroWay to form a permeable layer (4), the thickness of which is approximately 3 cm, after drying of said permeable layer ( 4), there is disposed on the latter, a layer of sand (5), the thickness of which is about 10 cm. -2- Method according to claim 1, characterized in that disposes and distributes the permeable layer (4) by means of a mechanical shovel, said layer (4) being manually equalized by means of a tool. -3- Bunker for a golf course (1) resulting from a cavity (1a) made on said ground, the bottom of said cavity (1a) being equipped at the bottom, with a drainage system (2) (3) , characterized in that it comprises a layer of a mixture of aggregates and a binder of the type known under the trademark HydroWay distributed in the bottom of the depression in order to form a permeable layer (4) with a thickness of approximately 3 cm able to receive a layer of sand (5) with a thickness of about 10 cm.
FR1653080A 2016-04-07 2016-04-07 METHOD FOR MAKING OR RENOVATING A BUNKER FOR GOLF COURSE AND THE BUNKER RESULTING FROM THE PROCESS Expired - Fee Related FR3049964B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1653080A FR3049964B1 (en) 2016-04-07 2016-04-07 METHOD FOR MAKING OR RENOVATING A BUNKER FOR GOLF COURSE AND THE BUNKER RESULTING FROM THE PROCESS

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1653080A FR3049964B1 (en) 2016-04-07 2016-04-07 METHOD FOR MAKING OR RENOVATING A BUNKER FOR GOLF COURSE AND THE BUNKER RESULTING FROM THE PROCESS
FR1653080 2016-04-07

Publications (2)

Publication Number Publication Date
FR3049964A1 FR3049964A1 (en) 2017-10-13
FR3049964B1 true FR3049964B1 (en) 2019-08-23

Family

ID=56855528

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1653080A Expired - Fee Related FR3049964B1 (en) 2016-04-07 2016-04-07 METHOD FOR MAKING OR RENOVATING A BUNKER FOR GOLF COURSE AND THE BUNKER RESULTING FROM THE PROCESS

Country Status (1)

Country Link
FR (1) FR3049964B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10597830B1 (en) 2018-12-06 2020-03-24 Gerald Lynn Lemons Apparatus, system, and method for providing drainage of a surface layer

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8062143B1 (en) * 2009-09-17 2011-11-22 Daniel Meersman Golf course sand bunker construction and its associated method of production
US8529159B2 (en) * 2010-02-12 2013-09-10 Jerry Lemons Methods and materials for golf course sand bunker construction
GB201017013D0 (en) * 2010-10-08 2010-11-24 Blinder Bunker Liner Ltd Golf bunker

Also Published As

Publication number Publication date
FR3049964A1 (en) 2017-10-13

Similar Documents

Publication Publication Date Title
FR2694318A1 (en) A manhole head assembly, a manhole ring having an adjustable upper portion and a method of using said manhole ring.
FR3049964B1 (en) METHOD FOR MAKING OR RENOVATING A BUNKER FOR GOLF COURSE AND THE BUNKER RESULTING FROM THE PROCESS
CA2576628C (en) Device and method for a tower reinforcing foundation
EP3483339B1 (en) Method for easier renovation of expansion joint for concrete slabs shuttering system
FR2981373A1 (en) Coating i.e. floor covering e.g. flagstone, for draining water in basin of swimming pool, has lower structural layer made of concrete, and upper layer formed of agglomerate of aggregates and bonded with hydrogenated aliphatic epoxy resin
EP3411531B1 (en) Modular device for creating an anchor point in the ground
EP1447604B1 (en) Method for the burying of tubular elements and mortar composition for carrying out this method
FR2506800A1 (en) Method of making sports surface - involves simultaneously cutting and filling drainage channels with gravel using plough
FR2976604A1 (en) VEGETALIZED ROOF
EP1069241B1 (en) Method for producing a surfacing and groundcovering
FR2917384A1 (en) Storage module for forming buried rainwater recuperating space in urban medium, has models placed one after another along assembling direction, where module is single block hollow piece made of polyethylene through rotational molding
EP3770324B1 (en) Surface coating arrangement and process for repairing same
FR3078084A1 (en) BASIN RAIN WATER RETENTION SYSTEM, CONSISTING OF SMALL HOLLOW PIECES OF PLASTIC MATERIAL DISPOSED IN BULK
WO2013144517A1 (en) System for protecting a floor against climate hazards and outdoor sports area provided with such a system, and method for protecting a floor against climate hazards
FR2801914A1 (en) Water retaining structure e.g. for collecting rainwater for subsequent release has layer of porous ducts able to support earth layer
FR2924446A1 (en) Channel surface box retaining device for operating control valve of drinking water conveyance system on pavement, has support plate with orifice carrying supporting and bracing units that support and brace head of channel surface box
FR2823233A1 (en) A carriageway resistant to freeze/unfreeze cycles for use on secondary roads has an underlayer comprising stone granules of differing maximum and minimum diameters chosen to give a void volume after compaction of 15-25%
FR2799145A3 (en) Circular saw blade e.g. for stone or concrete has peripheral segments with abrasive particles and gaps between
FR2528467A1 (en) PROCESS FOR RETAINING LAND AFTER EXCAVATION OF A SLOPED GROUND, PARTICULARLY FOR CROSSING A PIPE IN A TRENCH
FR2529924A1 (en) Method for producing a sports ground and sports ground thus obtained
FR2982624A1 (en) Device for recovering and channeling water spread on e.g. side of swimming pool, has watertight facing arranged to cover upper face in contact with collected water and junction zone that is located between drain and bearing structure
WO2021123580A1 (en) Pneumatic tyre tread for a heavy duty vehicle comprising stone-expelling and noise-preventing protuberances
FR2870882A1 (en) Gypsum or anhydrite quarry mining process, involves forming tunnels in gypsum heaps by removing marl layer separating heaps, where tunnels are spaced at preset distance, and mining one heap after removing layer once another heap is mined
FR2545121A1 (en) Method for a foundation on undulating underwater ground
EP2714998A1 (en) Method for manufacturing a retaining wall from a rough soil-mix wall

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

EXTE Extension to a french territory

Extension state: PF

PLSC Publication of the preliminary search report

Effective date: 20171013

PLFP Fee payment

Year of fee payment: 3

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7

ST Notification of lapse

Effective date: 20231205