FR3008111A1 - GATEWAY AND METHOD OF MAKING SUCH A GATEWAY - Google Patents

GATEWAY AND METHOD OF MAKING SUCH A GATEWAY Download PDF

Info

Publication number
FR3008111A1
FR3008111A1 FR1356582A FR1356582A FR3008111A1 FR 3008111 A1 FR3008111 A1 FR 3008111A1 FR 1356582 A FR1356582 A FR 1356582A FR 1356582 A FR1356582 A FR 1356582A FR 3008111 A1 FR3008111 A1 FR 3008111A1
Authority
FR
France
Prior art keywords
cap
concrete
beams
abutment
foundation concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1356582A
Other languages
French (fr)
Other versions
FR3008111B1 (en
Inventor
Yves Brugeaud
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Conseil Services Investissements
Original Assignee
Conseil Services Investissements
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Conseil Services Investissements filed Critical Conseil Services Investissements
Priority to FR1356582A priority Critical patent/FR3008111B1/en
Priority to EP14175487.9A priority patent/EP2821552B1/en
Publication of FR3008111A1 publication Critical patent/FR3008111A1/en
Application granted granted Critical
Publication of FR3008111B1 publication Critical patent/FR3008111B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Abstract

Passerelle (1) comportant une première culée (2) et une deuxième culée (2) entre lesquelles s'étendent des poutres (30) longitudinales ayant des extrémités solidaires des culées, la première culée comprend un bloc de béton de fondation (3) qui reçoit une partie inférieure d'une armature (4) et qui est noyé dans le sol, et un chapeau (5) de coffrage perdu coiffant une partie supérieure de l'armature, le chapeau ayant une paroi périphérique (6) qui a un bord inférieur noyé dans le bloc de béton de fondation et qui est surmontée d'une paroi supérieure (7) percée d'au moins une ouverture d'introduction de béton dans le chapeau, le chapeau comportant des ouvertures (9) de réception des extrémités des poutres longitudinales de telle manière que celles-ci soient prises dans le béton introduit dans le chapeau. Procédé de fabrication d'une telle passerelle.Footbridge (1) having a first abutment (2) and a second abutment (2) between which extend longitudinal beams (30) having ends integral with the abutments, the first abutment comprises a foundation concrete block (3) which receives a lower portion of a frame (4) and which is embedded in the ground, and a lost form cap (5) covering an upper part of the frame, the cap having a peripheral wall (6) which has an edge lower part embedded in the foundation concrete block and which is surmounted by an upper wall (7) pierced with at least one concrete introduction opening in the cap, the cap having openings (9) for receiving the ends of the longitudinal beams so that they are taken in the concrete introduced into the hat. Method of manufacturing such a gateway

Description

La présente invention concerne une passerelle. Par passerelle, on entend tout ouvrage de construction enjambant un obstacle et permettant la circulation de piétons ou de véhicules. L'invention concerne notamment les ouvrages de franchissement de longueur inférieure à 2,5 mètres environ. L'invention a également pour objet un procédé de réalisation d'une telle passerelle. Il est connu des passerelles comportant une première culée et une deuxième culée entre lesquelles s'étendent des poutres longitudinales ayant des extrémités solidaires des culées. Les poutres longitudinales sont le plus souvent préfabriquées tandis que les culées sont obtenues en coulant sur place du béton dans des fouilles qui sont creusées dans le sol avant d'être surmontées de coffrage. Les extrémités des poutres sont ensuite fixées aux culées après retrait des coffrages. Des poteaux de garde-fous sont ensuite fixés sur les culées par boulonnage au moyen d'inserts scellés dans le béton des culées.The present invention relates to a gateway. By footbridge, we mean any construction work spanning an obstacle and allowing the movement of pedestrians or vehicles. The invention particularly relates to crossing structures of less than about 2.5 meters in length. The invention also relates to a method for producing such a gateway. It is known bridges having a first abutment and a second abutment between which extend longitudinal beams having ends integral with the abutments. Longitudinal beams are most often prefabricated while abutments are obtained by casting concrete on site in excavations that are dug into the ground before being surmounted by formwork. The ends of the beams are then fixed to the abutments after removal of the formwork. Guardrail posts are then bolted to the abutments by means of inserts sealed in the abutment concrete.

La réalisation des coffrages demande des compétences. L'obtention de culée ayant une forme et un état de surface esthétique complique encore la tâche des coffreurs. En outre, le positionnement et la fixation des 25 poutres sont rendus délicats par le poids et l'encombrement de celles-ci. Un but de l'invention est de fournir un moyen permettant de simplifier la réalisation de ces passerelles tout en garantissant leur résistance et leur 30 aspect. A cet effet, on prévoit, selon l'invention, une passerelle comportant une première culée et une deuxième culée entre lesquelles s'étendent des poutres longitudinales ayant des extrémités solidaires des 35 culées, la première culée comprend un bloc de béton de fondation qui reçoit une partie inférieure d'une armature et qui est noyé dans le sol, et un chapeau de coffrage perdu coiffant une partie supérieure de l'armature, le chapeau ayant une paroi périphérique qui a un bord inférieur noyé dans le bloc de béton de fondation et qui est surmontée d'une paroi supérieure percée d'au moins une ouverture d'introduction de béton dans le chapeau, le chapeau comportant des ouvertures de réception des extrémités des poutres longitudinales de telle manière que celles-ci soient prises dans le béton introduit dans le chapeau. Ainsi, le chapeau procure à la culée l'essentiel de sa forme et rend superflue l'utilisation de coffrages supplémentaires.Formwork production requires skills. Obtaining abutment having a shape and an aesthetic surface condition further complicates the task of the formers. In addition, the positioning and fixing of the beams are made delicate by the weight and bulk of these. An object of the invention is to provide a means for simplifying the realization of these bridges while ensuring their strength and appearance. For this purpose, according to the invention, there is provided a bridge comprising a first abutment and a second abutment between which longitudinal beams having ends integral with the abutments extend, the first abutment comprises a foundation concrete block which receives a lower part of a frame and which is embedded in the ground, and a lost form cap capping an upper part of the frame, the cap having a peripheral wall which has a lower edge embedded in the foundation concrete block and which is surmounted by an upper wall pierced with at least one concrete introduction opening in the cap, the cap having openings for receiving the ends of the longitudinal beams in such a way that they are taken in the concrete introduced into hat. Thus, the hat provides the abutment most of its shape and makes superfluous the use of additional forms.

Selon une caractéristique avantageuse, la passerelle comporte au moins un garde corps comportant au moins deux poteaux fixés chacun sur une des culées, le poteau solidaire de la première culée étant reçu dans une ouverture du chapeau et ayant une extrémité inférieure noyée dans le bloc de béton de fondation. La zone de fixation du poteau se trouve ainsi sous le chapeau de sorte qu'elle est totalement invisible. Elle est en outre particulièrement résistante du fait que l'extrémité inférieure du poteau est noyée dans le bloc de béton de fondation. Avantageusement, la passerelle dans laquelle les poutres sont de forme plate et ont une surface inférieure pourvue d'une nervure longitudinale en saillie, les ouvertures de réception des extrémités de poutre étant agencées pour recevoir chacune une portion de nervure de telle manière que les poutres aient leur surface inférieure reposant sur la paroi supérieure du chapeau. Les nervures facilitent le positionnement des poutres dont la surface inférieure va reposer sur la paroi supérieure du chapeau.According to an advantageous characteristic, the bridge comprises at least one guard having at least two posts each fixed on one of the abutments, the integral post of the first abutment being received in an opening of the cap and having a lower end embedded in the concrete block foundation. The pole fixing area is thus under the hat so that it is completely invisible. It is also particularly resistant because the lower end of the post is embedded in the foundation concrete block. Advantageously, the bridge in which the beams are of flat shape and have a lower surface provided with a projecting longitudinal rib, the receiving openings of the beam ends being arranged to receive each a portion of rib so that the beams have their lower surface resting on the upper wall of the hat. The ribs facilitate the positioning of the beams whose lower surface will rest on the upper wall of the cap.

L'invention a également pour objet un procédé de réalisation d'une passerelle du type ci-dessus. D'autres caractéristiques et avantages de l'invention ressortiront à la lecture de la description 5 qui suit d'un mode de réalisation particulier non limitatif de l'invention. Il sera fait référence aux dessins annexés, parmi lesquels : - la figure 1 est une vue en perspective d'une 10 passerelle selon l'invention ; - la figure 2 est une vue de dessus d'un des chapeaux de la passerelle selon l'invention ; - la figure 3 est une vue en coupe de ce chapeau selon la ligne III-III de la figure 2 ; 15 - la figure 4 est une vue agrandie en coupe transversale d'une des poutres de la passerelle selon l'invention ; - la figure 5 est une vue partielle en perspective d'une des culées de cette 20 passerelle ; - la figure 6 est une vue en coupe transversale d'une des culées réalisées selon une variante de l'invention. En référence aux figures 1 à 5, la passerelle, 25 généralement désignée en 1, est destinée à enjamber une tranchée T ménagée dans le sol S. La passerelle 1 comporte des culées, généralement désignée en 2, entre lesquelles s'étendent des poutres longitudinales, généralement désignées en 30, ayant des 30 extrémités solidaires des culées 2. Les poutres 30 sont de forme plate et ont une surface inférieure 31 pourvue d'une nervure longitudinale 32 en saillie. Chaque culée 2 comprend un bloc de béton de 35 fondation 3 qui est noyé dans une fouille F creusée dans le sol S d'un côté de la tranchée T. Le bloc de béton de fondation 3 a une surface affleurant le sol S. Le béton de fondation est de type C16/20. Le bloc de béton de fondation 3 reçoit une partie inférieure d'une armature 4, métallique, ayant une partie supérieure qui s'étend en saillie du bloc de béton de fondation 3 et qui est coiffée par un chapeau de coffrage perdu généralement désigné en 5. Le chapeau 5 a une paroi périphérique 6, à contour trapézoïdal, qui a un bord inférieur noyé dans le bloc de béton de fondation 3 et qui est surmontée d'une paroi supérieure 7. Le chapeau 5 est rempli d'un béton de scellement de type C20/25 et a paroi supérieure 7 qui est percée d'ouvertures 8 d'introduction du béton dans le chapeau 5. Le chapeau 5 comporte des ouvertures 9 de réception des extrémités des poutres 3. Les ouvertures 9 ont la forme d'encoches rectangulaires s'étendant à cheval sur la paroi supérieure 7 et un long côté de la paroi périphérique 6. Les ouvertures 9 sont agencées de telle manière que les extrémités des poutres 3 soient prises dans le béton introduit dans le chapeau 5. Plus précisément ici, les extrémités des nervures 32 sont reçues chacune dans une des ouvertures 9 de telle manière que la portion d'extrémité de la surface inférieure 31 de chaque poutre 30 repose sur la paroi supérieure 7 des chapeaux 5. La paroi supérieure 7 est percée à chacune de ses extrémités d'une ouverture 10 de passage d'un poteau.The invention also relates to a method for producing a gateway of the above type. Other characteristics and advantages of the invention will emerge on reading the description which follows of a particular non-limiting embodiment of the invention. Reference will be made to the accompanying drawings, in which: FIG. 1 is a perspective view of a bridge according to the invention; FIG. 2 is a view from above of one of the bridge caps according to the invention; - Figure 3 is a sectional view of this hat along the line III-III of Figure 2; FIG. 4 is an enlarged cross-sectional view of one of the beams of the bridge according to the invention; FIG. 5 is a partial perspective view of one of the abutments of this bridge; - Figure 6 is a cross-sectional view of one of the abutments made according to a variant of the invention. With reference to FIGS. 1 to 5, the bridge, generally designated 1, is intended to span a trench T formed in the ground S. The bridge 1 comprises abutments, generally designated 2, between which longitudinal beams extend. , generally designated 30, having integral ends of the abutments 2. The beams 30 are of flat shape and have a lower surface 31 provided with a longitudinal rib 32 protruding. Each abutment 2 comprises a foundation concrete block 3 which is embedded in an excavation F excavated in the ground S on one side of the trench T. The foundation concrete block 3 has a surface flush with the ground S. Concrete foundation is of type C16 / 20. The foundation concrete block 3 receives a lower portion of a metal frame 4 having an upper portion which protrudes from the foundation concrete block 3 and which is capped by a loose formwork cap generally designated 5 The cap 5 has a peripheral wall 6 with a trapezoidal contour, which has a lower edge embedded in the foundation concrete block 3 and which is surmounted by an upper wall 7. The cap 5 is filled with a concrete sealant of type C20 / 25 and has an upper wall 7 which is pierced with openings 8 for introducing the concrete into the cap 5. The cap 5 has openings 9 for receiving the ends of the beams 3. The openings 9 are in the form of rectangular notches extending astride the upper wall 7 and a long side of the peripheral wall 6. The openings 9 are arranged such that the ends of the beams 3 are taken in the concrete introduced into the cap 5. Pl Precisely here, the ends of the ribs 32 are each received in one of the openings 9 in such a way that the end portion of the lower surface 31 of each beam 30 rests on the upper wall 7 of the caps 5. The upper wall 7 is pierced at each of its ends with an opening 10 for the passage of a post.

En effet, la passerelle 1 comporte ici deux garde-corps, généralement désignés en 11, s'étendant parallèlement aux poutres 3 de chaque côté de la passerelle 1. Chaque garde-corps 11 comporte deux poteaux 12 fixés chacun sur une des culées 2 et des câbles 13 ayant des extrémités fixées aux poteaux pour s'étendre entre ceux-ci. Chaque poteau 12 est reçu dans une des ouvertures 10 d'un des chapeaux 5 et a une extrémité inférieure noyée dans le bloc de béton de fondation 3.Indeed, the bridge 1 here comprises two guardrails, generally designated 11, extending parallel to the beams 3 on each side of the bridge 1. Each railing 11 comprises two posts 12 each fixed to one of the abutments 2 and cables 13 having ends attached to the posts for extending therebetween. Each post 12 is received in one of the openings 10 of one of the caps 5 and has a lower end embedded in the foundation concrete block 3.

Plus précisément, ladite extrémité inférieure est solidaire d'une platine 14 reposant sur un plot de béton de fondation qui s'étend au fond de la fouille F et qui est noyé dans le bloc de béton de fondation 3 avec la platine 14 et l'extrémité inférieure du poteau 12.More specifically, said lower end is secured to a plate 14 resting on a foundation concrete pad which extends to the bottom of the excavation F and which is embedded in the foundation concrete block 3 with the plate 14 and the lower end of the post 12.

Chaque chapeau 5 est recouvert d'une plaque de parement 15 qui est fixée, ici par scellement, sur la paroi supérieure 7 du chapeau 5 et obture les ouvertures 8. La plaque de parement 15 a une surface supérieure rainurée pour former une surface antidérapante et inclinée pour s'étendre depuis un bord de la paroi supérieure 7 opposé aux poutres 30 jusqu'à la surface supérieure des poutres 30. Les chapeaux 5, les poutres 30 et les plaques de parement 15 sont réalisés en béton. En variante, les poutres 30 peuvent être réalisées en bois ou en métal. Le procédé de réalisation de cette passerelle va maintenant être décrit. La passerelle 1 en question enjambe une tranchée d'environ 2,30 m de large et offre une largeur de circulation d'1,20 m.Each cap 5 is covered with a facing plate 15 which is fixed, here by sealing, on the upper wall 7 of the cap 5 and closes the openings 8. The facing plate 15 has a grooved upper surface to form a non-slip surface and inclined to extend from an edge of the upper wall 7 opposite the beams 30 to the upper surface of the beams 30. The caps 5, the beams 30 and the facing plates 15 are made of concrete. Alternatively, the beams 30 may be made of wood or metal. The method for producing this gateway will now be described. The footbridge 1 in question spans a trench approximately 2.30 m wide and has a circulation width of 1.20 m.

Les chapeaux 5, les poutres 30 et les plaques de parement 15 sont tout d'abord préfabriqués en usine. Pour chaque culée 2, le procédé débute par le creusement d'une fouille F dans le sol S. - y déposer l'armature 4 de telle manière que l'armature 4 dépasse du niveau supérieur du sol S. La fouille F par exemple une longueur De 1,80 m et une largeur de 0,50 m. La fouille F a une profondeur suffisante pour atteindre une couche hors-gel de portance supérieure à 2 bars (une profondeur de 0,60 m est généralement suffisante).The caps 5, the beams 30 and the facing plates 15 are first prefabricated in the factory. For each abutment 2, the process starts by digging a dig F in the soil S. - Deposit the armature 4 in such a way that the armature 4 protrudes from the upper level of the ground S. The excavation F for example a length of 1.80 m and width of 0.50 m. The excavation F has a sufficient depth to reach an anti-freeze layer of lift greater than 2 bars (a depth of 0.60 m is generally sufficient).

Deux plots de béton de fondation sont ensuite formés à chaque extrémité du fond de la fouille F et arasés au niveau du fond de la fouille F. Le béton de fondation est par exemple de type C16/20.Two foundation concrete blocks are then formed at each end of the bottom of the excavation F and leveled at the bottom of the excavation F. The foundation concrete is for example of the C16 / 20 type.

Un des poteaux 12 solidaires des platines 14 est alors disposé sur chaque plot, la platine 14 reposant sur le plot. L'armature 4 est ensuite enfilée sur les poteaux 12 qui ont une hauteur telle qu'ils dépassent de la partie supérieure de l'armature 4, ladite partie supérieure s'étendant en saillie du sol S hors de la fouille F. L'armature 4 est calée sur les platines 14. Le procédé se poursuit par l'étape de couler du béton de fondation dans la fouille F jusqu'au niveau du sol S. Le béton de fondation, de type C16/20, est de préférence relativement ferme. Le chapeau 5 est enfilé sur les poteaux et l'armature 4 après la coulée du béton de fondation et est calé sur l'armature 4 de telle manière que le chapeau 5 coiffe l'armature 4 et que le bord inférieur de la paroi périphérique 6 soit engagé dans le béton de fondation. Puis, on laisse prendre le béton de fondation. Après mise à longueur des poutres 30 si nécessaire, un béton de scellement est coulé par les ouvertures 8 dans le chapeau 5 de chaque culée 2 de manière à remplir ledit chapeau 5. Le béton de scellement est un béton relativement fluide de type C20/25. Le procédé se poursuit par l'étape de mettre en place les extrémités nervures 32 des poutres 30 dans les ouvertures 9 de telle manière que les poutres 30 aient les portions d'extrémités de leur surface inférieure 31 qui reposent sur les parois supérieures 7 des deux chapeaux 5 des culées 2. Les reflux éventuels de béton de scellement sont rapidement nettoyés.One of the posts 12 secured to the plates 14 is then disposed on each pad, the plate 14 resting on the pad. The armature 4 is then threaded onto the posts 12 which have a height such that they protrude from the upper part of the armature 4, said upper part projecting from the ground S out of the excavation F. The armature 4 is keyed on the plates 14. The process continues with the step of casting foundation concrete in the excavation F to the ground level S. The foundation concrete, type C16 / 20, is preferably relatively firm . The cap 5 is threaded onto the posts and the frame 4 after pouring the foundation concrete and is wedged on the frame 4 so that the cap 5 covers the frame 4 and the lower edge of the peripheral wall 6 be engaged in foundation concrete. Then let the foundation concrete be taken. After lengthening the beams 30 if necessary, a sealing concrete is poured through the openings 8 in the cap 5 of each abutment 2 so as to fill said cap 5. The sealing concrete is a relatively fluid concrete type C20 / 25 . The process is continued by the step of placing the rib ends 32 of the beams 30 in the openings 9 in such a way that the beams 30 have the end portions of their lower surface 31 which rest on the upper walls 7 of the two caps 2 abutments 2. Potential reflux of sealing concrete is rapidly cleaned.

Puis, on laisser prendre le béton de scellement.Then, let the concrete seal.

On notera que les chapeaux 5 forment ainsi des coffrages perdus. Les filins 13 sont ensuite tendus entre les poteaux 12 et les plaques de parement 15 sont collées sur les parois supérieures 7 des chapeaux 5. Bien entendu, l'invention n'est pas limitée aux modes de réalisation décrits mais englobe toute variante entrant dans le champ de l'invention telle que définie par les revendications.It will be noted that the hats 5 thus form lost formwork. The strands 13 are then stretched between the posts 12 and the facing plates 15 are glued to the upper walls 7 of the caps 5. Of course, the invention is not limited to the embodiments described but encompasses any variant entering the field of the invention as defined by the claims.

En particulier, selon une variante de l'invention, on laisse le béton de fondation prendre avant de disposer le chapeau. Ainsi, on pose simplement le chapeau sur le bloc de béton de fondation, ce qui simplifie la mise en place.In particular, according to a variant of the invention, the foundation concrete is allowed to take before arranging the cap. Thus, we simply put the hat on the foundation concrete block, which simplifies the implementation.

Dans cette variante, il est possible de réaliser un garde-fou. A cette fin, pour chaque culée, un poteau 12 est fixé sur le béton de fondation pris et le chapeau 5 comporte une ouverture 10 de passage du poteau de telle manière que le chapeau puisse être enfilé sur le poteau et l'armature, après la prise du béton de fondation. Le procédé comprend l'étape ultérieure de fixer aux poteaux un garde-fou s'étendant parallèlement aux poutres. Dans une autre variante, le chapeau peut avoir une autre forme. La paroi périphérique du chapeau peut par exemple avoir un contour rectangulaire.In this variant, it is possible to make a guardrail. For this purpose, for each abutment, a post 12 is fixed on the foundation concrete taken and the cap 5 has an opening 10 for the passage of the post so that the cap can be threaded onto the post and the reinforcement, after the taking foundation concrete. The method comprises the subsequent step of securing to the posts a guardrail extending parallel to the beams. In another variant, the hat may have another shape. The peripheral wall of the cap may for example have a rectangular contour.

Claims (12)

REVENDICATIONS1. Passerelle (1) comportant une première culée (2) et une deuxième culée (2) entre lesquelles s'étendent des poutres (30) longitudinales ayant des extrémités solidaires des culées, caractérisées en ce que la première culée comprend un bloc de béton de fondation (3) qui reçoit une partie inférieure d'une armature (4) et qui est noyé dans le sol, et un chapeau (5) de coffrage perdu coiffant une partie supérieure de l'armature, le chapeau ayant une paroi périphérique (6) qui a un bord inférieur noyé dans le bloc de béton de fondation et qui est surmontée d'une paroi supérieure (7) percée d'au moins une ouverture d'introduction de béton dans le chapeau, le chapeau comportant des ouvertures (9) de réception des extrémités des poutres longitudinales de telle manière que celles-ci soient prises dans le béton introduit dans le chapeau.REVENDICATIONS1. Footbridge (1) comprising a first abutment (2) and a second abutment (2) between which extend longitudinal beams (30) having ends integral with the abutments, characterized in that the first abutment comprises a foundation concrete block (3) receiving a lower portion of a frame (4) and which is embedded in the ground, and a lost form cap (5) covering an upper portion of the frame, the cap having a peripheral wall (6) which has a lower edge embedded in the foundation concrete block and which is surmounted by an upper wall (7) pierced with at least one concrete introduction opening in the cap, the cap having openings (9) of receiving the ends of the longitudinal beams such that they are taken in the concrete introduced into the cap. 2. Passerelle selon la revendication 1, comportant au moins un garde corps (11) comportant au moins deux poteaux (12) fixés chacun sur une des culées (2), le poteau solidaire de la première culée étant reçu dans une ouverture (10) du chapeau (5) et ayant une extrémité inférieure noyée dans le bloc de béton de fondation (3).2. Gateway according to claim 1, comprising at least one guard (11) comprising at least two posts (12) each fixed to one of the abutments (2), the integral post of the first abutment being received in an opening (10). hat (5) and having a lower end embedded in the foundation concrete block (3). 3. Passerelle selon la revendication 1 ou 2, dans laquelle les poutres (30) sont de forme plate et ont une surface inférieure (31) pourvue d'une nervure (31) longitudinale en saillie, les ouvertures (9) de réception des extrémités de poutre étant agencées pour recevoir chacune une portion de nervure de telle manière que les poutres (30) aient leur surface inférieure reposant sur la paroi supérieure (7) du chapeau (5).3. A gangway according to claim 1 or 2, wherein the beams (30) are of flat shape and have a lower surface (31) provided with a longitudinal rib (31) protruding, the openings (9) for receiving the ends. beam members being arranged to receive each a portion of rib so that the beams (30) have their lower surface resting on the upper wall (7) of the cap (5). 4. Passerelle selon l'une quelconque desrevendications 1 à 3, dans laquelle les poutres (30) sont en béton.4. Gateway according to any one of claims 1 to 3, wherein the beams (30) are concrete. 5. Passerelle selon l'une quelconque des revendications précédentes, dans laquelle le chapeau (5) est en béton.5. Gateway according to any one of the preceding claims, wherein the cap (5) is made of concrete. 6. Passerelle selon l'une quelconque des revendications précédentes, dans laquelle une plaque de parement (15) est fixée sur la paroi supérieure (7) du chapeau (5) et obture l'ouverture (8) d'introduction de béton.6. Gateway according to any one of the preceding claims, wherein a facing plate (15) is fixed on the upper wall (7) of the cap (5) and closes the opening (8) of introduction of concrete. 7. Passerelle selon l'une quelconque des revendications précédentes, dans laquelle la deuxième culée (2) est identique à la première culée (2).7. Gateway according to any one of the preceding claims, wherein the second abutment (2) is identical to the first abutment (2). 8. Procédé de réalisation d'une passerelle selon la revendication 7, les chapeaux (5) et les poutres (30) étant préfabriqués, le procédé comprenant, pour chaque culée (2), les étapes de : - creuser une fouille (F) dans le sol (S), - y déposer l'armature (4) de telle manière que l'armature dépasse du sol, - couler du béton de fondation dans la fouille, - disposer par-dessus l'armature un chapeau préfabriqué de coffrage perdu de telle manière que le chapeau coiffe l'armature, - couler dans le chapeau un béton de scellement, - mettre en place les extrémités de poutres de telle manière que les poutres s'étendent entre les culées, - laisser prendre le béton de scellement.8. A method of producing a bridge according to claim 7, the caps (5) and the beams (30) being prefabricated, the method comprising, for each abutment (2), the steps of: - dig a dig (F) in the ground (S), - depositing the reinforcement (4) in such a way that the reinforcement protrudes from the ground, - pouring foundation concrete into the excavation, - placing a prefabricated formwork cap over the reinforcement lost in such a way that the cap caps the frame, - pour a sealing concrete into the cap, - place the ends of the beams in such a way that the beams extend between the abutments, - let the concrete seal . 9. Procédé selon la revendication 8, dans lequel le chapeau est disposé avant que le béton de fondation ne soit pris de manière que le chapeau ait un bord inférieur engagé dans le béton de fondation, le béton de scellement étant coulé après prise du béton de fondation.9. The method of claim 8, wherein the cap is disposed before the foundation concrete is taken so that the cap has a lower edge engaged in the foundation concrete, the sealing concrete being poured after setting concrete. foundation. 10. Procédé selon la revendication 9, danslequel, préalablement à la mise en place de l'armature, au moins un plot de béton de fondation est formé au fond de la fouille et au moins un poteau (12) est disposé sur le plot, l'armature (4) étant enfilée sur le poteau qui a une hauteur telle qu'il dépasse de la partie supérieure de l'armature et le chapeau (5) comportant une ouverture (10) de passage du poteau de telle manière que le chapeau puisse être enfilé sur le poteau et l'armature après la coulée du béton de fondation, le procédé comprenant l'étape ultérieure de fixer aux poteaux un garde-fou s'étendant parallèlement aux poutres.10. The method of claim 9, wherein, prior to the establishment of the armature, at least one foundation concrete block is formed at the bottom of the excavation and at least one post (12) is disposed on the stud, the armature (4) being threaded onto the post which has a height such that it protrudes from the upper part of the frame and the cap (5) having an opening (10) for the passage of the post so that the cap may be threaded onto the post and reinforcement after pouring the foundation concrete, the method comprising the subsequent step of securing to the posts a guardrail extending parallel to the beams. 11. Procédé selon la revendication 8, dans lequel on laisse le béton de fondation prendre avant de disposer le chapeau.11. The method of claim 8, wherein the foundation concrete is allowed to take before arranging the cap. 12. Procédé selon la revendication 11, dans lequel un poteau (12) est fixé sur le béton de fondation pris et le chapeau (5) comporte une ouverture (10) de passage du poteau de telle manière que le chapeau puisse être enfilé sur le poteau et l'armature après la prise du béton de fondation, le procédé comprenant l'étape ultérieure de fixer aux poteaux un garde-fou s'étendant parallèlement aux poutres.12. The method of claim 11, wherein a post (12) is fixed on the foundation concrete taken and the cap (5) has an opening (10) for the passage of the post so that the cap can be threaded on the post and reinforcement after the setting of the foundation concrete, the method comprising the subsequent step of securing to the posts a guardrail extending parallel to the beams.
FR1356582A 2013-07-04 2013-07-04 GATEWAY AND METHOD OF MAKING SUCH A GATEWAY Expired - Fee Related FR3008111B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR1356582A FR3008111B1 (en) 2013-07-04 2013-07-04 GATEWAY AND METHOD OF MAKING SUCH A GATEWAY
EP14175487.9A EP2821552B1 (en) 2013-07-04 2014-07-02 Gateway and method for producing such a gateway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1356582A FR3008111B1 (en) 2013-07-04 2013-07-04 GATEWAY AND METHOD OF MAKING SUCH A GATEWAY

Publications (2)

Publication Number Publication Date
FR3008111A1 true FR3008111A1 (en) 2015-01-09
FR3008111B1 FR3008111B1 (en) 2015-07-24

Family

ID=49293690

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1356582A Expired - Fee Related FR3008111B1 (en) 2013-07-04 2013-07-04 GATEWAY AND METHOD OF MAKING SUCH A GATEWAY

Country Status (2)

Country Link
EP (1) EP2821552B1 (en)
FR (1) FR3008111B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930474A (en) * 2019-04-04 2019-06-25 中交第三航务工程勘察设计院有限公司 A kind of connected structure for pile foundation type trestle and barrel type basis

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1258565A1 (en) * 2001-05-18 2002-11-20 Societe Civile De Brevets Matiere Prefabricated bridge bearing
EP2549028A1 (en) * 2011-07-20 2013-01-23 Conseil Service Investissement Method for manufacturing a suspended structure and set of formworks for implementing same

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1258565A1 (en) * 2001-05-18 2002-11-20 Societe Civile De Brevets Matiere Prefabricated bridge bearing
EP2549028A1 (en) * 2011-07-20 2013-01-23 Conseil Service Investissement Method for manufacturing a suspended structure and set of formworks for implementing same

Also Published As

Publication number Publication date
EP2821552A1 (en) 2015-01-07
EP2821552B1 (en) 2016-04-06
FR3008111B1 (en) 2015-07-24

Similar Documents

Publication Publication Date Title
EP0081402B1 (en) Process for obtaining hollow structures such as ducts, grain tanks or shelters.
CA1302111C (en) Process and apparatus for making a rigid load-bearing slab
EP2821552B1 (en) Gateway and method for producing such a gateway
EP0028558B1 (en) Method of improving the sliding resistance of a civil engineering construction and its foundation
FR2631397A1 (en) METHOD FOR ASSEMBLING A CONCRETE ELEMENT AND A SUPPORT AND CORRESPONDING STRUCTURE
KR101975502B1 (en) Manufacturing method of composite block and composite block
EP0603060B1 (en) Prefabricated plate and method for making a bridge using such plates
JP5704847B2 (en) Side groove cover, installation method thereof, and side groove
EP1258565A1 (en) Prefabricated bridge bearing
EP1918488A1 (en) Formwork support device for constructions such as concrete reservoirs
FR3094996A1 (en) Fence base and fence structure comprising such a base
EP0325574A1 (en) Semi-prefabricated bridge
WO1996003552A1 (en) Underground passage
EP0242497A1 (en) Tunnel construction process
FR2580011A1 (en) Method for building the foundations of a construction, formwork intended for the implementation of this method, and construction thus obtained
FR2898925A1 (en) Swimming pool, basin or other water sheet forming method, involves filling space between grilles and watertight membrane with rubble upto level of sundeck receiving zone, and forming sundeck to permanently immobilize grilles
EP1457599B1 (en) Method for constructing a railroad level-crossing
FR2938858A1 (en) Concrete floor framework for e.g. buried parking area, in building site, has posts surmounted by capital presenting variable inertia section maximal at right of posts, and beams whose ends are set with respect to each other in posts axis
FR2629496A1 (en) BUILDING WALLS OF THE WALL TYPE IN PREFABRICATED CONCRETE ELEMENTS
FR2775998A1 (en) Method of construction of prefabricated building
FR2738580A1 (en) Composite cast and prefabricated bridge deck construction
FR2894267A1 (en) Outer separation structure manufacturing method for forming e.g. partition wall, involves pouring grout of hardenable material in formwork to form anchoring units such that formwork and excavations are simultaneously filled with grout
FR2841266A1 (en) Expansion joint for roads comprises two identical toothed elements comprising teeth able to fit into each other and countersunk reservations for anchoring bolts
FR2833290A1 (en) Low wall constructed from prefabricated components has at least one U-section panel with end apertures for connecting to foundation blocks
EP4063590A1 (en) Device for securing a construction accessory to tie bars, associated attachment method and construction element

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 4

ST Notification of lapse

Effective date: 20180330