EP0028558B1 - Method of improving the sliding resistance of a civil engineering construction and its foundation - Google Patents

Method of improving the sliding resistance of a civil engineering construction and its foundation Download PDF

Info

Publication number
EP0028558B1
EP0028558B1 EP80401512A EP80401512A EP0028558B1 EP 0028558 B1 EP0028558 B1 EP 0028558B1 EP 80401512 A EP80401512 A EP 80401512A EP 80401512 A EP80401512 A EP 80401512A EP 0028558 B1 EP0028558 B1 EP 0028558B1
Authority
EP
European Patent Office
Prior art keywords
ground
walls
foundation
cross
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
EP80401512A
Other languages
German (de)
French (fr)
Other versions
EP0028558A1 (en
Inventor
Jean Aubert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Spie Batignolles SA
Original Assignee
Spie Batignolles SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Spie Batignolles SA filed Critical Spie Batignolles SA
Priority to AT80401512T priority Critical patent/ATE7717T1/en
Publication of EP0028558A1 publication Critical patent/EP0028558A1/en
Application granted granted Critical
Publication of EP0028558B1 publication Critical patent/EP0028558B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements

Definitions

  • the present invention relates to a method for improving the sliding resistance of a civil engineering structure, in accordance with the preamble of the main claim, which would risk moving due to the forces which it is called upon to bear, particularly when the efforts in question have a horizontal component.
  • the invention also relates to a foundation, in accordance with the preamble of claim 2, produced by the aforementioned method.
  • the above-mentioned horizontal components appear, in particular when the structure under consideration is subjected on two opposite faces to different water pressures and thus plays a role of dam.
  • the structure risks slipping on the ground on which it rests. This risk is low, when it is a rocky soil or of good quality alluvium, with a satisfactory internal friction angle. It is different if the soil is more or less clayey or muddy.
  • a platform is immersed in the water to rest it on two parallel sheet pile curtains sunk into the ground.
  • the concrete is then poured under the platform so as to fill the space between the ground, this platform and the two curtains. This produces a concrete block which forms the foundation or the foundation of the body of the dam.
  • One of the sheet pile walls is located directly above the upstream face of the dam, while the other is placed along the downstream face.
  • the strength of the foundations thus made depends in part on the strength of the two parallel curtains anchored in the ground. It will however be observed that these two curtains work perpendicular to their plane and are, therefore, liable to deform.
  • the object of the present invention is to provide a method making it possible to improve the slip resistance of the foundation of a civil engineering structure exposed to withstand forces having a horizontal component comprising a concrete block in contact with the ground.
  • this process is characterized in that beats in the ground of the metal pallet curtains parallel to the direction of the forces that the structure will have to bear, curtains which are called cross curtains and in that, after having beaten the sheet piles in the ground without driving them completely, the concrete constituting the concrete block is poured around the upper parts projecting from the ground of the split curtains so that they are embedded in said massive.
  • the sheet piles of these split curtains can not slide relative to each other under the action of a horizontal force exerted in the plane of the curtain in question. Put in the impossibility of sliding as it has just been said and hung to each other by their locks, they constitute a resistant and non-deformable monolithic wall which could only move in one piece.
  • the curtain of partition could not move in its plane compared to the ground only under the action of considerable efforts, higher than those which one must envisage, the solid mass of concrete will be solidly anchored in the ground.
  • Another object of the invention is to create a foundation exposed to withstand forces having a horizontal component, comprising a platform serving as formwork above a concrete block, this platform being stiffened on its underside by beaming and resting on two metal sheet pile walls threshed in the ground so that their upper parts protrude from the ground and arranged perpendicular to the horizontal component of the forces, the concrete filling the space between the ground, the platform and sheet pile curtains.
  • this foundation characterized in that it also comprises cross-curtains constituted by metal sheet piles beaten in the ground parallel to the horizontal component of the forces and in that these cross-curtains are arranged under the beams and that their upper part, projecting from the ground is embedded in the concrete block, said block thus connecting the curtain curtains to the beams which stiffen the platform.
  • dredging is optionally carried out, then a pile of soil is driven into the ground 1 palplan ches 2 so as to form two parallel curtains of sheet piles 3 and 4, substantially perpendicular to the direction F of the stream of water (see fig. 1).
  • the curtain 3 is arranged upstream relative to the curtain 4 relative to the aforementioned direction F of the stream of water.
  • the sheet piles 2 of the curtains 3 and 4 are hooked to each other by their locks 2a, 2b, as shown in fig. 2.
  • the parallel curtains 3 and 4 are intended to serve as a support for a platform 5, the longitudinal edges 5a, 5b of which are folded down at 6 and 7.
  • a series of sheet piles 8 is driven into the ground 1, between the parallel curtains 3 and 4, so as to form curtains 9, 10. ., said to be split, perpendicular to the curtains 3 and 4.
  • These sheet piles 8 are hooked to each other by their locks 8a, 8b, while the ends 9a, 9b, 10a, 10b, of these curtains 9, 10 are preferably connected to the two parallel curtains 3 and 4.
  • the grooves 20 of the various curtains open alternately in opposite directions.
  • the platform 5 has on its lower surface 5a, a beam which gives the sheet the necessary rigidity, beam which is represented schematically by the beams 11.
  • the sheet piles 8 of the split curtains 9, ..., are driven into the ground until the dimension of their upper edges 12 is located slightly below that of the flanges 13 of the beams 11.
  • Concrete 15 is then poured into the substantially closed space situated between the platform 5, the ground 1 and the massive embankments 14 (see fig. 3), as described in FR-A-2 190 129.
  • This operation can be carried out by means of concrete injection nozzles 16 which are engaged in openings 17 made in the platform 5.
  • the platform 5 is securely fixed to the concrete by the beam which stiffens it.
  • the mass of concrete 15 completely covers the upper part of the sheet piles 8, which constitute the cross-sections 9, 10 ...
  • the foundation thus obtained can then serve as a base for a dam body or constitute the raft of a movable closure system with valve 19 (see fig. 4) as described for example in FR-A-2 458 633.
  • the dividing curtains 9, 10, ..., arranged between the upstream 3 and downstream 4 curtains considerably increase the sliding resistance of the foundation, sliding which could result from the forces exerted by the pressure of the water in a direction perpendicular to these upstream 3 and downstream 4 curtains.
  • the dividing curtains 9, 10 ... each offer, thanks to the grooves 20 formed by the juxtaposed sheet piles 8 considerable resistance and even practically infinite resistance to displacement in a direction parallel to their plane.
  • the slip resistance of the foundation with respect to a force applied parallel to the cross curtains 9, 10 ... increases with the number of curtains 9, 10 ... It is all the more important as the distance L (see fig. 2) between two adjacent cross curtains 9, 10 ... is lower. Between two cross curtains, the raft constitutes a beam whose height corresponds to a significant fraction of the span.
  • the invention can also be applied to the case of non-submerged foundations, resting on a slippery floor and liable to be subjected to significant forces comprising a horizontal component such as that which could result from a push of the earth.
  • the use of the platform 5 for pouring concrete 15 is of course not necessary. Frequently, the light curtains can also be removed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Hydrology & Water Resources (AREA)
  • Mechanical Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Revetment (AREA)
  • Lubricants (AREA)
  • Sliding-Contact Bearings (AREA)

Abstract

A foundation for a retaining wall-type of structure acted upon by a principal force tending to slide same in a predetermined direction is anchored by a plurality of slide resisting walls. The slide resisting walls extend parallel to the predetermined direction in which the foundation tends to slide. The upper portions of the slide resisting walls are embedded in a concrete mass. The lower portions of the slide resisting walls project downwardly from the concrete mass into the earth, and are solely in engagement with the earth and not with concrete.

Description

La présente invention concerne un procédé pour l'amélioration de la résistance au glissement d'un ouvrage de génie civil, conformément au préambule de la revendication principale, qui risquerait de se déplacer en raison des efforts qu'il est appelé à supporter, particulièrement lorsque les efforts en question comportent une composante horizontale.The present invention relates to a method for improving the sliding resistance of a civil engineering structure, in accordance with the preamble of the main claim, which would risk moving due to the forces which it is called upon to bear, particularly when the efforts in question have a horizontal component.

L'invention vise également une fondation, conformément au préambule de la revendication 2, réalisée selon le procédé précité. Les composantes horizontales précitées apparaissent, notamment lorsque l'ouvrage considéré est soumis sur deux faces opposées à des pressions d'eau différentes et qu'il joue ainsi un rôle de barrage.The invention also relates to a foundation, in accordance with the preamble of claim 2, produced by the aforementioned method. The above-mentioned horizontal components appear, in particular when the structure under consideration is subjected on two opposite faces to different water pressures and thus plays a role of dam.

Des efforts horizontaux analogues apparaissent lorsqu'un ouvrage construit à terre est soumis à une poussée des terres.Similar horizontal forces appear when a structure built on the ground is subjected to an earth pressure.

Dans les deux cas ci-dessus, l'ouvrage risque de glisser sur le sol sur lequel il repose. Ce risque est faible, lorqu'il s'agitd'un sol rocheux ou d'alluvions de bonne qualité, ayant un angle de frottement interne satisfaisant. Il en va différemment si le sol est plus ou moins argileux ou vaseux.In the two cases above, the structure risks slipping on the ground on which it rests. This risk is low, when it is a rocky soil or of good quality alluvium, with a satisfactory internal friction angle. It is different if the soil is more or less clayey or muddy.

Le procédé de consolidation d'une fondation par un ou plusieurs murs de refend, qui constitue l'objet de la présente invention, a un caractère très général et est déjà connu du FR-A-2 088 676 ou du FR-A-2 190 129. Il prendra évidemment des formes différentes suivant le type considéré d'ouvrage supportant des efforts horizontaux, dont la fondation doit être consolidée. On décrira son application dans le cas du type particulier d'ouvrage faisant l'objet du FR-A-2 190 129.The process of consolidating a foundation by one or more cross walls, which constitutes the object of the present invention, has a very general character and is already known from FR-A-2 088 676 or from FR-A-2 190 129. It will obviously take different forms depending on the type of work considered supporting horizontal forces, the foundation of which must be consolidated. Its application will be described in the case of the particular type of structure which is the subject of FR-A-2 190 129.

Dans ce procédé, on immerge dans l'eau une plate-forme pour la faire reposer sur deux rideaux parallèles de palplanches enfoncée dans le sol. On coule ensuite le béton sous la plate-forme de façon à remplir l'espace compris entre le sol, cette plate-forme et les deux rideaux. On réalise ainsi un massif de béton qui constitue le radier ou l'assise du corps du barrage.In this process, a platform is immersed in the water to rest it on two parallel sheet pile curtains sunk into the ground. The concrete is then poured under the platform so as to fill the space between the ground, this platform and the two curtains. This produces a concrete block which forms the foundation or the foundation of the body of the dam.

L'un des rideaux de palplanches est situé à l'aplomb de la face amont du barrage, tandis que l'autre est disposé le long de la face aval. La résistance des fondations ainsi réalisées dépend en partie de la résistance des deux rideaux parallèles ancrés dans le sol. On observera cependant que ces deux rideaux travaillent perpendiculairement à leur plan et sont, de ce fait, susceptibles de se déformer.One of the sheet pile walls is located directly above the upstream face of the dam, while the other is placed along the downstream face. The strength of the foundations thus made depends in part on the strength of the two parallel curtains anchored in the ground. It will however be observed that these two curtains work perpendicular to their plane and are, therefore, liable to deform.

Le but de la présente invention est de fournir un procédé permettant d'améliorer la résistance au glissement de la fondation d'un ouvrage de génie civil exposé à supporter des efforts ayant une composante horizontale comprenant un massif de béton en contact avec le sol.The object of the present invention is to provide a method making it possible to improve the slip resistance of the foundation of a civil engineering structure exposed to withstand forces having a horizontal component comprising a concrete block in contact with the ground.

Suivant l'invention, ce procédé est caractérisé en ce qu'on bat dans le sol des rideaux de pal pl anches métalliques parallèles à la direction des efforts que l'ouvrage aura à supporter, rideaux que l'on appelle rideaux de refend et en ce que, après avoir battu les palplanches dans le sol sans les enfoncer complètement, on coule le béton constituant le massif en béton autour des parties supérieures en saillie par rapport au sol des rideaux de refend de telle sorte que celles-ci soient noyées dans ledit massif.According to the invention, this process is characterized in that beats in the ground of the metal pallet curtains parallel to the direction of the forces that the structure will have to bear, curtains which are called cross curtains and in that, after having beaten the sheet piles in the ground without driving them completely, the concrete constituting the concrete block is poured around the upper parts projecting from the ground of the split curtains so that they are embedded in said massive.

Du fait que les parties supérieures des rideaux de refend sont noyées dans le massif en béton, les palplanches de ces rideaux de refend ne peuvent pas glisser les unes par rapport aux autres sous l'action d'un effort horizontal s'exerçant dans le plan du rideau en question. Mises dans l'impossibilité de glisser comme il vient d'être dit et accrochées les unes aux autres par leurs serrures, elles constituent un mur monolithique résistant et indéformable qui ne pourrait se déplacer que tout d'une pièce.Because the upper parts of the split curtains are embedded in the concrete block, the sheet piles of these split curtains can not slide relative to each other under the action of a horizontal force exerted in the plane of the curtain in question. Put in the impossibility of sliding as it has just been said and hung to each other by their locks, they constitute a resistant and non-deformable monolithic wall which could only move in one piece.

Comme, par ailleurs, le rideau de refend ne pourrait se déplacer dans son plan par rapport au sol que sous l'action d'efforts considérables, supérieurs à ceux que l'on doit envisager, le massif de béton se trouvera solidement ancré dans le sol.As, in addition, the curtain of partition could not move in its plane compared to the ground only under the action of considerable efforts, higher than those which one must envisage, the solid mass of concrete will be solidly anchored in the ground.

Un autre but de l'invention est de créer une fondation exposée à supporter des efforts ayant une composante horizontale, comprenant une plate-forme servant de coffrage supérieur à un massif de béton, cette plate-forme étant raidie sur sa face inférieure par une poutraison et reposant sur deux rideaux de palplanches métalliques battues dans le sol de telle sorte que leurs parties supérieures fassent saillie par rapport au sol et disposés perpendiculairement à la composante horizontale des efforts, le béton remplissant l'espace compris entre le sol, la plate-forme et les rideaux de palplanches.Another object of the invention is to create a foundation exposed to withstand forces having a horizontal component, comprising a platform serving as formwork above a concrete block, this platform being stiffened on its underside by beaming and resting on two metal sheet pile walls threshed in the ground so that their upper parts protrude from the ground and arranged perpendicular to the horizontal component of the forces, the concrete filling the space between the ground, the platform and sheet pile curtains.

Suivant l'invention cette fondation caractérisée en ce qu'elle comprend en outre des rideaux de refend constitués par des palplanches métalliques battues dans le sol parallèlement à la composante horizontale des efforts et en ce que ces rideaux de refend sont disposés sous la poutraison et que leur partie supérieure, en saillie par rapport au sol est noyée dans le massif de béton, ledit massif reliant ainsi les rideaux de refend à la poutraison qui raidit la plate-forme.According to the invention, this foundation, characterized in that it also comprises cross-curtains constituted by metal sheet piles beaten in the ground parallel to the horizontal component of the forces and in that these cross-curtains are arranged under the beams and that their upper part, projecting from the ground is embedded in the concrete block, said block thus connecting the curtain curtains to the beams which stiffen the platform.

D'autres particularités et avantages de l'invention apparaîtront encore dans la description ci-après.

  • La fig. 1 est une vue schématique transversale montrant une plate-forme conforme à l'invention reposant sur deux rideaux parallèles de palplanches, avant la constitution du massif de béton,
  • la fig. 2 est une vue en coupe suivant le plan II-II de la fig. 1,
  • la fig. 3 est une vue analogue à la fig. 1, montrant la coulée du béton sous la plate-forme,
  • la fig. 4 représente, en coupe schématique, l'application de l'invention à la réalisation d'une fondation de barrage mobile.
Other features and advantages of the invention will appear in the description below.
  • Fig. 1 is a schematic transverse view showing a platform in accordance with the invention resting on two parallel sheet pile walls, before the concrete block is formed,
  • fig. 2 is a sectional view along the plane II-II of FIG. 1,
  • fig. 3 is a view similar to FIG. 1, showing the pouring of the concrete under the platform,
  • fig. 4 shows, in schematic section, the application of the invention to the production of a mobile dam foundation.

Pour réaliser les fondations immergées en mer ou en rivière d'un radier de barrage mobile ou de l'assise d'un ouvrage de génie civil, on procède éventuellement à un dragage, puis on enfonce dans le sol 1 par battage, une série de palplanches 2 de façon à former deux rideaux parallèles de palplanches 3 et 4, sensiblement perpendiculaires au sens F du courant d'eau (voir fig. 1). Le rideau 3 est disposé en amont par rapport au rideau 4 relativement au sens F précité du courant d'eau.To make the submerged foundations at sea or in the river of a movable dam raft or the foundation of a civil engineering structure, dredging is optionally carried out, then a pile of soil is driven into the ground 1 palplan ches 2 so as to form two parallel curtains of sheet piles 3 and 4, substantially perpendicular to the direction F of the stream of water (see fig. 1). The curtain 3 is arranged upstream relative to the curtain 4 relative to the aforementioned direction F of the stream of water.

Les palplanches 2 des rideaux 3 et 4 sont accrochées les unes aux autres par leurs serrures 2a, 2b, comme indiqué sur la fig. 2.The sheet piles 2 of the curtains 3 and 4 are hooked to each other by their locks 2a, 2b, as shown in fig. 2.

Les rideaux parallèles 3 et 4 sont destinés à servir de support à une plate-forme 5 dont les bords longitudinaux 5a, 5b sont rabattus en 6 et 7.The parallel curtains 3 and 4 are intended to serve as a support for a platform 5, the longitudinal edges 5a, 5b of which are folded down at 6 and 7.

Avant la mise en place de cette plate-forme 5 sur les rideaux 3 et 4, on enfonce dans le sol 1, entre les rideaux parallèles 3 et 4, une série de palplanches 8, de façon à former des rideaux 9, 10..., dits de refend, perpendiculaires aux rideaux 3 et 4. Ces palplanches 8 sont accrochées les unes aux autres par leurs serrures 8a, 8b, tandis que les extrémités 9a, 9b, 10a, 10b, de ces rideaux 9, 10 sont de préférence reliées aux deux rideaux parallèles 3 et 4. Les cannelures 20 des divers rideaux s'ouvrent alternativement dans des directions opposées.Before the installation of this platform 5 on the curtains 3 and 4, a series of sheet piles 8 is driven into the ground 1, between the parallel curtains 3 and 4, so as to form curtains 9, 10. ., said to be split, perpendicular to the curtains 3 and 4. These sheet piles 8 are hooked to each other by their locks 8a, 8b, while the ends 9a, 9b, 10a, 10b, of these curtains 9, 10 are preferably connected to the two parallel curtains 3 and 4. The grooves 20 of the various curtains open alternately in opposite directions.

Dans le cas de la réalisation représentée, la plate-forme 5 présente sur sa surface inférieure 5a, une poutraison qui donne à la tôle la rigidité indispensable, poutraison qui est représentée schématiquement par les poutres 11. Les palplanches 8 des rideaux de refend 9,..., sont enfoncées dans le sol jusqu'à ce que la cote de leurs bords supérieurs 12 soit située légèrement en dessous de celle des semelles 13 des poutres 11.In the case of the embodiment shown, the platform 5 has on its lower surface 5a, a beam which gives the sheet the necessary rigidity, beam which is represented schematically by the beams 11. The sheet piles 8 of the split curtains 9, ..., are driven into the ground until the dimension of their upper edges 12 is located slightly below that of the flanges 13 of the beams 11.

Après mise en place de la plate-forme 5 sur les rideaux 3 et 4, on constitue le long de ces derniers et contre les bords 6 et 7 de la plate-forme 5, des massifs d'alluvions 14, de façon à obturer l'espace compris entre le sol 1 et ces bords 6 et 7.After the platform 5 has been placed on the curtains 3 and 4, alluviums 14 are formed along the latter and against the edges 6 and 7 of the platform 5, so as to close off the space between the ground 1 and these edges 6 and 7.

On coule ensuite du béton 15 dans l'espace sensiblement fermé situé entre la plate-forme 5, le sol 1 et les talus massifs 14 (voir fig. 3), comme décrit dans le FR-A-2 190 129. Cette opération peut être effectuée au moyen de buses d'injection de béton 16 que l'on engage dans des ouvertures 17 pratiquées dans la plate-forme 5.Concrete 15 is then poured into the substantially closed space situated between the platform 5, the ground 1 and the massive embankments 14 (see fig. 3), as described in FR-A-2 190 129. This operation can be carried out by means of concrete injection nozzles 16 which are engaged in openings 17 made in the platform 5.

Une fois la masse de béton 15 durcie, la plate-forme 5 se trouve solidement fixée au béton par la poutraison qui la raidit.Once the concrete mass 15 has hardened, the platform 5 is securely fixed to the concrete by the beam which stiffens it.

La masse de béton 15 enrobe d'autre part entièrement la partie supérieure des palplanches 8, qui constituent les rideaux de refend 9, 10...On the other hand, the mass of concrete 15 completely covers the upper part of the sheet piles 8, which constitute the cross-sections 9, 10 ...

La fondation ainsi obtenue peut alors servir de soubassement à un corps de barrage ou constituer le radier d'un système de bouchure mobile à clapet 19 (voir fig. 4) tel que décrit par exemple dans le FR-A-2 458 633.The foundation thus obtained can then serve as a base for a dam body or constitute the raft of a movable closure system with valve 19 (see fig. 4) as described for example in FR-A-2 458 633.

Les rideaux de refend 9, 10,..., disposés entre les rideaux amont 3 et aval 4 augmentent considérablement la résistance au glissement de la fondation, glissement qui pourrait résulter des efforts exercés par la pression de l'eau dans une direction perpendiculaire à ces rideaux amont 3 et aval 4.The dividing curtains 9, 10, ..., arranged between the upstream 3 and downstream 4 curtains considerably increase the sliding resistance of the foundation, sliding which could result from the forces exerted by the pressure of the water in a direction perpendicular to these upstream 3 and downstream 4 curtains.

Cette résistance résulte d'une part de la liaison des rideaux de refend 9, 10,..., avec le sol 1 et d'autre part de la liaison de ces rideaux 9, 10,..., avec le massif de béton 15 solidaire du radier.This resistance results on the one hand from the connection of the cross curtains 9, 10, ..., with the ground 1 and on the other hand from the connection of these curtains 9, 10, ..., with the concrete block 15 integral with the raft.

Les rideaux de refend 9, 10... offrent chacun, grâce aux cannelures 20 formées par les palplanches juxtaposées 8 une résistance considérable et même pratiquement infinie à un déplacement dans une direction parallèle à leur plan.The dividing curtains 9, 10 ... each offer, thanks to the grooves 20 formed by the juxtaposed sheet piles 8 considerable resistance and even practically infinite resistance to displacement in a direction parallel to their plane.

La résistance au glissement de la fondation à l'égard d'une force appliquée parallèlement aux rideaux de refend 9, 10... croît avec le nombre des rideaux 9, 10... Elle est d'autant plus importante que la distance L (voir fig. 2) comprise entre deux rideaux de refend adjacents 9, 10... est plus faible. Entre deux rideaux de refend, le radier constitue une poutre dont la hauteur correspond à une fraction importante de la portée.The slip resistance of the foundation with respect to a force applied parallel to the cross curtains 9, 10 ... increases with the number of curtains 9, 10 ... It is all the more important as the distance L (see fig. 2) between two adjacent cross curtains 9, 10 ... is lower. Between two cross curtains, the raft constitutes a beam whose height corresponds to a significant fraction of the span.

Par ailleurs, de bonnes conditions d'ancrage de la dalle de béton 15 relativement au sol 1 sont réalisées lorsque la partie supérieure des palplanches 8 composant les rideaux de refend 9, 10... est noyée dans le béton 15 sur une hauteur H comprise entre 0,30 et 1 m.Furthermore, good conditions for anchoring the concrete slab 15 relative to the ground 1 are achieved when the upper part of the sheet piles 8 making up the cross-curtains 9, 10, etc. is embedded in the concrete 15 over a height H included. between 0.30 and 1 m.

Bien entendu, l'invention n'est pas limitée à l'exemple que l'on vient de décrire et on peut apporter à celui-ci de nombreuses modifications sans sortir du cadre de l'invention.Of course, the invention is not limited to the example which has just been described and many modifications can be made to it without departing from the scope of the invention.

Ainsi l'invention peut s'appliquer également au cas de fondations non immergées, reposant sur un sol glissant et susceptibles d'être soumises à des efforts importants comportant une composante horizontale telle que celle qui pourrait résulter d'une poussée des terres.Thus the invention can also be applied to the case of non-submerged foundations, resting on a slippery floor and liable to be subjected to significant forces comprising a horizontal component such as that which could result from a push of the earth.

Dans de telles fondations non immergées, l'utilisation de la plate-forme 5 pour couler le béton 15 n'est bien entendu pas nécessaire. Fréquemment, les rideaux parafouilles pourront eux aussi être supprimés.In such non-submerged foundations, the use of the platform 5 for pouring concrete 15 is of course not necessary. Frequently, the light curtains can also be removed.

Par ailleurs, pour construire un mur de refend monolithique, résistant et indéformable, on pourrait utiliser non pas des palplanches métalliques, mais avoir recours à la technique bien connue des parois moulées dans le sol, pour y construire directement un mur en béton armé.Furthermore, to build a solid, non-deformable, monolithic crosswall, one could not use metal sheet piles, but use the well-known technique of walls molded into the ground, to directly build a reinforced concrete wall.

Claims (4)

1. Method for improving the resistance to sliding of the foundation of a civil engineering structure destined to withstand forces having a horizontal component and comprising a massive concrete structure (15) which is in contact with the ground (1) or attached to this latter by any means known per se, characterized in that metallic sheet-pile walls (9, 10) which are parallel to the direction of the forces to be resisted by the structure are driven into the ground, said sheet-pile walls (9, 10) being known as cross-walls, and that, after the sheet piles have been driven into the ground without being driven-in completely, the concrete constituting the massive concrete structure (15) is placed around the top portions of the cross-walls (9, 10) which project with respect to the ground, with the result that these latter are embedded in said massive structure (15).
2. Foundation which is destined to withstand forces having a horizontal component, comprising a platform (5) which serves as a top shuttering element for a massive concrete structure (15), this platform (5) being stiffened on its bottom face by a system of girders (11) and supported on two metallic sheet-pile walls (3, 4) which are driven into the ground so that their top portions project with respect to the ground (1), and disposed at right angles to the horizontal component of the forces, the space formed between the ground, the platform (5) and the foundation sheet-pile walls (3, 4) being filled with the concrete (15), characterized in that the structure further comprises cross-walls (9, 10) constituted by metallic sheet-piles driven into the ground in a direction parallel to the horizontal component of the forces and that these cross-walls (9, 10) are placed beneath the system of girders (11) and that their top portion which projects with respect to the ground (1) is embedded in the massive concrete structure (15), the cross-walls (9, 10) being thus joined by said massive structure (15) to the system of girders (11) which stiffens the platform (5).
3. Foundation in accordance with claim 2, characterized in that the distance (L) between the cross-walls (9, 10) is substantially comprised between 5 and 10 times the distance (D) comprised between the two sheet-pile cross-walls (3, 4) which are driven-in first.
4. Foundation in accordance with claim 3, characterized in that the upper portion of the cross-walls (9, 10) is embedded in the concrete (15) to a depth (H) comprised between 0.30 and 1 m.
EP80401512A 1979-11-06 1980-10-24 Method of improving the sliding resistance of a civil engineering construction and its foundation Expired EP0028558B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT80401512T ATE7717T1 (en) 1979-11-06 1980-10-24 METHOD OF IMPROVING THE SLIPPING RESISTANCE OF A BUILDING STRUCTURE AND ITS FOUNDATION.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR7927297 1979-11-06
FR7927297A FR2468698A1 (en) 1979-11-06 1979-11-06 METHOD FOR IMPROVING THE SLIDING RESISTANCE OF CIVIL ENGINEERING WORKS AND ASSOCIATED FOUNDATIONS

Publications (2)

Publication Number Publication Date
EP0028558A1 EP0028558A1 (en) 1981-05-13
EP0028558B1 true EP0028558B1 (en) 1984-05-30

Family

ID=9231326

Family Applications (1)

Application Number Title Priority Date Filing Date
EP80401512A Expired EP0028558B1 (en) 1979-11-06 1980-10-24 Method of improving the sliding resistance of a civil engineering construction and its foundation

Country Status (9)

Country Link
US (1) US4704052A (en)
EP (1) EP0028558B1 (en)
AT (1) ATE7717T1 (en)
BR (1) BR8007180A (en)
DE (1) DE3068057D1 (en)
FR (1) FR2468698A1 (en)
HU (1) HU183242B (en)
PL (1) PL227677A1 (en)
YU (1) YU282380A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3612374A1 (en) * 1986-04-12 1987-10-15 Gerhard Geiger Low overfall, in particular for rain and melt water
DE3714585A1 (en) * 1987-05-01 1988-11-10 Pfeifenbring Bau Retaining arrangement for a watercourse

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4881848A (en) * 1988-07-26 1989-11-21 Davy Mckee Corporation Method of forming an immersed dam foundation and a dam structure thereon
US4860508A (en) * 1989-01-24 1989-08-29 Jackson Thomas L A Flooring system and method for constructing same
US5257489A (en) * 1991-10-15 1993-11-02 Angelette A M Railroad crossing signal foundation
US5228805A (en) * 1992-03-19 1993-07-20 Jeffery Chang Water pressure reducing structure of a raft foundation bottom plate
US5533835A (en) * 1995-02-06 1996-07-09 Angelette; A. M. Railroad crossing signal foundation and method of producing and erecting the same
US7827748B2 (en) * 2004-05-21 2010-11-09 Dixie Precast, Inc. Tower foundation
CN101806070B (en) * 2010-04-23 2011-12-14 中船第九设计研究院工程有限公司 Free-standing low pile cap dock wall structure with double rows of piles as foundation
US8806821B1 (en) 2013-02-01 2014-08-19 Franklin Brown Tower foundation pillar slab and method of producing such
EP3362607B1 (en) * 2015-10-13 2022-08-17 Armour Wall Group Pty Ltd Earth retention levee system
CN114152284B (en) * 2021-11-26 2023-04-11 福建工程学院 Tunnel grout stopping wall stability prediction method under full-face grouting

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2088676A5 (en) * 1970-04-21 1972-01-07 Aubert J

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US851436A (en) * 1906-08-16 1907-04-23 Jesse Theodor Pyle Pile structure.
US1007717A (en) * 1909-07-12 1911-11-07 Marshall Lapham Pile.
US1742947A (en) * 1928-02-14 1930-01-07 Victor G Brash Piling for subaqueous constructions
US3720067A (en) * 1971-04-15 1973-03-13 J Aubert Method for building immersed structures and a device for carrying out said method
FR2190129A5 (en) * 1972-06-22 1974-01-25 Aubert J
FR2147728A5 (en) * 1972-08-10 1973-03-09 Irwin Childs Francis

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2088676A5 (en) * 1970-04-21 1972-01-07 Aubert J

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3612374A1 (en) * 1986-04-12 1987-10-15 Gerhard Geiger Low overfall, in particular for rain and melt water
DE3714585A1 (en) * 1987-05-01 1988-11-10 Pfeifenbring Bau Retaining arrangement for a watercourse

Also Published As

Publication number Publication date
PL227677A1 (en) 1981-08-21
US4704052A (en) 1987-11-03
FR2468698A1 (en) 1981-05-08
HU183242B (en) 1984-04-28
BR8007180A (en) 1981-05-12
DE3068057D1 (en) 1984-07-05
YU282380A (en) 1983-10-31
EP0028558A1 (en) 1981-05-13
FR2468698B1 (en) 1981-12-04
ATE7717T1 (en) 1984-06-15

Similar Documents

Publication Publication Date Title
EP0839231B1 (en) River bank flood barrier
EP0028558B1 (en) Method of improving the sliding resistance of a civil engineering construction and its foundation
EP3359744B1 (en) Foundation structure
CA2225508A1 (en) Lightweight embankment
FR2682410A1 (en) WATER RETENTION TANK STRUCTURE.
EP0381547B1 (en) Method for laying an entrenched conduit
EP1827958A1 (en) Method for obtaining a box frame for construction and resulting box frame
FR2660681A1 (en) Connection element and methods for constructing walls which are connected at their base to a sole plate or to a baseplate
EP0165355A1 (en) Method of realizing a basement underneath an existing structure
FR2792661A1 (en) Barrage assembly for controlling the flow of water through a channel, into and out of a main body of water and other such applications, utilizes piles driven through the bed and lower substrata supporting rotating vanes
EP0034520B1 (en) Mining excavating process using the bord and pillar method
FR2898925A1 (en) Swimming pool, basin or other water sheet forming method, involves filling space between grilles and watertight membrane with rubble upto level of sundeck receiving zone, and forming sundeck to permanently immobilize grilles
FR2649428A1 (en) COMPONENT ELEMENTS OF EROSION DEFENSE STRUCTURES, RESULTING STRUCTURE AND METHOD FOR REINFORCING AND PLACING THE SAME
FR2619401A1 (en) PREFABRICATED ELEMENTS FOR THE CONSTRUCTION OF WALLS AND WALLS
FR2509771A1 (en) ASSEMBLY OF PREFABRICATED ELEMENTS FOR THE CONSTRUCTION OF A BEAM-WALL HOUSING AND WALL-HOUSING OBTAINED
FR2530696A1 (en) Breakwater dyke crest.
FR3105273A1 (en) Ready-to-assemble set of parts for barring a torrent to maintain a fixed level ford.
EP0395534A1 (en) Building construction
EP0584053A1 (en) Wall and method of manufacture
FR2812323A1 (en) Prefabricated concrete swimming pool is composed of two longitudinal elements forming vertical wall and bottom wall portion having longitudinal rabbet fitting rabbet in bottom slab forming pool bottom and two end elements
CH641863A5 (en) Prefabricated element for the erection of a crib wall and wall obtained
EP2821552A1 (en) Gateway and method for producing such a gateway
WO1995012714A1 (en) Formwork for dyke
FR2570729A1 (en) Retaining wall
FR2581102A1 (en) Prefabricated wall with internal buttresses

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19801029

AK Designated contracting states

Designated state(s): AT BE CH DE GB IT NL

ITCL It: translation for ep claims filed

Representative=s name: BARZANO' E ZANARDO ROMA S.P.A.

TCAT At: translation of patent claims filed
DET De: translation of patent claims
ITF It: translation for a ep patent filed

Owner name: BARZANO' E ZANARDO ROMA S.P.A.

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Designated state(s): AT BE CH DE GB IT LI NL

REF Corresponds to:

Ref document number: 7717

Country of ref document: AT

Date of ref document: 19840615

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3068057

Country of ref document: DE

Date of ref document: 19840705

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19841101

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19841107

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19841231

Year of fee payment: 5

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19861015

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19861031

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Effective date: 19871024

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19871031

Ref country code: CH

Effective date: 19871031

Ref country code: BE

Effective date: 19871031

BERE Be: lapsed

Owner name: SPIE-BATIGNOLLES

Effective date: 19871031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19880501

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
GBPC Gb: european patent ceased through non-payment of renewal fee
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19880701

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19881118