FR2535759A1 - METHOD FOR FORMING CONCRETE PILES AND NEW PREPARATORY PIEU FOR THIS PROCESS - Google Patents

METHOD FOR FORMING CONCRETE PILES AND NEW PREPARATORY PIEU FOR THIS PROCESS Download PDF

Info

Publication number
FR2535759A1
FR2535759A1 FR8317463A FR8317463A FR2535759A1 FR 2535759 A1 FR2535759 A1 FR 2535759A1 FR 8317463 A FR8317463 A FR 8317463A FR 8317463 A FR8317463 A FR 8317463A FR 2535759 A1 FR2535759 A1 FR 2535759A1
Authority
FR
France
Prior art keywords
pile
preparatory
shaft
diameter
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
FR8317463A
Other languages
French (fr)
Inventor
Ian Harold Braatvedt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Frankignoul Pieux Armes
Original Assignee
Frankignoul Pieux Armes
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frankignoul Pieux Armes filed Critical Frankignoul Pieux Armes
Publication of FR2535759A1 publication Critical patent/FR2535759A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Abstract

L'INVENTION CONCERNE UN PROCEDE DE FORMATION DE PIEUX EN BETON ET NOUVEAU PIEU PREPARATOIRE POUR CE PROCEDE. LE PIEU PREPARATOIRE 20 COMPORTE UN FUT 21 ET UNE BASE 22 FIXEE DE MANIERE AMOVIBLE A LA PARTIE INFERIEURE DU FUT 21, TANDIS QU'IL COMPORTE EGALEMENT, A UNE HAUTEUR REPRESENTANT A PEU PRES QUATRE FOIS LE DIAMETRE DU FUT 21 AU-DESSUS DE LA BASE 22 DU PIEU PREPARATOIRE, UN TUBAGE 24 D'UN DIAMETRE EGAL A CELUI DU FUT DU PIEU PERMANENT, CE TUBAGE ETANT ASSOCIE DANS SON DEPLACEMENT AVEC LE FUT 21 AU COURS DE L'ENFONCEMENT DU PIEU PREPARATOIRE 20. L'INVENTION EST UTILISEE POUR EMPECHER LE CISAILLEMENT ET LE DEPLACEMENT DU SOL AU COURS DE L'ENFONCEMENT D'UN PIEU PREPARATOIRE.THE INVENTION RELATES TO A PROCESS FOR FORMING CONCRETE PILES AND A NEW PILE PREPARATORY FOR THIS PROCESS. THE PREPARATORY PIE 20 INCLUDES A SHAFT 21 AND A BASE 22 REMOVABLE ATTACHED TO THE LOWER PART OF THE SHAFT 21, WHILE IT ALSO CONTAINS, AT A HEIGHT REPRESENTING ABOUT FOUR TIMES THE DIAMETER OF THE SHAFT 21 ABOVE THE BASE 22 OF THE PREPARATORY PILE, A TUBING 24 OF A DIAMETER EQUAL TO THAT OF THE SHAFT OF THE PERMANENT PILE, THIS TUBING BEING ASSOCIATED IN ITS MOVEMENT WITH THE SHAFT 21 DURING THE SINKING OF THE PREPARATORY PILE 20. THE INVENTION IS USED FOR PREVENT SHEARING AND DISPLACEMENT OF SOIL DURING PREPARATORY PIE DRIVING.

Description

Procédé de formation de pieux en béton et nouveauMethod of forming concrete piles and new

pieu préparatoire pour ce procédé.  preparatory pile for this process.

La présente invention concerne essentiel-  The present invention relates essentially to

lement un procédé en vue de former des pieux en béton, ainsi qu'un nouveau pieu préparatoire pour ce procédé. Il est bien connu (notamment d'après le brevet des Etats-Unis d'Amérique N O 779 881) de former des pieux en béton en enfonçant> dans le sol, un pieu préparatoire comprenant un fût, ainsi qu'une base ou  a process for forming concrete piles, as well as a new preparatory pile for this process. It is well known (particularly according to U.S. Patent No. 779,881) to form concrete piles by driving> into the ground a preparatory pile comprising a shaft, as well as a base or

un patin fixé de manière amovible à la partie infé-  a pad removably attached to the lower portion

rieure du fût du pieu, formant ainsi une ouverture qui, du moins autour du fat du pieu, est remplie par  of the pile, thus forming an opening which, at least around the pile pile, is filled by

le béton dont le pieu permanent doit être constitué,.  concrete whose permanent pile must be made ,.

la base étant ensuite détachée du fût avant de retirer  the base is then detached from the drum before removing

ce dernier de l'ouverture précitée.  the latter of the aforementioned opening.

Plusieurs perfectionnements ont été apportés  Several improvements have been made

au procédé décrit dans le brevet des Etats-Unis d'Amé-  to the process described in the United States patent of

rique no 779 881, ces perfectionnements étant le mieux  No. 779 881, these improvements being the best

illustrés à titre d'exemple dans le brevet des Etats-  illustrated by way of example in the United States patent.

Unis d'Amérique no 3 851 485 au nom de STEDING Ces perfectionnements se rapportent essentiellement à des formes de réalisation améliorées de la trémie destinée  United States No. 3,851,485 to STEDING These improvements relate primarily to improved embodiments of the hopper

à charger le béton dans l'ouverture, ainsi qu'à diver-  to load the concrete into the opening, as well as to diversify

ses configurations des pieux préparatoires.  its configurations of the preparatory piles.

Ces procédés et appareils connus en vue de former des pieux en béton présentent un inconvénient  These methods and apparatus known for forming concrete piles have a disadvantage

majeur qui consiste en ce que, au cours de l'enfonce-  which consists in the fact that during

nient du pieu préparatoire> il se produit un mouvement  deny the preparatory stake> there is a movement

du sol donnant lieu à un "étranglement" ou à une ré-  ground giving rise to a "choke" or a

duction du diamètre du fût selon des principes géo-  diameter of the barrel according to geo-

techniques bien connus en ce qui concerne le cisaille-  well-known techniques with regard to shears

ment et le déplacement du sol.and the displacement of the soil.

Le but de la présente invention est de trou-  The object of the present invention is to

ver> pour la première fois, une solution empêchant l'étranglement" ou la réduction ci-dessus du diamètre du f t se produisant au cours de l'enfoncement du pieu préparatoire, évitant ainsi l'inconvénient des  for the first time, a solution preventing the restriction or reduction of the diameter of the ft occurring during the driving of the preparatory pile, thus avoiding the inconvenience of

solutions connues pour l'enfoncement.  known solutions for driving.

Suivant la présente invention" cette solu-  According to the present invention, this solution

tion est réalisée par un procédé en vue de former des pieux en béton, ce procédé consistant à enfoncer, dans le sol, un pieu préparatoire comportant un f Ot et une base ou un patin fixé de manière amovible à la partie inférieure du fût du pieu, formant ainsi une ouverture; remplir l'ouverture, du moins autour du fût du pieu,  The method is carried out by a method of forming concrete piles, which method comprises driving into the ground a preparatory pile having an eye and a base or shoe removably attached to the lower portion of the pile shaft. thus forming an opening; fill the opening, at least around the shaft of the pile,

avec le béton dont le pieu permanent doit être cons-  with concrete whose permanent pile must be con-

titué et ensuite détacher la base du pieu avant de retirer le fût par l'ouverture, caractérisé en ce qu'il consiste également à équiper le fût du pieu préparatoire,  staggered and then detach the base of the pile before removing the barrel through the opening, characterized in that it also consists in equipping the barrel of the preparatory pile,

à une hauteur représentant environ quatre fois le dia-  at a height of about four times the diameter

mètre du fût du pieu permanent au-dessus de la base du fût préparatoire, d'un tubage d'un diamètre égal à celui du fût permanent, ce tubage étant associé dans  meter of the shaft of the permanent pile above the base of the preparatory shaft, a casing of a diameter equal to that of the permanent shaft, this casing being associated in

son déplacement avec le fût du pieu au cours de l'en-  its displacement with the pile of the pile during the

foncement du pieu préparatoire, empêchant ainsi le  of the preparatory pile, thus preventing the

cisaillement et le déplacement du sol.  shearing and moving the soil.

Suivant une forme de réalisation particu-  According to a particular embodiment

lière, ce tubage peut être constitué d'une membrane circulaire fixée au f t du pieu en des points discrets autour de ce dernier afin de chasser le béton vers le bas au cours de l'enfoncement du pieu préparatoire, cette membrane étant ensuite retirée par l'ouverture  Alternatively, this casing may consist of a circular membrane fixed to the pile at discrete points around the pile in order to drive the concrete downwards during the driving of the preparatory pile, this membrane being then removed by the 'opening

conjointement avec le fût du pieu.together with the pile shaft.

Suivant une autre forme de réalisation, le tubage peut avoir une longueur égale à quatre fois le diamètre du fût du pieu permanent et, par conséquent,  According to another embodiment, the casing may have a length equal to four times the diameter of the shaft of the permanent pile and, consequently,

il s'étend vers le bas à partir de cette hauteur d'en-  it extends downwards from this height of

viron quatre fois le diamètre du fût du pieu permanent pour entrer en contact avec la base du pieu, ce tubage  four times the diameter of the shaft of the permanent pile to make contact with the base of the pile, this casing

étant fixé au fût du pieu pour être retiré conjointe-  being attached to the pile shaft to be removed together

3.3.

ment avec ce dernier par l'ouverture précitée.  with the latter by the aforementioned opening.

Suivant une autre forme de réalisation, le tubage peut être constitué d'une enveloppe en béton ou en amiante/ciment ou encore il peut être constitué d'une conduite en matière plastique ou d'un manchon métallique d'une longueur égale à environ quatre fois le diamètre du fût du pieu permanent et s'étendant vers le bas à partir de cette hauteur située à quatre fois 1 e d i a m è t r e d u f L t du pieu permanent au-dessus de la base du pieu pour entrer en contact avec cette base De préférence, suivant cette forme de réalisation, cette enveloppe est située dans une cavité correspondante du fût du  According to another embodiment, the casing may consist of a concrete or asbestos / cement envelope or it may consist of a plastic pipe or a metal sleeve of a length equal to about four the diameter of the pile of the permanent pile and extending downwards from this height located four times as long as the permanent pile above the base of the pile to make contact with this base. according to this embodiment, this envelope is located in a corresponding cavity of the barrel of the

pieu préparatoire, ce dernier ayant, en section trans-  preparatory stake, the latter having, in trans-

versale, une longueur profilée égale au diamètre du  versale, a profiled length equal to the diameter of the

fût du pieu permanent.barrel of the permanent pile.

De même, la présente invention concerne un nouveau pieu préparatoire comprenant un fût et une base ou un patin fixé de manière amovible à la partie inférieure du fût du pieu, ce pieu étant caractérisé en ce qu'il comprend, en outre, à une hauteur égale  Similarly, the present invention relates to a new preparatory pile comprising a drum and a base or a pad removably attached to the lower part of the pile shaft, this pile being characterized in that it further comprises at a height equal

à environ quatre fois le diamètre du fût du pieu per-  at about four times the diameter of the shaft of the pile

manent au-dessus de la base du pieu préparatoire) un  manate above the base of the preparatory pile) a

tubage d'un diamètre égal à celui du fût du pieu per-  casing of a diameter equal to that of the pile of the pile

manent à former, ce tubage étant disposé, par rapport au fût du pieu, pour être associé dans son déplacement  are formed to form, this casing being arranged, relative to the pile of the pile, to be associated in its displacement

avec ce dernier au cours de l'enfoncement du pieu pré-  with the latter during the insertion of the pre-existing pile

paratoire. En conséquence, ce tubage peut être réalisé  paratoire. As a result, this casing can be realized

conformément aux formes de réalisation réellement pré-  in accordance with the actual embodiments

férées dont il a été fait mention ci-dessus.  which has been mentioned above.

La présente invention sera illustrée en se référant aux dessins annexes dans lesquels  The present invention will be illustrated with reference to the accompanying drawings in which

2535 ? 59.2535? 59.

la figure 1 est une illustration schéma-  Figure 1 is a schematic illustration of

tique du cisaillement et du déplacement du sol se  shear and soil displacement

produisant au cours de l'enfoncement du pieu prépara-  producing during the driving of the prepared pile

toire conformément aux procédés connus de la technique antérieure qui sont illustrés à titre d'exemple dans le brevet des Etats-Unis d'Amérique no 779 881; la figure 2 est une vue en élévation du procédé de leinvention suivant la première forme de réalisation du pieu préparatoire de l'invention; la figure 2 a est une vue en coupe prise suivant la ligne I Ia-I Ia de la figure 2;  in accordance with known methods of the prior art which are illustrated by way of example in US Pat. No. 779,881; Figure 2 is an elevational view of the method of the invention according to the first embodiment of the preparatory pile of the invention; Figure 2a is a sectional view taken along the line Ia-I Ia of Figure 2;

la figure 3 est également une vue en élé-  FIG. 3 is also an elevational view of

vation du procédé de l'invention suivant une deuxième  of the process of the invention according to a second

forme de réalisation du pieu préparatoire de l'inven-  embodiment of the preparatory pile of the invention

tion; la figure 3 a est une vue en coupe prise suivant la ligne II Ia-II Ia de la figure 3; la figure 4 est une vue en élévation du procédé de l'invention suivant une troisième forme de  tion; Figure 3a is a sectional view taken along the line IIa-II Ia of Figure 3; FIG. 4 is an elevational view of the method of the invention according to a third form of

réalisation du pieu préparatoire de l'invention.  realization of the preparatory pile of the invention.

En se référant à la figure 1, le procédé.  Referring to Figure 1, the method.

connu consiste à enfoncer, dans le sol 1, un pieu préparatoire 2 comprenant un fût 3 et une base ou un patin 4 fixé de manière amovible à la partie inférieure  known is to sink, in the ground 1, a preparatory pile 2 comprising a shaft 3 and a base or a pad 4 removably attached to the lower part

du fût du pieu, définissant ainsi une ouverture 5.  of the pile of the pile, thus defining an opening 5.

Ce procédé connu consiste également à remplir l'ouver-  This known method also consists in filling the opening

ture 5, du moins autour du fût 3 du pieu, avec le béton 6 dont le pieu permanent doit être constitué, par  5, at least around the pile 3 of the pile, with the concrete 6 whose permanent pile must be constituted by

exemple, à l'aide du conduit d'alimentation de béton 7.  for example, using the concrete feed pipe 7.

Suivant ce procédé connu, le niveau de béton est main-  According to this known method, the level of concrete is now

tenu constant dans le trou formé par le pieu prépara-  held constant in the hole formed by the pile

toire afin de remplir l'ouverture 5 au fur et à mesure de sa formation Lorsqu'il est constitué d'un tube  to fill the opening 5 as it is formed When it is made of a tube

creux, le fût 3 du peu préparatoire comporte avanta-  hollow, barrel 3 of the preparatory bit

3.5 geusement des trous 8 permettant, au béton, de se  3.5 digging holes 8 allowing concrete to

253 575253,575

déplacer librement à l'intérieur du fût du pieu La base est ensuite détachée avant de retirer le fût 3  move freely inside the pile of the pile The base is then detached before removing the drum 3

du pieu.of the stake.

Suivant ce procédé connu, au cours de l'en-  According to this known method, during the

foncement du pieu préparatoire 2, de la base 4 ou du bouchon du pieu préparatoire 2 dont le diamètre D est  of the preparatory pile 2, the base 4 or the plug of the preparatory pile 2 whose diameter D is

obligatoirement égal au diamètre du fût du pieu per-  necessarily equal to the diameter of the shaft of the pile

manent, il se produit un mouvement du sol suivant les  manent, there is a movement of the soil following the

flèches 10 représentées en figure 1 les limites appro-  arrows 10 shown in FIG.

ximatives du mouvement du sol étant indiquées par la  of the movement of the soil being indicated by the

ligne extérieure 12.outside line 12.

D'après la figure 1, on peut constater que la limite inférieure du mouvement du sol se situe à  From Figure 1 it can be seen that the lower limit of soil movement is

peu près à une profondeur égale à une fois le diamè-  approximately one depth equal to one

tre de la base 4 du pieu, tandis que cette limite approximative du mouvement du sol se termine à une hauteur égale à quatre fois le diamètre de la base du pieu ou du fût du pieu permanent, puisqu'aussi bien le diamètre de la base du pieu est celui du fût du  of the base 4 of the pile, while this approximate limit of the movement of the ground ends at a height equal to four times the diameter of the base of the pile or the shaft of the permanent pile, since both the diameter of the base of the pile stake is that of the barrel

pieu permanent à former.permanent pile to form.

Ce mouvement du sol donne lieu à un effet d'"étranglement" ou à une réduction du diamètre de l'ouverture, c'est-à-dire une réduction du diamètre  This movement of the soil gives rise to a "throttling" effect or a reduction in the diameter of the opening, ie a reduction in the diameter

du pieu permanent.of the permanent pile.

On évite cet inconvénient majeur du procédé connu par le procédé de la présente invention qui sera  This major disadvantage of the known process is avoided by the process of the present invention which will be

décrit ci-après en se référant à trois formes de réa-  described below with reference to three forms of

lisation réellement préférées qui sont illustrées  really favorite which are illustrated

dans les figures 2 à 4.in Figures 2 to 4.

En se référant à la figure 2 qui représente la première forme de réalisation du pieu préparatoire de l'invention, le pieu préparatoire 20 enfoncé dans le sol 1 comporte bien entendu également un fût 21, ainsi qu'une base ou un patin amovible 22 constituant  With reference to FIG. 2, which represents the first embodiment of the preparatory pile of the invention, the preparatory pile 20 driven into the ground 1 of course also comprises a shank 21, as well as a base or a removable pad 22 constituting

la pointe du pieu permanent de façon connue antérieure-  the tip of the permanent pile in a manner known prior-

2535 ? 592535? 59

ment et comme illustré à titre d'exemple en figure 1.  and illustrated as an example in Figure 1.

En outre, suivant la présente invention, à une hauteur à peu près égale à quatre fois le diamètre du fût du  In addition, according to the present invention, at a height approximately equal to four times the diameter of the barrel of the

pieu permanent au-dessus de la base 22 du pieu prépa-  permanent pile above the base 22 of the prepa-

ratoire, ce dernier comporte également un tubage 24 d'un diamètre égal à celui du fût du pieu permanent, ce tubage étant associé dans son déplacement au fût 21 au cours de l'enfoncement du pieu préparatoire 20, empêchant ainsi le cisaillement et le déplacement du  the latter also comprises a casing 24 of a diameter equal to that of the shaft of the permanent pile, this casing being associated in its movement to the shaft 21 during the driving of the preparatory pile 20, thus preventing shearing and displacement of

sol.ground.

De préférence, comme représenté en figure 2, le tubage 24 a une longueur égale à environ quatre  Preferably, as shown in FIG. 2, the casing 24 has a length equal to approximately four

fois le diamètre du fût du pieu permanent et, en con-  the diameter of the pile of the permanent pile and, in

séquence" à partir de cette hauteur située à environ quatre fois le diamètre au-dessus de la base 22 du pieu, il s'étend vers le bas pour entrer en contact avec cette base 22,comme représenté clairement en figure 2 Suivant la forme de réalisation illustrée en figure 2, le tubage est fixé au fût 21 en des points discrets autour de ce dernier à l'aide de protubérances 26 qui sont dirigées vers l'intérieur et qui, dans ce  sequence "from this height located at about four times the diameter above the base 22 of the pile, it extends downward to make contact with this base 22, as clearly shown in Figure 2 in the form of embodiment illustrated in Figure 2, the casing is fixed to the barrel 21 at discrete points around the latter with the aid of protrusions 26 which are directed towards the inside and which, in this case,

cas, sont inclinées Cette fixation peut être effec-  This inclination may be effected

tuée suivant n'importe quelle technique connue et ces protubérances intérieures peuvent être, par exemple,  killed by any known technique and these inner protuberances may be, for example,

soudées sur le fût 21 du pieu.welded on the barrel 21 of the pile.

Suivant la forme de réalisation illustrée en figure 2, on peut, par conséquent, constater que le  According to the embodiment illustrated in FIG. 2, it can therefore be observed that the

tubage 24 empêche tout "étranglement" ou toute réduc-  tubing 24 prevents any "throttling" or any reduction

tion du fût du pieu permanent, puisqu'aussi bien ce tubage 24 s'étend sur une longueur représentant quatre fois le diamètre du fût du pieu permanent, empêchant ainsi tout mouvement du sol au cours de ltenfoncement  the casing of the permanent pile, since this casing 24 extends over a length representing four times the diameter of the shaft of the permanent pile, thus preventing any movement of the soil during the entrenchement

du pieu préparatoire 20.of the preparatory stake 20.

Dans la présente forme de réalisation, tout comme dans l'autre forme de réalisation illustrée en 25357 sg figure 3, le fût 21 du pieu est constitué d'un tube comportant des trous 28 permettant, au béton, de se  In the present embodiment, as in the other embodiment illustrated in FIG. 3, the barrel 21 of the pile consists of a tube comprising holes 28 enabling the concrete to be

déplacer librement à l'intérieur de ce tube, puis-  move freely inside this tube, then

qu'aussi bien le béton est chargé à l'extérieur du pieu préparatoire 20, comme indiqué par la flèche C en figure 2, le niveau-du béton étant indiqué par les lettres C L à l'intérieur du tubage provisoire 30  that both the concrete is loaded outside the preparatory pile 20, as indicated by the arrow C in Figure 2, the level-concrete being indicated by the letters C L inside the temporary casing 30

qui peut être une trémie située dans louverture pra-  which can be a hopper located in the opening

tiquée dans le sol 1.grounded 1.

La figure 2 a montre que le fût 21 du pieu comprend, en fait, une partie tubulaire centrale 21 a et des prolongements radiaux 21 b qui, dans ce cas, sont au nombre de quatre, ce nombre pouvant évidemment  FIG. 2a shows that the barrel 21 of the pile comprises, in fact, a central tubular part 21a and radial extensions 21b which, in this case, are four in number, this number being obviously

être plus faible ou plus élevé.be lower or higher.

Ce tubage 24 qui est fixé au fût 21 du pieu préparatoire, sera retiré avec ce fût 21 lorsque ce  This casing 24 which is fixed to the barrel 21 of the preparatory pile, will be removed with this drum 21 when this

-dernier sera retiré de l'ouverture au terme du proces-  -last will be removed from the opening at the end of the process-

sus et après avoir détaché,, de façon connue en soi,  and after having detached, in a manner known per se,

la base 22 du pieu constituant la pointe du pieu per-  the base 22 of the pile constituting the tip of the pile

manent Ces assemblages amovibles entre le fût et la base du pieu sont bien connus dans la technique et l'on peut utiliser, par exemple, ceux du brevet des  These removable assemblies between the barrel and the base of the pile are well known in the art and can be used, for example, those of the US Pat.

Etats-Unis d'Amérique ne 779-881 ou également les per-  United States of America No. 779-881 or also

fectionnements décrits dans le brevet des Etats-Unis  described in the US patent

d'Amérique no 308510485 au nom de STEDING.  No. 308510485 in the name of STEDING.

Enfin, il est également utile que la par-  Finally, it is also useful that the

tie supérieure 32 du tubage 24 qui, dans le cas pré-  upper section 32 of the casing 24 which, in the case

sent, consiste en un tube creux à section transversale à peu près circulaire, soit inclinée vers l'intérieur, cette partie inclinée ménageant un espace libre 36 entre le fût 21 du pieu et la partie supérieure du  consists of a hollow tube of approximately circular cross section, inclined inwards, this inclined portion providing a free space 36 between the barrel 21 of the pile and the upper part of the

tubage 24, cet espace libre représentant, de préfé-  casing 24, this free space representing, preferably

rence, à peu près la moitié de la distance comprise entre le fût 21 du pieu et la paroi intérieure de  approximately half the distance between the pile drum 21 and the inner wall of

l'ouverture 34.the opening 34.

2535759-2535759-

La figure 3 représente une autre forme de réalisation du pieu préparatoire de l'invention qui,  FIG. 3 represents another embodiment of the preparatory pile of the invention which,

dans ce cas, comporte le même fût 21 que celui illus-  in this case, includes the same drum 21 as that illustrated

tré en figure 2 avec l même base 22 Toutefois, dans la présente forme de réalisation, le tubage est cons- titué d'une membrane circulaire 40 qui, de préférence, est fixée au fût 21 du pieu préparatoire de la même manière que le tubage 24 de la forme de réalisation de la figure 2, notamment à l'aide de protubérances  However, in the present embodiment, the casing is constituted by a circular membrane 40 which, preferably, is fixed to the barrel 21 of the preparatory pile in the same manner as the casing. 24 of the embodiment of Figure 2, in particular using protuberances

42 qui sont dirigées vers l'intérieur et qui sont in-  42 which are directed inwards and which are in-

clinées comme représenté dans le dessin, De même, la partie supérieure 44 de la membrane circulaire 40 peut  as shown in the drawing, Similarly, the upper portion 44 of the circular membrane 40 may

avantageusement être inclinée vers l'intérieur en mé-  advantageously be inclined inwards in

nageant un espace libre 46 entre le fût 21 du pieu et  swimming a free space 46 between the barrel 21 of the pile and

la partie supérieure 44 du tubage 40.  the upper part 44 of the casing 40.

Comme représenté en figure 3, cette membrane circulaire 40 constituant le tubage est située à une hauteur représentant environ quatre fois le diamètre D du fût du pieu permanent au-dessus de la base 22 du fût préparatoire et, de préférence, elle se termine exactement à cette hauteur et s'étend vers le bas à partir de cette hauteurexacte pour obtenir l'effet désiré La longueur minimum permettant d'obtenir cet effet désiré représente à peu près la moitié du diamètre D du fût du pieu permanent, cette longueur minimum englobant la partie inclinée 44 Dans cette forme de réalisation, tout comme dans celle de la figure 2, grâce aux protubérances intérieures 42, le béton est chassé vers le bas au cours de l'enfoncement  As represented in FIG. 3, this circular membrane 40 constituting the casing is located at a height representing approximately four times the diameter D of the shaft of the permanent pile above the base 22 of the preparatory drum and, preferably, it ends exactly at this height and extends downward from this exact height to achieve the desired effect The minimum length to achieve this desired effect is about half the diameter of the shaft of the permanent pile, this minimum length including the In this embodiment, as in that of FIG. 2, thanks to the internal protuberances 42, the concrete is driven downwards during the depression.

du pieu préparatoire.of the preparatory stake.

La figure 4 illustre une troisième forme  Figure 4 illustrates a third form

de réalisation du pieu préparatoire de l'invention.  embodiment of the preparatory pile of the invention.

Dans ce cas, le pieu préparatoire 50 comporte un fût  In this case, the preparatory pile 50 comprises a barrel

51 qui est représenté en figure 4 a et qui doit compor-  51 which is shown in Figure 4a and which must

ter une plaque 51 a sur laquelle deux barres 51 b, 51 c  a plate 51a on which two bars 51b, 51c

ont été fixées perpendiculairement et en alignement.  have been fixed perpendicularly and in alignment.

Ce fit 51 comporte également des trous 52 établissant une communication libre entre les compartiments définis entre la plaque 51 a et les barres 51 b, 51 c, comme on le comprend clairement en examinant la figure 4 a.  This fit 51 also includes holes 52 establishing a free communication between the compartments defined between the plate 51a and the bars 51b, 51c, as is clearly understood by examining Figure 4a.

Suivant la présente invention, ce pieu pré-  According to the present invention, this pile pre-

paratoire 50 comporte également une enveloppe permanente en béton ou en une autre matière résistante 54 d'une longueur à peu près égale à quatre fois le diamètre D du fût du pieu permanent, la partie inférieure 54 a de ce pieu entrant en contact avec la base 55 fixée de manière amovible au fût 51 du pieu Cette enveloppe permanente 54 est située à llintérieur d'une cavité correspondante 56 du fût 51 du pieu préparatoire, ce dernier ayant, dans cette forme de réalisation et en  paratory 50 also comprises a permanent casing made of concrete or another resistant material 54 having a length approximately equal to four times the diameter D of the shaft of the permanent pile, the lower portion 54a of this pile coming into contact with the base This permanent casing 54 is located inside a corresponding cavity 56 of the barrel 51 of the preparatory pile, the latter having in this embodiment and in

dehors de la cavité 56, une longueur profilée en sec-  outside the cavity 56, a length profiled in sec-

tion transversale pratiquement égale au diamètre D du fût du pieu permanent,comme représenté clairement en  cross section substantially equal to the diameter of the shaft of the permanent pile, as clearly

figure 4.figure 4.

En conséquence, l'enveloppe permanente est pratiquement "verrouillée" dans la cavité 56 du fût 51  As a result, the permanent casing is practically "locked" in the cavity 56 of the barrel 51

à l'aide de la base 55 du pieu En conséquence, lors-  With the help of the base 55 of the pile

qu'on détache la base 55 du pieu du fût 51 et lorsqu'on retire ce dernier, l'enveloppe permanente 54 qui, dans ce cas, constitue le tubage de l'invention, reste dans le sol, empêchant ainsi les mouvements de ce dernier  the base 55 is detached from the pile of the barrel 51 and when the latter is removed, the permanent casing 54 which in this case constitutes the casing of the invention, remains in the ground, thus preventing the movements of this casing. latest

tant au cours de l'enfoncement du pieu qu'ultérieure-  both during the pushing down of the stake and later

ment. Dès lors, il est clair que l'une ou l'autre des trois formes de réalisation illustrées dans les figures 2 à 4 est conforme au procédé de l'invention  is lying. Therefore, it is clear that one or the other of the three embodiments illustrated in FIGS. 2 to 4 is in accordance with the method of the invention

qui a été décrit précédemment.which has been described previously.

Claims (8)

REVENDICATIONS 1 Procédé en vue de former des pieux en béton, ce procédé consistant à enfoncer, dans le sol, un pieu préparatoire comportant un fût et une base ou un patin fixé de manière amovible à la partie inférieu-  A method of forming concrete piles, which method comprises driving a preparatory pile into the ground with a barrel and a base or pad removably attached to the lower portion; re du fût du pieu, formant ainsi une ouverture; rem-  the barrel of the pile, thus forming an opening; replaced plir l'ouverture, du moins autour du fût du pieu, avec le béton dont le pieu permanent doit être constitué, et ensuite détacher la base du pieu avant de retirer  crease the opening, at least around the pile of the pile, with the concrete whose permanent pile must be made, and then detach the base of the pile before removing le fût par l'ouverture, caractérisé en ce qu'il con-  the barrel through the opening, characterized in that it siste également à équiper le fût du pieu préparatoire,  is also to equip the barrel of the preparatory stake, à une hauteur représentant environ quatre fois le dia-  at a height of about four times the diameter mètre du fût du pieu permanent au-dessus de la base du fût préparatoire, d'un tubage d'un diamètre égal à celui du fût permanent> ce tubage étant associé dans  meter of the shaft of the permanent pile above the base of the preparatory shaft, a casing of a diameter equal to that of the permanent shaft> this casing being associated in son déplacement avec le fût du pieu au cours de l'en-  its displacement with the pile of the pile during the foncement du pieu préparatoire, empêchant ainsi le  of the preparatory pile, thus preventing the cisaillement et le déplacement du sol.  shearing and moving the soil. 2 Procédé suivant la revendication 1, caractérisé en ce que le tubage est constitué d'une membrane circulaire fixée au fût du pieu en des points discrets autour de ce dernier afin de chasser le béton  2 Process according to claim 1, characterized in that the casing consists of a circular membrane fixed to the shaft of the pile at discrete points around the latter in order to drive the concrete vers le bas au cours de l'enfoncement du pieu prépara-  down during the depression of the prepared pile. toire, cette membrane étant ensuite retirée conjointe-  this membrane is then removed together ment avec le fût du pieu.with the pile of the pile. 3 Procédé suivant la revendication 1, caractérisé en ce que le tubage a une longueur égale  Process according to Claim 1, characterized in that the casing has an equal length à environ quatre fois le diamètre du fût du pieu per-  at about four times the diameter of the shaft of the pile manent et s'étend vers le bas à partir de cette hauteur située à environ quatre fois le diamètre du fût du pieu permanent pour ainsi entrer en contact avec la base du pieu, ce tubage étant fixé au fût du pieu pour être  and extends downward from this height about four times the diameter of the shaft of the permanent pile so as to come into contact with the base of the pile, this casing being fixed to the shaft of the pile to be retiré conjointement avec ce dernier.  withdrawn together with the latter. 4 Procédé suivant la revendication 1, caractérisé en ce que le tubage est constitué d'une enveloppe d'une matière résistante d'une longueur égale  4 Process according to claim 1, characterized in that the casing consists of a casing of a resistant material of equal length à environ quatre fois le diamètre du fût du pieu per-  at about four times the diameter of the shaft of the pile manent, tandis qu'elle s'étend vers le bas à partir de cette hauteur située à environ quatre fois le diamètre du fût du pieu permanent audessus de la base du pieu,  manent, while it extends downward from this height about four times the diameter of the shaft of the permanent pile above the base of the pile, pour ainsi entrer en contact avec cette base.  to get in touch with this base. Procédé suivant la revendication 4, ca- ractérisé en ce que l'enveloppe est située dans une cavité correspondante du f t du pieu préparatoire qui,  Method according to Claim 4, characterized in that the envelope is located in a corresponding cavity of the preparatory pile which, en section transversale, a une longueur profilée pra-  in cross-section, has a profiled length tiquement égale au diamètre du f t du pieu permanent,  only equal to the diameter of the f t of the permanent pile, en dehors de la cavité.outside the cavity. 6 Nouveau pieu préparatoire comportant un fût et une base ou un patin fixé de manière amovible à la partie inférieure de ce fût, caractérisé en ce qu'il comporte également un tubage ( 24; 40, 54) situé  6 New preparatory pile having a drum and a base or a pad removably attached to the lower part of this drum, characterized in that it also comprises a casing (24; 40, 54) located à une hauteur représentant environ quatre fois le dia-  at a height of about four times the diameter mètre du fût du pieu permanent au-dessus de la base du pieu préparatoire, ce tubage ayant un diamètre égal  meter of the pile of the permanent pile above the base of the preparatory pile, this casing having an equal diameter à celui du fût du pieu permanent et étant as-  to that of the shaft of the permanent stake and being socié dans son déplacement au fût du pieu au cours de l'enfoncement du pieu préparatoire, empêchant ainsi le cisaillement et le déplacement du solo  associated in its displacement at the barrel of the stake during the sinking of the preparatory stake, thus preventing the shear and displacement of the solo 7 Pieu préparatoire suivant la revendica-  7 Preparatory pile according to the claim tion 6, caractérisé en ce que le tubage ( 40) est cons-  6, characterized in that the casing (40) is constructed titué d'une membrane circulaire fixée au-fût ( 21) du pieu en des points discrets autour de ce dernier afin  a circular membrane fixed to the barrel (21) of the pile at discrete points around the latter so de chasser le béton vers le bas au cours de l'enfon-  to drive the concrete down during the cement du pieu préparatoire, cette membrane étant  the preparatory pile, this membrane being ensuite retirée conjointement avec le fût ( 21) du pieu.  then removed together with the pile shaft (21). 8 Pieu préparatoire suivant la revendica-  8 Preparatory pile according to the claim tion 6, caractérisé en ce que le tubage ( 24) a une longueur égale à environ quatre fois le diamètre du fût du pieu permanent, tandis qu'il s'étend vers le bas à partir de cette hauteur située à environ quatre fuis le diamètre du fût du pieu permanent pour entrer en cuntact avec la base ( 22) du pieu, ce tubage ( 24)  6, characterized in that the casing (24) has a length equal to about four times the diameter of the shaft of the permanent pile, while it extends downwardly from this height about four times the diameter of the shaft of the permanent pile to engage with the base (22) of the pile, this casing (24) étant fixé au fût ( 21)-du pieu pour être retiré con-  being fixed to the shaft (21) of the pile to be removed jointement avec ce dernier.with the latter. 9 Pieu préparatoire suivant la revendica-  9 Preparatory pile according to the claim tion 6, caractérisé en ce que le tubage ( 54) est cons-  6, characterized in that the casing (54) is constructed titué d'une enveloppe en une matière résistante d'une longueur égale à environ quatre fois le diamètre du  provided with an envelope made of a resistant material of a length equal to approximately four times the diameter of the fût du pieu permanent et s'étendant vers le bas à par-  bole of the permanent pile and extending downwards to tir de cette hauteur située à environ quatre fois le diamètre du fût du pieu permanent au-dessus de la base ( 55) du pieu, pour entrer en contact avec cette base  firing from this height approximately four times the diameter of the shaft of the permanent pile above the base (55) of the pile, to make contact with this base ( 55).(55). Pieu préparatoire suivant la revendi-  Preparatory pile according to the cation 9, caractérisé en ce que l'enveloppe en béton est située à l'intérieur d'une cavité correspondante ( 56) du fût ( 52) du pieu préparatoire, ce dernier ayant, en section transversale, une longueur profilée à peu près égale au diamètre du fût du pieu permanent, en  cation 9, characterized in that the concrete envelope is located inside a corresponding cavity (56) of the barrel (52) preparatory pile, the latter having, in cross section, a profile length approximately equal to the diameter of the shaft of the permanent pile, in dehors de la cavité ( 56).outside the cavity (56).
FR8317463A 1982-11-05 1983-11-03 METHOD FOR FORMING CONCRETE PILES AND NEW PREPARATORY PIEU FOR THIS PROCESS Pending FR2535759A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB08231680A GB2129855A (en) 1982-11-05 1982-11-05 Method of forming concrete piles and new preparatory pile therefore

Publications (1)

Publication Number Publication Date
FR2535759A1 true FR2535759A1 (en) 1984-05-11

Family

ID=10534073

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8317463A Pending FR2535759A1 (en) 1982-11-05 1983-11-03 METHOD FOR FORMING CONCRETE PILES AND NEW PREPARATORY PIEU FOR THIS PROCESS

Country Status (12)

Country Link
BE (1) BE898138A (en)
BR (1) BR8305914A (en)
CA (1) CA1200111A (en)
CH (1) CH655530B (en)
DE (1) DE3339509A1 (en)
FI (1) FI834032A (en)
FR (1) FR2535759A1 (en)
GB (1) GB2129855A (en)
GR (1) GR79644B (en)
LU (1) LU85072A1 (en)
NL (1) NL8303614A (en)
ZA (1) ZA837999B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2479199A (en) * 2010-04-01 2011-10-05 Abbey Pynford Holdings Plc In-situ foundation pile manufacture with simultaneous driving and filling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR583391A (en) * 1924-02-07 1925-01-12 Anciens Etablissements Ed Zubl Method and device applicable to the fabrication of concrete foundation piles with large cross section cast in place using a temporary sheath
FR1497022A (en) * 1966-10-19 1967-10-06 Parera S Aannemings En Handelm Method of manufacturing a widened foot pile in the ground
US3881320A (en) * 1973-06-27 1975-05-06 Raymond Int Inc Pile installation in submerged bearing strata
US4152089A (en) * 1977-07-07 1979-05-01 Stannard George E Method and apparatus for forming a cast-in-place support column

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB870497A (en) * 1959-11-16 1961-06-14 Raymond Int Inc Methods and apparatus for making concrete pile shells and piles
US3851485A (en) * 1972-04-14 1974-12-03 J Steding Method and apparatus for installing concrete piles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR583391A (en) * 1924-02-07 1925-01-12 Anciens Etablissements Ed Zubl Method and device applicable to the fabrication of concrete foundation piles with large cross section cast in place using a temporary sheath
FR1497022A (en) * 1966-10-19 1967-10-06 Parera S Aannemings En Handelm Method of manufacturing a widened foot pile in the ground
US3881320A (en) * 1973-06-27 1975-05-06 Raymond Int Inc Pile installation in submerged bearing strata
US4152089A (en) * 1977-07-07 1979-05-01 Stannard George E Method and apparatus for forming a cast-in-place support column

Also Published As

Publication number Publication date
CH655530B (en) 1986-04-30
NL8303614A (en) 1984-06-01
LU85072A1 (en) 1984-04-02
FI834032A0 (en) 1983-11-03
BE898138A (en) 1984-03-01
GB2129855A (en) 1984-05-23
ZA837999B (en) 1984-06-27
BR8305914A (en) 1984-09-18
FI834032A (en) 1984-05-06
DE3339509A1 (en) 1984-05-30
GR79644B (en) 1984-10-31
CA1200111A (en) 1986-02-04

Similar Documents

Publication Publication Date Title
EP1525371B1 (en) Telescopic guide line for offshore drilling
FR2605657A1 (en) METHOD FOR PRODUCING A PIEU IN SOIL, DRILLING MACHINE AND DEVICE FOR IMPLEMENTING SAID METHOD
FR3026754A1 (en) MACHINE AND METHOD FOR PRODUCING COLUMNS IN A SOIL
FR2763635A1 (en) Downhole well element support system
FR2566813A1 (en) Device and method for producing concrete piles in the ground and piles obtained by this method
CA1228237A (en) Ramming and guiding tool for pins intended for anchoring posts or stakes in the ground, said tool having a pile helmet over a seat on its top center part
FR2535759A1 (en) METHOD FOR FORMING CONCRETE PILES AND NEW PREPARATORY PIEU FOR THIS PROCESS
CA2064429C (en) Sealing device for expansion joints cut in dams
FR2497249A1 (en) METHOD FOR MAKING MOLDED WALL PANELS AND MOLDED WALL THUS OBTAINED
FR2535760A1 (en) METHOD AND APPARATUS FOR REALIZING IN SITU CONCRETE PILES WITH EXTENDED BASES
EP3414399B1 (en) Method for producing an anchoring tie rod and anchoring tie rod
BE369818A (en)
FR2472075A1 (en) Tunnel anchor bolt for rock - bolt is surrounded by cylindrical cover with tubes to introduce tamping material
FR2718482A3 (en) Ground-anchor for resilient top soil
FR2534292A1 (en) Method for installing foundation casing tubes in ground of poor quality.
EP2900875A1 (en) Method for producing a ground anchor
FR2831204A1 (en) Offshore platform, with subsea angled drilling system, uses guidance conduit with large major radius of curvature, which is introduced beneath sea bed
WO2014083263A1 (en) Method for installing and sealing a tubular element in the ground under a head of water
BE898026A (en) PILE INSTALLATION.
FR2478158A1 (en) Round hollow section self-boring pile - uses spiral ramped cutters on leading edge and used as fence post or cable-anchor
FR2575776A1 (en) Method of constructing cast-in-place concrete pile
BE508872A (en)
FR3086956A1 (en) DEVICE FOR FLUSHING A COLUMN
FR2634804A1 (en) Method of inserting a prefabricated post in a very deep bore and post for the use of this method.
FR2615880A1 (en) Method for integrating consolidating frames or the like into vertical sloping or counter-sloping ground, and tools for its implementation