BE508872A - - Google Patents

Info

Publication number
BE508872A
BE508872A BE508872DA BE508872A BE 508872 A BE508872 A BE 508872A BE 508872D A BE508872D A BE 508872DA BE 508872 A BE508872 A BE 508872A
Authority
BE
Belgium
Prior art keywords
tube
base
reinforcements
rigid
concrete
Prior art date
Application number
Other languages
French (fr)
Publication of BE508872A publication Critical patent/BE508872A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  PROCEDE ET DISP'OSITIF POUR L'EXECUTION DE PIEUX DE FONDATION ARMES 
A BASE ELARGIE. 



   L'invention concerne un procédé et un dispositif pourl'exécution de pieux de fondation en béton armé ou analogues, pourvus d'une base élargie moulée dans le sol. Elle a plus spécialement pour but de former un pieu de ce genre, dont la base élargie est exécutée sur une hauteur et avec un vo- lume contrôlables, tout en assurant l'obtention d'un pieu possédant une ré- sistance élevée à la traction. Le terme béton est utilisé pour désigner tou- te matière meuble ou plastique convenant pour l'exécution de pieux de fonda- tion. 



   Le procédé selon l'invention est essentiellement caractérisé par le fait que, après fonçage du tube jusqu'à   la   profondeur voulue., on provoque un déplacement axial déterminé entre le tube et un corps rigide occupant au moins une grande partie de la section libre à la base du tube, de façon à placer ce corps rigide a une distance déterminée sous la base du tube, et on maintient cette distance pendant qu'on dame dU   .béton   introduit dans le tu- be pour le refouler latéralement dans le sol, ledit corps rigide formant dé- flecteur,,jusqu'à formation d'une base élargie de hauteur et de volume vou- lus entre ledit corps et l'extrémité inférieure du tube, pour achever en- suite l'exécution du pieu de toute manière appropriée. 



   Selon l'invention, ledit corps rigide, qui est de préférence éta- bli en béton., est avantageusement réuni à des armatures longitudinales dé- passant l'extrémité supérieure du tube, et l'on immobilise les armatures par rapport au tube lorsque l'écartement entre ledit corps et la'base du tube est atteint. La face supérieure dudit corps est de préférence conique ou analogue pour faciliter le refoulement latéral du béton. 



   Si sous l'effet du damage, le corps rigide descend sous le tube d'une distance inférieure à la hauteur voulue de la base   élargie,   on relè- vera le tube d'une hauteur correspondante, en le maintenant dans sa nouvel- le position jusqu'à achèvement de la base élargie. 

 <Desc/Clms Page number 2> 

 



   Il   arrive   toutefois fréquemment que sous l'effet du damage, le tube étant maintenu, le corps rigide poursuivrait sa descente sans qu'il se produise un élargissement notable de la base du pieu. Cet inconvénient est évité par l'invention, qui prévoit qu'on immobilise les armatures solidaires du corps rigide après une descente déterminée de celui-ci sous le tube, l'ar- mature n'étant alors libérée qu'après formation d'une base élargie du volume et de la hauteur voulus, qui peuvent être exactement déterminés d'avance. 



   Selon l'invention également, le corps rigide est, de préférence, placé au-dessus d'une couche de béton se trouvant dans l'extrémité infé- rieure du tube et facilement expulsable de celui-ci. 



   A titre démonstratif, quelques exemples de réalisation de l'in- vention se trouvent décrits ci-après avec référence au dessin schématique an- nexé, dans lequel! les Figs. 1 et 2 montrent deux vues en coupe verticale, respective- -ment avanttet après la formation de la base élargie d'un pieu en cours d'exé- cution au moyen d'un tube foncé à l'aide d'un bouchon étanche en béton ou ana- logue formé dans son extrémité inférieure; les Figs. 3 et 4 montrent des vues partielles semblables, dans le cas où le tube repose sur une p ointe rigide et est foncé par frappe directe sur le tube, et les Figs. 5 et 6 montrent encore deux variantes d'exécution. 



   Dans l'exemple montré en Figs. 1 et 2, le tube 1 a été enfoncé dans. le sol en frappant sur un bouchon   adhérent .ébauche   2 formé de béton ou matiè- re analogue comprimée. Lorsque la profondeur voulue a été atteinte, le tube 1 est maintenu et on poursuit la frappe sur le bouchon jusqu'à ce qu'il soit expulsé partiellement,ou même totalement si aucune pénétration d'eau ou de boue dans le tube n'est à craindre. On introduit alors le corps rigide 3, avantageusement en béton, dans lequel les barres d'armatures 4, 5, par exem- ple au nombre de trois ou quatre, sont solidement ancrées. Ces barres peuvent être réunies par une ligature appropriée quelconque 6. 



   Sur ce corps 3, on verse une certaine quantité de béton et on poursuit le damage de façon à expulser le corps 3 et le béton hors du tube 1. On continue à déverser du béton et à frapper sur celui-ci jusqu'à ce que le corps 3 soit descendu sous le tube d'une distance A déterminée d'avance, correspondant   à   la hauteur de la base élargie qui doit être formée. A ce moment,on maintient les armatures   4,   5 afin d'éviter toute descente supplé- mentaire du corps 3, qui pourrait se produire si celui-ci n'était pas mainte- nu, le terrain étant supposé être de nature telle, par exemple de l'argile, qu'il n'offre pas une résistance suffisantepour empêcher cette descente sous l'effet du damage. 



   Ce maintien des armatures est d'ailleurs toujours avantageux, aussi dans le cas   où   le corps rigide   n'aurait   pas tendance à s'enfoncer da- vantage et même s'il fallait relever quelque peu le tube pour créer l'écar- tement voulu entre son extrémité inférieure et le corps rigide. En effet, si les armatures étaient libres,elles pourraient s'infléchir vers l'exté- rieur sous l'effet du damage, ce qui serait désavantageux et ne permettrait plus le contrôle exact de la hauteur de la base élargie, puisque le mouve- ment axial relatif entre les armatures et l'extrémité supérieure du tube ne correspondrait plus exactement à l'écartement entre la base du tube et le corps rigide. 



   Les nouvelles charges de béton qui seraint ensuite déversées dans le tube et damées, seront refoulées latéralement dans le sol, le corps 3 formant déflecteur. A cet effet, la face supérieure de ce corps sera avanta- geusement conique, arrondie ou analogue. On comprendra que le contrôle du 

 <Desc/Clms Page number 3> 

 volume des charges de béton permet de déterminer avec exactitude le volume de la base élargie qui sera formée sur la hauteur   A.   On achève ensuite le bétonnage du pieu de la manière habituelle;, soit en retirant le tube 1, soit en l'abandonnant dans le sol s'il s'agit d'un fourreau permanent. 



   L'immobilisation de l'armature pendant la formation de la base élargie peut être réalisée de toute façon appropriée, par exemple au moyen de crochets 7 formés à l'extrémité supérieure des armatures 4. 5, lesquels crochets viennent s'appuyer sur la tête du tube 1 lorsque le corps 3 est descendu de la distance   A   sous le tube. Il suffira de couper les crochets pour libérer l'armature après formation de la base élargie., S'il s'agit d'un fourreau abandonné dans le sol, les crochets peuvent subsister. On peut aussi munir l'armature d'une bague de renfort à son extrémité supérieure et immobiliser celle-ci par rapport au tube pendant la formation de la base élargie'. Dans le cas d'un fourreau permanent, on peut donner à cette bague un diamètre correspondant à celui du fourreau, de façon qu'elle vienne s'ap- puyer sur celui-ci.

   Une telle disposition est montrée en Fig. 4 (bague 8). 



   L'application de l'invention est particulièrement avantageuse lors- que le fonçage s'opère au moyen d'un bouchon de béton, comme décrit ci-des- sus,ou au moyen d'un mandrin reposant à la fois sur la tête du tube et sur un bouchon d'étanchéité en béton ou analogue placé dans celui-ci. L'invention s'applique cependant également avec avantage lorsqu'on utilise d'autres pro- cédés de fonçage. 



   Dans l'exemple montré en Figs. 3-49 le tube 1 repose sur une poin- te de fonçage 9 et est par exemple descendu dans le sol par frappe directe sur le tube.   Avant   la mise en place du corps 3 avec l'armature 4, 5, 6, on déverse dans le tube une quantité de béton 10. Lorsque la profondeur voulue est atteinte, ce béton 10 est expulsé, soit avant l'introduction du corps   3,   soit après cette introduction et déversement d'une certaine quantité de bé- ton sur ce corps. Ensuite, on forme la base élargie comme décrit avec   réféL   rence aux Figs. 1-2. 



   De la même façon que le bouchon 2, la masse de béton 10 formera la partie inférieure de la'base élargie, enrobant ainsi complètement la face inférieure du corps 3 et supprimant tout danger.d'infiltration le long de la surface de ce corps, et donc tout danger de destruction des armatures à leur point d'attache au corps 3. On reste donc assuré d'un parfait ancrage de l'armature dans la base du pieu, ainsi que de sa forte résistance aux trac- tions qui tendent à séparer le fût de la base et qui se produisent par exem- ple lors des soulèvements du sol qui sont fréquents dans les terrains argi- leux. 



   Il est cependant bien entendu que l'invention s'étend aussi au cas où le corps 3 serait posé directement sur la pointe 9, ainsi qu'au cas   où   le corps 3 ferait corps avec cette pointe 9, c'est-à-dire au cas où les armatures   4,   5 seraient ancrées directement dans la pointe 9comme montré en Figs. 5 et   6,   cette pointe étant alors avantageusement munie d'une face supérieure conique ou arrondie. 



   Pour s'opposer à la flexion des armatures vers l'extérieur sur la hauteur libre entre le tube et le corps rigide pendant le damage du béton pour former la base élargie;, l'invention prévoit également un renforcement des armatures sur au moins cette hauteur libre. Par ailleursafin de rédui- re le nombre de lobes dont se composera la base élargie par suite de la présence des barres d'armature qui font fatalement obstacle au refoulement latéral du béton,, il convient de réduire le nombre des armatures par exemple à trois, qui est le minimum pour éviter le basculement du corps 3, là sec- tion de ces barres étant augmentée en conséquence. L'emploi d'un petit nom- bre d'armatures de forte section est donc très avantageux. Le nombre des barres d'armature pour le fût du pieu pourra être plus grand.

   Les Figs.5 et 6 montrent de telles réalisations. 

 <Desc/Clms Page number 4> 

 



   Dans   la Fig.   5, 1'armature comprend un petit nombre de grosses barres 11 ancrées dans le corps rigide formant déflecteur et un certain nom- bre de minces barres 12   s'arrêtant   approximativement à la base du tube 1, toutes ces barres étant réunies*.par une ligature 6. La pointe 9 et le corps 3 (Fig. 3) sont combinés en'un corps   unique.'13'.   



   Dans la Fig.  6,   la corbeille d'armature pour le fût du pieu com- prend des barres minces 12 et à l'extrémité inférieure'd'au moins certaines d'entre elles sont fixées, par exemple par .soudure, des barres plus grosses   14   ancrées dans le corps 13. 
 EMI4.1 
 



  'R E S U M E '. ' t .."" .,; 'i' ' ".,'..." #.' . :,' .' .,'



   <Desc / Clms Page number 1>
 



  PROCEDURE AND DEVICE FOR THE EXECUTION OF ARMED FOUNDATION PILES
WIDELY BASED.



   The invention relates to a method and a device for the execution of foundation piles made of reinforced concrete or the like, provided with a widened base molded into the ground. It is more especially intended to form a pile of this kind, the widened base of which is executed at a height and with a controllable volume, while ensuring the obtaining of a pile having a high tensile strength. . The term concrete is used to denote any loose or plastic material suitable for the execution of foundation piles.



   The method according to the invention is essentially characterized by the fact that, after driving the tube to the desired depth., A determined axial displacement is caused between the tube and a rigid body occupying at least a large part of the free section at the base of the tube, so as to place this rigid body at a determined distance under the base of the tube, and this distance is maintained while concrete is being introduced into the tube in order to push it laterally into the ground, said rigid body forming a deflector, until an enlarged base of desired height and volume is formed between said body and the lower end of the tube, to then complete the execution of the pile in any suitable manner .



   According to the invention, said rigid body, which is preferably made of concrete, is advantageously joined to longitudinal reinforcements extending beyond the upper end of the tube, and the reinforcements are immobilized relative to the tube when 'spacing between said body and the base of the tube is reached. The upper face of said body is preferably conical or the like to facilitate the lateral upsetting of the concrete.



   If, under the effect of tamping, the rigid body descends under the tube by a distance less than the desired height of the enlarged base, the tube will be raised by a corresponding height, keeping it in its new position. until completion of the enlarged base.

 <Desc / Clms Page number 2>

 



   However, it often happens that under the effect of the tamping, the tube being held, the rigid body would continue its descent without there occurring a notable widening of the base of the pile. This drawback is avoided by the invention, which provides for immobilizing the reinforcements integral with the rigid body after a determined descent of the latter under the tube, the reinforcement then only being released after formation of a. base enlarged by the desired volume and height, which can be precisely determined in advance.



   Also according to the invention, the rigid body is preferably placed on top of a concrete layer located in the lower end of the tube and easily removable therefrom.



   By way of demonstration, some exemplary embodiments of the invention are described below with reference to the appended schematic drawing, in which! Figs. 1 and 2 show two views in vertical section, respectively before and after the formation of the enlarged base of a pile in progress by means of a dark tube using a waterproof plug in concrete or the like formed at its lower end; Figs. 3 and 4 show similar partial views, in the case where the tube rests on a rigid p ointe and is darkened by direct striking on the tube, and Figs. 5 and 6 show two further variants.



   In the example shown in Figs. 1 and 2, tube 1 has been pushed into. the ground by striking an adherent plug .out 2 formed of concrete or the like compressed. When the desired depth has been reached, the tube 1 is maintained and the impact on the stopper is continued until it is partially expelled, or even completely if no water or mud penetration into the tube is to fear. The rigid body 3, advantageously made of concrete, is then introduced into which the reinforcing bars 4, 5, for example three or four in number, are firmly anchored. These bars can be joined by any suitable ligature 6.



   On this body 3, a certain quantity of concrete is poured and the ramming is continued so as to expel the body 3 and the concrete out of the tube 1. We continue to pour concrete and knock on it until the body 3 is lowered under the tube by a distance A determined in advance, corresponding to the height of the widened base which is to be formed. At this moment, the reinforcements 4, 5 are maintained in order to avoid any additional descent of the body 3, which could occur if it was not maintained, the ground being supposed to be of such nature, for example. example of clay, that it does not offer sufficient resistance to prevent this descent under the effect of ramming.



   This maintenance of the reinforcements is also always advantageous, also in the case where the rigid body does not tend to sink in further and even if the tube had to be raised somewhat to create the desired spacing. between its lower end and the rigid body. Indeed, if the reinforcements were free, they could bend outwards under the effect of the ramming, which would be disadvantageous and no longer allow exact control of the height of the widened base, since the movement. Relative axial ment between the reinforcements and the upper end of the tube would no longer correspond exactly to the distance between the base of the tube and the rigid body.



   The new loads of concrete which will then be poured into the tube and tamped, will be pushed back laterally into the ground, the body 3 forming a deflector. For this purpose, the upper face of this body will advantageously be conical, rounded or the like. It will be understood that the control of

 <Desc / Clms Page number 3>

 volume of the concrete loads makes it possible to determine with exactitude the volume of the widened base which will be formed on the height A. The concreting of the pile is then completed in the usual way ;, either by removing the tube 1, or by abandoning it in the ground if it is a permanent sheath.



   The immobilization of the frame during the formation of the enlarged base can be achieved in any suitable way, for example by means of hooks 7 formed at the upper end of the frames 4.5, which hooks come to rest on the head. of the tube 1 when the body 3 has descended the distance A under the tube. It will be enough to cut the hooks to release the frame after formation of the widened base., If it is about a sheath abandoned in the ground, the hooks can remain. It is also possible to provide the frame with a reinforcing ring at its upper end and immobilize the latter relative to the tube during the formation of the enlarged base. In the case of a permanent sheath, this ring can be given a diameter corresponding to that of the sheath, so that it comes to rest on the latter.

   Such an arrangement is shown in FIG. 4 (ring 8).



   The application of the invention is particularly advantageous when the jacking takes place by means of a concrete plug, as described above, or by means of a mandrel resting at the same time on the head of the. tube and on a sealing plug made of concrete or the like placed therein. However, the invention also applies with advantage when other jacking methods are used.



   In the example shown in Figs. 3-49 the tube 1 rests on a jacking point 9 and is for example lowered into the ground by direct impact on the tube. Before the installation of the body 3 with the reinforcement 4, 5, 6, a quantity of concrete 10 is poured into the tube. When the desired depth is reached, this concrete 10 is expelled, ie before the introduction of the body 3. , or after this introduction and pouring of a certain quantity of concrete onto this body. Then, the enlarged base is formed as described with reference to Figs. 1-2.



   In the same way as the plug 2, the concrete mass 10 will form the lower part of the enlarged base, thus completely coating the underside of the body 3 and eliminating any danger of infiltration along the surface of this body, and therefore any danger of destruction of the reinforcements at their point of attachment to the body 3. We therefore remain assured of a perfect anchoring of the reinforcement in the base of the pile, as well as of its strong resistance to traction which tends to separating the shaft from the base and which occur, for example, during soil heaving which is frequent in clay soils.



   However, it is understood that the invention also extends to the case where the body 3 is placed directly on the point 9, as well as in the case where the body 3 is one with this point 9, that is to say in the case where the reinforcements 4, 5 are anchored directly in the point 9 as shown in Figs. 5 and 6, this point then being advantageously provided with a conical or rounded upper face.



   To oppose the bending of the reinforcements outwards over the free height between the tube and the rigid body during the tamping of the concrete to form the widened base ;, the invention also provides for reinforcement of the reinforcements over at least this height free. Furthermore, in order to reduce the number of lobes of which the enlarged base will be composed as a result of the presence of the reinforcing bars which inevitably obstruct the lateral upset of the concrete, it is advisable to reduce the number of reinforcements, for example to three which is the minimum to avoid tilting of the body 3, the section of these bars being increased accordingly. The use of a small number of reinforcements of large section is therefore very advantageous. The number of reinforcing bars for the pile shaft may be greater.

   Figs.5 and 6 show such embodiments.

 <Desc / Clms Page number 4>

 



   In Fig. 5, the frame comprises a small number of large bars 11 anchored in the rigid deflector body and a number of thin bars 12 terminating approximately at the base of the tube 1, all of these bars being joined by one. ligature 6. The tip 9 and the body 3 (Fig. 3) are combined into a single body.'13 '.



   In Fig. 6, the reinforcing basket for the pile shank comprises thin bars 12 and at the lower end of at least some of them are fixed, for example by welding, larger bars 14 anchored in the body 13.
 EMI4.1
 



  'ABSTRACT '. 't .. "".,; 'i' '".,' ..." #. ' . :, '.' ., '


    

Claims (1)

L'invention concerne l'exécution 'de pieux de fondation armés à EMI4.2 base élargie et comprend essentiellement le.s. particularités ci-après, prises séparément ou. s-q.iv :pt 'c 1!lbinai.sÓn:: ::.. .. , , 1) un procédé dans lequel, a.p'.r,, .fnçage .d tube jûs.q.'â la pro- fondeur voulue, on provoque un .déplacement axial déterminé entre le tube et un corps rigide occupant au moins une .grande' 'partie de la section libre à la base du tube, de façon à placer ce corps rigide à une distance déterminée sous la base du tube, et.on maintient cette distance pendant qu'on dame du béton introduit dans le tube pour le refouler-latéralement dans le sol, EMI4.3 ledit corps formant déflcéur,; The invention relates to the construction of reinforced foundation piles EMI4.2 broad base and mainly includes the.s. particularities below, taken separately or. sq.iv: pt 'c 1! lbinai.sÓn :: :: .. ..,, 1) a process in which, a.p'.r ,, .fnining .d tube jûs.q.'â la pro - desired founder, a determined axial displacement is caused between the tube and a rigid body occupying at least a large part of the free section at the base of the tube, so as to place this rigid body at a determined distance under the base of the tube, and this distance is maintained while the concrete is fed into the tube to push it laterally into the ground, EMI4.3 said deflcéur-forming body; jsqu'à. f0rÍJltiÓri d'une 'base élargie de hauteur et de vci1umg'ven Iit corps, et l'extrémité inférieure du tube, pour achever ens.ite:1'exécution'dù pieu. de toute'''manière appropriée; EMI4.4 2) on util:l3e ,u4.' c9ips rigide réuni à des armatures longitudina- les dépassant l'extrémité 'supérieure' du tubé) et!,or' iI)llIlobi1ise' cés '.armatures par rapport au tubé lorsquel'écartement voulu entre ledit corps et la base du tube est atteint, ces armatures étant de nouveau libérées après formation de la base élargie de volume voulu; EMI4.5 "..,: '. ;. - ' ¯ >', ; until. f0rÍJltiÓri of a 'base widened of height and of vci1umg'ven the body, and the lower end of the tube, to complete ens.ite: the execution of the stake. in any '' 'appropriate manner; EMI4.4 2) we use: l3e, u4. ' rigid c9ips joined to longitudinal reinforcements protruding from the 'upper' end of the casing) and!, or 'iI) llIlobi1ise' these 'reinforcements with respect to the casing when the desired distance between said body and the base of the tube is reached , these reinforcements being released again after formation of the enlarged base of the desired volume; EMI4.5 "..,: '.;. -' ¯> ',; , ;;1 ' Il' 3) on utilise un corps rigide de section transversale plus petite que le tube, lequel éorps est .placé dans le, tube'au-dessus d'une, couche de béton préalablement introduit dans l'extrémité inférieure du tube;, 4.) ladite couche de:béton est'vergée'dans le aube, au-dessus d'une pointe de fonçage sur laquelle repose le tube ; 5) un dispositif .pour la 'mise en deuvre du'susdit procédé, compor- tant un corps rigide .en béton du analogue, dans lequel sont ancrées; , ;; 1 'He' 3) a rigid body of smaller cross section than the tube is used, which body is placed in the tube above a layer of concrete previously introduced into the lower end of the tube; 4.) said layer of: concrete est'vergée 'in the blade, above a jacking point on which the tube rests; 5) a device for carrying out the aforesaid method, comprising a rigid concrete body of the analogue, in which are anchored; des ar- matures longitudinales pour ...le 'pieu,' c,es armatures -étant plus longues que le tube et ledit corps présentant,''de préférence, une face,supérieure conique ou analogue; 6) ledit corps présente une;section transversale plus petite que EMI4.6 la section libre du tube; r.< ; . ,: . section ;-: .. 1. ::i-:. < 1 . '.: ;.,.l'f .µ, 1 . : ,r, 7) ledit' .corps 'Piresq1te une sec:iôn tari,ëversal.e; plus g:ande que la section libre du tube; 'i" ", " " ¯ .' , , ,, ; longitudinal reinforcements for ... the 'pile,' c, the reinforcements - being longer than the tube and said body having, preferably, a face, conical top or the like; 6) said body has a; cross section smaller than EMI4.6 the free section of the tube; r. <; . ,:. section; -: .. 1. :: i- :. <1. '.:;.,. l'f .µ, 1. :, r, 7) said '.corps' Piresq1te a sec: iôn tari, ëversal.e; greater than the free section of the tube; 'i "", "" ¯.' ,, ,,; 8) les extrémités supérieures d'au'moins certaines des armatures présentent des éléments dirigés vers l'extérieur jusqu'en.dehors de la sec- EMI4.7 tion libre du tube, la' longúeur es armatures .8>tan t telle que ces éléments rencontrent l'extrémité supérieure du tube lorsque le corps rigide se trou- ve sous le tube, à une distance correspondant, à la hauteur voulue de la ba- se élargie ; 8) the upper ends of at least some of the reinforcements have elements directed outwards until outside the sec- EMI4.7 free tion of the tube, the length of the reinforcements .8> tan t such that these elements meet the upper end of the tube when the rigid body is located under the tube, at a corresponding distance, at the desired height of the ba - widens; 9) à son extrémité supérieure, l'armature est pourvue d'une bague de renfort permettant d'immobiliser' provisoirement l'armature par rapport au tube, au moyen de. cibles .ou analogues; ' <Desc/Clms Page number 5> 10) pour coopérer avec un tube constituant un fourreau permanent pour le pieu, la bague selon 9) a un diamètre correspondant à celui du fourreau,la largeur de l'armature étant telle que la bague rencontre l'extrémité supérieure du fourreau lorsque le corps rigide se trouve à la distance voulue sous le fourreau; 11) les armatures réunies au corps rigide présentent une partie inférieure renforcée s'étendant sur une longueur plus grande que la longueur sur laquelle les armatures sortent de la base du tube pendant la formation de la base élargie; 9) at its upper end, the frame is provided with a reinforcing ring for temporarily immobilizing the frame relative to the tube, by means of. targets or the like; ' <Desc / Clms Page number 5> 10) to cooperate with a tube constituting a permanent sleeve for the pile, the ring according to 9) has a diameter corresponding to that of the sleeve, the width of the reinforcement being such that the ring meets the upper end of the sleeve when the body rigid is at the desired distance under the scabbard; 11) the frames joined to the rigid body have a reinforced lower part extending over a length greater than the length over which the frames protrude from the base of the tube during the formation of the enlarged base; 12) les barres d'armature réunies au corps rigide sont reliées., par une ligature transversale, à des barres d'armature plus courtes, écartées d'une certaine distance dudit corps rigide, ces barres.plus courtes pouvant également être plus minces. 12) the reinforcing bars joined to the rigid body are connected., By a transverse ligature, to shorter reinforcing bars, spaced a certain distance from said rigid body, these shortest bars can also be thinner.
BE508872D BE508872A (en)

Publications (1)

Publication Number Publication Date
BE508872A true BE508872A (en)

Family

ID=148457

Family Applications (1)

Application Number Title Priority Date Filing Date
BE508872D BE508872A (en)

Country Status (1)

Country Link
BE (1) BE508872A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1110092B (en) * 1954-03-29 1961-06-29 Hamburger Gaswerke Gmbh Method and device for the production of reinforced in-situ concrete foundation piles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1110092B (en) * 1954-03-29 1961-06-29 Hamburger Gaswerke Gmbh Method and device for the production of reinforced in-situ concrete foundation piles

Similar Documents

Publication Publication Date Title
FR2536447A1 (en) METHOD FOR PRODUCING A CONCRETE CAST CONCRETE PILLAR
EP0110925A1 (en) Tool for driving in and guiding pegs for fixing stakes.
BE508872A (en)
EP3414399B1 (en) Method for producing an anchoring tie rod and anchoring tie rod
FR2535760A1 (en) METHOD AND APPARATUS FOR REALIZING IN SITU CONCRETE PILES WITH EXTENDED BASES
CH299963A (en) Process for the execution of reinforced foundation piles with widened base.
FR2460837A1 (en) ANCHOR TO BE BURIED AND METHOD FOR ITS LANDFILLING
FR2575776A1 (en) Method of constructing cast-in-place concrete pile
BE498717A (en)
BE513698A (en)
BE518438A (en)
BE450549A (en)
BE1006194A5 (en) Drilling device and process for the formation of piles or the like
EP3205775B1 (en) Method of drilling
EP3320147B1 (en) Method for constructing a foundation including a step of cutting-of
FR2534952A1 (en) METHOD FOR INSTALLING A PIEU IN THE SOIL, AND PIEU USED THEREIN
FR2535759A1 (en) METHOD FOR FORMING CONCRETE PILES AND NEW PREPARATORY PIEU FOR THIS PROCESS
FR2503210A3 (en) PROCESS FOR ANCHORING A TUBE AS A NON-RIGID ANCHOR AND TUBE FOR PERFORMING THE PROCESS
BE393943A (en)
FR2754006A1 (en) METHOD FOR SETTING UP A GROUND ANCHORING, ANCHORING AND LANDING AND THRESHING TOOL FOR EXECUTING THE PROCESS
FR2659677A1 (en) Method for producing submerged foundations, particularly for viaduct pillars (columns)
BE431610A (en)
BE504613A (en)
FR2634804A1 (en) Method of inserting a prefabricated post in a very deep bore and post for the use of this method.
BE368065A (en)