FR2615880A1 - Method for integrating consolidating frames or the like into vertical sloping or counter-sloping ground, and tools for its implementation - Google Patents

Method for integrating consolidating frames or the like into vertical sloping or counter-sloping ground, and tools for its implementation Download PDF

Info

Publication number
FR2615880A1
FR2615880A1 FR8707642A FR8707642A FR2615880A1 FR 2615880 A1 FR2615880 A1 FR 2615880A1 FR 8707642 A FR8707642 A FR 8707642A FR 8707642 A FR8707642 A FR 8707642A FR 2615880 A1 FR2615880 A1 FR 2615880A1
Authority
FR
France
Prior art keywords
holes
ground
head
sloping
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR8707642A
Other languages
French (fr)
Other versions
FR2615880B1 (en
Inventor
Jean-Michel Heller
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SADE TRAVAUX HYDRAULIQUE
Original Assignee
SADE TRAVAUX HYDRAULIQUE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SADE TRAVAUX HYDRAULIQUE filed Critical SADE TRAVAUX HYDRAULIQUE
Priority to FR8707642A priority Critical patent/FR2615880B1/en
Publication of FR2615880A1 publication Critical patent/FR2615880A1/en
Application granted granted Critical
Publication of FR2615880B1 publication Critical patent/FR2615880B1/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/26Drilling without earth removal, e.g. with self-propelled burrowing devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The method consists in boring holes 3, in filling these with cement grout 18 and in inserting into these holes, before the grout has set, anchoring ties 2 to which the frames are fastened. According to the invention, each bore 3 is made by compacting the ground on the sides without removing materials 4 and by fluting 5 the wall of the hole in question, the holes then being lined with plastic ducts 17 to prevent the ground from moving back while the said holes are empty and these ducts being removed during the injection 19 of the grout.

Description

Procédé pour integrer à un terrain vertical en pente ou en contre-pente des ossatures de consolidation ou autres et outillage pour sa ise en oeuvre.Method for integrating into a sloping or counter-sloping vertical ground consolidation or other frameworks and tools for its use.

Lorsqu'il s'agit de consolider un terrain vertical en pente ou en contre-pente qui tend à s'ébouler, une technique particulière est mise-en oeuvre. When it comes to consolidating a vertical slope or slope that tends to collapse, a particular technique is implemented.

Cette technique consiste à accrocher au terrain des plaques préfabriquées ou des ossatures en béton armé coulées sur place. Selon ladite technique, on "cloute" le terrain et on fixe aux "clous" Les structures qui doivent faire corps avec le terrain pour le consolider et'le stabiliser. This technique consists in hanging on the ground prefabricated plates or reinforced concrete frames cast on site. According to the said technique, the ground is "studded" and the structures which must form one body with the ground to consolidate and stabilize it are fixed to the "nails".

Ces "clous"-sont des fers à béton ancrés dans le terrain et constituant dès lors des tirants d'ancrage. These "nails" - are concrete irons anchored in the ground and therefore constitute anchor rods.

Jusqu'à présent, pour exécuter cet ancrage, on creuse des trous cylindriques au moyen d'un outil de forage qui procède par enlèvement de matériau dans le terrain et on remplit ces trous avec un coulis de ciment. Puis, avant prise du coulis, on introduit dans lesdits trous des fers à béton. Up to now, to carry out this anchoring, cylindrical holes are dug by means of a drilling tool which proceeds by removing material from the ground and these holes are filled with a cement grout. Then, before setting the grout, concrete bars are introduced into said holes.

Ce procédé de cloutage présente certains inconvénients. This studding process has certain drawbacks.

En premier lieu, l'ancrage des tirants n'est pas sûr, ni fiable, étant donné que certains se déchaussent alors que d'autres résistent aux sollicitations auxquelles l'ossature est soumise. En outre, la résistance à l'arrachement de ces tirants est limitée de sorte qu'il est nécessaire d'en multiplier le nombre et d'accroître la profondeur d'ancrage.In the first place, the anchoring of the tie rods is neither safe nor reliable, given that some take off their shoes while others resist the stresses to which the framework is subjected. In addition, the pullout resistance of these tie rods is limited so that it is necessary to multiply the number and increase the anchoring depth.

En second lieu, lors du forage, il est relativement fréquent que la paroi du trou s'éboule, surtout dans la zone aboutissant à l'extérieur. Les matériaux détachés de ta paroi tombent dans le trou et le bouchent en partie sans qu'il soit possible de détecter la quantité accumulée au fond. En pratique, la hauteur de la colonne de coulis de ciment qui adhère à la paroi du trou n'est jamais connue avec précision et par conséquent, il n'est pas possible de prévoir et de garantir La qualité et l'efficacité de l'ancrage. Secondly, during drilling, it is relatively frequent for the wall of the hole to collapse, especially in the zone leading to the outside. The materials detached from your wall fall into the hole and partially block it without it being possible to detect the amount accumulated at the bottom. In practice, the height of the cement grout column which adheres to the wall of the hole is never known with precision and therefore, it is not possible to predict and guarantee The quality and effectiveness of the anchoring.

La présente invention a pour but de remédier à ces inconvénients en proposant un procédé grace auquel la paroi du trou se trouve consolidée, l'accrochage du coulis de béton à cette paroi amélioré et Les risques d'éboulement et de retrait annihilés. The present invention aims to remedy these drawbacks by proposing a method by which the wall of the hole is consolidated, the attachment of the concrete grout to this improved wall and the risks of landslide and withdrawal annihilated.

Concomitamment, ce procédé permet avantageusement une réduction importante de l'espace occupé par le matériel de mise en oeuvre. Concomitantly, this method advantageously allows a significant reduction in the space occupied by the implementation equipment.

Dans ce but et conformément à l'invention, chaque forage est exécuté en compactant le terrain sur Les côtés sans enlèvement de matériaux et en cannelant la paroi du trou considéré, les trous étant ensuite chemisés avec des gaines plastiques pour empêcher le retrait du terrain tant que lesdits trous sont vides et ces gaines étant retirées pendant l'injection du coulis. For this purpose and in accordance with the invention, each drilling is carried out by compacting the ground on the sides without removing materials and by grooving the wall of the hole in question, the holes then being lined with plastic sheaths to prevent the withdrawal of the ground as long that said holes are empty and these sheaths are removed during the injection of the grout.

Avantageusement, le coulis de ciment est injecté à travers une canne par une buse terminale, la canne étant introduite à fond dans chaque trou et retirée au fur et à mesure que celui-ci se remplit, en entrainant la gaine plastique de chemisage du trou considéré. Advantageously, the cement slurry is injected through a cane by a terminal nozzle, the cane being introduced fully into each hole and withdrawn as it fills, causing the plastic sheath to line the hole in question. .

L'invention s'étend par ailleurs à un outillage perfectionné pour la mise en oeuvre du procédé. The invention also extends to improved tools for implementing the method.

Cet outillage d'un type connu comporte une tête cylindres étagés montée à mouvement linéaire alternatif en bout d'un corps de fusée. This tool of a known type comprises a stepped cylinder head mounted with reciprocating linear movement at the end of a rocket body.

Conformément à l'invention, une bague est enfilée sur La tête pour buter contre l'un au moins des épaulements de celle-ci et est goupillée sur cette tête, la bague présentant une surface extérieure conique pourvue de saillies, convergeant vers L'avant et ayant un diamètre maximal supérieur à celui de la tête. According to the invention, a ring is threaded on the head to abut against at least one of the shoulders thereof and is pinned on this head, the ring having a conical outer surface provided with projections, converging towards the front and having a maximum diameter greater than that of the head.

Divers autres caractéristiques et avantages de l'invention ressortent d'ailleurs de la description détaillée qui suit. Various other characteristics and advantages of the invention will also emerge from the detailed description which follows.

Un mode d'exécution du procédé de l'invention et une forme de réalisation du perfectionnement de l'outillage objet de l'invention sont illustrés, à titre d'exemple non Limitatif, par le dessin annexé. An embodiment of the method of the invention and an embodiment of the improvement of the tooling object of the invention are illustrated, by way of nonlimiting example, by the appended drawing.

Sur ce dessin :
- la figure 1 est une coupe du terrain dans lequel sont représentées de haut en bas les différentes phases du procédé,
- la figure 2 est une élévation montrant l'outillage,
- la figure 3 est une demi-vue en bout, demi-coupe prise suivant la ligne III-III de la figure 2,
- la figure 4 est une vue de dessus de la tête d'outillage avec la bague illustrée en coupe suivant la ligne IV-IV de la figure 2.
On this drawing :
FIG. 1 is a section through the terrain in which the different phases of the process are represented from top to bottom,
FIG. 2 is an elevation showing the tool,
FIG. 3 is a half-view at the end, half-section taken along line III-III of FIG. 2,
- Figure 4 is a top view of the tool head with the ring illustrated in section along line IV-IV of Figure 2.

1 désigne un terrain en pente dans lequel des tirants 2 doivent être ancrés. Ces tirants sont constitués par des fers à béton cannelés qui après pose dépassent du sol pour permettre la fixation d'une ossature de consolidation non représentée. 1 designates a sloping terrain in which tie rods 2 must be anchored. These tie rods are constituted by fluted concrete irons which, after laying, protrude from the ground to allow the fixing of a consolidation framework, not shown.

Le procédé tel qu'il est illustré par la figure 1 consiste à forer un trou 3 au moyen d'un matériel connu sous le nom de fusée "Grundomat". La fusée comporte un corps 4 en plusieurs éléments tubulaires raccordables les uns au bout des autres, au fur et à mesure que le forage progresse dans le terrain. A son extrémité libre, le ' corps 4 est équipé d'une tête 5 mobile en translation axiale suivant un mouvement alternatif, sous l'action d'un moteur linéaire à fluide. Ce moteur est intégré dans le dernier élément du corps 4 et les canalisations véhiculant le fluide d'actionnement s'étendent à l'intérieur des éléments suivants pour être raccordées à leur sortie à un groupe moto-pompe ou moto-compresseur. The method as illustrated in FIG. 1 consists in drilling a hole 3 using a material known as the "Grundomat" rocket. The rocket comprises a body 4 in several tubular elements connectable one after the other, as the drilling progresses in the ground. At its free end, the body 4 is equipped with a head 5 movable in axial translation in an alternating movement, under the action of a linear fluid motor. This motor is integrated in the last element of the body 4 and the pipes carrying the actuating fluid extend inside the following elements to be connected at their output to a motor-pump or motor-compressor group.

La tête 5 est conformée pour pénétrer dans le terrain en progressant par mouvement alternatif. Elle comporte, entre un embout pénétrant 6 et une embase 8, des cylindres étagés au nombre de cinq 7.1 à 7.5 dans l'exemple représenté. Lors du mouvement alternatif de cette tête 5 se superposant à une translation axiale,
Les arêtes circulaires des cylindres 7.1 à 7.5 cassent les obstacles rencontrés, tels que des cailloux, et l'ensemble étagé 6, 7, 8 pénètre dans le terrain en refoulant les matériaux sur les côtés, ce qui a pour effet de compacter la paroi du trou 3.
The head 5 is shaped to penetrate the ground while progressing by reciprocating motion. It comprises, between a penetrating endpiece 6 and a base 8, five-stage cylinders 7.1 to 7.5 in the example shown. During the reciprocating movement of this head 5 superimposed on an axial translation,
The circular edges of the cylinders 7.1 to 7.5 break the obstacles encountered, such as stones, and the stepped assembly 6, 7, 8 penetrates into the ground by pushing the materials to the sides, which has the effect of compacting the wall of the hole 3.

Le procédé consiste non seulement à forer le trou 3 considéré en compactant sa paroi, mais également à canneler cette paroi durant cette opération de forage. The method consists not only in drilling the hole 3 considered by compacting its wall, but also in grooving this wall during this drilling operation.

A cet effet, une bague 9 présentant un alésage épaulé 10 est enfilée sur la tête 5 pour que cet alésage soit centré sur le cylindre 7.5 et l'embase 8 et que son épaulement 10 bute contre celui qui relie ces derniers. La bague 9 comporte des encoches 11 dans lesquelles font saillie les extrémités de goupilles fendues 12 engagées dans des trous 13 de la tête et maintenues serrées dans ceux-ci par d'autres goupilles fendues 14. To this end, a ring 9 having a stepped bore 10 is threaded on the head 5 so that this bore is centered on the cylinder 7.5 and the base 8 and that its shoulder 10 abuts against the one which connects the latter. The ring 9 has notches 11 in which the ends of the split pins 12 protrude engaged in holes 13 of the head and held tight in these by other split pins 14.

La bague 9 fait donc corps avec la tête 5, mais est cependant démontable et remplaçable. Elle présente une surface extérieure tronconique 15 convergeant vers l'embout 6, surface dont le diamètre maximal D est supérieur au diamètre d de l'embase 8. The ring 9 is therefore integral with the head 5, but is however removable and replaceable. It has a frustoconical outer surface 15 converging towards the endpiece 6, a surface whose maximum diameter D is greater than the diameter d of the base 8.

Cette bague 9 est pourvue de saillies 16 pour rainurer la paroi du trou 3 considéré. Dans l'exemple représenté, les saillies 16 sont constituées par des tronçons de fers cannelés et ces tronçons sont avantageusement inclinés en hélices.This ring 9 is provided with projections 16 to groove the wall of the hole 3 considered. In the example shown, the projections 16 consist of sections of fluted bars and these sections are advantageously inclined in helices.

Ainsi que cela ressort de la figure 1, le procédé consiste, après forage du trou 3 et extraction de la fusée 4, à introduire dans ce trou une gaine plastique 17 chemisant la paroi et empêchant que celle-ci se rétracte et/ou s'éboule. As can be seen from FIG. 1, the method consists, after drilling the hole 3 and extracting the rocket 4, to introduce into this hole a plastic sheath 17 lining the wall and preventing it from retracting and / or s' landslide.

Lorsque tous les trous 3 sont forés et chemisés, on prépare un coulis de ciment 18 et on l'injecte dans ces trous successivement en-utilisant une canne 19 se terminant par une buse 20. Au début de l'injection, la canne plonge à fond dans Le trou à remplir et au fur et à mesure que l'injection se poursuit, la canne 19 est retirée en étant accompagnée par la gaine plastique 17. When all the holes 3 are drilled and jacketed, a cement slurry 18 is prepared and it is injected into these holes successively using a cane 19 ending in a nozzle 20. At the start of the injection, the cane dips to bottom in The hole to be filled and as the injection continues, the rod 19 is withdrawn, being accompanied by the plastic sheath 17.

Lorsque tous les trous 3 sont remplis et avant que La prise du coulis 18 soit accomplie, Les tirants d'ancrage 2 sont enfoncés dans le remplissage desdits trous. When all the holes 3 are filled and before the grout 18 is taken, the anchor rods 2 are pressed into the filling of said holes.

L'expérience a monté Lors d'essais sur Le site que si L'on exerce une traction sur un tirant posé selon la technique antérieure précitée, lq mortier vient avec ce tirant et est arraché du terrain. Experience has risen during tests on the site that if traction is exerted on a tie laid according to the aforementioned prior art, the mortar comes with this tie and is torn from the ground.

Par contre, si cette traction est appliquée à un tirant posé selon le procédé de L'invention, le mortier reste ancré au terrain et le tirant se détache par cisaillement dudit mortier. En outre, la force d'ancrage à vaincre est bien supérieure. On the other hand, if this traction is applied to a tie laid according to the method of the invention, the mortar remains anchored to the ground and the tie is detached by shearing of said mortar. In addition, the anchoring force to be overcome is much greater.

Sien entendu, il peut être avantageux de faire varier l'inclinaison des tirants 2. L'ancrage se trouve ainsi amélioré, sans qu'apparaisse au moment du forage le risque de bouchage partiel desdits trous. Of course, it may be advantageous to vary the inclination of the tie rods 2. The anchoring is thus improved, without the risk of partial plugging of said holes appearing during drilling.

L'exposé qui précède concerne la consolidation d'un terrain en pente, mais il est bien évident que les moyens mis en oeuvre s'appliquent si le terrain est vertical ou en contre pente.  The above description concerns the consolidation of sloping ground, but it is quite obvious that the means implemented apply if the ground is vertical or in slope.

Claims (5)

REVENDICATIONS 1.- Procédé pour intégrer à un terrain vertical en pente ou en contre-pente des ossatures de consolidation ou autres consistant à forer des trous (3), à remplir ceux-ci d'un coulis de ciment (18) et à introduire dans ces trous avant prise du coulis des tirants d'ancrage (2) auxquels les ossatures sont accrochées, 1.- Method for integrating into a sloping or counter-sloping vertical ground consolidation or other frameworks consisting of drilling holes (3), filling them with a cement grout (18) and introducing into these holes before setting the grout of the anchor rods (2) to which the frameworks are attached, caractérisé en ce que chaque forage (3) est exécuté en compactant le terrain sur les côtés sans enlèvement de matériaux (4) et en cannelant (5) la paroi du trou considéré, les trous étant ensuite chemisés avec des gaines plastiques (17) pour empecher le retrait du terrain tant que lesdits trous sont vides et ces gaines étant retirées pendant l'injection (19) du coulis. characterized in that each drilling (3) is carried out by compacting the ground on the sides without removing material (4) and by grooving (5) the wall of the hole in question, the holes then being lined with plastic sheaths (17) to prevent the withdrawal of the ground while said holes are empty and these sheaths being removed during the injection (19) of the grout. 2.- Procédé selon la revendication 1, caractérisé en ce que le coulis de ciment (18) est injecté à travers une canne (19) par une buse'terminale (20), la canne étant introduite à fond dans chaque trou et retirée au fur et à mesure que celui-ci se remplit, en entrainant la gaine plastique (17) de chemisage du trou considéré (3). 2.- Method according to claim 1, characterized in that the cement slurry (18) is injected through a cane (19) by a terminal nozzle (20), the cane being introduced fully into each hole and withdrawn at as it fills, driving the plastic sheath (17) for lining the hole in question (3). 3.- Procédé selon la revendication 1 ou 2, caractérisé en ce que les trous (3) sont forés suivant des axes d'inclinaisons différentes. 3.- Method according to claim 1 or 2, characterized in that the holes (3) are drilled along axes of different inclinations. 4.- Outillage pour la mise en oeuvre du procédé selon l'une quelconque des revendications 1 à 3, cet outillage comportant une tete (5) à cylindres étagés (7.1 à 7.5) montée à mouvement linéaire alternatif en bout d'un corps de fusée (4) et Ledit outillage étant caractérisé en ce qu'une bague (9) est enfilée sur la tête (5) pour buter contre l'un au moins des épaulements (7.5 à 8) de celle-ci et est goupillée (12, 14) sur cette tête, la bague (9) présentant une surface extérieure conique (15) pourvue de saillies (16), convergeant vers l'avant et ayant un diamètre maximal (D) supérieur à celui (d) de la tête. 4.- Tooling for implementing the method according to any one of claims 1 to 3, this tooling comprising a head (5) with stepped cylinders (7.1 to 7.5) mounted with reciprocating linear movement at the end of a body of rocket (4) and said tooling being characterized in that a ring (9) is threaded on the head (5) to abut against at least one of the shoulders (7.5 to 8) thereof and is pinned (12 , 14) on this head, the ring (9) having a conical outer surface (15) provided with projections (16), converging forward and having a maximum diameter (D) greater than that (d) of the head. 5.- Outillage selon la revendication 4, caractérisé en ce que les saillies (16) sont des tronçons de fer rond cannelé, soudés sur la bague et s'étendant en biais.  5.- Tool according to claim 4, characterized in that the projections (16) are sections of fluted round iron, welded to the ring and extending at an angle.
FR8707642A 1987-06-01 1987-06-01 METHOD FOR INTEGRATING CONSOLIDATION OR OTHER STRUCTURES INTO A VERTICAL SLOPE OR COUNTER-SLOPE AND TOOLS FOR IMPLEMENTING SAME Expired FR2615880B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR8707642A FR2615880B1 (en) 1987-06-01 1987-06-01 METHOD FOR INTEGRATING CONSOLIDATION OR OTHER STRUCTURES INTO A VERTICAL SLOPE OR COUNTER-SLOPE AND TOOLS FOR IMPLEMENTING SAME

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8707642A FR2615880B1 (en) 1987-06-01 1987-06-01 METHOD FOR INTEGRATING CONSOLIDATION OR OTHER STRUCTURES INTO A VERTICAL SLOPE OR COUNTER-SLOPE AND TOOLS FOR IMPLEMENTING SAME

Publications (2)

Publication Number Publication Date
FR2615880A1 true FR2615880A1 (en) 1988-12-02
FR2615880B1 FR2615880B1 (en) 1989-12-15

Family

ID=9351622

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8707642A Expired FR2615880B1 (en) 1987-06-01 1987-06-01 METHOD FOR INTEGRATING CONSOLIDATION OR OTHER STRUCTURES INTO A VERTICAL SLOPE OR COUNTER-SLOPE AND TOOLS FOR IMPLEMENTING SAME

Country Status (1)

Country Link
FR (1) FR2615880B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999013167A1 (en) * 1997-09-10 1999-03-18 Abb Research Ltd. Foundation structure method using piles

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1243595B (en) * 1962-04-13 1967-06-29 Hans Rust Dipl Ing Method for producing a reinforced anchor pile
US3638433A (en) * 1969-03-28 1972-02-01 James L Sherard Method and apparatus for forming structures in the ground
DE2157259B1 (en) * 1971-11-18 1972-11-09 Tracto Technik Ram drilling rig
FR2344683A1 (en) * 1976-03-19 1977-10-14 Schmidt Paul METHOD AND DEVICE FOR DRILLING ANCHOR HOLES IN THE GROUND

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1243595B (en) * 1962-04-13 1967-06-29 Hans Rust Dipl Ing Method for producing a reinforced anchor pile
US3638433A (en) * 1969-03-28 1972-02-01 James L Sherard Method and apparatus for forming structures in the ground
DE2157259B1 (en) * 1971-11-18 1972-11-09 Tracto Technik Ram drilling rig
FR2344683A1 (en) * 1976-03-19 1977-10-14 Schmidt Paul METHOD AND DEVICE FOR DRILLING ANCHOR HOLES IN THE GROUND

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
TRAVAUX, no. 477, décembre 1974, pages 31-40, Paris, FR; J.L. PORTIER: "Protection des tirants d'ancrage contre la corrosion" *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999013167A1 (en) * 1997-09-10 1999-03-18 Abb Research Ltd. Foundation structure method using piles

Also Published As

Publication number Publication date
FR2615880B1 (en) 1989-12-15

Similar Documents

Publication Publication Date Title
RU2451134C2 (en) Method and equipment to develop micropiles in soil, in particular, to fix active anchors
EP0240493B1 (en) Method for compaction-trussing-injection or decompaction-draining and construction of linear works or planar works in grounds
FR2557174A1 (en) DEEP COMPACTION FOUNDATION, METHOD AND DEVICE FOR CARRYING OUT SAID METHOD
CH642141A5 (en) UNDERGROUND PASSAGE AND METHOD FOR CONSTRUCTING THE PASSAGE.
EP0251165B1 (en) Drilling means serving as ground anchor and method
KR100908085B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
FR2615880A1 (en) Method for integrating consolidating frames or the like into vertical sloping or counter-sloping ground, and tools for its implementation
EP0413676B1 (en) Process for fixing anchors
EP3414399B1 (en) Method for producing an anchoring tie rod and anchoring tie rod
KR100361108B1 (en) Green Slope Reinforcement Method
FR2903435A1 (en) Helical load bearing micropile resistance controlling device for e.g. realizing foundations in hard terrain, has limiting unit constituted of support surfaces and limiting rotation of micropile
WO2014049277A1 (en) Method for producing a ground anchor
FR2524030A1 (en) Anchor head for progressively contracted composite tie rod - has truncated anchoring pin wedged into anchoring ring orifice
KR100717252B1 (en) Grouting apparatus and Method of construction work using Earth anchor
KR20020012451A (en) apparatus and method for removal anchor using double uneven pipe
AU723991B2 (en) Methods of and apparatus for forming in-ground columns
JPH11280066A (en) Pile body and pile body work execusion method
NL2014075B1 (en) Method for anchoring and/or founding an object to the ground.
GB2154636A (en) Improved precast concrete pile and method of placing it in the ground
JPH07216883A (en) Pipe rod process
RU2169234C1 (en) Method for manufacturing built-in-place pile
FR2634804A1 (en) Method of inserting a prefabricated post in a very deep bore and post for the use of this method.
FR2754006A1 (en) METHOD FOR SETTING UP A GROUND ANCHORING, ANCHORING AND LANDING AND THRESHING TOOL FOR EXECUTING THE PROCESS
FR2960573A1 (en) Device for creating ground basin utilized to store water in ground, has mobile casing and blocking assembly allowing to glue concrete on walls of hole and to create ground basin, and pallet sliding in guide housing
BE1006194A5 (en) Drilling device and process for the formation of piles or the like