EP4101958A1 - Spinning machine and method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine - Google Patents

Spinning machine and method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine Download PDF

Info

Publication number
EP4101958A1
EP4101958A1 EP21213545.3A EP21213545A EP4101958A1 EP 4101958 A1 EP4101958 A1 EP 4101958A1 EP 21213545 A EP21213545 A EP 21213545A EP 4101958 A1 EP4101958 A1 EP 4101958A1
Authority
EP
European Patent Office
Prior art keywords
yarn
production
group
batch
assigned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP21213545.3A
Other languages
German (de)
French (fr)
Inventor
Bernd Bahlmann
Franz Hüttinger
Mario Maleck
Julian Reuthlinger
Martin Zipperer
Oskar Kintzler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maschinenfabrik Rieter AG
Original Assignee
Maschinenfabrik Rieter AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maschinenfabrik Rieter AG filed Critical Maschinenfabrik Rieter AG
Publication of EP4101958A1 publication Critical patent/EP4101958A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H1/00Spinning or twisting machines in which the product is wound-up continuously
    • D01H1/14Details
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H13/00Other common constructional features, details or accessories
    • D01H13/32Counting, measuring, recording or registering devices
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H4/00Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques
    • D01H4/42Control of driving or stopping
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H1/00Spinning or twisting machines in which the product is wound-up continuously
    • D01H1/14Details
    • D01H1/20Driving or stopping arrangements
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H4/00Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques
    • D01H4/04Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques imparting twist by contact of fibres with a running surface
    • D01H4/08Rotor spinning, i.e. the running surface being provided by a rotor

Definitions

  • the present invention relates to a method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine, with a large number of identical, at least partially self-sufficient work stations arranged next to one another, each of the work stations having a spinning device for producing a yarn and a winding device for winding up the yarn Having yarn on a spool, with several production groups being defined and with several jobs producing the same batch of yarn each forming a production group. After a definable period of time, a shift report for each production group is created by the spinning machine.
  • Partly or fully automatic spinning machines are known in various designs from the prior art.
  • the workstations of these spinning machines each have a spinning device with a spinning element, for example a spindle with a ring traveler, an open-end spinning rotor or an air spinning device, for producing a yarn, a winding device for winding the yarn produced onto a bobbin and a large number of other production elements and handling of the yarn and the presented fiber material.
  • a spinning device with a spinning element for example a spindle with a ring traveler, an open-end spinning rotor or an air spinning device, for producing a yarn
  • a winding device for winding the yarn produced onto a bobbin and a large number of other production elements and handling of the yarn and the presented fiber material.
  • the shift report contains various production parameters and statistical evaluations of the activities at the workplace. This information is recorded and displayed as total values for the entire shift and all jobs, but preferably also for each individual job. Through this the operator receives information about the activities of the workplace and, if necessary, also information about problems within the shift. This has become known, for example, from the applicant's R 66 rotor spinning machine.
  • the work stations of the spinning machine are divided into several production groups, with several work stations producing the same batch of yarn each forming a production group.
  • the shift reports are created individually for each production group. It is also recorded which jobs belong to the respective production group. A separate evaluation can thus be carried out for each yarn lot.
  • the object of the present invention is to propose a method for operating a partially or fully automatic spinning machine, which provides improved information about the activity of the work stations. Furthermore, a corresponding spinning machine is to be proposed.
  • a method for operating a partially or fully automatic spinning machine in particular an open-end rotor spinning machine, with a large number of similar, at least partially self-sufficient work stations arranged next to one another, each of the work stations having a spinning device for producing a yarn and a winding device for winding up the yarn on a spool
  • several production groups are defined.
  • Several jobs producing the same batch of yarn each form a production group.
  • a shift report for each production group is created by the spinning machine.
  • a free group is also defined, with at least jobs that are not currently assigned to any of the production groups being assigned to the free group and that a shift report is also created for the free group.
  • a corresponding partially or fully automatic spinning machine in particular an open-end rotor spinning machine, with a large number of similar, at least partially self-sufficient work stations arranged next to one another, each of which has a spinning device for producing a yarn and a winding device for winding the yarn onto a bobbin
  • the Jobs can be divided into several production groups.
  • Several jobs producing the same batch of yarn each form a production group.
  • the spinning machine has a control device for carrying out the method.
  • non-production times of each individual work station within the shift can now be precisely recorded and thus much more precise information about the efficiency of the spinning machine and each individual production group can be obtained than before.
  • the production groups therefore also included jobs that were not productive at times or even for the entire shift, for example because they were not required for production or because they were switched off or defective.
  • the operator only has to assign the work stations to the individual production groups.
  • the assignment of the work stations, which are not currently intended for production and which are therefore not assigned to any of the production groups, to the free group is preferably carried out independently by a control device of the spinning machine. This can be a workplace control or a central machine control, which can also work together for this purpose.
  • work stations that are assigned to a production group but are currently switched off or defective are assigned to the free group. Assignment to the free group is only temporary. As soon as the work stations are switched on again or the defect has been remedied, these work stations can be assigned to a production group again. For this purpose, the work stations can be assigned to one of the production groups by the operator. However, it is also conceivable that a work station initially assigned by the operator to one of the production groups is automatically assigned to the free group by the control device due to a defect or switching off by the operator. In this case, the control device can switch off after switching on again or after eliminating the defect automatically reassign them to the production group to which they were previously assigned.
  • the work station therefore preferably remains assigned to its original production group, ie remains connected to it in terms of control technology, and is only assigned to the free group for reporting purposes.
  • the workstations that are already assigned to a production group but are currently waiting for the start of a new yarn batch in the relevant production group after the spinning machine has started are assigned to the free group.
  • the waiting time is no longer counted as a downtime during the production of the yarn lot in the shift report, but can be correctly recorded as a waiting time for the start of the lot.
  • the work station can preferably already be assigned to the production group in terms of control technology, even if it is temporarily assigned to the free group for recording the report data.
  • a work station reaches the end of the batch with the removal of the last bobbin of the old yarn batch produced at this work station from the spooling device. In this way, a defined point in time for reaching the end of the batch can be set at the respective work station, thereby achieving a correct assignment of unproductive downtimes.
  • downtimes of the work station are still assigned to the production of the old yarn lot in question.
  • downtimes of the work station are already counted towards the production of a new batch of yarn if the work station is already assigned to a new production group. If this is not the case, the workplace in question changes to the free group and downtimes are counted as non-batch-related downtimes within the free group.
  • the end of the batch for the entire batch must be distinguished from the end of the batch at the individual work station. This is achieved when the last spool of this yarn lot has been removed from the spooling device. Reaching the end of the batch at the individual work stations, like the end of the entire batch, is known to the control device(s) of the spinning machine based on the stored production data, so that the control device(s) assign the work stations to the production groups and the free group accordingly can.
  • the batch report contains total values for the relevant production group over the entire batch runtime from the start of the batch to the end of the batch. This gives the user all the data relating to the entire batch of yarn at a glance and allows them to easily compare them with other batches of yarn.
  • the batch report contains at least the shift reports for the relevant production group from the start of the batch to the end of the batch. This also makes it possible to determine abnormalities during individual shifts or during several shifts.
  • the game report can also contain further information, for example about the preparation of a game, as a separate preparation report. For example, at the beginning of a new batch of yarn, it is possible to initially operate work stations in a preparatory mode, which enables or also requires certain interventions by an operator. This period can be shown separately in the preparatory report.
  • FIG 1 shows a schematic front view of a spinning machine 1 in an overview.
  • the spinning machine 1 is designed as an automatic or at least semi-automatic spinning machine 1 and has a Variety of similar, juxtaposed jobs 2, which are arranged between two frames 9.
  • Each of the work stations 2 has a feed device 4 for a fiber material 7, which in the case of an open-end rotor spinning machine is a feed roller 16 (see figure 2 ) and an opening roller 12 (see figure 2 ) contains.
  • the feed device 4 contains a drafting system (not shown).
  • each of the work stations 2 has a spinning device 3 for producing a yarn 5 , a drawing-off device 11 for drawing off the yarn 5 and a winding device 19 for winding the yarn 5 produced onto a bobbin 6 held in a bobbin holder 17 .
  • the jobs 2 are designed as at least partially self-sufficient jobs.
  • the work stations 2 have at least one individually drivable spinning element, for example a spinning rotor 10 (see Fig. figure 2 ), an air spinning nozzle or a spindle with a ring traveler, so that the individual work stations 2 can also be operated independently of the other work stations 2 of the spinning machine 1.
  • the workstations 2 can independently rectify at least some of the faults occurring during operation, at least the piecing after a yarn break or a clearer cut, without the need for an operating robot or the intervention of an operator.
  • a display element 20 can also be provided at each of the work stations 2 to display various information relating to the work stations 2 .
  • the spinning machine 1 also has a machine control 14 which controls at least the central and higher-level processes on the spinning machine 1 .
  • machine control 14 controls at least the central and higher-level processes on the spinning machine 1 .
  • work station controls 13 may be provided, which interact with the machine control 14 and possibly other control devices of the spinning machine 1.
  • FIG 2 shows a work station 2 of such a spinning machine 1 in a schematic side view.
  • the spinning machine 1 is designed here as an open-end rotor spinning machine and therefore has a feed roller 16 and an opening roller 12 as the feed device and a spinning rotor 10 as the spinning element of the spinning device 3 .
  • the spinning rotor 10 be driven by means of a single drive 21, but also the other working elements of work station 2, such as the feed roller 16, the opening roller 12, the take-off device 11 and the winding device 19, are driven by means of a single drive 21.
  • production groups PG are defined on such a spinning machine at the beginning of production when the machine starts or at the beginning of a specific shift or also during a specific shift to carry out a lot change. Become the production groups PG then assigned to the jobs 2, which are to produce the respective yarn lot. It is also possible to carry out a so-called flying batch change. A batch change from an old yarn batch that is still up-to-date to a new yarn batch can also be carried out at a single workstation 2 in such spinning machines 1 with at least partially self-sufficient workstations 2, without having to wait for the end of the batch to be reached at the other workstations 2 belonging to the same production group PG would have to.
  • the jobs 2 are assigned to a new production group PG. This can be done in advance as part of production planning or only after the end of an old yarn lot has been reached. Work station 2 is first stopped when the end of the batch is reached. For the batch change, work station 2 must then be assigned to the new production group in terms of control technology and, if necessary, also converted, e.g. equipped with new spinning means and a different fiber material 7 or supplied with different empty tubes.
  • the spinning means include, for example, spinning elements such as the spinning rotor 10, draw-off nozzles, twisting elements or other elements influencing the yarn quality.
  • shift reports 8 are created at the spinning machines 1. If the spinning machine 1 can produce several yarn lots in parallel and several production groups PG are set up during one shift, such a shift report 8 is created for each production group PG.
  • the shift report 8 contains data on the start of the shift, the end of the shift and, if applicable, a shift number for the clear identification of the shift. Furthermore, production-related information such as the yarn lot, the amount of yarn produced 5 in [kg] and/or in [m] and the efficiency are contained in the shift reports 8 . Individual events that influence the efficiency, such as the above-mentioned yarn breaks, clearer cuts, the running out of the fiber material 7 and other operating requests from the work stations 2 are preferably also recorded, and are therefore shown in dashed lines. This data is presented as total values for all jobs 2 and the entire shift. The shift report 8 therefore also contains the number and job numbers of the jobs 2 belonging to a production group PG.
  • the shift reports 8 can, for example, as in figure 1 shown, can be accessed via the machine control 14. It is optional and therefore also possible to call up a job report 18 for each individual job 2 , which contains the specified data and the times the respective job 2 belonged to the production group PG broken down for each job 2 . This is in the right pane figure 3 shown schematically.
  • the present invention therefore proposes, in addition to the production groups PG, a free group FG (see 1 ) and to assign all jobs 2, which are currently not intended for yarn production and therefore do not have to be assigned to any of the production groups PG, to the free group FG.
  • a shift report 8 is also created for the Freiner FG.
  • Such a shift report 8 of a free group FG is shown schematically in 4 shown.
  • the free group FG is defined in the same way as the production groups PG, but no lot data has to be assigned to it.
  • the shift report 8 for the free group FG only contains data on the start of the shift, the end of the shift and the total number of jobs 2 assigned to the free group FG within this shift. Due to the definition of the free group FG, it is no longer necessary to list all jobs 2 in one assigned to the production groups PG. Instead, jobs 2 that are not assigned to any production groups PG are automatically assigned to the free group FG by the machine controller 14 .
  • Analogously to shift report 8 for the production groups PG can optionally also be called up in the shift report 8 for the free group FG job reports 18, which contain data on the exact times when the respective job 2 belonged to the free group FG.
  • the free group FG like the production groups PG, is not a constantly defined group over the entire shift, but it is possible that during a shift work stations 2 join a production group PG or the free group FG or leave them again.
  • the shift report 8 can also contain the reasons for belonging to the free group FG, in order to to enable better evaluation of the data. For example, it would be conceivable to show separately the number and job numbers of jobs 2 that were not assigned to any production group PG. It is also possible to separately record the number and job numbers of jobs 2 that are at least temporarily switched off and/or the number and job numbers of defective jobs 2 . Further reasons for belonging to the free group FG can be waiting times for the start of a new yarn lot after the spinning machine 1 has started, waiting times for the start of a lot in connection with a lot change or also waiting times until a new production group PG is assigned in connection with a lot change. These waiting times can be collected or individually broken down and displayed. Optionally and therefore shown in dashed lines, the reasons for belonging to the Freioli FG can also be recorded for each job 2 and shown in the job reports 18 .
  • the reference point in time for the assignment of a work station 2 to the free group FG in connection with a lot change is preferably the point in time at which the last bobbin 6 of an old yarn lot is removed from the bobbin holder 17.
  • the relevant lot remains Work station 2 is assigned to its production group PG and the waiting times of this spinning station, eg for a spinning agent or fiber material exchange, are recorded within the old production group PG.
  • the waiting times are already added to the new production group PG if the relevant job 2 is assigned directly to a new, already running production group PG.
  • job 2 is assigned to the free group FG and the waiting times are recorded within the free group FG.
  • the lot-related shift reports 8 also reflect the production data of the jobs 2 of a production group PG much more precisely, since these are not falsified by unproductive jobs 2 which are only assigned to the production group PG for formal reasons.
  • a theoretical production capacity of the spinning machine 1 can also be determined in this way and optimization measures for the operation of the spinning machine 1 can be determined therefrom. If the reasons for the assignment to the free group FG are also recorded and presented in shift report 8 of the free group FG, optimization measures for a lot change can also be derived from this, for example.
  • lot reports 18 in addition to the previously usual shift reports 8 .
  • the lot reports 18 cover the entire production period of a yarn lot, which can also extend over several weeks and numerous shifts. Shift reports 8 are often stored on spinning machines 1 only for a specific period of time, or only a certain number of shift reports 8 are stored for capacity reasons.
  • the now proposed game reports 18, on the other hand, enable the identification of certain events at the workplaces 2 over a longer period of time and thus allow more extensive evaluations.
  • the figure 5 shows a first version of a lot report 15, which contains data about the lot start and the lot end as well as production data of the work stations 2. These are only recorded and displayed as cumulative values over the entire duration of the game.
  • the batch reports 15 can contain the quantity of yarn 5 produced, the duration of downtimes, possibly differentiated according to reasons for the downtimes, or the number of specific events at the work stations 2, such as yarn breakages.
  • the events and times can also be recorded and displayed in a further breakdown.
  • lot report 15 only provides information about the production data for the entire yarn lot, but does not allow any conclusions to be drawn about the chronological occurrence of the individual events or the recorded times.
  • figure 6 shows, however, another version of a game report 15, which in addition or as an alternative to the total values of figure 5 also includes the individual shift reports 8 per yarn lot.
  • a lot report 15 allows the chronological assignment of specific production data to a specific shift. Events that only occurred in certain shifts can also be recorded in this way and their cause can be eliminated if necessary.
  • a preparation report (not shown) can also be included, for example, which contains data about the set-up of the yarn lot. Since such a batch report 15 containing the individual shift reports 8 for each batch of yarn is very extensive, it can also be advantageous to create the batch report 15 at intervals with respective transmission to a higher-level control system. If the spinning machine 1 is connected to such a control system, it continues to be so conceivable to create shift reports 8 and batch reports 15 directly there.

Abstract

Bei einem Verfahren zum Betreiben einer teil- oder vollautomatischen Spinnmaschine (1), insbesondere einer Offenend-Rotorspinnmaschine, mit einer Vielzahl gleichartiger, nebeneinander angeordneter, zumindest teilweise autarker Arbeitsstellen (2), wobei jede der Arbeitsstellen (2) eine Spinnvorrichtung (3) zur Herstellung eines Garns (5) sowie eine Spulvorrichtung (19) zum Aufwickeln des Garns (5) auf eine Spule (6) aufweist, wobei mehrere Produktionsgruppen (PG) definiert werden, wobei mehrere, dieselbe Garnpartie herstellende Arbeitsstellen (2) jeweils eine Produktionsgruppe (PG) bilden, wird jeweils nach einer festlegbaren Zeitdauer ein Schichtbericht (8) für jede Produktionsgruppe (PG) durch die Spinnmaschine (1) erstellt. Es wird eine Freigruppe (FG) definiert, wobei zumindest Arbeitsstellen (2), welche aktuell keiner Produktionsgruppe (PG) zugeordnet sind, der Freigruppe (FG) zugewiesen werden und wobei auch für die Freigruppe (FG) ein Schichtbericht (8) erstellt wird. Eine entsprechende teil- oder vollautomatische Spinnmaschine (1) mit einer Vielzahl gleichartiger, nebeneinander angeordneter, zumindest teilweise autarker Arbeitsstellen (2) weist eine Steuervorrichtung (13, 14) zur Durchführung des Verfahrens auf.In a method for operating a partially or fully automatic spinning machine (1), in particular an open-end rotor spinning machine, with a large number of similar, at least partially self-sufficient work stations (2) arranged next to one another, each of the work stations (2) having a spinning device (3) for production of a yarn (5) and a winding device (19) for winding the yarn (5) onto a bobbin (6), with several production groups (PG) being defined, with several work stations (2) producing the same batch of yarn each having a production group ( PG), a shift report (8) for each production group (PG) is created by the spinning machine (1) after a definable period of time. A free group (FG) is defined, with at least jobs (2) that are currently not assigned to a production group (PG) being assigned to the free group (FG) and a shift report (8) also being created for the free group (FG). A corresponding partially or fully automatic spinning machine (1) with a large number of similar, at least partially self-sufficient work stations (2) arranged next to one another has a control device (13, 14) for carrying out the method.

Description

Die vorliegende Erfindung betrifft ein Verfahren zum Betreiben einer teil- oder vollautomatischen Spinnmaschine, insbesondere einer Offenend-Rotorspinnmaschine, mit einer Vielzahl gleichartiger, nebeneinander angeordneter, zumindest teilweise autarker Arbeitsstellen, wobei jede der Arbeitsstellen eine Spinnvorrichtung zur Herstellung eines Garns sowie eine Spulvorrichtung zum Aufwickeln des Garns auf eine Spule aufweist, wobei mehrere Produktionsgruppen definiert werden und wobei mehrere, dieselbe Garnpartie herstellende Arbeitsstellen jeweils eine Produktionsgruppe bilden. Jeweils nach einer festlegbaren Zeitdauer wird ein Schichtbericht für jede Produktionsgruppe durch die Spinnmaschine erstellt.The present invention relates to a method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine, with a large number of identical, at least partially self-sufficient work stations arranged next to one another, each of the work stations having a spinning device for producing a yarn and a winding device for winding up the yarn Having yarn on a spool, with several production groups being defined and with several jobs producing the same batch of yarn each forming a production group. After a definable period of time, a shift report for each production group is created by the spinning machine.

Teil- oder vollautomatische Spinnmaschinen sind aus dem Stand der Technik in verschiedenen Ausführungen bekannt. Die Arbeitsstellen dieser Spinnmaschinen verfügen dabei jeweils über eine Spinnvorrichtung mit einem Spinnelement, beispielsweise eine Spindel mit Ringläufer, einen Offenend-Spinnrotor oder eine Luftspinnvorrichtung, zur Herstellung eines Garns, eine Spulvorrichtung zum Aufwickeln des produzierten Garns auf eine Spule sowie eine Vielzahl weiterer Elemente zum Herstellen und Handhaben des Garns sowie des vorgelegten Fasermaterials. Bei derartigen Spinnmaschinen ist es üblich, dass verschiedene Daten über die Dauer einer Produktionsschicht beobachtet werden, welche dann bei Schichtende von der Spinnmaschine als Schichtbericht gespeichert werden und vom Bedienpersonal abgerufen werden können. Der Schichtbericht enthält dabei neben dem Schichtbeginn und dem Schichtende verschiedene Produktionsparameter und statistische Auswertungen der Tätigkeit der Arbeitsstellen. Diese Informationen werden als Summenwerte über die gesamte Schicht und alle Arbeitsstellen erfasst und dargestellt, bevorzugt jedoch auch für jede einzelne Arbeitsstelle. Hierdurch erhält der Bediener Informationen über die Tätigkeit der Arbeitsstellen und gegebenenfalls auch Hinweise auf Probleme innerhalb der Schicht. Beispielsweise ist dies durch die Rotorspinnmaschine R 66 der Anmelderin bekannt geworden.Partly or fully automatic spinning machines are known in various designs from the prior art. The workstations of these spinning machines each have a spinning device with a spinning element, for example a spindle with a ring traveler, an open-end spinning rotor or an air spinning device, for producing a yarn, a winding device for winding the yarn produced onto a bobbin and a large number of other production elements and handling of the yarn and the presented fiber material. With spinning machines of this type, it is common for various data to be observed over the duration of a production shift, which data is then stored by the spinning machine as a shift report at the end of the shift and can be called up by the operating personnel. In addition to the start and end of the shift, the shift report contains various production parameters and statistical evaluations of the activities at the workplace. This information is recorded and displayed as total values for the entire shift and all jobs, but preferably also for each individual job. Through this the operator receives information about the activities of the workplace and, if necessary, also information about problems within the shift. This has become known, for example, from the applicant's R 66 rotor spinning machine.

Bei Spinnmaschinen mit zumindest teilweise autarken Arbeitsstellen, welche zumindest einen Anspinnvorgang mittels an den Arbeitsstellen angeordneter Bedienelemente selbstständig durchführen können und bei welchen zumindest das Spinnelement einzeln antreibbar ist, ist es möglich, an den einzelnen Arbeitsstellen auch verschiedene Garnpartien herzustellen. Die Arbeitsstellen der Spinnmaschine werden hierzu in mehrere Produktionsgruppen unterteilt, wobei mehrere, dieselbe Garnpartie herstellende Arbeitsstellen jeweils eine Produktionsgruppe bilden. Bei derartigen Spinnmaschinen werden die Schichtberichte jeweils für jede Produktionsgruppe einzeln erstellt. Es wird hierzu auch erfasst, welche Arbeitsstellen jeweils der jeweiligen Produktionsgruppe zugehören. Es kann somit für jede Garnpartie eine gesonderte Auswertung erfolgen.In the case of spinning machines with at least partially self-sufficient work stations, which can independently carry out at least one piecing process using operating elements arranged at the work stations and in which at least the spinning element can be driven individually, it is also possible to produce different yarn lots at the individual work stations. For this purpose, the work stations of the spinning machine are divided into several production groups, with several work stations producing the same batch of yarn each forming a production group. With such spinning machines, the shift reports are created individually for each production group. It is also recorded which jobs belong to the respective production group. A separate evaluation can thus be carried out for each yarn lot.

Aufgabe der vorliegenden Erfindung ist es, ein Verfahren zum Betreiben einer teil- oder vollautomatischen Spinnmaschine vorzuschlagen, welches verbesserte Informationen über die Tätigkeit der Arbeitsstellen bereitstellt. Weiterhin soll eine entsprechende Spinnmaschine vorgeschlagen werden.The object of the present invention is to propose a method for operating a partially or fully automatic spinning machine, which provides improved information about the activity of the work stations. Furthermore, a corresponding spinning machine is to be proposed.

Die Aufgabe wird gelöst durch ein Verfahren und eine Spinnmaschine mit den Merkmalen der unabhängigen Patentansprüche.The object is achieved by a method and a spinning machine with the features of the independent patent claims.

Bei einem Verfahren zum Betreiben einer teil- oder vollautomatischen Spinnmaschine, insbesondere einer Offenend-Rotorspinnmaschine, mit einer Vielzahl gleichartiger, nebeneinander angeordneter, zumindest teilweise autarker Arbeitsstellen, wobei jede der Arbeitsstellen eine Spinnvorrichtung zur Herstellung eines Garns sowie eine Spulvorrichtung zum Aufwickeln des Garns auf eine Spule aufweist, werden mehrere Produktionsgruppen definiert. Dabei bilden mehrere, dieselbe Garnpartie herstellende Arbeitsstellen jeweils eine Produktionsgruppe. Jeweils nach einer festlegbaren Zeitdauer wird ein Schichtbericht für jede Produktionsgruppe durch die Spinnmaschine erstellt.In a method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine, with a large number of similar, at least partially self-sufficient work stations arranged next to one another, each of the work stations having a spinning device for producing a yarn and a winding device for winding up the yarn on a spool, several production groups are defined. Several jobs producing the same batch of yarn each form a production group. After a definable period of time, a shift report for each production group is created by the spinning machine.

Es wird vorgeschlagen, dass zusätzlich eine Freigruppe definiert wird, wobei zumindest Arbeitsstellen, welche aktuell keiner der Produktionsgruppen zugeordnet sind, der Freigruppe zugewiesen werden und dass auch für die Freigruppe ein Schichtbericht erstellt wird. Bei einer entsprechenden teil- oder vollautomatischen Spinnmaschine, insbesondere Offenend-Rotorspinnmaschine, mit einer Vielzahl gleichartiger, nebeneinander angeordneter, zumindest teilweise autarker Arbeitsstellen, von denen jede eine Spinnvorrichtung zur Herstellung eines Garns sowie eine Spulvorrichtung zum Aufwickeln des Garns auf eine Spule aufweist, sind die Arbeitsstellen in mehrere Produktionsgruppen unterteilbar. Dabei bilden mehrere, dieselbe Garnpartie herstellende Arbeitsstellen jeweils eine Produktionsgruppe. Die Spinnmaschine weist eine Steuervorrichtung zur Durchführung des Verfahrens auf.It is proposed that a free group is also defined, with at least jobs that are not currently assigned to any of the production groups being assigned to the free group and that a shift report is also created for the free group. In a corresponding partially or fully automatic spinning machine, in particular an open-end rotor spinning machine, with a large number of similar, at least partially self-sufficient work stations arranged next to one another, each of which has a spinning device for producing a yarn and a winding device for winding the yarn onto a bobbin, the Jobs can be divided into several production groups. Several jobs producing the same batch of yarn each form a production group. The spinning machine has a control device for carrying out the method.

Durch die Definition der Freigruppe können nun produktionslose Zeiten jeder einzelnen Arbeitsstelle innerhalb der Schicht genau erfasst werden und damit auch wesentlich genauere Informationen über den Nutzeffekt der Spinnmaschine wie auch jeder einzelnen Produktionsgruppe erhalten werden als bisher. Bisher war es nämlich erforderlich, die Arbeitsstellen vollständig auf Produktionsgruppen aufzuteilen und jede Arbeitsstelle einer der Produktionsgruppen zuzuordnen. Die Produktionsgruppen umfassten daher auch Arbeitsstellen, die zeitweise oder sogar über die gesamte Schicht nicht produktiv waren, etwa weil sie für die Produktion gar nicht benötigt wurden oder weil sie z.B. ausgeschaltet oder defekt waren. Durch die Definition der Freigruppe ist es nun möglich, diese Arbeitsstellen und die produktionslosen Zeiten dieser Arbeitsstellen exakt zu erfassen und von anderen, ereignisbedingten Stillstandszeiten im Spinnbetrieb zu unterscheiden. Dies ist deshalb möglich, da für jede Arbeitsstelle sowohl die Zuordnung dieser Arbeitsstelle zur Freigruppe als auch der Zeitpunkt der Zuordnung zur Freigruppe sowie der Zeitpunkt des Verlassens der Freigruppe im Schichtbericht der Freigruppe erfasst werden kann. Die partiebezogenen Schichtberichte geben hierdurch wesentlich exaktere Informationen über die Tätigkeit der Arbeitsstellen und die Erzeugung einer bestimmten Garnpartie wieder, da nun Arbeitsstellen, welche aus verschiedenen Gründen gar nicht zur Produktion der Garnpartie beitragen, nicht mehr in dem partiebezogenen Schichtbericht erfasst sind und diesen verfälschen.By defining the free group, non-production times of each individual work station within the shift can now be precisely recorded and thus much more precise information about the efficiency of the spinning machine and each individual production group can be obtained than before. Previously it was necessary to divide the jobs completely into production groups and to assign each job to one of the production groups. The production groups therefore also included jobs that were not productive at times or even for the entire shift, for example because they were not required for production or because they were switched off or defective. By defining the free group, it is now possible to precisely record these jobs and the non-production times of these jobs and to differentiate them from other, event-related downtimes in the spinning operation. This is possible because for each job, both the assignment of this job to the free group and the time of assignment to the free group and the time of leaving the free group can be recorded in the shift report of the free group. As a result, the lot-related shift reports provide much more precise information about the activities of the work stations and the production of a specific yarn lot, since now work stations which, for various reasons, do not contribute to the production of the yarn lot at all are no longer recorded in the lot-related shift report and falsify it.

Der Bediener muss zur Einrichtung der Arbeitsstellen für die folgende Schicht oder für die folgenden Garnpartien somit lediglich die Arbeitsstellen den einzelnen Produktionsgruppen zuordnen. Das Zuweisen der Arbeitsstellen, welche aktuell gar nicht für die Produktion vorgesehen sind und welche daher keiner der Produktionsgruppen zugewiesen werden, an die Freigruppe erfolgt vorzugsweise selbstständig durch eine Steuereinrichtung der Spinnmaschine. Es kann sich dabei um eine Arbeitsstellensteuerung oder um eine zentrale Maschinensteuerung handeln, welche hierzu auch zusammenwirken können.To set up the work stations for the following shift or for the following yarn lots, the operator only has to assign the work stations to the individual production groups. The assignment of the work stations, which are not currently intended for production and which are therefore not assigned to any of the production groups, to the free group is preferably carried out independently by a control device of the spinning machine. This can be a workplace control or a central machine control, which can also work together for this purpose.

Weiterhin bringt es Vorteile mit sich, wenn auch Arbeitsstellen, welche einer Produktionsgruppe zwar zugeordnet sind, jedoch aktuell ausgeschaltet oder defekt sind, der Freigruppe zugewiesen werden. Das Zuweisen zur Freigruppe ist lediglich temporär. Sobald die Arbeitsstellen wieder eingeschaltet werden oder aber der Defekt behoben ist, können diese Arbeitsstellen wieder einer Produktionsgruppe zugeordnet werden. Die Arbeitsstellen können hierzu vom Bediener einer der Produktionsgruppen zugewiesen werden. Es ist allerdings auch denkbar, dass eine zunächst vom Bediener einer der Produktionsgruppen zugewiesene Arbeitsstelle aufgrund eines Defekts oder Ausschaltens durch den Bediener automatisch von der Steuereinrichtung der Freigruppe zugewiesen wird. In diesem Fall kann die Steuereinrichtung nach dem Wiedereinschalten oder dem Beheben des Defekts die Arbeitsstelle auch automatisch wieder der Produktionsgruppe zuweisen, der sie zuvor zugewiesen war. Vorzugsweise bleibt somit die Arbeitsstelle ihrer ursprünglichen Produktionsgruppe zugeordnet, d. h. bleibt steuerungstechnisch mit dieser verbunden, und wird lediglich für das Berichtswesen der Freigruppe zugewiesen. Denkbar wäre es aber natürlich auch, auch die steuerungstechnische Zuordnung zu der Produktionsgruppe ebenfalls aufzuheben und diese zusammen mit dem Wiederzuordnen der Arbeitsstelle zu ihrer Produktionsgruppe ebenfalls erneut zuzuordnen.Furthermore, there are advantages if work stations that are assigned to a production group but are currently switched off or defective are assigned to the free group. Assignment to the free group is only temporary. As soon as the work stations are switched on again or the defect has been remedied, these work stations can be assigned to a production group again. For this purpose, the work stations can be assigned to one of the production groups by the operator. However, it is also conceivable that a work station initially assigned by the operator to one of the production groups is automatically assigned to the free group by the control device due to a defect or switching off by the operator. In this case, the control device can switch off after switching on again or after eliminating the defect automatically reassign them to the production group to which they were previously assigned. The work station therefore preferably remains assigned to its original production group, ie remains connected to it in terms of control technology, and is only assigned to the free group for reporting purposes. Of course, it would also be conceivable to also cancel the control-related assignment to the production group and to assign it again together with the reassignment of the work station to its production group.

Daneben ist es vorteilhaft, wenn auch Arbeitsstellen, welche einer Produktionsgruppe bereits zugeordnet sind, sich jedoch nach Erreichen eines Partieendes einer alten Garnpartie aktuell in einer Wartezeit auf einen Partiestart einer neuen Garnpartie an der Produktionsgruppe befinden, der Freigruppe zugewiesen werden. Die Wartezeit wird hierdurch nicht mehr fälschlicherweise als Stillstandszeit während der Produktion der Garnpartie gewertet. Der Schichtbericht für die betreffende Garnpartie fällt hierdurch nochmals exakter aus. Auch hier kann vorzugsweise die steuerungstechnische Zuordnung der Arbeitsstelle zu der Produktionsgruppen grundsätzlich erhalten bleiben und die Arbeitsstelle wird lediglich für die Erfassung der Berichtsdaten der Freigruppe zugewiesen.In addition, it is advantageous if workstations that are already assigned to a production group, but are currently waiting for the start of a new yarn batch in the production group after reaching the end of a batch of an old yarn batch, are assigned to the free group. As a result, the waiting time is no longer incorrectly evaluated as downtime during the production of the yarn lot. As a result, the shift report for the relevant batch of yarn is even more precise. Here, too, the control-related assignment of the work station to the production group can preferably be retained in principle and the work station is only assigned to the free group for recording the report data.

Auch ist es vorteilhaft, wenn auch Arbeitsstellen, welche einer Produktionsgruppe bereits zugeordnet sind, sich jedoch nach einem Start der Spinnmaschine aktuell in einer Wartezeit auf einen Partiestart einer neuen Garnpartie an der betreffenden Produktionsgruppe befinden, der Freigruppe zugewiesen werden. Ebenso wie oben beschrieben wird die Wartezeit hierdurch im Schichtbericht nicht mehr als Stillstandszeit während der Produktion der Garnpartie gezählt, sondern kann korrekt als Wartezeit auf den Partiestart erfasst werden. Auch hier kann vorzugsweise die Arbeitsstelle steuerungstechnisch bereits der Produktionsgruppe zugeordnet sein, auch wenn sie für die Erfassung der Berichtsdaten vorübergehend der Freigruppe zugewiesen ist.It is also advantageous if workstations that are already assigned to a production group but are currently waiting for the start of a new yarn batch in the relevant production group after the spinning machine has started are assigned to the free group. As described above, the waiting time is no longer counted as a downtime during the production of the yarn lot in the shift report, but can be correctly recorded as a waiting time for the start of the lot. Here, too, the work station can preferably already be assigned to the production group in terms of control technology, even if it is temporarily assigned to the free group for recording the report data.

Vorteile bringt es zudem mit sich, wenn eine Arbeitsstelle mit der Entnahme der letzten, an dieser Arbeitsstelle produzierten Spule der alten Garnpartie aus der Spulvorrichtung das Partieende erreicht. Hierdurch kann ein definierter Zeitpunkt für das Erreichen des Partieendes an der jeweiligen Arbeitsstelle festgelegt werden und dadurch eine korrekte Zuordnung von unproduktiven Stillstandszeiten erzielt werden. Bis zur Entnahme der letzten Spule der alten Garnpartie aus der Spulvorrichtung werden Stillstandszeiten der Arbeitsstelle noch der Produktion der betreffenden, alten Garnpartie zugeordnet. Nach der Entnahme werden Stillstandszeiten der Arbeitsstelle hingegen bereits zur Produktion einer neuen Garnpartie gezählt, wenn die Arbeitsstelle bereits einer neuen Produktionsgruppe zugeordnet ist. Ist dies nicht der Fall, wechselt die betreffende Arbeitsstelle in die Freigruppe und Stillstandszeiten werden als nicht partiebezogene Stillstandszeiten innerhalb der Freigruppe gezählt.It is also advantageous if a work station reaches the end of the batch with the removal of the last bobbin of the old yarn batch produced at this work station from the spooling device. In this way, a defined point in time for reaching the end of the batch can be set at the respective work station, thereby achieving a correct assignment of unproductive downtimes. Until the last coil of the old yarn lot is removed from the winding device, downtimes of the work station are still assigned to the production of the old yarn lot in question. On the other hand, after removal, downtimes of the work station are already counted towards the production of a new batch of yarn if the work station is already assigned to a new production group. If this is not the case, the workplace in question changes to the free group and downtimes are counted as non-batch-related downtimes within the free group.

Von dem Partieende an der einzelnen Arbeitsstelle zu unterscheiden ist das Partieende für die gesamte Partie. Dieses ist dann erreicht, wenn die letzte Spule dieser Garnpartie aus der Spulvorrichtung entnommen wurde. Das Erreichen des Partieendes an den einzelnen Arbeitsstellen ist ebenso wie das Partieende der gesamten Partie der oder den Steuereinrichtung(en) der Spinnmaschine aufgrund der hinterlegten Produktionsdaten bekannt, so dass die Steuereinrichtung(en) die Zuordnung der Arbeitsstellen zu den Produktionsgruppen und der Freigruppe entsprechend vornehmen kann.The end of the batch for the entire batch must be distinguished from the end of the batch at the individual work station. This is achieved when the last spool of this yarn lot has been removed from the spooling device. Reaching the end of the batch at the individual work stations, like the end of the entire batch, is known to the control device(s) of the spinning machine based on the stored production data, so that the control device(s) assign the work stations to the production groups and the free group accordingly can.

Ebenso bringt es Vorteile mit sich, wenn Arbeitsstellen, welche einer Produktionsgruppe zugeordnet sind, ab dem Partiestart der neuen Garnpartie an der betreffenden Produktionsgruppe die Freigruppe verlassen. Es wird somit nur die tatsächliche Wartezeit auf den Partiestart der Freigruppe zugerechnet und sämtliche Stillstandszeiten ab dem Partiestart korrekterweise der jeweiligen Garnpartie. Als Partiestart gilt dabei der Start der ersten Arbeitsstelle der betreffenden Garnpartie.There are also advantages if work stations that are assigned to a production group leave the free group from the start of the new yarn batch on the relevant production group. Thus, only the actual waiting time for the start of the batch is allocated to the free group and all downtimes from the start of the batch are correctly allocated to the respective yarn batch. The start of the first work station of the relevant yarn lot is considered to be the start of the lot.

Vorteilhaft ist es, wenn auch Arbeitsstellen, welche nach Erreichen des Partieendes einer alten Garnpartie noch einer Produktionsgruppe zugeordnet sind, der Freigruppe zugewiesen werden. Somit können auch Arbeitsstellen, welche nicht oder noch nicht für die Produktion einer anderen Garnpartie vorgesehen sind, korrekt erfasst werden und deren Berichtszeiten werden nicht mehr fälschlicherweise der alten Garnpartie zugeordnet.It is advantageous if work stations which are still assigned to a production group after reaching the end of a batch of an old yarn batch are also assigned to the free group. This means that work stations that are not or not yet intended for the production of another yarn lot can be recorded correctly and their reporting times are no longer incorrectly assigned to the old yarn lot.

Besonders vorteilhaft ist es weiterhin, wenn für jede Produktionsgruppe ein Partiebericht erstellt wird. Der Nutzer kann somit Informationen über die Tätigkeit der Arbeitsstellen über die gesamte Garnpartie erhalten und muss diese nicht mehr aus den einzelnen Schichtberichten herauslesen.It is also particularly advantageous if a batch report is created for each production group. The user can thus obtain information about the activities of the work stations for the entire yarn batch and no longer has to read this out from the individual shift reports.

Nach einer ersten Ausführung enthält der Partiebericht dabei Summenwerte für die betreffende Produktionsgruppe über die gesamte Partielaufzeit vom Partiestart bis zum Partieende. Der Nutzer erhält hierdurch auf einen Blick sämtliche Daten, die die gesamte Garnpartie betreffen und kann diese in einfacher Weise mit anderen Garnpartien vergleichen.According to a first version, the batch report contains total values for the relevant production group over the entire batch runtime from the start of the batch to the end of the batch. This gives the user all the data relating to the entire batch of yarn at a glance and allows them to easily compare them with other batches of yarn.

Zusätzlich oder alternativ kann es jedoch auch vorteilhaft sein, wenn der Partiebericht zumindest die Schichtberichte für die betreffende Produktionsgruppe vom Partiestart bis zum Partieende enthält. Hierdurch ist es auch möglich, Auffälligkeiten während einzelner oder während einiger Schichten zu ermitteln. Der Partiebericht kann in diesem Fall zudem weitere Informationen beispielsweise über die Vorbereitung einer Partie als gesonderten Vorbereitungsbericht enthalten. Beispielsweise ist es möglich, zu Beginn einer neuen Garnpartie Arbeitsstellen zunächst in einem Vorbereitungsmodus zu betreiben, der bestimmte Eingriffe eines Bedieners ermöglicht oder auch erfordert. Dieser Zeitraum kann mittels des Vorbereitungsberichts gesondert ausgewiesen werden.In addition or as an alternative, however, it can also be advantageous if the batch report contains at least the shift reports for the relevant production group from the start of the batch to the end of the batch. This also makes it possible to determine abnormalities during individual shifts or during several shifts. In this case, the game report can also contain further information, for example about the preparation of a game, as a separate preparation report. For example, at the beginning of a new batch of yarn, it is possible to initially operate work stations in a preparatory mode, which enables or also requires certain interventions by an operator. This period can be shown separately in the preparatory report.

Weitere Vorteile der Erfindung sind in den nachfolgenden Ausführungsbeispielen beschrieben. Es zeigen:

Figur 1
eine Spinnmaschine in einer schematischen Vorderansicht als Übersichtsdarstellung,
Figur 2
eine Arbeitsstelle einer Spinnmaschine in einer schematischen, teilweise geschnittenen Seitenansicht,
Figur 3
eine schematische Darstellung eines Schichtberichts für eine Produktionsgruppe,
Figur 4
eine schematische Darstellung eines Schichtberichts für eine Freigruppe,
Figur 5
eine schematische Darstellung eines Partieberichts nach einer ersten Ausführung, sowie
Figur 6
eine schematische Darstellung eines Partieberichts nach einer zweiten Ausführung.
Further advantages of the invention are described in the following exemplary embodiments. Show it:
figure 1
a spinning machine in a schematic front view as an overview,
figure 2
a work station of a spinning machine in a schematic, partially sectioned side view,
figure 3
a schematic representation of a shift report for a production group,
figure 4
a schematic representation of a shift report for a free group,
figure 5
a schematic representation of a game report according to a first version, as well as
figure 6
a schematic representation of a game report according to a second embodiment.

Bei der nachfolgenden Beschreibung der Figuren werden für Merkmale, die bei den einzelnen Ausführungen bzw. den einzelnen Figuren jeweils identisch oder zumindest vergleichbar sind, gleiche Bezugszeichen verwendet. Einige der Merkmale werden daher nur bei ihrer ersten Erwähnung bzw. nur einmal anhand einer geeigneten Figur erläutert. Sofern diese Merkmale in Verbindung mit den weiteren Figuren nicht nochmals gesondert erläutert werden, entspricht deren Ausgestaltung und/oder Wirkweise der Ausgestaltung und Wirkweise der identischen oder vergleichbaren, beschriebenen Merkmale. Aus Gründen der Übersichtlichkeit ist weiterhin bei mehreren identischen Merkmalen oder Bauteilen in einer Figur nur eines davon bezeichnet.In the following description of the figures, the same reference symbols are used for features that are identical or at least comparable in the individual embodiments or the individual figures. Some of the features are therefore only explained when they are first mentioned or only once using a suitable figure. If these features are not explained separately again in connection with the other figures, their design and/or mode of action corresponds to the design and mode of action of the identical or comparable features described. For reasons of clarity, if there are several identical features or components in one figure, only one of them is indicated.

Figur 1 zeigt eine schematische Vorderansicht einer Spinnmaschine 1 in einer Übersichtsdarstellung. Die Spinnmaschine 1 ist als automatische oder zumindest teilautomatische Spinnmaschine 1 ausgebildet und weist eine Vielzahl gleichartiger, nebeneinander angeordneter Arbeitsstellen 2 auf, die zwischen zwei Gestellen 9 angeordnet sind. Jede der Arbeitsstellen 2 weist eine Zuführvorrichtung 4 für ein Fasermaterial 7 auf, die im Falle einer Offenend-Rotorspinnmaschine eine Speisewalze 16 (siehe Figur 2) und eine Auflösewalze 12 (siehe Figur 2) beinhaltet. Im Falle einer Luftspinnmaschine oder Ringspinnmaschine beinhaltet die Zuführvorrichtung 4 hingegen ein Streckwerk (nicht dargestellt). figure 1 shows a schematic front view of a spinning machine 1 in an overview. The spinning machine 1 is designed as an automatic or at least semi-automatic spinning machine 1 and has a Variety of similar, juxtaposed jobs 2, which are arranged between two frames 9. Each of the work stations 2 has a feed device 4 for a fiber material 7, which in the case of an open-end rotor spinning machine is a feed roller 16 (see figure 2 ) and an opening roller 12 (see figure 2 ) contains. In the case of an air-jet spinning machine or ring spinning machine, however, the feed device 4 contains a drafting system (not shown).

Weiterhin weist jede der Arbeitsstellen 2 eine Spinnvorrichtung 3 zur Herstellung eines Garns 5, eine Abzugsvorrichtung 11 zum Abziehen des Garns 5 sowie eine Spulvorrichtung 19 zum Aufspulen des produzierten Garns 5 auf eine in einem Spulenhalter 17 gehaltene Spule 6 auf. Die Arbeitsstellen 2 sind als zumindest teilweise autarke Arbeitsstellen ausgebildet. Dies bedeutet, dass die Arbeitsstellen 2 zumindest über ein einzeln antreibbares Spinnelement, beispielsweise einen Spinnrotor 10 (s. Figur 2), eine Luftspinndüse oder eine Spindel mit Ringläufer verfügen, so dass die einzelnen Arbeitsstellen 2 auch unabhängig von den anderen Arbeitsstellen 2 der Spinnmaschine 1 betrieben werden können. Weiterhin können die Arbeitsstellen 2 zumindest einen Teil der im Betrieb auftretenden Störungen, zumindest das Anspinnen nach einem Fadenbruch oder einem Reinigerschnitt, selbstständig beheben, ohne dass hierfür ein Bedienroboter oder das Eingreifen einer Bedienperson erforderlich wäre. Zur Anzeige verschiedener, die Arbeitsstellen 2 betreffenden Informationen kann weiterhin an jeder der Arbeitsstellen 2 ein Anzeigeelement 20 vorgesehen sein.Furthermore, each of the work stations 2 has a spinning device 3 for producing a yarn 5 , a drawing-off device 11 for drawing off the yarn 5 and a winding device 19 for winding the yarn 5 produced onto a bobbin 6 held in a bobbin holder 17 . The jobs 2 are designed as at least partially self-sufficient jobs. This means that the work stations 2 have at least one individually drivable spinning element, for example a spinning rotor 10 (see Fig. figure 2 ), an air spinning nozzle or a spindle with a ring traveler, so that the individual work stations 2 can also be operated independently of the other work stations 2 of the spinning machine 1. Furthermore, the workstations 2 can independently rectify at least some of the faults occurring during operation, at least the piecing after a yarn break or a clearer cut, without the need for an operating robot or the intervention of an operator. A display element 20 can also be provided at each of the work stations 2 to display various information relating to the work stations 2 .

Die Spinnmaschine 1 weist weiterhin eine Maschinensteuerung 14 auf, die zumindest die zentralen und übergeordneten Vorgänge an der Spinnmaschine 1 steuert. Zur Steuerung der Vorgänge an den einzelnen Arbeitsstellen 2 können, wie in Fig. 2 dargestellt, Arbeitsstellensteuerungen 13 vorgesehen sein, die mit der Maschinensteuerung 14 und ggf. weiteren Steuervorrichtungen der Spinnmaschine 1 zusammenwirken.The spinning machine 1 also has a machine control 14 which controls at least the central and higher-level processes on the spinning machine 1 . To control the processes at the individual work stations 2, as in 2 shown, work station controls 13 may be provided, which interact with the machine control 14 and possibly other control devices of the spinning machine 1.

Figur 2 zeigt eine Arbeitsstelle 2 einer solchen Spinnmaschine 1 in einer schematischen Seitenansicht. Die Spinnmaschine 1 ist vorliegend als Offenend-Rotorspinnmaschine ausgebildet und weist daher als Zuführeinrichtung eine Speisewalze 16 und eine Auflösewalze 12 und als Spinnelement der Spinnvorrichtung 3 einen Spinnrotor 10 auf. Bei der vorliegend dargestellten Arbeitsstelle 2 ist nicht nur der Spinnrotor 10 mittels eines Einzelantriebs 21 antreibbar, sondern auch die weiteren Arbeitsorgane der Arbeitsstelle 2 wie die Speisewalze 16, die Auflösewalze 12, die Abzugsvorrichtung 11 sowie die Spulvorrichtung 19 sind mittels eines Einzelantriebs 21 angetrieben. Es ist allerdings auch denkbar, einige der weiteren Arbeitsorgane zentral anzutreiben. figure 2 shows a work station 2 of such a spinning machine 1 in a schematic side view. The spinning machine 1 is designed here as an open-end rotor spinning machine and therefore has a feed roller 16 and an opening roller 12 as the feed device and a spinning rotor 10 as the spinning element of the spinning device 3 . In the work station 2 shown here, not only can the spinning rotor 10 be driven by means of a single drive 21, but also the other working elements of work station 2, such as the feed roller 16, the opening roller 12, the take-off device 11 and the winding device 19, are driven by means of a single drive 21. However, it is also conceivable to drive some of the other working elements centrally.

An derartigen Spinnmaschinen 1 wie in Fig. 1 und 2 dargestellt mit zumindest teilweise autarken Arbeitsstellen 2 ist es möglich, mehrere Garnpartien gleichzeitig an verschiedenen Arbeitsstellen 2 herzustellen. Dabei bilden mehrere, dieselbe Garnpartie herstellende Arbeitsstellen 2 jeweils eine Produktionsgruppe PG. An der vorliegenden Spinnmaschine 1 sind aktuell drei Produktionsgruppen PG1 - PG3 dargestellt. Es versteht sich, dass im Falle einer doppelseitig ausgeführten Spinnmaschine 1 auch auf der der sichtbaren Längsseite gegenüberliegenden Längsseite der Spinnmaschine 1 weitere Arbeitsstellen 2 angeordnet sind, die ebenfalls mehrere Produktionsgruppen PG bilden können. Eine Produktionsgruppe PG kann dabei auch Arbeitsstellen 2 beider Längsseiten der Spinnmaschine 1 umfassen. Ebenso ist es nicht erforderlich, dass wie vorliegend gezeigt die einer Produktionsgruppe PG zugehörigen Arbeitsstellen 2 direkt nebeneinander angeordnet sind. Es wäre ebenso denkbar, dass an beliebigen Stellen über die Spinnmaschine 1 verteilte Arbeitsstellen 2 gemeinsam eine Produktionsgruppe PG bilden.On such spinning machines 1 as in 1 and 2 shown with at least partially self-sufficient work stations 2, it is possible to produce several yarn lots at different work stations 2 at the same time. In this case, several work stations 2 producing the same batch of yarn each form a production group PG. Three production groups PG1 - PG3 are currently shown on the present spinning machine 1 . It goes without saying that in the case of a double-sided spinning machine 1 further work stations 2 are also arranged on the longitudinal side of the spinning machine 1 opposite the visible longitudinal side, which can also form several production groups PG. A production group PG can also include work stations 2 on both longitudinal sides of the spinning machine 1 . Likewise, it is not necessary for the jobs 2 associated with a production group PG to be arranged directly next to one another, as shown here. It would also be conceivable that work stations 2 distributed at any desired points over the spinning machine 1 together form a production group PG.

Zu Beginn der Produktion bei einem Maschinenstart oder zu Beginn einer bestimmten Schicht oder auch während einer bestimmten Schicht zur Durchführung eines Partiewechsels werden an einer solchen Spinnmaschine mehrere Produktionsgruppen PG definiert. Den Produktionsgruppen PG werden sodann die Arbeitsstellen 2 zugewiesen, die die jeweilige Garnpartie produzieren sollen. Dabei ist es auch möglich, einen sogenannten fliegenden Partiewechsel durchzuführen. Ein Partiewechsel von einer alten, noch aktuellen Garnpartie auf eine neue Garnpartie kann bei solchen Spinnmaschinen 1 mit zumindest teilweise autarken Arbeitsstellen 2 auch an einer einzelnen Arbeitsstelle 2 durchgeführt werden, ohne dass das Erreichen des Partieendes der weiteren, derselben Produktionsgruppe PG zugehörigen Arbeitsstellen 2 abgewartet werden müsste.Several production groups PG are defined on such a spinning machine at the beginning of production when the machine starts or at the beginning of a specific shift or also during a specific shift to carry out a lot change. Become the production groups PG then assigned to the jobs 2, which are to produce the respective yarn lot. It is also possible to carry out a so-called flying batch change. A batch change from an old yarn batch that is still up-to-date to a new yarn batch can also be carried out at a single workstation 2 in such spinning machines 1 with at least partially self-sufficient workstations 2, without having to wait for the end of the batch to be reached at the other workstations 2 belonging to the same production group PG would have to.

Um einen Partiewechsel durchzuführen, werden die Arbeitsstellen 2 einer neuen Produktionsgruppe PG zugewiesen. Dies kann bereits vorab im Rahmen der Produktionsplanung erfolgen oder auch erst nach dem Erreichen des Partieendes einer alten Garnpartie. Die Arbeitsstelle 2 wird bei Erreichen des Partieendes zunächst stillgesetzt. Für den Partiewechsel muss die Arbeitsstelle 2 sodann steuerungstechnisch der neuen Produktionsgruppe zugeordnet werden und ggf. auch umgerüstet werden, z.B. mit neuen Spinnmitteln sowie einem anderen Fasermaterial 7 ausgestattet werden oder mit anderen Leerhülsen versorgt werden. Die Spinnmittel umfassen beispielsweise Spinnelemente wie den Spinnrotor 10, Abzugsdüsen, Drallelemente oder sonstige, die Garnqualität beeinflussende Elemente.In order to carry out a lot change, the jobs 2 are assigned to a new production group PG. This can be done in advance as part of production planning or only after the end of an old yarn lot has been reached. Work station 2 is first stopped when the end of the batch is reached. For the batch change, work station 2 must then be assigned to the new production group in terms of control technology and, if necessary, also converted, e.g. equipped with new spinning means and a different fiber material 7 or supplied with different empty tubes. The spinning means include, for example, spinning elements such as the spinning rotor 10, draw-off nozzles, twisting elements or other elements influencing the yarn quality.

Da eine Arbeitsstelle 2 zur Durchführung eines Partiewechsels stillgesetzt werden muss, entstehen unproduktive Stillstandszeiten. Weitere Stillstandszeiten entstehen beim Beheben von Störungen wie Fadenbrüchen, beim Durchführen von Reinigerschnitten sowie bei der Durchführung weiterer Wartungsarbeiten wie beispielsweise der Reinigung von Spinnmitteln, dem Wechseln des Fasermaterials 7 oder dem Spulenwechsel. Um derartige Ereignisse an den Arbeitsstellen 2 sowie die Tätigkeit der Arbeitsstellen 2 und der Spinnmaschine 1 insgesamt zu erfassen und auswerten zu können, werden an Spinnmaschinen 1 Schichtberichte 8 erstellt. Sofern die Spinnmaschine 1 mehrere Garnpartien parallel zueinander produzieren kann und mehrere Produktionsgruppen PG während einer Schicht eingerichtet sind, wird ein solcher Schichtbericht 8 für jede Produktionsgruppe PG erstellt.Since a work station 2 has to be shut down to carry out a lot change, unproductive downtimes arise. Further downtimes arise when correcting faults such as yarn breaks, when carrying out cleaning cuts and when carrying out other maintenance work such as cleaning spinning means, changing the fiber material 7 or changing bobbins. In order to be able to record and evaluate such events at the workplaces 2 and the activities of the workplaces 2 and the spinning machine 1 as a whole, shift reports 8 are created at the spinning machines 1. If the spinning machine 1 can produce several yarn lots in parallel and several production groups PG are set up during one shift, such a shift report 8 is created for each production group PG.

Ein Beispiel eines solchen partiebezogenen Schichtberichts 8 ist in der Figur 3 dargestellt. Der Schichtbericht 8 enthält zur eindeutigen Identifikation der Schicht Daten zum Schichtbeginn, zum Schichtende sowie gegebenenfalls eine Schichtnummer. Weiterhin sind produktionsbezogene Informationen wie beispielsweise die Garnpartie, die Menge an produziertem Garn 5 in [Kg] und/oder in [m] sowie der Nutzeffekt in den Schichtberichten 8 enthalten. Vorzugsweise und daher gestrichelt dargestellt werden auch einzelne Ereignisse, welche den Nutzeffekt beeinflussen, wie die oben erwähnten Fadenbrüche, Reinigerschnitte, das Auslaufen des Fasermaterials 7 sowie sonstige Bedienanforderungen der Arbeitsstellen 2 erfasst. Diese Daten werden als Summenwerte über alle Arbeitsstellen 2 und die gesamte Schicht dargestellt. Der Schichtbericht 8 enthält daher auch die Anzahl und die Arbeitsstellennummern der einer Produktionsgruppen PG zugehörigen Arbeitsstellen 2. Die Schichtberichte 8 können beispielsweise, wie in Figur 1 dargestellt, über die Maschinensteuerung 14 abgerufen werden. Dabei ist es optional und daher gestrichelt dargestellt auch möglich, je einzelner Arbeitsstelle 2 einen Arbeitsstellenbericht 18 abzurufen, welche die genannten Daten sowie die Zeiten der Zugehörigkeit der jeweiligen Arbeitsstelle 2 zur Produktionsgruppe PG aufgeschlüsselt je Arbeitsstelle 2 enthält. Dies ist im rechten Bereich der Figur 3 schematisch dargestellt.An example of such a batch-related shift report 8 is in figure 3 shown. The shift report 8 contains data on the start of the shift, the end of the shift and, if applicable, a shift number for the clear identification of the shift. Furthermore, production-related information such as the yarn lot, the amount of yarn produced 5 in [kg] and/or in [m] and the efficiency are contained in the shift reports 8 . Individual events that influence the efficiency, such as the above-mentioned yarn breaks, clearer cuts, the running out of the fiber material 7 and other operating requests from the work stations 2 are preferably also recorded, and are therefore shown in dashed lines. This data is presented as total values for all jobs 2 and the entire shift. The shift report 8 therefore also contains the number and job numbers of the jobs 2 belonging to a production group PG. The shift reports 8 can, for example, as in figure 1 shown, can be accessed via the machine control 14. It is optional and therefore also possible to call up a job report 18 for each individual job 2 , which contains the specified data and the times the respective job 2 belonged to the production group PG broken down for each job 2 . This is in the right pane figure 3 shown schematically.

Im Stand der Technik war es erforderlich, die Arbeitsstellen 2 vollständig auf die definierten Produktionsgruppen PG aufzuteilen. Es musste somit zu jedem Zeitpunkt jede Arbeitsstelle 2 einer der Produktionsgruppen PG zugeordnet sein, auch wenn diese Arbeitsstelle 2 zeitweise oder gar nicht zur Produktion der jeweiligen Garnpartie beitrug. Stillstandszeiten dieser Arbeitsstellen 2 wurden daher stets in den Schichtberichten 8 sowie den Informationen zum Nutzeffekt usw. berücksichtigt, auch wenn die betreffenden Arbeitsstellen 2 zur jeweiligen Garnpartie gar nicht beitrug. Die in den Schichtberichten 8 dargestellten Summenwerte aller Arbeitsstellen 2 der Produktionsgruppe PG waren daher nur eingeschränkt aussagekräftig.In the prior art, it was necessary to split the jobs 2 completely between the defined production groups PG. Each work station 2 therefore had to be assigned to one of the production groups PG at all times, even if this work station 2 contributed to the production of the respective yarn batch at times or not at all. Downtimes of these jobs 2 were therefore always taken into account in the shift reports 8 and the information on efficiency, etc., even if the jobs 2 in question did not contribute to the respective yarn lot at all. The ones in the shift reports 8 total values of all jobs 2 of the production group PG were therefore only of limited significance.

Die vorliegende Erfindung schlägt daher vor, zusätzlich zu den Produktionsgruppen PG eine Freigruppe FG (s. Fig. 1) zu definieren und alle Arbeitsstellen 2, welche aktuell für die Garnproduktion nicht vorgesehen sind und daher keiner der Produktionsgruppen PG zugeordnet werden müssen, der Freigruppe FG zuzuweisen. Auch für die Freigruppe FG wird ein Schichtbericht 8 erstellt.The present invention therefore proposes, in addition to the production groups PG, a free group FG (see 1 ) and to assign all jobs 2, which are currently not intended for yarn production and therefore do not have to be assigned to any of the production groups PG, to the free group FG. A shift report 8 is also created for the Freigruppe FG.

Ein solcher Schichtbericht 8 einer Freigruppe FG ist schematisch in Fig. 4 dargestellt. Die Freigruppe FG wird analog zu den Produktionsgruppen PG definiert, es müssen dieser jedoch keine Partiedaten zugewiesen werden. Der Schichtbericht 8 für die Freigruppe FG enthält nach einer einfachen Ausführung lediglich Daten zum Schichtbeginn, zum Schichtende sowie zur Gesamtanzahl der innerhalb dieser Schicht der Freigruppe FG zugeordneten Arbeitsstellen 2. Aufgrund der Definition der Freigruppe FG ist es nun nicht mehr erforderlich, alle Arbeitsstellen 2 einer der Produktionsgruppen PG zuzuordnen. Vielmehr werden Arbeitsstellen 2, welche keiner Produktionsgruppen PG zugeordnet sind, automatisch durch die Maschinensteuerung 14 der Freigruppe FG zugewiesen. Analog zum Schichtbericht 8 für die Produktionsgruppen PG (siehe Figur 3) sind optional auch im Schichtbericht 8 für die Freigruppe FG Arbeitsstellenberichte 18 abrufbar, welche Daten zu den genauen Zeiten der Zugehörigkeit der jeweiligen Arbeitsstelle 2 zur Freigruppe FG enthalten. Die Freigruppe FG ist somit, ebenso wie die Produktionsgruppen PG, keine konstant über die gesamte Schicht definierte Gruppe, sondern es ist möglich, dass während einer Schicht Arbeitsstellen 2 zu einer Produktionsgruppe PG oder zur Freigruppe FG hinzukommen oder diese auch wieder verlassen.Such a shift report 8 of a free group FG is shown schematically in 4 shown. The free group FG is defined in the same way as the production groups PG, but no lot data has to be assigned to it. According to a simple design, the shift report 8 for the free group FG only contains data on the start of the shift, the end of the shift and the total number of jobs 2 assigned to the free group FG within this shift. Due to the definition of the free group FG, it is no longer necessary to list all jobs 2 in one assigned to the production groups PG. Instead, jobs 2 that are not assigned to any production groups PG are automatically assigned to the free group FG by the machine controller 14 . Analogously to shift report 8 for the production groups PG (see figure 3 ) can optionally also be called up in the shift report 8 for the free group FG job reports 18, which contain data on the exact times when the respective job 2 belonged to the free group FG. The free group FG, like the production groups PG, is not a constantly defined group over the entire shift, but it is possible that during a shift work stations 2 join a production group PG or the free group FG or leave them again.

Optional und daher gestrichelt dargestellt kann der Schichtbericht 8 auch die Gründe für die Zugehörigkeit zur Freigruppe FG enthalten, um eine noch bessere Auswertung der Daten zu ermöglichen. Beispielsweise wäre es denkbar, die Anzahl und die Arbeitsstellennummern der Arbeitsstellen 2 gesondert auszuweisen, die keiner Produktionsgruppe PG zugeordnet wurden. Ebenso ist es möglich, die Anzahl und die Arbeitsstellennummern der zumindest zeitweise ausgeschalteten Arbeitsstellen 2 und/oder die Anzahl und die Arbeitsstellennummern von defekten Arbeitsstellen 2 gesondert zu erfassen. Weitere Gründe für die Zugehörigkeit zur Freigruppe FG können Wartezeiten auf einen Partiestart einer neuen Garnpartie nach einem Start der Spinnmaschine 1, Wartezeiten auf einen Partiestart in Verbindung mit einem Partiewechsel oder auch Wartezeiten bis zum Zuweisen einer neuen Produktionsgruppe PG in Verbindung mit einem Partiewechsel sein. Diese Wartezeiten können gesammelt oder auch einzeln aufgeschlüsselt erfasst und dargestellt werden. Optional und daher gestrichelt dargestellt können die Gründe für die Zugehörigkeit zur Freigruppe FG zusätzlich auch je Arbeitsstelle 2 erfasst und in den Arbeitsstellenberichten 18 ausgewiesen werden.Optionally and therefore shown in dashed lines, the shift report 8 can also contain the reasons for belonging to the free group FG, in order to to enable better evaluation of the data. For example, it would be conceivable to show separately the number and job numbers of jobs 2 that were not assigned to any production group PG. It is also possible to separately record the number and job numbers of jobs 2 that are at least temporarily switched off and/or the number and job numbers of defective jobs 2 . Further reasons for belonging to the free group FG can be waiting times for the start of a new yarn lot after the spinning machine 1 has started, waiting times for the start of a lot in connection with a lot change or also waiting times until a new production group PG is assigned in connection with a lot change. These waiting times can be collected or individually broken down and displayed. Optionally and therefore shown in dashed lines, the reasons for belonging to the Freigruppe FG can also be recorded for each job 2 and shown in the job reports 18 .

Als Stichzeitpunkt für die Zuweisung einer Arbeitsstelle 2 zur Freigruppe FG in Verbindung mit einem Partiewechsel dient vorzugsweise der Zeitpunkt der Entnahme der letzten Spule 6 einer alten Garnpartie aus dem Spulenhalter 17. Solange sich die Spule 6 der alten Partie im Spulenhalter 17 befindet, bleibt die betreffende Arbeitsstelle 2 ihrer Produktionsgruppe PG zugeordnet und die Wartezeiten dieser Spinnstelle, z.B. auf einen Spinnmittel- oder Fasermaterialtausch werden innerhalb der alten Produktionsgruppe PG erfasst. Ab der Entnahme der letzten Spule 6 der alten Garnpartie aus dem Spulenhalter 17 werden hingegen die Wartezeiten bereits der neuen Produktionsgruppe PG zugerechnet, sofern die betreffende Arbeitsstelle 2 unmittelbar einer neuen, bereits laufenden Produktionsgruppe PG zugewiesen wird. Falls hingegen die Arbeitsstelle 2 zunächst noch keiner neuen Produktionsgruppe PG zugewiesen wird oder die neue Garnpartie der neuen Produktionsgruppen PG noch nicht gestartet wurde, wird die Arbeitsstelle 2 der Freigruppe FG zugewiesen und die Wartezeiten werden innerhalb der Freigruppe FG erfasst.The reference point in time for the assignment of a work station 2 to the free group FG in connection with a lot change is preferably the point in time at which the last bobbin 6 of an old yarn lot is removed from the bobbin holder 17. As long as the bobbin 6 of the old lot is in the bobbin holder 17, the relevant lot remains Work station 2 is assigned to its production group PG and the waiting times of this spinning station, eg for a spinning agent or fiber material exchange, are recorded within the old production group PG. From the removal of the last bobbin 6 of the old yarn lot from the bobbin holder 17, however, the waiting times are already added to the new production group PG if the relevant job 2 is assigned directly to a new, already running production group PG. On the other hand, if job 2 has not yet been assigned to a new production group PG or the new batch of yarn in the new production group PG has not yet started, job 2 is assigned to the free group FG and the waiting times are recorded within the free group FG.

Durch die Definition der Freigruppe FG können nun Zeiten, während derer eine Arbeitsstelle 2 nicht zur Produktion einer bestimmten Garnpartie beiträgt, exakt erfasst werden, da diese eindeutig von anderen, ereignisbedingten Stillstandszeiten während des Spinnbetriebs unterschieden werden können. Diese Zeiten werden gesondert in der Freigruppe FG erfasst. Ereignisbedingte Stillstandszeiten während des Spinnbetriebs wie beispielsweise Wartezeiten auf Wartungsvorgänge oder einen Bedienereingriff werden hingegen korrekterweise in der Produktionsgruppe PG erfasst, der die betreffende Arbeitsstelle zugewiesen ist, da diese den Nutzeffekt der betreffenden Produktionsgruppen tatsächlich beeinträchtigen. Hierdurch kann beispielsweise Aufschluss über die Kosten der Produktion einer bestimmten Garnpartie oder auch über partiespezifische Probleme an den Arbeitsstellen erhalten werden. Ebenso geben die partiebezogenen Schichtberichte 8 die Produktionsdaten der Arbeitsstellen 2 einer Produktionsgruppe PG wesentlich exakter wieder, da diese nicht durch unproduktive Arbeitsstellen 2, welche lediglich aus formalen Gründen der Produktionsgruppe PG zugeordnet sind, verfälscht werden. Hierdurch kann auch eine theoretische Produktionskapazität der Spinnmaschine 1 ermittelt werden und es können daraus Optimierungsmaßnahmen für den Betrieb der Spinnmaschine 1 ermittelt werden. Werden zusätzlich die Gründe für die Zuweisung zur Freigruppe FG erfasst und im Schichtbericht 8 der Freigruppe FG dargestellt, so können hieraus beispielsweise auch Optimierungsmaßnahmen für einen Partiewechsel abgeleitet werden.By defining the free group FG, times during which a work station 2 does not contribute to the production of a specific yarn lot can now be precisely recorded, since these can be clearly distinguished from other, event-related downtimes during the spinning operation. These times are recorded separately in the free group FG. On the other hand, event-related downtimes during the spinning operation, such as waiting times for maintenance processes or operator intervention, are correctly recorded in the production group PG to which the relevant work station is assigned, since these actually impair the efficiency of the relevant production groups. In this way, for example, information can be obtained about the costs of producing a certain batch of yarn or also about batch-specific problems at the work stations. The lot-related shift reports 8 also reflect the production data of the jobs 2 of a production group PG much more precisely, since these are not falsified by unproductive jobs 2 which are only assigned to the production group PG for formal reasons. A theoretical production capacity of the spinning machine 1 can also be determined in this way and optimization measures for the operation of the spinning machine 1 can be determined therefrom. If the reasons for the assignment to the free group FG are also recorded and presented in shift report 8 of the free group FG, optimization measures for a lot change can also be derived from this, for example.

Es wird weiterhin vorgeschlagen, zusätzlich zu den bisher üblichen Schichtberichten 8 auch Partieberichte 18 zu erstellen. Die Partieberichte 18 umfassen den gesamten Produktionszeitraum einer Garnpartie, der sich auch über mehrere Wochen und zahlreiche Schichten erstrecken kann. Oftmals werden an Spinnmaschinen 1 Schichtberichte 8 nur über einen bestimmten Zeitraum gespeichert oder es wird aus Kapazitätsgründen nur eine bestimmte Anzahl an Schichtberichten 8 gespeichert. Die nun vorgeschlagenen Partieberichte 18 ermöglichen hingegen auch über einen längeren Zeitraum die Identifikation bestimmter Ereignisse an den Arbeitsstellen 2 und erlauben dadurch weitreichendere Auswertungen.It is also proposed to create lot reports 18 in addition to the previously usual shift reports 8 . The lot reports 18 cover the entire production period of a yarn lot, which can also extend over several weeks and numerous shifts. Shift reports 8 are often stored on spinning machines 1 only for a specific period of time, or only a certain number of shift reports 8 are stored for capacity reasons. The now proposed game reports 18, on the other hand, enable the identification of certain events at the workplaces 2 over a longer period of time and thus allow more extensive evaluations.

Die Figur 5 zeigt eine erste Ausführung eines Partieberichts 15, der Daten über den Partiestart und das Partieende sowie Produktionsdaten der Arbeitsstellen 2 enthält. Diese werden lediglich als Summenwerte über die gesamte Laufzeit der Partie erfasst und dargestellt. Beispielsweise können die Partieberichte 15 die Menge des produzierten Garns 5, die Dauer von Stillstandszeiten, gegebenenfalls nach Gründen für die Stillstandszeiten differenziert oder die Anzahl bestimmter Ereignisse an den Arbeitsstellen 2 wie z.B. Fadenbrüche enthalten. Dies ist jedoch lediglich beispielhaft zu verstehen, die Ereignisse und Zeiten können auch noch weiter aufgeschlüsselt erfasst und dargestellt werden. Der Partiebericht 15 gibt in diesem Fall lediglich Aufschluss über die Produktionsdaten der gesamten Garnpartie, erlaubt jedoch keine Rückschlüsse auf das zeitliche Auftreten der einzelnen Ereignisse bzw. der erfassten Zeiten.the figure 5 shows a first version of a lot report 15, which contains data about the lot start and the lot end as well as production data of the work stations 2. These are only recorded and displayed as cumulative values over the entire duration of the game. For example, the batch reports 15 can contain the quantity of yarn 5 produced, the duration of downtimes, possibly differentiated according to reasons for the downtimes, or the number of specific events at the work stations 2, such as yarn breakages. However, this is only to be understood as an example, the events and times can also be recorded and displayed in a further breakdown. In this case, lot report 15 only provides information about the production data for the entire yarn lot, but does not allow any conclusions to be drawn about the chronological occurrence of the individual events or the recorded times.

Figur 6 zeigt hingegen eine weitere Ausführung eines Partieberichts 15, welcher zusätzlich oder alternativ zu den Summenwerten der Figur 5 auch die einzelnen Schichtberichte 8 je Garnpartie umfasst. Ein derartiger Partiebericht 15 erlaubt die zeitliche Zuordnung bestimmter Produktionsdaten zu einer bestimmten Schicht. Ereignisse, die nur in bestimmten Schichten aufgetreten sind, können hierdurch ebenfalls erfasst werden und deren Ursache gegebenenfalls abgestellt werden. Zusätzlich zu dem dargestellten Schichtbericht 8 je Garnpartie kann beispielsweise auch noch ein Vorbereitungsbericht (nicht dargestellt) enthalten sein, welcher Daten über die Einrichtung der Garnpartie enthält. Da ein solcher, die einzelnen Schichtberichte 8 je Garnpartie enthaltender Partiebericht 15 sehr umfangreich ist, kann auch eine zeitabschnittsweise Erstellung des Partieberichts 15 mit jeweiliger Übermittlung an ein übergeordnetes Leitsystem vorteilhaft sein. Ist die Spinnmaschine 1 an ein solches Leitsystem angeschlossen, ist es weiterhin auch denkbar, Schichtberichte 8 und Partieberichte 15 auch direkt dort zu erstellen. figure 6 shows, however, another version of a game report 15, which in addition or as an alternative to the total values of figure 5 also includes the individual shift reports 8 per yarn lot. Such a lot report 15 allows the chronological assignment of specific production data to a specific shift. Events that only occurred in certain shifts can also be recorded in this way and their cause can be eliminated if necessary. In addition to the shift report 8 shown for each yarn lot, a preparation report (not shown) can also be included, for example, which contains data about the set-up of the yarn lot. Since such a batch report 15 containing the individual shift reports 8 for each batch of yarn is very extensive, it can also be advantageous to create the batch report 15 at intervals with respective transmission to a higher-level control system. If the spinning machine 1 is connected to such a control system, it continues to be so conceivable to create shift reports 8 and batch reports 15 directly there.

Die vorliegende Erfindung ist nicht auf die dargestellten und beschriebenen Ausführungsbeispiele beschränkt. Abwandlungen im Rahmen der Patentansprüche sind ebenso möglich wie eine beliebige Kombination der beschriebenen Merkmale, auch wenn sie in unterschiedlichen Teilen der Beschreibung bzw. den Ansprüchen oder in unterschiedlichen Ausführungsbeispielen dargestellt und beschrieben sind, vorausgesetzt, dass kein Widerspruch zur Lehre der unabhängigen Ansprüche entsteht.The present invention is not limited to the illustrated and described embodiments. Modifications within the scope of the patent claims are just as possible as any combination of the features described, even if they are shown and described in different parts of the description or the claims or in different exemplary embodiments, provided that there is no contradiction with the teaching of the independent claims.

BezugszeichenlisteReference List

11
Spinnmaschinespinning machine
22
Arbeitsstelleplace of work
33
Spinnvorrichtungspinning device
44
Zuführvorrichtungfeeding device
55
Garnyarn
66
SpuleKitchen sink
77
Fasermaterialfiber material
88th
Schichtberichtshift report
99
Gestellframe
1010
Spinnrotorspinning rotor
1111
Abzugsvorrichtungtrigger device
1212
Auflösewalzeopening roller
1313
Arbeitsstellensteuerungjob control
1414
Maschinensteuerungmachine control
1515
Partieberichtgame report
1616
Speisewalzefood roller
1717
Spulenhalterspool holder
1818
Arbeitsstellenberichtjob report
1919
Spulvorrichtungspooling device
2020
Anzeigeelementdisplay element
2121
Einzelantriebsingle drive
FGFG
Freigruppefree group
PGPG
Produktionsgruppeproduction group

Claims (11)

Verfahren zum Betreiben einer teil- oder vollautomatischen Spinnmaschine (1), insbesondere einer Offenend-Rotorspinnmaschine, mit einer Vielzahl gleichartiger, nebeneinander angeordneter, zumindest teilweise autarker Arbeitsstellen (2), wobei jede der Arbeitsstellen (2) eine Spinnvorrichtung (3) zur Herstellung eines Garns (5) sowie eine Spulvorrichtung (19) zum Aufwickeln des Garns (5) auf eine Spule (6) aufweist, wobei mehrere Produktionsgruppen (PG) definiert werden, wobei mehrere, dieselbe Garnpartie herstellende Arbeitsstellen (2) jeweils eine Produktionsgruppe (PG) bilden, und wobei jeweils nach einer festlegbaren Zeitdauer ein Schichtbericht (8) für jede Produktionsgruppe (PG) durch die Spinnmaschine (1) erstellt wird, dadurch gekennzeichnet, dass eine Freigruppe (FG) definiert wird, dass zumindest Arbeitsstellen (2), welche aktuell keiner der Produktionsgruppe (PG) zugeordnet sind, der Freigruppe (FG) zugewiesen werden und dass auch für die Freigruppe (FG) ein Schichtbericht (8) erstellt wird.Method for operating a partially or fully automatic spinning machine (1), in particular an open-end rotor spinning machine, with a large number of similar, at least partially self-sufficient work stations (2) arranged next to one another, each of the work stations (2) having a spinning device (3) for producing a Yarn (5) and a winding device (19) for winding the yarn (5) onto a spool (6), several production groups (PG) being defined, several work stations (2) producing the same batch of yarn each having a production group (PG) form, and wherein a shift report (8) for each production group (PG) is created by the spinning machine (1) after a definable period of time, characterized in that a free group (FG) is defined that at least work stations (2) which are currently are not assigned to the production group (PG), are assigned to the free group (FG) and that a shift report (8th ) is created. Verfahren nach dem vorhergehenden Anspruch, dadurch gekennzeichnet, dass auch Arbeitsstellen (2), welche einer Produktionsgruppe (PG) zugeordnet sind, jedoch aktuell ausgeschaltet oder defekt sind, der Freigruppe (FG) zugewiesen werden.Method according to the preceding claim, characterized in that workstations (2) which are assigned to a production group (PG) but are currently switched off or defective are also assigned to the free group (FG). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass auch Arbeitsstellen (2), welche einer Produktionsgruppe (PG) bereits zugeordnet sind, sich jedoch nach Erreichen eines Partieendes einer alten Garnpartie aktuell in einer Wartezeit auf einen Partiestart einer neuen Garnpartie an der betreffenden Produktionsgruppe (PG) befinden, der Freigruppe (FG) zugewiesen werden.Method according to one of the preceding claims, characterized in that workstations (2) which have already been assigned to a production group (PG) are, however, currently waiting after the end of a batch of an old batch of yarn for the start of a batch of a new batch of yarn at the relevant production group (PG) are assigned to the free group (FG). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass auch Arbeitsstellen (2), welche einer Produktionsgruppe (PG) bereits zugeordnet sind, sich jedoch nach einem Start der Spinnmaschine (1) aktuell in einer Wartezeit auf einen Partiestart einer neuen Garnpartie an der betreffenden Produktionsgruppe (PG) befinden, der Freigruppe (FG) zugewiesen werden.Method according to one of the preceding claims, characterized in that workstations (2) which are already assigned to a production group (PG), however, after the spinning machine (1) has started, are currently waiting for the start of a new batch of yarn at the relevant one production group (PG) are assigned to the free group (FG). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass eine Arbeitsstelle (2) mit der Entnahme der letzten an dieser Arbeitsstelle (2) produzierten Spule (6) der alten Garnpartie aus der Spulvorrichtung (19) das Partieende erreicht.Method according to one of the preceding claims, characterized in that a work station (2) reaches the end of the lot with the removal of the last bobbin (6) of the old yarn lot produced at this work station (2) from the spooling device (19). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass Arbeitsstellen (2), welche einer Produktionsgruppe (PG) zugeordnet sind, nach dem Partiestart der neuen Garnpartie an der betreffenden Produktionsgruppe (PG) die Freigruppe (FG) verlassen.Method according to one of the preceding claims, characterized in that workstations (2) which are assigned to a production group (PG) leave the free group (FG) after the start of the new yarn lot at the relevant production group (PG). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass auch Arbeitsstellen (2), welche nach Erreichen des Partieendes einer alten Garnpartie noch einer Produktionsgruppe (PG) zugeordnet sind, der Freigruppe (FG) zugewiesen werden.Method according to one of the preceding claims, characterized in that workstations (2) which are still assigned to a production group (PG) after the end of an old yarn batch has been reached are also assigned to the free group (FG). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass für jede Produktionsgruppe (PG) ein Partiebericht (15) erstellt wird.Method according to one of the preceding claims, characterized in that a batch report (15) is created for each production group (PG). Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Partiebericht Summenwerte für die betreffende Produktionsgruppe (PG) über die gesamte Partielaufzeit vom Partiestart bis zum Partieende enthält.Method according to one of the preceding claims, characterized in that the batch report contains cumulative values for the relevant production group (PG) over the entire batch duration from the start of the batch to the end of the batch. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Partiebericht zumindest die Schichtberichte (8) für die betreffende Produktionsgruppe (PG) vom Partiestart bis zum Partieende enthält.Method according to one of the preceding claims, characterized in that the lot report contains at least the shift reports (8) for the relevant production group (PG) from the start of the lot to the end of the lot. Teil- oder vollautomatische Spinnmaschine (1), insbesondere Offenend-Rotorspinnmaschine, mit einer Vielzahl gleichartiger, nebeneinander angeordneter, zumindest teilweise autarker Arbeitsstellen (2), wobei jede der Arbeitsstellen (2) eine Spinnvorrichtung (3) zur Herstellung eines Garns (5) sowie eine Spulvorrichtung (19) zum Aufwickeln des Garns (5) auf eine Spule (6) aufweist, wobei die Arbeitsstellen (2) in mehrere Produktionsgruppen (PG) unterteilbar sind, wobei mehrere, dieselbe Garnpartie herstellende Arbeitsstellen (2) jeweils eine Produktionsgruppe (PG) bilden, und mit einer Steuervorrichtung (13, 14) zur Durchführung des Verfahrens nach einem der vorhergehenden Ansprüche.Semi or fully automatic spinning machine (1), in particular an open-end rotor spinning machine, with a large number of similar, at least partially self-sufficient work stations (2) arranged next to one another, each of the work stations (2) having a spinning device (3) for producing a yarn (5) and has a winding device (19) for winding the yarn (5) onto a bobbin (6), the work stations (2) being divisible into a number of production groups (PG), with a number of work stations (2) producing the same batch of yarn each forming a production group (PG ) form, and with a control device (13, 14) for carrying out the method according to any one of the preceding claims.
EP21213545.3A 2020-12-18 2021-12-09 Spinning machine and method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine Withdrawn EP4101958A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102020134252.7A DE102020134252A1 (en) 2020-12-18 2020-12-18 Method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine, and spinning machine

Publications (1)

Publication Number Publication Date
EP4101958A1 true EP4101958A1 (en) 2022-12-14

Family

ID=81847067

Family Applications (1)

Application Number Title Priority Date Filing Date
EP21213545.3A Withdrawn EP4101958A1 (en) 2020-12-18 2021-12-09 Spinning machine and method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine

Country Status (3)

Country Link
EP (1) EP4101958A1 (en)
CN (1) CN114645341A (en)
DE (1) DE102020134252A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19505023A1 (en) * 1995-02-15 1996-08-22 Schlafhorst & Co W Automatic textile machine assembly control
EP1460016A1 (en) * 2003-03-17 2004-09-22 Murata Kikai Kabushiki Kaisha Automatic winder
EP2107141A2 (en) * 2008-03-31 2009-10-07 Murata Machinery Ltd. Spinning apparatus

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10153457B4 (en) 2001-10-30 2015-07-16 Rieter Ingolstadt Gmbh Textile machine having a plurality of processing stations and communication method therefor
DE102004016796B4 (en) 2004-04-06 2013-02-07 Rieter Ingolstadt Gmbh Open-end spinning machine
DE102018121316A1 (en) 2018-08-31 2020-03-05 Maschinenfabrik Rieter Ag Textile machine and method for controlling a textile machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19505023A1 (en) * 1995-02-15 1996-08-22 Schlafhorst & Co W Automatic textile machine assembly control
EP1460016A1 (en) * 2003-03-17 2004-09-22 Murata Kikai Kabushiki Kaisha Automatic winder
EP2107141A2 (en) * 2008-03-31 2009-10-07 Murata Machinery Ltd. Spinning apparatus

Also Published As

Publication number Publication date
CN114645341A (en) 2022-06-21
DE102020134252A1 (en) 2022-06-23

Similar Documents

Publication Publication Date Title
EP3802927B1 (en) Ring-spinning line and process thereof
EP3144418B1 (en) Method for adapting a work-side design of an open ended rotor spinning machine related to yarn section production
EP3760772A1 (en) Optimization of the operation of a spinning machine
DE4431810B4 (en) Setting the parameters for optimal piecing of a piecing device during a lot change on a rotor spinning machine
EP0090911A2 (en) Method and apparatus to optimize a work occurrence at each working station of a textile machine
DE102016014976A1 (en) Method and apparatus for melt spinning a thread
EP3757264A1 (en) Method for operating a partially or fully automatic spinning machine for creating cross-wound spools
EP0731195B1 (en) Device and procedure for maintenance of spinning devices
EP3604642B1 (en) Textile machine and method for operating a textile machine
EP3642401B1 (en) Method and device for melt-spinning synthetic threads
DE102015118987A1 (en) Method for operating a spinning machine with a fully automatic piecing device and spinning machine with a fully automatic piecing device
EP4101958A1 (en) Spinning machine and method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine
DE2944219A1 (en) Monitoring and control of open=end spinning units - using control signals modified by feedback from individual units
EP1526195A2 (en) Textile machine and method for improving the production cycle of such a machine
DE102018121316A1 (en) Textile machine and method for controlling a textile machine
EP3882383A1 (en) Textile machine and method for operating a textile machine
DE102004044551B4 (en) Method for operating a spinning machine and spinning machine for carrying out this method
DE102020134251A1 (en) Method for operating a partially or fully automatic spinning machine, in particular an open-end rotor spinning machine, and spinning machine
EP3875647B1 (en) Spinning machine and method for operating same
EP2576877B1 (en) Monitoring device on a textile machine
WO2024078939A1 (en) Method for operating a spinning-machine installation comprising at least one spinning machine, and spinning-machine installation comprising at least one spinning machine
DE102020129172A1 (en) Process for maintaining at least one work station of a spinning machine
CH469620A (en) Method for monitoring the winding positions of an automatic winding machine
EP0159567B1 (en) Method for removing clog in a false-twisting spinning unit
DE4440206A1 (en) Method for assessing the sliver quality in a textile machine

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20230130

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20230613

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20231024