EP3874095A2 - Aufgrabungsvorrichtung und verfahren zur aufgrabung - Google Patents

Aufgrabungsvorrichtung und verfahren zur aufgrabung

Info

Publication number
EP3874095A2
EP3874095A2 EP19798556.7A EP19798556A EP3874095A2 EP 3874095 A2 EP3874095 A2 EP 3874095A2 EP 19798556 A EP19798556 A EP 19798556A EP 3874095 A2 EP3874095 A2 EP 3874095A2
Authority
EP
European Patent Office
Prior art keywords
boom
ground
chain
ground engagement
trenching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP19798556.7A
Other languages
English (en)
French (fr)
Inventor
Jack Geelhoed
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mastenbroek Ltd
Original Assignee
Mastenbroek Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB1817669.3A external-priority patent/GB2578484A/en
Priority claimed from GB1817664.4A external-priority patent/GB2578480A/en
Priority claimed from GB1817665.1A external-priority patent/GB2578481A/en
Priority claimed from GB1817666.9A external-priority patent/GB2578482A/en
Priority claimed from GB1817668.5A external-priority patent/GB2578483B/en
Application filed by Mastenbroek Ltd filed Critical Mastenbroek Ltd
Publication of EP3874095A2 publication Critical patent/EP3874095A2/de
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/14Component parts for trench excavators, e.g. indicating devices travelling gear chassis, supports, skids
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/13Foundation slots or slits; Implements for making these slots or slits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/08Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
    • E02F3/082Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain including a belt-type conveyor for transporting the excavated material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/08Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
    • E02F3/12Component parts, e.g. bucket troughs
    • E02F3/14Buckets; Chains; Guides for buckets or chains; Drives for chains
    • E02F3/143Buckets; Chains; Guides for buckets or chains; Drives for chains chains; chain links; scraper chains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/08Superstructures; Supports for superstructures
    • E02F9/085Ground-engaging fitting for supporting the machines while working, e.g. outriggers, legs

Definitions

  • the present invention relates to trenching apparatus and a method of trenching.
  • a prime mover such as a crawler tractor, or a conventional tractor pulling a trailer
  • a cutting device is positioned in the trench on a boom.
  • the main examples are a cutting rotor rotating about an axis transverse to the trench, known as a ripper cutter, or one or more cutting rotors rotating about an axis aligned along the length of the boom, generally known as a milling cutter, or a cutting device having an elongate endless support means carrying a plurality of cutting elements and trained along upper and lower runs on the boom, known as a chain cutter.
  • a cutting rotor is used this is mounted on the distal end of a boom projecting forwardly and downwardly from the prime mover, relative to the direction of digging of the trench.
  • a chain cutter is used, this is normally mounted on a boom extending downwardly and rearwardly from the prime mover relative to the direction of cutting of the trench.
  • trenching machines examples include CH-A-239498, WO-A- 95/13433, WO-A-03/044286, US-A-6,467,201 , EP-A-080,802, CN-A-2010 50077, CN-A- 2517789, GB-A-786,829, WO-A-2007/035,400, JP-H04169696, US-A-5,540,006, GB-A- 972,208, GB-A-848,277, GB-A-735,1 16, US-A-6,470,607, GB-A-1 ,1 18,907, GB-A- 2,088,930, GB-A-155,766, GB-A-2,551 ,419 and WO-A-2012/123,622.
  • trenchers that are arranged to utilize a vertical cutting boom.
  • Examples include trenchers provided by Soletanche Bachy.
  • one example of equipment provided by Soletanche Bachy suitable for deep trenching is known as the TM- 80.
  • a trenching apparatus comprising: a trencher body moveable on the ground surface, and a ground engagement boom associated with the trencher body;
  • lifting means arranged to control and configure the ground engagement boom so as to enter the ground in a substantially vertical configuration
  • selectively configurable support legs moveable between a first closed position and a second deployed configuration in which the legs are extended in a direction away from the body of the apparatus to provide support to the trenching apparatus when the boom is configured vertically and not engaged with the ground.
  • the boom is movable in a substantially vertical plane when engaged with an end surface of the trench.
  • the trencher body is moveable on the ground surface above the level of the trench.
  • the present invention utilizes support legs to enable a simple vertical angle of attack for a ground engaging boom in a trenching machine.
  • TRD Soil Mix wall method of Hayward Baker this provides significant advantages.
  • there is no need for a complex method of modular boom construction so as to enable the base unit that supports and controls the cutter to maintain a low profile. Due to the stability provided by the support legs, it is no longer necessary to ensure that the base unit has a low profile.
  • the lifting means is arranged to control and configure the ground engagement boom so as to enter the ground from above.
  • the ground engagement boom is a cutting boom for cutting earthen material from the end surface of the trench.
  • the cutting boom is an endless chain cutting boom.
  • the ground engagement boom is a mixing boom for mixing agent such as (but not limited to) cement or bentonite with earth within the trench.
  • the longitudinal length of the ground engagement boom is between 10 and 20 metres. In an embodiment, the ground engagement boom weighs between 10 and 20 tonnes, and preferably weighs up to 15 tonnes.
  • the support legs are pivotally mounted to the body so as to be selectively reconfigurable between the closed and extended configurations.
  • the support legs are telescopically mounted so as to be slidably configurable between the first closed and second deployed configuration.
  • the legs have a first longitudinal section and a second longitudinal component configured telescopically with respect to the first longitudinal section, and wherein the first longitudinal section is coupled to the body of the prime mover and when extended in the second deployed configuration the second longitudinal component slides out of the first longitudinal component.
  • the second longitudinal component has at its distal end a downwardly deployable longitudinal support member.
  • each of the downwardly deployable longitudinal support members has a foot removably fixable thereto, for engagement with the ground.
  • the support legs when in the deployed configuration, increase the overall envelope of the footprint of the trenching apparatus by at least 150%, and preferably 200%, as compared to when the legs are in the first closed configuration.
  • the trenching apparatus comprises tracks for moving the trenching apparatus when the legs are in the first closed configuration.
  • a method of trenching, using trenching apparatus having a trencher body moveable on the ground, and a ground engagement boom associated with the trencher body, the boom being movable in a substantially vertical plane, and lifting means arranged to control and configure the ground engagement boom so as to enter the ground from above in a substantially vertical configuration the method comprising;
  • the lifting means is arranged to control and configure the ground engagement boom so as to enter the ground from above in a substantially vertical configuration.
  • a trenching apparatus comprising: a body moveable on the ground surface, and a ground engagement boom associated with the body, the boom being movable when engaged with the ground to form a trench; lifting means arranged to control and configure the ground engagement boom so as to enter the ground and to configure the boom to an inclined orientation in which the boom extends at least partially over the body of the apparatus;
  • a protection chute provided on the body to protect the body from material that falls from the boom, when the boom is in the inclined orientation.
  • a trenching apparatus includes a chute positioned to ensure that material that falls from the boom when in an inclined position does not fall onto the apparatus thereby damaging it.
  • a chute positioned to ensure that material that falls from the boom when in an inclined position does not fall onto the apparatus thereby damaging it.
  • the boom is positioned in an inclined position which can be substantially within the footprint of the apparatus during maintenance and/or cleaning.
  • the ground engagement boom is a cutting boom for cutting earthen material from the end surface of the trench.
  • the cutting boom is an endless chain cutting boom.
  • the ground engagement boom is a mixing boom for mixing cement mixing agent such as (but not limited to) cement or bentonite with earth within the trench.
  • the longitudinal length of the ground engagement boom is between 10 and 20 metres.
  • the ground engagement boom weighs between 10 and 20 tonnes, and preferably weighs up to 15 tonnes.
  • the chute is sized to receive the entire part of the boom that extends over the body of the trenching apparatus when the ground engagement boom is in the inclined orientation.
  • the chute is supported by arms fixed to the body of the trenching apparatus.
  • the chute is orientated at an angle to the horizontal plane of the trenching apparatus.
  • the angle is between 10 and 45 degrees.
  • the trencher comprises at its end, e.g. its rear end a boom engagement cage for controlling the depth in the ground or height relative thereto at which the boom is positioned.
  • the boom engagement cage comprises a continuation chute which when the boom is in the inclined orientation forms a continuous channel with the protection chute.
  • the trenching apparatus comprises water or fluid outlets such as jets to direct and cause fluid to flow along the protection chute when the boom is arranged therein.
  • a method of trenching which could include trench digging or mixing, using a trenching apparatus comprising a body moveable on the ground surface, and a ground engagement boom associated with the body, the boom being movable when engaged with the ground to form a trench; lifting means arranged to control and configure the ground engagement boom so as to enter the ground and to configure the boom to an inclined orientation in which the boom extends at least partially over the body of the apparatus, the method comprising: providing a protection chute on the body to protect the body and/or the apparatus from material that falls from the boom, when the boom is in the inclined orientation.
  • a trenching apparatus comprising: a body moveable on the ground surface, a ground engagement boom
  • ground engagement boom comprises a chain for interacting with earth in use; lifting means arranged to control and configure the ground engagement boom so as to enter the ground and to configure the boom to an inclined orientation in which the boom extends at least partially over the body; a winch provided on the body to engage with the chain of the ground engagement boom when in the inclined orientation.
  • the ground engagement boom is movable in a substantially vertical plane.
  • a trenching apparatus in which a winch for changing the chain on a chain cutting or mixing boom is provided on the trenching apparatus (or body thereof) itself, and not on the boom itself. Positioning of the winch in the present system on the body of the machine or apparatus itself enables and ensures that a chain can easily be changed on the ground engaging boom irrespective of the size of the ground engaging boom and the associated size and weight of the cutting chain itself.
  • the ground engagement boom is a cutting boom for cutting earthen material from the end surface of the trench.
  • the ground engagement boom is a mixing boom for mixing an agent such as (but not limited to) cement with earth within the trench.
  • the longitudinal length of the ground engagement boom is between 10 and 20 metres.
  • the ground engagement boom weighs between 10 and 20 tonnes, and preferably weighs up to 15 tonnes.
  • the apparatus comprises a protection chute provided on the body of the trencher to protect the body from material that falls from the boom and to support the boom in the inclined orientation.
  • the apparatus comprises a spool with a cable having an end connector for engagement with the end of a replacement chain to be put on the ground engagement boom when in the inclined orientation.
  • the cable is routed via a shoulder on the distal end of the ground engagement boom to enable substantially the entire length of the ground engagement boom to be surrounded by the replacement chain.
  • the shoulder comprises a pulley.
  • the shoulder is slidably mounted on the body of the boom so that it can be moved from the top end to the distal end at which end it can be used to change the chain on the boom.
  • a shoulder is provided slidably mounted on the boom for housing a pulley or routing point for directing the cable of the winch used when changing the chain on the boom. This means that the shoulder can be selectively repositioned at appropriate times so that it is placed in position for changing the chain only when needed and at other times can be appropriately positioned or stowed so as not to cause any possible obstruction during normal use of the trenching apparatus.
  • the ground engagement boom in the inclined orientation, is at an angle of between 10 and 45 degrees to the body of the trencher.
  • a method of putting a chain on to the ground engagement boom of a trencher wherein the trencher comprises a body that is moveable on the ground surface and a ground engagement boom associated with the body, and lifting means arranged to control and configure the ground engagement boom so as to enter the ground from above and to configure the boom to an inclined orientation in which the boom extends at least partially over the body of the trencher, the method comprising, orienting the boom in the inclined orientation; engaging one of the ends of the chain with a cable of a winch provided on the body of the trencher; activating the winch to pull the chain onto the ground engagement boom.
  • the ground engagement boom is movable in a substantially vertical plane.
  • a trenching method in which a winch for putting a chain onto a boom, or changing the chain on a chain cutting or mixing boom, is provided on the trenching apparatus (or body thereof) itself, and not on the boom itself. Positioning of the winch in the present system on the body of the machine or apparatus itself enables and ensures that a chain can easily be changed on the ground engaging boom irrespective of the size of the ground engaging boom and the associated size and weight of the cutting chain itself.
  • the cable is routed via a shoulder on the distal end of the ground engagement boom to enable substantially the entire length of the ground engagement boom to be surrounded by the chain.
  • the method can include moving e.g. slidably moving a shoulder or pulley mounted on the boom for directing the cable of the winch used when changing the chain on the boom.
  • This means that the shoulder can be selectively repositioned at appropriate times so that it is placed in position for changing the chain only when needed and at other times can be appropriately positioned or stowed so as not to cause any possible obstruction during normal use of the trenching apparatus.
  • a trenching apparatus comprising: a body moveable on the ground surface; a ground engagement boom associated with the body, the boom being movable when engaged with the ground to form a trench; lifting means arranged to control and configure the ground engagement boom for engagement with the ground; in which the ground engaging boom is an endless chain ground-engaging boom, comprising a main body and a chain tensioner coupled to the main body at the upper end thereof.
  • the tensioning mechanism is remote from the lower end of the ground engaging boom which will be interacting on a more regular basis with the earth formation being trenched. It is less likely therefore to be damaged by impact on use.
  • the tensioning mechanism is kept away from the section of the boom that is likely to be most engaged with the mixing agent such as (but not limited to) cement or bentonite mixing agent, such as cement or bentonite, when used as a mixing mechanism.
  • the mixing agent such as (but not limited to) cement or bentonite mixing agent, such as cement or bentonite
  • the lifting means is arranged to configure and control the ground engaging boom so as to enter the ground in a substantially vertical configuration.
  • the chain tensioner comprises an arm pivotally coupled to the main body of the ground engagement boom.
  • the arm is hydraulically controllable to move between a first closed position in which its distal end is close to the main body and a second deployed position in which its distal end is moved away from the main body to tension a chain arranged on the ground engagement boom.
  • the apparatus comprises an endless chain mounted on the main body.
  • the chain is a cutting or mixing chain.
  • the ground engagement boom weighs between 10 and 20 tonnes, and preferably weighs up to 15 tonnes.
  • the arm comprises a pinion at its distal end to gearingly engage with the chain as it is driven around the ground engagement boom.
  • the arm is between 1 and 3 metres long.
  • the arm has a plurality of hydraulic drive cylinders provided to
  • the chain tensioner is positioned with respect to the main body such that when the ground engaging boom is fully engaged with the ground the chain tensioner is above ground surface.
  • an endless chain ground-engaging boom in which the ground engaging boom, comprises a main body and a chain tensioner coupled to the main body at or close to the upper end thereof.
  • the chain tensioning mechanism on the ground engaging boom and particularly at or close to the top of the ground engaging boom it is possible to ensure that the tensioning mechanism is less likely itself to go below the surface of the ground. Thus it can remain relatively free of material from the ground. Also the tensioning mechanism is kept away from the section of the boom that is likely to be most engaged with the mixing agent, such as cement or bentonite, mixing agent such as (but not limited to) cement or bentonite when used as a mixing mechanism.
  • the mixing agent such as cement or bentonite
  • mixing agent such as (but not limited to) cement or bentonite when used as a mixing mechanism.
  • the chain tensioner comprises an arm pivotally coupled to the main body of the ground engagement boom.
  • the arm is hydraulically controllable to move between a first closed position in which its distal end is close to the main body and a second deployed position in which its distal end is moved away from the main body to tension a chain arranged on the ground engagement boom.
  • the ground engaging boom comprises an endless chain mounted on the main body.
  • the chain is a cutting or mixing chain.
  • the ground engagement boom weighs between 10 and 20 tonnes, and preferably weighs up to 15 tonnes.
  • the arm comprises a pinion at its distal end to gearingly engage with the chain as it is driven around the ground engagement boom.
  • the arm is between 1 and 3 metres long.
  • the arm has a plurality of hydraulic drive cylinders provided to hydraulically control the position of the arm with respect to the body.
  • the chain tensioner is positioned with respect to the main body such that when the ground engaging boom is fully engaged with the ground the chain tensioner is above ground surface.
  • a method of varying tension in the chain of a ground-engaging boom of trenching apparatus in which the trenching apparatus comprises a body moveable on the ground surface and a ground engagement boom associated with the body, the boom being movable when engaged with the ground to form a trench, the method comprising: controlling the tension of the chain using a chain tensioner coupled to the main body of the ground engaging boom at the upper end thereof.
  • a trenching apparatus comprising: a body moveable on the ground surface, and a ground engagement boom associated with the body, the boom being movable when engaged with the ground to form a trench; a main power supply to provide power to the apparatus; lifting means, powered by the main power supply, arranged to control and configure the ground engagement boom so as to enter the ground; an auxiliary power supply arranged to provide power to the lifting means in the event of failure of the main power supply
  • the lifting means is arranged to control and configure the ground engagement boom so as to enter the ground from above in a substantially vertical orientation.
  • a trenching apparatus including an auxiliary power supply which can be used to provide power to the apparatus in the event of failure of the main power supply of the apparatus.
  • This is important as it enables power to be provided in situations that might be time critical such as when there is a power supply failure during trenching. This is particularly the case when trenching involves the use of some setting material, such as cement or bentonite, to perform soil or ground mixing.
  • some setting material such as cement or bentonite
  • the ground engaging boom can be left for extended periods of time within the environment of the recently mixed setting material. This can then cause the material to harden and set around the ground engaging boom which can then be impossible, or economically unfeasible, to retrieve in a reusable way from the ground.
  • Forming a trench can of course include the process of actually digging the trench so as to leave a an empty trench in the ground, or indeed the mixing of a material, such as but not limited to, cement with soil in so as to form a trench of mixed soil and material.
  • the lifting means is arranged to selectively reconfigure the boom from the substantially vertical orientation to an inclined orientation in which the boom extends at least partially over the body of the apparatus
  • the ground engagement boom is a cutting boom for cutting earthen material from the end surface of the trench.
  • the ground engaging boom is an endless chain cutting boom.
  • the ground engagement boom is a mixing boom for mixing cement with earth within the trench.
  • another mixing agent could be used.
  • the boom is a ground engagement boom for mixing an agent in general and not limited to cement.
  • the longitudinal length of the ground engagement boom is between 10 and 20 metres.
  • the ground engagement boom weighs between 10 and 20 tonnes, and preferably weighs up to 15 tonnes.
  • the apparatus comprises a protection chute, to protect the body of the apparatus from material that falls from the boom.
  • the chute is sized to receive the entire part of the boom that extends over the body of the trenching apparatus when the ground engagement boom is an inclined orientation.
  • the auxiliary power supply is integrated with the body of the apparatus.
  • the auxiliary power supply will be a separate power circuit and pump but can be built into or permanently coupled to the housing of the trenching apparatus.
  • the auxiliary power supply may be a hydraulic pump having an inlet conduit and an outlet conduit with connectors for connecting the inlet and outlet conduits to hydraulic power lines of the apparatus that during power supply from the main power supply are connected to hydraulic conduits of the main power supply.
  • the auxiliary power supply is an independent separate unit connectable to the apparatus in the event of failure of the main power supply. This is advantageous as it can be supplied or provided (or replaced) separately from the trenching apparatus itself.
  • the separate auxiliary power supply may be a hydraulic pump having an inlet conduit and an outlet conduit with connectors for connecting the inlet and outlet conduits to hydraulic power lines of the apparatus that during power supply from the main power supply are connected to hydraulic conduits of the main power supply.
  • the main power supply is a hydraulic pump arranged to pump hydraulic fluid along hydraulic power lines to operate the lifting means.
  • the auxiliary power supply is a hydraulic pump arranged to pump hydraulic fluid along the hydraulic power lines when there is a failure of the main power supply to the boom.
  • the hydraulic pump of the auxiliary power supply has an inlet conduit and an outlet conduit with connectors for connecting the inlet and outlet conduits to the hydraulic power lines.
  • a method of operating a trenching apparatus wherein the apparatus comprises a body moveable on the ground surface above the level of a trench, and a ground engagement boom associated with the body, the boom being movable when engaged with the trench, a main power supply to provide power to the apparatus and lifting means, powered by the main power supply to control the ground engagement boom so as to enter the ground, and an auxiliary power supply, the method comprising: in the event of failure of the main power supply providing power to the lifting means from the auxiliary power supply.
  • the lifting means is arranged to control and configure the ground engagement boom so as to enter the ground from above in a substantially vertical orientation.
  • a trenching method including an auxiliary power supply which can be used to provide power to the apparatus in the event of failure of the main power supply of the apparatus.
  • This is important as it enables power to be provided in situations that might be time critical such as when there is a power supply failure during trenching. This is particularly the case when trenching involves the use of some setting material, such as cement or bentonite, to perform soil or ground mixing.
  • some setting material such as cement or bentonite
  • the inventors have recognised that a method of using an auxiliary power supply will solve this technical problem.
  • the main and auxiliary power supplies comprise hydraulic power supplies and the method comprises, in the in the event of failure of the main power supply, disconnecting the main hydraulic power supply from the apparatus and connecting hydraulic fluid conduits of the auxiliary power supply to the apparatus to thereby power the apparatus.
  • the auxiliary power supply is integrated with the body of the apparatus.
  • the auxiliary power supply is an independent separate unit connectable to the apparatus in the event of failure of the main power supply.
  • Figures 1 and 2 are a schematic views of a known trenching apparatus
  • Figure 3 is a schematic view of component parts of a vertical chain cutting trencher
  • Figure 4 is a schematic view of the trencher Figure 3, assembled prior to engagement of the ground engaging boom with the ground;
  • Figure 5 is a schematic view of the trencher in Figure 4 with the ground engaging boom at full depth in the ground;
  • Figure 6 is a schematic view of the trencher machine on a trailer arriving at a trenching site
  • Figure 7 is a schematic view of the machine of Figure 6 with support legs extended
  • Figure 8 is a schematic view of the machine of Figure 7 with support legs extended and feet lowered;
  • Figure 9 is a schematic view of the machine of Figure 8 with tracks provided on the machine;
  • Figure 9a is a schematic view of the machine of Figure 9, with the trailer removed;
  • Figure 10 is a schematic view of the machine of Figure 9A with the legs in a closed position
  • Figure 11 is a schematic view of the machine of Figure 10 with hydraulic reels provided thereon;
  • Figure 12 is a view of the machine of Figure 1 1 with a protective chute provided thereon;
  • Figure 13 is a view of the machine of Figure 12, assembled with the ground engaging boom prior to engagement of the ground engaging boom with the ground and prior to connection of the boom to hydraulic lines;
  • Figure 14 is a view of the machine of Figure 13 with the ground engaging boom lowered for connection of chain drive services such as hydraulic lines;
  • Figure 14A is a view of the machine of Figure 14 with the ground engaging boom partly submerged, i.e. at an intermediate trenching depth;
  • Figure 15 is a view of the machine of Figure 14A with the ground engaging boom at full trenching depth;
  • Figure 16 is a detailed view of the machine including the ground engaging boom cradle;
  • Figure 17 is a schematic view of the machine showing the boom cradle open
  • Figure 18 is a schematic view of the machine with the boom cradle open without a cutting boom assembled therein including a chute extension;
  • Figure 19 is a representation of the machine with a ground engaging boom in position but no cutting chain installed;
  • Figure 20 is a view of a close-up of the top of the ground engaging boom.
  • Figure 21 is a schematic view of a machine including an auxiliary power supply.
  • Figure 22 is a view of a trenching machine including an auxiliary power supply unit.
  • Figures 1 and 2 show schematic views of a known trenching apparatus. It is a trench cutting apparatus as described in EP-A-0080802, for cutting a trench in rock.
  • Two crawler chassis 3 and 5 are coupled together by tie bars 7, the rear crawler 3 having a cutting boom 2 pivotally mounted at 6.
  • the forward end of the boom 2 has a cutting boom 2 pivotally mounted at 6.
  • the forward end of the boom 2 has a cutting rotor 7 driven in rotation about an axis transverse to the trench to be cut.
  • the distal end of the boom 2 is coupled to the forward crawler 5 by a telescopic control arm 8 comprising a hydraulic ram and telescopically extending sleeves coupled to the boom 2 by a coupling 9.
  • the machine is positioned to straddle the line of the trench and the boom 2 is lowered into contact with the ground.
  • the cutting head 7 is rotated while applying force by way of the hydraulic ram 8 to move the cutting head 7 on an arcuate path downwardly and to remove rock from the forward end of the trench.
  • An endless chain conveyor 4 is positioned behind the cutting rotor 7 and the spoil is carried away. The boom 2 is then raised and the machine moved forward and the process is repeated.
  • trenching apparatus works well, there is a need for a trenching apparatus that is able to cut a deeper trench.
  • This has application in fields such as the building of trenches in riverbanks for example.
  • Such trenches may be built for the purpose of the creation of water-impermeable barriers or for strengthening the structure of the ground, for example, by mixing earth from the trench region with cement, thereby forming a hardened vertical wall within the ground where the trench is formed.
  • trenching includes the use of ground engaging members both for cutting trenches in the ground and also for mixing of the earth or material within a trench as might be done for example where cement or some other material is mixed with soil to control various physical properties of the ground.
  • ground engaging member or“ground engaging boom” is to be understood as relating to a member that generally engages with the ground which could include either cutting or forming a trench within the ground or mixing cement or other mixing material such as bentonite, within a trench with the soil in the trench. Indeed considering these two specific examples, either could be referred to as“trenching” and in both cases a trench is formed.
  • Figure 3 shows a disassembled schematic view of a trenching apparatus for such purpose.
  • the apparatus includes a trenching machine 10 arranged to receive a ground engaging boom 12 which may be a cutting boom and importantly which can be inserted into the ground in a vertical orientation.
  • a vertical cutting boom trenching machine has particular advantage in that the ground engaging boom can be inserted into the ground effectively within the footprint of the machine itself, i.e. without requiring space outside of the footprint for a cutting arc.
  • Vertical insertion typically means that the movement of the ground engaging boom is translationally downwards rather than, say pivoted but it need not require that the boom extends and enters the ground at precisely 90 degrees to the ground surface.
  • an angle of attack of the ground engaging boom i.e. the angle that the longitudinal axis of the ground engaging boom makes to the surface of the ground, will be ⁇ 10% to the vertical.
  • the angle of attack is ⁇ 5 degrees to the vertical and most preferably it is vertical.
  • the ground engaging boom 12 includes a cutting chain 14 which has the function both of cutting a trench and, in this example, also due to the features and elements 16 on the chain providing a mixing function, for mixing an agent such as (but not limited to) cement that may be provided in the trench with the surrounding earth.
  • a cutting chain 14 which has the function both of cutting a trench and, in this example, also due to the features and elements 16 on the chain providing a mixing function, for mixing an agent such as (but not limited to) cement that may be provided in the trench with the surrounding earth.
  • the trenching apparatus 10 includes tracks 18 and jack legs 20, which provide a significant technical function to this specific type of trenching machine in accordance with a disclosed embodiment, and as will be described in greater detail below.
  • a protective chute 22 is provided arranged, in use, and as will be described in greater detail below, to couple with a chute section 24 provided as part of a boom cradle 26.
  • the protection chute 22 may also be used for other functions such as washing the ground engaging boom when it is not engaged with the ground.
  • An engine and control module 28 is provided in which a driver or operator may sit to control the apparatus 10 in use.
  • Hydraulic reels 30 are provided which are arranged on the main body 34 of the machine 10, arranged to be driven by a main hydraulic power supply (not shown) within the main body 34.
  • the main hydraulic power supply is also arranged to provide power to drive the movement of the ground engaging boom 12 by powering a pinion 40 (see Figure 18), to be described below.
  • the main hydraulic power supply may typically be a hydraulic pump having an inlet and an outlet and being arranged and configured to pump hydraulic fluid to provide power as required. Any suitable type of hydraulic pump can be used, as will be known to the skilled person.
  • the hydraulic reels 30 are provided, arranged to receive hydraulic fluid from the main hydraulic power supply and thereby to drive the cutting chain 14.
  • the hydraulic lines 30 are coupled to an upper end 36 of the ground engaging boom 12, as will be descried in greater detail below.
  • the ground engaging boom 12 is provided with an integrated rack 38 arranged in use to interact and be driven by the pinion 40 (see Figure 18).
  • the pinion 40 is driven, in most cases by the main hydraulic power supply too and thereby controls the vertical position of the ground engaging boom 12 with respect to the cradle 26, and hence to the ground too.
  • FIG 4 shows a schematic view of the trenching machine 10 arranged in position ready for operation.
  • the ground engaging boom 12 is ready for engagement with the earth, but has not yet been driven into an engaged position. Hydraulic power is provided which drives the ground engaging boom down into the ground.
  • the elements 14 (teeth in this case) at the lower end of the cutting boom 12 are close to the ground, but have not yet broken the surface.
  • the angle of attack of the ground engaging boom 12 is almost exactly 90 degrees in the example shown.
  • the driving force will be in line with the boom and thus vertically downwards.
  • the height of the boom 12 can be as required for the particular job, which could involve cutting and/or mixing a material in a trench, but preferably is at least 10 metres long and more preferably between 15 and 20 metres long. In particular, trenching operations, it is desired that the boom is at least 15 metres long. In such cases, the mass of the boom, including the cutting chain, in use, could be up to 30,000KG.
  • a plurality of stabilising legs 20 are provided which function to stabilise the machine itself while, or during, the lowering of the cutting or mixing boom 12 into the surface of the soil takes place.
  • a stability providing mechanism flexibly or selectively reconfigurably connected to the housing 34 of the machine 10 provides a convenient and advantageous mechanism for ensuring stability of the machine during the lowering of the trenching/mixing boom 12 into the surface of the soil. It has been recognised that although the centre of mass of the machine will still be positioned above the footprint of the machine the height of the boom itself can generate a lack of stability, particularly if, say the environment is one in which high winds can be present.
  • the stability legs 20 comprise a proximal end 42 coupled to the machine and a distal end 44 from which a vertically downwardly depending longitudinal support member 46 is arranged to extend.
  • the legs 20 are selectively reconfigurable such that they can be folded (or telescopically collapsed) into close alignment with the machine 10 as shown in, say, Figures 1 1 or 12, or provided in an extended configuration as shown in any of, say, Figures 7 to 9 and 9A. In such a configuration they are not in close alignment with the body or can be said to extend away from a central longitudinal axis of the machine thereby increasing its stability.
  • the legs In extending away from a central longitudinal axis of the machine the legs could be directionally square on to the axis or at some other angle whilst still extending away from it and thereby extending the width. In one embodiment, the legs are normal to the axis or at an angle of less than ⁇ 45 degrees to the normal to the longitudinal axis. The length of the legs when deployed can be variable and selected to provide the required stability.
  • Feet 48 are provided as separate and connectable components which are provided with an engagement region 50 for connection to the distal end of the downwardly depending longitudinal support member 46. In this examples, the downwardly depending longitudinal support members 46 are arranged to extend telescopically from an upper region 49.
  • the legs 20 are used during the process of erection of the ground engaging boom 12 and lowering of the boom into the surface of the ground. Once the boom 12 has been lowered to a desired depth, the requirement for the extension of the legs 20 into the extended configuration as shown in Figure 7 is reduced.
  • the boom 12 inserted into the ground, itself provides a stabilising function and therefore the legs 20 can be collapsed or retracted or removed.
  • the legs may be pivotably connected to the machine 10 at the proximal end 42. In an alternative embodiment, they may be removably and fixedly connected. In the example of Figure 7, the shaping of the legs 20 can be seen.
  • Each of the legs has a length that extends across the width of the body of the machine such that looking at the first pair of legs 52 it can be seen that the longitudinal body of the leg 56 extends under the machine and to the other transverse side. Still looking at the rear pair of legs 52, the end 58 of the second leg of the pair (the foot of which cannot be seen in Figure 9) can be seen extending towards the opposite transverse side of the machine 10. Thus, there is overlap of the pair of legs in the region of the body of the machine 10 as indicated by the arrow A. This ensures that the legs, when extended and engaged with the ground, through their interaction with the centre of mass of the body of the machine 10, provides significant stability to it.
  • the legs may be formed of two telescopic sections such that there is an outer telescopic section 60 and an inner telescopic section 62 which, when in a closed configuration, will be positioned substantially within the length of the first telescopic section 60.
  • legs 20 ensures that stability can be provided to the machine as a whole during insertion or lowering of the boom 12 into a trench for cutting or mixing. Typically whenever the ground engaging boom 12 is not engaged with the ground, i.e. not submerged below ground surface, the legs will be extended so as to provide stability to the trenching apparatus.
  • the machine 10 includes an integrated protective chute 22 which has a generally U-shaped cross-section.
  • the position and configuration of the chute on the machine is so as to be able to prevent fouling of the machine body 34 during the forward folding and transporting of the ground engaging boom or cutting mechanism.
  • the chute 22 can be seen coupled to the body 34 of the machine 10.
  • Coupling arms 66 are provided to support the chute 22 along its longitudinal extension.
  • the cradle 26 is included with a chute extension 24 which, when the cradle 26 is in the upwards (folded) position as shown in Figure 14 for transporting of the ground engaging boom 12, forms a continuous channel with the fixed chute 22.
  • the dimensions of the chute 22 and the chute section 24 forming part of or associated with the cradle 26, are such that the end 68 of the chute 22 will fit within the dimensions of the end 70 of the chute section 24.
  • the general dimensions will be substantially the same, but the end 70 of the chute section 24 may have a slightly enlarged width so as to accommodate the cross- section of the end 68 of the chute 22.
  • the chute and chute section 24 when assembled, form a continuous channel within which at least some of the cutting elements 14 of the chain are positioned.
  • This assembly is particularly advantageous since it means that the chain 14 and its cutting elements 16 can be easily washed by water or other washing fluid introduced to flow down the chute 22 under the force of gravity and/or from pressurised fluid flow from an associated pump.
  • the configuration of the assembled chute 22 and chute section 24 ensures that washed or dropped cutting material from the chain 14 is directed away from the machine and to a suitable place.
  • the water and the washings from the chain 14 may be directed into the trench that has just been cut or indeed onto the ground in a region where a trench will shortly be cut. In either case, the positioning of the washings is advantageous in that it is away from the machine 10 itself and importantly the cuttings or droppings from the chain do not fall onto the machine.
  • the chain is actually driven when in the configuration as shown in Figure 16 at the same time as a pressurised flow or jet of water is directed down the down the chute and chute extension 24 such as to ensure that all cutting elements on the chain 14 of the boom 12 are washed.
  • This means for washing the chain of a chain cutter is advantageous as it is conveniently performed by the machine 10 itself and at least partially within the footprint of the machine itself.
  • a winch 80 is shown mounted on the machine 10.
  • the winch 80 is configured to function as a source of force to pull a chain onto the ground engaging boom when required.
  • a winch may typically be provided on the ground engaging boom itself. It has been recognised that this may be disadvantageous given the weight of the ground engaging boom.
  • the positioning of the winch in the present system is on the machine 10 itself. As will be described below, this ensures that a chain can easily be changed on the ground engaging boom irrespective of the size of the ground engaging boom and the associated size and weight of the cutting chain itself.
  • a plurality of hydraulic drive cylinders 82 are provided.
  • the configuration of the hydraulic drive cylinders 82 can be seen clearly in Figure 5 which shows the hydraulic drive cylinders 82 having a pivoted connection 84 to a rear wall 86 of the cradle 26.
  • the cradle also has a central pivoted coupling 88 to a fixed section of the machine 10.
  • the cradle 26 is usually, during mixing/ground engagement, arranged with the hydraulic drive cylinders 82 extended such that the back surface 86 is generally vertical.
  • the ground engaging boom is first lifted out of the ground and the hydraulic drive cylinders 82 are contracted. This causes the back surface 86 of the cradle to pivot about pivot point 88 such that the ground engaging boom will then be rested within the chute 22, as described above.
  • the winch 80 can be activated as described with reference to Figure 19.
  • the winch 80 is coupled to a longitudinal coupling member such as a rope or wire cable 90.
  • the cable 90 extends back and forth around a shoulder 92 including a pulley wheel 94 around which the cable 90 is arranged to go.
  • the cable 90 then extends backwards to the top of the cutting boom 36 and then forwards again to its end 96.
  • the end 96 of the rope or cable 90 may then be coupled to a replacement chain, the first link 98 of which is visible in Figure 19.
  • Replacing the cutting chain on the boom is then simply achieved by activating the winch 80 to wind up the rope 90 and thereby pull the chain 98along the length of the ground engaging boom so as to entirely surround the both longitudinal sides of the boom and enable the chain to be fixed to it.
  • the rope 90 can be disconnected form the new chain 98 and the chain closed in known ways. This for example could involve pulling round the then distal (free) end of the chain that has not yet been pulled onto the boom and connected to the end of the chain that has been pulled by the rope or cable 90.
  • the tensioning mechanism 100 can be seen more clearly in Figure 20.
  • the tensioning mechanism includes a pivot arm 102 pivotally connected to the top end of the cutting boom via a pivot 104.
  • a pinion 106 is provided for engagement with the chain 14.
  • the chain will pass between the pinion 106 and bracket 108 which acts as a restraining or containing mechanism for the chain on the tensioning system 100.
  • the arm 102 is driven via a hydraulic drive system including cylinders 1 10 which is pivotally mounted to a fixed pivot 112 on the top end of the boom and a fixed pivot 114 at the distal end of the arm 102 of the tensioning mechanism 100. It will be appreciated that by extension of the hydraulic system 1 10, the arm 102 will be pivoted about pivot 104 relative to the boom, thereby tensioning the chain 14 around the cutting boom 12.
  • the tensioning mechanism is remote from the lower end of the ground engaging boom 12 which will be interacting on a more regular basis with the earth formation being trenched. Secondly, this will ensure that the tensioning mechanism is kept away from the section of the boom that is likely to be most engaged with the mixing agent, such as cement, when used as a mixing mechanism. It is known and conventional to provide such tensioning mechanisms at the distal end of a ground engaging boom but it has been recognised that by providing the tensioning mechanism at the top end of the cutting boom the risk from the mixing agent being used setting and thereby possibly rendering the tensioning mechanism ineffective, is significantly reduced.
  • the chain tensioning mechanism can be provided at the end or within 1-2 metres of the upper end of the boom. In some examples it is positioned at a distance that is no more than 5% (or 10 or 15%) of the way along the length of the boom from the upper end thereof.
  • the cradle 26 has a number of sections and the cradle can be opened or closed to enable replacement and/or orientation of the ground engaging boom 12.
  • the cradle in the example of Figure 17 includes a pivoted door section 41 hingedly mounted via hinges 43 to a rear section 45.
  • a pinion 40 is provided which in use is arranged to mesh with rack 38 formed of a plurality of teeth on the ground engaging boom 12.
  • the pinion 40 is preferably driven by hydraulic power from main trencher body 34 that may be derived from hydraulic power lines 15 (seen in Figure 4, but not shown in Figure 17).
  • main trencher body 34 may be derived from hydraulic power lines 15 (seen in Figure 4, but not shown in Figure 17).
  • Figure 18 shows the cradle 26 open and with the ground engaging boom 12 removed.
  • the chute section 24 can be seen with flared ends 70 and 71.
  • the chute section is preferably provided as a fixed or integrated part of the cradle and ensures that a continuous channel can be formed with the chute 22 when the cradle is in a raised (folded), such as that shown in Figure 14.
  • the machine 10 may be provided on a trailer 120 for moving to an area where trenching is to be performed.
  • the legs 20 are stowed so as not to generate unnecessary width of the machine during transport.
  • the legs 20 are extended and feet 48 arranged in position to receive and engage with the legs. Any suitable form of fixing can be used to lock the feet 48 temporarily to the legs 20.
  • the legs 20 With the machine still on the trailer, the legs 20 are jacked down such as to engage with the feet 48 as shown in Figure 8.
  • tracks are coupled to the machine as shown in Figure 9.
  • the legs and feet coupled as shown in Figure 9A the trailer can be removed leaving the machine 10 supported by the legs and feet 48.
  • Figure 10 shows clearly the tracks now supporting the machine on the ground with the feet 48 lifted such that they are no longer in contact with the ground.
  • the hydraulic reels 30 are positioned on the machine 10 and the cradle 26 is coupled to the rear of the machine.
  • the chute 22 is fitted to the machine 10.
  • the chute section 24 is already fixed to the cradle 26.
  • the mixing boom 12 is engaged with the cradle 26 as shown in Figure 13.
  • a crane may be used to initially lift the ground engaging boom 12 into position for engagement with the cradle 26. It is noted that the legs 20 are extended at this stage, thereby providing stability to the machine during the assembly of the machine with the boom 12 and prior to the boom actually engaging the ground and thereby providing stability of its own.
  • the machine or rather the ground engaging boom is then lowered as shown in Figure 14 by tilting back of the cradle 26.
  • This is achieved as described above by operation of the hydraulic controls via hydraulic cylinders 82 and the various pivot configurations provided on the back wall of the cradle.
  • connection of the chain drive services, via tubes (hoses) from the hydraulic reels 30 is possible.
  • the legs 20 are extended in preparation for the fitting of the ground engaging boom 12, because this is the point in the process at which the centre of gravity of the machine 10 is highest due to the vertical extent of the ground engaging boom 12 once there has been initial engagement in the cradle 26 (as shown in Figure 13).
  • the ground engaging boom 12 is now ready for folding down, (i.e. tilting backwards into the configuration shown in Figure 14) for connection of the hydraulic supply lines 30.
  • the hydraulic supply lines 30 are coupled to the top of the boom for driving the cutting and mixing chain on the ground engaging boom.
  • the ground engaging boom 12 is now ready for engagement with the ground.
  • the legs 20 provide stability in this configuration.
  • the trenching operation has commenced with the boom driven down by use of the rack and pinion described above provided within the cradle 26 and on the boom itself.
  • the ground engaging boom is partially submerged within the ground.
  • the boom is submerged to a desired depth which will produce a desired depth of trench.
  • the legs 20 are raised and brought into the body of the machine 10 as described above since they are not needed at this stage for stability.
  • the tracks of the machine can be controlled to control the formation of and the direction of the trench.
  • the machine is able to operate with an extended boom whilst not risking any lack of stability which could be catastrophic. This is particularly the case in high-wind situations, which may be encountered in some operating environments of trenching machines of this nature.
  • high-wind situations which may be encountered in some operating environments of trenching machines of this nature.
  • the machines are used in a river bank location, and winds occur, which is likely, the risk of damage to the ground engaging boom and even the machine 10 itself is significant.
  • Figures 21 and 22 are, views of a machine 75 including an auxiliary power supply 74.
  • Figure 21 is a simplified schematic view. Jn some situations, it is possible that the main hydraulic power supply provided as part of the machine 75 fails. This could occur for a number of reasons such as, for example, the supply runs out of fuel or one of the supply hoses becomes damaged in use or breaks off from the machine. In this situation, which may generally be thought of as failure of the main hydraulic power supply, there is a risk to the machine and in particular the ground engaging boom 12 which will typically be engaged with the ground if the main hydraulic power supply is in operation providing power to drive the pinion as described above.
  • the mixing fluid in the case of a mixing agent such as (but not limited to) cement could set thereby fixing the ground engaging boom in the trench that has been cut and filled with said mixing agent/cement.
  • an auxiliary power supply 74 is provided which can be used as a“hot stab” unit, i.e. which is then able to immediately replace the main hydraulic power supply of the machine and provide the required power to remove the ground engaging boom 12 from its engaged position.
  • the boom can then be extracted using the existing rack and pinion mechanism, described above, which is powered by the auxiliary power unit 74.
  • the auxiliary power supply unit 74 may be referred to as a hot stab unit since it will typically include a pair of hydraulic supply lines 76 which are connected to hydraulic inputs in a power circuit of the machine to thereby drive the pinion and extract the ground engaging boom from its engaged position.
  • Figure 21 which shows schematically, the arrangement of an auxiliary power supply unit, it can be seen that a lift motor 79 arranged in normal use to receive power from supply lines 30 is provided with sockets 81 to which the connectors 83 of the auxiliary supply unit can be connected. Valves 85 on the supply lines 30 are closed and the lift motor 79 is instead powered by the hydraulic pump and supply unit via inputs 81.
  • the lift motor may be the motor that in use powers the pinion 40.
  • the auxiliary power supply unit 74 is preferably provided as a separate unit. It may be provided entirely independently, but preferably is arranged coupled to the machine 75.
  • the machine 75 includes input sockets 81 arranged in normal use to be provided with power from the existing hydraulic supply lines of the machine but, in the event of main power supply failure, connectors 83 provided at the distal ends of the supply line 76 maybe coupled to the inputs 81 to power the pinion and thereby, via interaction with the rack on the ground engaging boom 12, cause the boom to be lifted out of the ground.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
EP19798556.7A 2018-10-29 2019-10-29 Aufgrabungsvorrichtung und verfahren zur aufgrabung Withdrawn EP3874095A2 (de)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
GB1817669.3A GB2578484A (en) 2018-10-29 2018-10-29 Trenching apparatus and a method of trenching
GB1817664.4A GB2578480A (en) 2018-10-29 2018-10-29 Trenching apparatus and a method of trenching
GB1817665.1A GB2578481A (en) 2018-10-29 2018-10-29 Trenching apparatus and a method of trenching
GB1817666.9A GB2578482A (en) 2018-10-29 2018-10-29 Trenching apparatus and a method of trenching
GB1817668.5A GB2578483B (en) 2018-10-29 2018-10-29 Trenching apparatus and a method of trenching
PCT/EP2019/079568 WO2020089251A2 (en) 2018-10-29 2019-10-29 Trenching apparatus and a method of trenching

Publications (1)

Publication Number Publication Date
EP3874095A2 true EP3874095A2 (de) 2021-09-08

Family

ID=68470467

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19798556.7A Withdrawn EP3874095A2 (de) 2018-10-29 2019-10-29 Aufgrabungsvorrichtung und verfahren zur aufgrabung

Country Status (3)

Country Link
US (1) US20210395974A1 (de)
EP (1) EP3874095A2 (de)
WO (1) WO2020089251A2 (de)

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB155766A (en) 1917-11-14 1921-12-29 Orenstein & Koppel Ag Improvements in, and relating to, machines for the excavation of trenches and the like
CH239498A (fr) 1943-07-26 1945-10-31 Grands Travaux Sa Entreprise D Excavateur pour la formation de tranchées.
FR1132693A (fr) 1955-10-05 1957-03-14 Matenin Ets Excavatrice de tranchées
GB848277A (en) 1957-04-25 1960-09-14 Mid Western Ind Inc Improved apparatus for mounting a mechanical shovel on a motor vehicle
GB735116A (en) 1958-03-11 1955-08-17 Priestman Brothers Improvements relating to trench excavators
FR1330860A (fr) 1962-05-16 1963-06-28 Faucheux Ets Pelle excavatrice à attelage rapide, déportable latéralement avec blocage hydraulique en toutes positions
US3332661A (en) 1965-12-27 1967-07-25 Steadman Ind Ltd Freight container with retractable legs
US3834049A (en) * 1972-12-07 1974-09-10 S Bond Trenching attachment for a tractor or the like
US4290495A (en) * 1979-06-18 1981-09-22 Hydra-Rig, Inc. Portable workover rig with extendable mast substructure, platform mounted drawworks and adjustable wellhead anchor
GB2088930A (en) 1980-12-08 1982-06-16 Case Co J I Trenching Machine
EP0080802A1 (de) 1981-10-14 1983-06-08 James Christopher Wallace Grabenfräse für Gestein
JPH0713376B2 (ja) 1990-10-31 1995-02-15 株式会社大林組 壁面掘削チェーンカッタの支持装置
GB9323298D0 (en) 1993-11-11 1994-01-05 Mastenbroek & Co Ltd J Improvements in and relating to excavating apparatus
US5540006A (en) 1994-11-14 1996-07-30 Lloyd; Claud A. Pickup truck-mounted hydraulic tool carrier
US20010013182A1 (en) * 1996-02-26 2001-08-16 Boyer Herbert Thomas Apparatus for digging trenches
US6397501B1 (en) * 1999-02-11 2002-06-04 Joseph P. Lembcke Wide multiple-chain trenching machine
US6470607B1 (en) 2000-08-04 2002-10-29 Scc Technology, Inc. Excavating method for constructing underground walls
US6658768B1 (en) * 2001-05-19 2003-12-09 Wesley Allen Bainter Trencher
US6467201B1 (en) 2001-06-26 2002-10-22 Mcsharry Chris Trench-cutting machine with cutting head lock mechanism
ES2278796T3 (es) 2001-11-13 2007-08-16 Mastenbroek Ltd. Metodo y aparato de hacer zanjas.
CN2517789Y (zh) 2002-03-29 2002-10-23 耿福明 地下窄深槽成槽机
US20070056425A1 (en) 2005-09-15 2007-03-15 Bonar Frank K Link and chain for rock cutting
GB0522033D0 (en) * 2005-10-28 2005-12-07 Elle Ltd Van Improvements relating to geotechnical site investigation
JP2007146554A (ja) * 2005-11-29 2007-06-14 Sanwa Kizai Co Ltd 矢板埋設機およびそれを用いた矢板埋設工法
CN201050077Y (zh) 2007-06-26 2008-04-23 华中农业大学 一种自走式链式开沟机
US20090260264A1 (en) * 2008-04-22 2009-10-22 Vermeer Manufacturing Company Trencher attachment
US8209889B2 (en) * 2009-11-20 2012-07-03 Lanser Jerry L Operator propelled and/or guided portable trencher
FI127384B (fi) 2011-03-15 2018-04-30 Laennen Mce Oy Työkoneen, kuten ruoppaajan tukijalkajärjestely
GB2551419A (en) 2016-04-08 2017-12-20 Harry Maria Jurgens Trenching machine

Also Published As

Publication number Publication date
WO2020089251A3 (en) 2020-07-23
US20210395974A1 (en) 2021-12-23
WO2020089251A2 (en) 2020-05-07

Similar Documents

Publication Publication Date Title
ES2397273T3 (es) Método y aparato para construir un puente
CA1280130C (en) Trenching system with trench wall enhancer, local longitudinal tractor, and concrete pouring facility
US3645343A (en) Rotary drilling machine
US5244315A (en) Excavator for constructing underground continuous wall and underground continuous wall construction method
US3700045A (en) Tractor-mounted post hole digger
US5247743A (en) Method and apparatus for digging trenches
US20210395974A1 (en) Trenching apparatus and a method of trenching
JP6254670B1 (ja) 連続壁掘削機
JP4931478B2 (ja) 低空頭杭打機
GB2578482A (en) Trenching apparatus and a method of trenching
EP0659943A1 (de) Graben-Grabvorrichtung und -verfahren
GB2578484A (en) Trenching apparatus and a method of trenching
GB2578481A (en) Trenching apparatus and a method of trenching
GB2578483A (en) Trenching apparatus and a method of trenching
GB2578480A (en) Trenching apparatus and a method of trenching
EP1409797B1 (de) Grabenziehmaschine
US3426857A (en) Earth drilling equipment
KR20230058524A (ko) 토양 제거를 위한 토목 기계 및 토목 공학 방법
JP2001003363A (ja) 地中埋設杭の破砕処理装置
JP3615892B2 (ja) 掘削機の排土装置
JP7359344B2 (ja) 削孔作業車及び削孔方法
KR101081032B1 (ko) 천공기와 이를 이용한 천공 방법
JP3637173B2 (ja) 掘削機の昇降装置
KR101756781B1 (ko) 각도 조정될 수 있는 교반혼합장치를 이용한 지중 차수벽 시공공법
JP7337343B2 (ja) 防護柵の支柱施工装置と支柱施工方法

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20210524

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20220104