US20090260264A1 - Trencher attachment - Google Patents

Trencher attachment Download PDF

Info

Publication number
US20090260264A1
US20090260264A1 US12/426,864 US42686409A US2009260264A1 US 20090260264 A1 US20090260264 A1 US 20090260264A1 US 42686409 A US42686409 A US 42686409A US 2009260264 A1 US2009260264 A1 US 2009260264A1
Authority
US
United States
Prior art keywords
auxiliary
boom
digger
main
trencher
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/426,864
Inventor
Mark Cooper
Robert Daniel Hawks
Edward Lee Cutler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vermeer Manufacturing Co
Original Assignee
Vermeer Manufacturing Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vermeer Manufacturing Co filed Critical Vermeer Manufacturing Co
Priority to US12/426,864 priority Critical patent/US20090260264A1/en
Priority to PCT/US2009/041284 priority patent/WO2009132025A2/en
Assigned to VERMEER MANUFACTURING COMPANY reassignment VERMEER MANUFACTURING COMPANY ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CUTLER, EDWARD LEE, HAWKS, ROBERT DANIEL, COOPER, MARK
Publication of US20090260264A1 publication Critical patent/US20090260264A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/08Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
    • E02F3/10Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain with tools that only loosen the material, i.e. with cutter-type chains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/13Foundation slots or slits; Implements for making these slots or slits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/08Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
    • E02F3/085Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain with auxiliary or additional digging elements other than digging elements on an endless chain
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/08Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
    • E02F3/088Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain pivotable relative to the frame
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/08Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain
    • E02F3/12Component parts, e.g. bucket troughs
    • E02F3/14Buckets; Chains; Guides for buckets or chains; Drives for chains
    • E02F3/145Buckets; Chains; Guides for buckets or chains; Drives for chains drives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/06Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging elements mounted on an endless chain

Definitions

  • the present disclosure relates to trenchers and, more particularly, to a wide boom attachment for a trencher.
  • Trenchers capable of digging/cutting trenches have a variety of uses. For example, in construction, trenchers are often used to dig trenches for laying pipes or cables. There exist a number of different types of trenchers.
  • One type of trencher includes a digger chain that rotates on a boom. The angle of the boom can be adjusted to control the depth of the cut. To cut the trench, the digger chain is rotated on the boom while the machine moves slowly in a direction away from the boom. The width of the chain defines the width of the trench. In most trenchers the width of the chain is limited by the width of the boom head and chassis.
  • the present disclosure provides a system and method of creating trenches of various widths, including widths that are substantially greater than the width of the boom head and chassis width.
  • the boom is designed so that it can be easily configured to create a trench of a first width and subsequently create a trench of a second width that is different than the first width.
  • FIG. 1 is a perspective view of a trencher according to the present disclosure
  • FIG. 2 is a side view of the trencher of FIG. 1 ;
  • FIG. 3 is a front view of the trencher of FIG. 1 ;
  • FIG. 4 is a top view of an embodiment of cutting teeth and dirt drags on a chain assembly according to the present disclosure
  • FIG. 5 is an end view of the embodiment shown in FIG. 4 ;
  • FIG. 6 is a front view of the trencher of FIG. 1 with the digger chains removed to show the main boom and auxiliary booms;
  • FIG. 7 is a top view of the trencher of FIG. 1 with the digger chains removed to show the main boom and auxiliary booms;
  • FIG. 8 is a top view of the main boom and auxiliary booms attached to the chassis of the trencher of FIG. 1 ;
  • FIG. 9 is a perspective view of a distal end of the main boom with one auxiliary boom removed;
  • FIG. 10 is a perspective view of the auxiliary boom of FIG. 1 ;
  • FIG. 11 is a perspective cross-sectional view of the auxiliary boom drive shaft
  • FIG. 12 is a perspective view of a portion of the auxiliary boom showing a tension system on the auxiliary boom.
  • FIG. 13 is a side cross-sectional view of a portion of the auxiliary boom shown in FIG. 12 .
  • the trencher 10 includes a chassis 12 that includes a first end 14 , a second end 16 , a first side 22 , and a second side 24 .
  • the chassis 12 is supported on a pair of tracks 18 , 20 located at each side 22 , 24 of the chassis.
  • the chassis 12 is configured to support, among other things, an operator cab 26 , engine 28 , hydraulic motors 30 , and a conveyor system 32 .
  • the engine 28 is used to power hydraulic motors 30 that drive the tracks 18 , 20 , the conveyor system 32 , as well as other trencher operations (e.g., boom position and digger chain rotation).
  • a main boom 34 is attached to the second end 16 of the chassis 12 .
  • the main boom 34 includes a proximal end 36 (the end near the chassis 12 ) and a distal end 38 (the end far from the chassis 12 ).
  • the main boom 34 supports a main digger chain 40 , and at each side of the main boom 34 are auxiliary booms 42 , 44 that support auxiliary digger chains 46 , 48 .
  • the first auxiliary digger chain 46 and the second auxiliary digger chain 48 are both driven by the drive shaft assembly 50 , and the drive shaft assembly 50 is driven by the main digger chain 40 .
  • the main boom 34 is lowered into the ground surface while the digger chains 40 , 46 , 48 are typically rotating in a direction that cause the cut debris (dirt, stone, etc.) to be pulled into the trencher 10 and out via the conveyor system 32 .
  • the trencher is driven slowly in a forward direction such that the first end 14 is the front of the chassis 12 and the second end 16 is the rear of the chassis. This movement of the trencher 10 while the digger chains 40 , 46 , 48 are rotating creates a trench in the ground that generally matches the combined width of the digger chains 40 , 46 , 48 .
  • trenching systems do not include auxiliary booms and auxiliary digger chains.
  • the width of the trench is typically limited by the maximum width of the main digger chain.
  • the maximum width of the main digger chain is typically limited by the width of the boom head and chassis.
  • kits that can be used with an existing trencher to enable it to create much wider trenches.
  • the kit includes auxiliary boom(s), auxiliary digger chain(s), and an associated drive shaft system.
  • Another embodiment of the present disclosure provides digger chains with cutting elements thereon that channel the debris from the auxiliary digger chains into the path of the main digger chain to enable the main digger chain to feed the debris into the conveyor system.
  • Another embodiment of the present disclosure provides a trencher with a main boom as well as auxiliary booms, wherein the auxiliary booms are configured to automatically funnel the debris into the path of a main digger chain so that the debris can be efficiently and effectively removed from the trench.
  • a method of creating trenches of varying width is disclosed wherein auxiliary digger chains can be relatively quickly and easily connected to or removed from the trencher.
  • the auxiliary booms 42 , 44 include proximal ends 52 , 53 and distal ends 54 , 55 .
  • the proximal ends 52 , 53 of the auxiliary booms 42 , 44 are the ends of the booms that are closest to the chassis 12
  • the distal ends 54 , 55 of the auxiliary booms 42 , 44 are the ends of the booms that are farthest from the chassis 12 .
  • the auxiliary booms 42 , 44 include upper support surfaces 56 , 57 and lower support surfaces 58 , 59 .
  • the upper support surfaces 56 , 57 are the surfaces that support the auxiliary digger chains 46 , 48 as they rotate over the top of the auxiliary booms 42 , 44 .
  • the portion of the digger chains that are generally viewable in use (face upward) is referred to herein as the upper cut surface of the digger chains 46 , 48 . Therefore, the upper support surfaces 56 , 57 support the upper cut surfaces 60 , 61 of the digger chains.
  • the lower support surfaces 58 , 59 are the surfaces that support the lower cut surfaces 64 , 65 of the auxiliary digger chains 46 , 48 as the digger chains rotate over the face of the auxiliary support booms 42 , 44 that face the ground in use.
  • the upper and lower support surfaces 56 - 59 are generally hidden under the digger chains 46 , 48 when the digger chains are installed on the auxiliary booms 42 , 44 .
  • the auxiliary booms 42 , 44 include an idler gear 62 , 63 positioned at the proximal ends 52 , 53 .
  • the idler gear 62 , 63 of each of the auxiliary booms 42 , 44 facilitates the movement of the track around the booms.
  • the idler gear has a smaller diameter than the distance between the upper support surface 56 , 57 and the lower support surface 58 , 59 (i.e., the thickness or depth of the booms 42 , 44 ).
  • the idler gear 62 , 63 is positioned such that the pivot axis of the idler gear is above the center line between the upper and lower support surfaces 56 - 59 of the auxiliary booms ( FIG. 2 ).
  • This configuration results in the lower cut surface 64 ( FIG. 1 ) gradually retracting from the lower cut surface of the main digger chain 40 .
  • the proximal ends 52 , 53 of the lower support surface 58 , 59 are curved such that the auxiliary digger chains 46 , 48 gradually pull away from the plane of the lower cut surface of the main digger chain 40 .
  • the radius of curvature of the curve of the lower support surface 58 , 59 of the auxiliary boom 42 , 44 is greater than the thickness of the auxiliary booms 42 , 44 . This configuration facilitates the movement of debris cut by the auxiliary booms 42 , 44 into the path of the main digger chain 40 .
  • the idler gear 62 , 63 is positioned such that the upper cut surfaces 60 , 61 of the auxiliary digger chains 46 , 48 are generally in the same plane (i.e., parallel) to the upper cut surface 64 of the main digger chain 40 . It should be appreciated that many other configurations are also possible. For example, the axis of the idler gear could be positioned so that the upper cut surface 60 , 61 at the proximal ends 52 , 53 of the digger chains 46 , 48 extend above the upper cut surface 64 of the main digger chain 40 .
  • the auxiliary booms 42 , 44 include a modular configuration.
  • the auxiliary booms 42 , 44 each include three main sections including a first end section that supports the idler gear 62 , 63 located at the proximal end 52 , 53 , a second section at the distal end that is shaped to receive a portion of the drive shaft assembly 50 , and a third section positioned between the first section and the second section.
  • the second section includes a curved end portion that is configured to allow the upper and lower support surfaces 56 - 59 of the auxiliary booms 42 , 44 to transition smoothly with the drive gears of the drive shaft assembly 50 .
  • the third section can be removed and replaced with a different third section to adjust the length of the auxiliary boom 42 , 44 .
  • additional sections can be added between the first and second section to increase the length of the boom without removing the third section.
  • Alternative embodiments of the modular feature of the boom may be configured such that the first and second section attach directly to each other without a mid-section therebetween.
  • the auxiliary booms may not be modular. In other words, they may be of a fixed length that is not adjustable.
  • the digger chains 40 , 46 , 48 are described in greater detail.
  • the digger chains are shown as a series of linked together plates 100 with cutting elements 102 and dirt drags 104 attached thereto.
  • the configuration and arrangement of the cutting elements facilitate the transport of the debris from the path of the auxiliary digger chains 46 , 48 into the path of the main digger chain 40 .
  • FIG. 4 illustrates an embodiment of a pattern of teeth 102 and dirt drags 104 that direct cut debris into the path of the main digger chain 40 .
  • the dirt drags 104 are angle towards the main digger chain. Some of the dirt drags include a bent therein that that further funnels the debris towards the main digger chain, others are straight.
  • the main digger chain 40 includes two rows of teeth that come together at the center of the digger chain. Between the teeth are larger dirt drags 106 that pull debris into the inlet of the conveyor system 32 .
  • the teeth in the two rows come together at the proximal end 36 of the boom 34 and are spread apart at the distal end 38 of the boom 34 .
  • the teeth are arranged so that they are spaced apart along the cut surface of the digger chains.
  • the spacing between the tips of adjacent teeth is between 1 to 2 inches.
  • the spacing between the teeth on any one plate may be much greater (e.g., 10 inches).
  • the drive shaft arrangement 50 includes a bearing assembly 70 that is configured to attach to the distal end 38 of the main boom 34 and rotatably support a cylindrical shaft 72 .
  • the cylindrical shaft includes a center portion and two opposed end portions.
  • a driving gear assembly 74 is fixedly mounted to the center portion of the cylindrical shaft 72 , and driven gears 76 , 78 are fixedly mounted to the end portions of the shaft.
  • the driving gear assembly 74 is configured to engage the main digger chain 40 and transmit force to the auxiliary digger chains 46 , 48 which are configured to engage the driven gears 76 , 78 .
  • the driving gear assembly includes two ring gears connected to a spacer arrangement, and each driven gear includes a ring gear attached to a spacer.
  • the ring gears include the same diameter and number of teeth.
  • the bearing assembly 70 can include a different configuration.
  • the space between the driven gear 76 , 78 can be adjusted via spacer that enable the driven gears to either be mounted closer together or further apart. The driven gears are mounted further apart when the auxiliary booms are spaced away from the main boom.
  • the system includes mounting plates 80 that are attached to the side of the main boom 34 .
  • the mounting plates are configured to be aligned and engaged with structural features connected to the auxiliary booms 42 , 44 (e.g., post, bolts, pins, apertures).
  • plates 80 are configured so that the spaces between the main boom 34 and auxiliary booms 42 , 44 are adjustable.
  • the plates 80 can be attached to the auxiliary booms via bolts which are received in apertures on the plates 80 .
  • the depicted embodiment includes two mounting plates 80 that engagement plates 82 - 85 on the auxiliary booms 42 , 44 .
  • the mounting plates 80 include a pair of horizontally arranged shear stops that slidably engage a match set of shear stops on engagement plates 82 - 85 . It should be appreciated that many other configurations are also possible.
  • the method of connecting the auxiliary booms includes the step of aligning structural features of the side boom (auxiliary booms) with structural features of the main boom; for example, aligning posts on the auxiliary booms 42 , 44 with the apertures on the mounting plates 80 of the main boom 34 .
  • the system and method for connecting the auxiliary digger chains 46 , 48 to the auxiliary booms 42 , 44 is described.
  • the digger chains 46 , 48 are positioned around the auxiliary boom 42 , 44 such that they engage the driven gear 76 , 78 and the idler gear 62 , 63 .
  • the idler gear 62 , 63 is configured to be adjusted to apply tension to the digger chains 46 , 48 .
  • the idler gear 62 , 63 is mounted to the auxiliary boom via a tension mechanism 90 that allows the idler gear 62 , 63 to take up slack in the digger chains 46 , 48 .
  • the idler gear is connected to a mounting arm 92 .
  • the connecting arm 92 is fixed in the vertical direction relative to the auxiliary booms 42 , 44 , but free to slide in the horizontal direction (direction parallel to the length of the booms).
  • a cylinder 94 e.g., a hydraulic cylinder or spring is positioned and configured to normally bias the connecting arm 92 in the proximal direction (i.e., in an outward direction towards the chassis 12 ).
  • one end of the cylinder 94 engages the connecting arm, and the other end of the cylinder engages a stop block mechanism 96 .
  • the cylinder and stop block mechanism are used to apply tension to the chain while the bolts 98 are tightened.
  • the pressure in the cylinder is released after the bolts 98 are tightened. It should be appreciated that many other alternative tension mechanisms are also possible.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Earth Drilling (AREA)
  • Connection Of Plates (AREA)
  • Catching Or Destruction (AREA)

Abstract

The present disclosure provides a system and method of creating trenches of various widths, including widths that are substantially greater than the width of the boom head or even the chassis. According to the trencher system of the present disclosure, the boom is designed so that it can be easily configured to create a trench of a first width and subsequently create a trench of a second width that is different than the first width.

Description

    CROSS REFERENCE TO RELATED APPLICATIONS
  • This application claims priority to provisional application No. 61/047,052 filed Apr. 22, 2008, entitled Trencher Attachment, which is incorporated by reference in its entirety herein.
  • TECHNICAL FIELD
  • The present disclosure relates to trenchers and, more particularly, to a wide boom attachment for a trencher.
  • BACKGROUND
  • Trenchers capable of digging/cutting trenches have a variety of uses. For example, in construction, trenchers are often used to dig trenches for laying pipes or cables. There exist a number of different types of trenchers. One type of trencher includes a digger chain that rotates on a boom. The angle of the boom can be adjusted to control the depth of the cut. To cut the trench, the digger chain is rotated on the boom while the machine moves slowly in a direction away from the boom. The width of the chain defines the width of the trench. In most trenchers the width of the chain is limited by the width of the boom head and chassis. There exists some disclosures in the prior art relating to systems and methods for creating a wider trench than is traditionally possible. See, for example, U.S. Pat. No. 5,228,220 to Bryan, Jr. and U.S. Pat. No. 5,497,567 to Gilbert. However, there remains a need to provide an improved system and method of creating wide trenches.
  • SUMMARY
  • The present disclosure provides a system and method of creating trenches of various widths, including widths that are substantially greater than the width of the boom head and chassis width. According to the trencher system of the present disclosure, the boom is designed so that it can be easily configured to create a trench of a first width and subsequently create a trench of a second width that is different than the first width.
  • BRIEF DESCRIPTION OF THE FIGURES
  • FIG. 1 is a perspective view of a trencher according to the present disclosure;
  • FIG. 2 is a side view of the trencher of FIG. 1;
  • FIG. 3 is a front view of the trencher of FIG. 1;
  • FIG. 4 is a top view of an embodiment of cutting teeth and dirt drags on a chain assembly according to the present disclosure;
  • FIG. 5 is an end view of the embodiment shown in FIG. 4;
  • FIG. 6 is a front view of the trencher of FIG. 1 with the digger chains removed to show the main boom and auxiliary booms;
  • FIG. 7 is a top view of the trencher of FIG. 1 with the digger chains removed to show the main boom and auxiliary booms;
  • FIG. 8 is a top view of the main boom and auxiliary booms attached to the chassis of the trencher of FIG. 1;
  • FIG. 9 is a perspective view of a distal end of the main boom with one auxiliary boom removed;
  • FIG. 10 is a perspective view of the auxiliary boom of FIG. 1;
  • FIG. 11 is a perspective cross-sectional view of the auxiliary boom drive shaft;
  • FIG. 12 is a perspective view of a portion of the auxiliary boom showing a tension system on the auxiliary boom; and
  • FIG. 13 is a side cross-sectional view of a portion of the auxiliary boom shown in FIG. 12.
  • DETAILED DESCRIPTION
  • Referring to FIG. 1, a trencher according to the present disclosure is described. The trencher 10 includes a chassis 12 that includes a first end 14, a second end 16, a first side 22, and a second side 24. The chassis 12 is supported on a pair of tracks 18, 20 located at each side 22, 24 of the chassis. The chassis 12 is configured to support, among other things, an operator cab 26, engine 28, hydraulic motors 30, and a conveyor system 32. In the depicted embodiments the engine 28 is used to power hydraulic motors 30 that drive the tracks 18, 20, the conveyor system 32, as well as other trencher operations (e.g., boom position and digger chain rotation).
  • In the depicted embodiment, a main boom 34 is attached to the second end 16 of the chassis 12. The main boom 34 includes a proximal end 36 (the end near the chassis 12) and a distal end 38 (the end far from the chassis 12). The main boom 34 supports a main digger chain 40, and at each side of the main boom 34 are auxiliary booms 42, 44 that support auxiliary digger chains 46, 48. In the depicted embodiment, the first auxiliary digger chain 46 and the second auxiliary digger chain 48 are both driven by the drive shaft assembly 50, and the drive shaft assembly 50 is driven by the main digger chain 40. In use the main boom 34 is lowered into the ground surface while the digger chains 40, 46, 48 are typically rotating in a direction that cause the cut debris (dirt, stone, etc.) to be pulled into the trencher 10 and out via the conveyor system 32. Once the main boom 34 is lowered to the desired depth, the trencher is driven slowly in a forward direction such that the first end 14 is the front of the chassis 12 and the second end 16 is the rear of the chassis. This movement of the trencher 10 while the digger chains 40, 46, 48 are rotating creates a trench in the ground that generally matches the combined width of the digger chains 40, 46, 48.
  • Most prior art trenching systems do not include auxiliary booms and auxiliary digger chains. The width of the trench is typically limited by the maximum width of the main digger chain. In turn, the maximum width of the main digger chain is typically limited by the width of the boom head and chassis. The present disclosure provides systems and methods that overcome the above-identified trench width limitations.
  • One embodiment of the present disclosure provides a kit that can be used with an existing trencher to enable it to create much wider trenches. The kit includes auxiliary boom(s), auxiliary digger chain(s), and an associated drive shaft system. Another embodiment of the present disclosure provides digger chains with cutting elements thereon that channel the debris from the auxiliary digger chains into the path of the main digger chain to enable the main digger chain to feed the debris into the conveyor system. Another embodiment of the present disclosure provides a trencher with a main boom as well as auxiliary booms, wherein the auxiliary booms are configured to automatically funnel the debris into the path of a main digger chain so that the debris can be efficiently and effectively removed from the trench. In yet another embodiment a method of creating trenches of varying width is disclosed wherein auxiliary digger chains can be relatively quickly and easily connected to or removed from the trencher.
  • Referring to FIGS. 2, 6, 8 and 10, the auxiliary booms 42, 44 are described in greater detail. In the depicted embodiment the auxiliary booms 42, 44 include proximal ends 52, 53 and distal ends 54, 55. The proximal ends 52, 53 of the auxiliary booms 42, 44 are the ends of the booms that are closest to the chassis 12, and the distal ends 54, 55 of the auxiliary booms 42, 44 are the ends of the booms that are farthest from the chassis 12. In the depicted embodiment the auxiliary booms 42, 44 include upper support surfaces 56, 57 and lower support surfaces 58, 59. The upper support surfaces 56, 57 are the surfaces that support the auxiliary digger chains 46, 48 as they rotate over the top of the auxiliary booms 42, 44. The portion of the digger chains that are generally viewable in use (face upward) is referred to herein as the upper cut surface of the digger chains 46, 48. Therefore, the upper support surfaces 56, 57 support the upper cut surfaces 60, 61 of the digger chains. The lower support surfaces 58, 59 are the surfaces that support the lower cut surfaces 64, 65 of the auxiliary digger chains 46, 48 as the digger chains rotate over the face of the auxiliary support booms 42, 44 that face the ground in use. The upper and lower support surfaces 56-59 are generally hidden under the digger chains 46, 48 when the digger chains are installed on the auxiliary booms 42, 44.
  • In the depicted embodiment the auxiliary booms 42, 44 include an idler gear 62, 63 positioned at the proximal ends 52, 53. The idler gear 62, 63 of each of the auxiliary booms 42, 44 facilitates the movement of the track around the booms. In the depicted embodiment, the idler gear has a smaller diameter than the distance between the upper support surface 56, 57 and the lower support surface 58, 59 (i.e., the thickness or depth of the booms 42, 44). In one embodiment the idler gear 62, 63 is positioned such that the pivot axis of the idler gear is above the center line between the upper and lower support surfaces 56-59 of the auxiliary booms (FIG. 2). This configuration results in the lower cut surface 64 (FIG. 1) gradually retracting from the lower cut surface of the main digger chain 40. In the depicted embodiment the proximal ends 52, 53 of the lower support surface 58, 59 are curved such that the auxiliary digger chains 46, 48 gradually pull away from the plane of the lower cut surface of the main digger chain 40. In the depicted embodiment the radius of curvature of the curve of the lower support surface 58, 59 of the auxiliary boom 42, 44 is greater than the thickness of the auxiliary booms 42, 44. This configuration facilitates the movement of debris cut by the auxiliary booms 42, 44 into the path of the main digger chain 40.
  • In one embodiment the idler gear 62, 63 is positioned such that the upper cut surfaces 60, 61 of the auxiliary digger chains 46, 48 are generally in the same plane (i.e., parallel) to the upper cut surface 64 of the main digger chain 40. It should be appreciated that many other configurations are also possible. For example, the axis of the idler gear could be positioned so that the upper cut surface 60, 61 at the proximal ends 52, 53 of the digger chains 46, 48 extend above the upper cut surface 64 of the main digger chain 40.
  • In the depicted embodiment the auxiliary booms 42, 44 include a modular configuration. The auxiliary booms 42, 44 each include three main sections including a first end section that supports the idler gear 62, 63 located at the proximal end 52, 53, a second section at the distal end that is shaped to receive a portion of the drive shaft assembly 50, and a third section positioned between the first section and the second section. In the depicted embodiment the second section includes a curved end portion that is configured to allow the upper and lower support surfaces 56-59 of the auxiliary booms 42, 44 to transition smoothly with the drive gears of the drive shaft assembly 50. In the depicted embodiment the third section can be removed and replaced with a different third section to adjust the length of the auxiliary boom 42, 44. Alternatively, additional sections can be added between the first and second section to increase the length of the boom without removing the third section. Alternative embodiments of the modular feature of the boom may be configured such that the first and second section attach directly to each other without a mid-section therebetween. It should also be appreciated that in some alternative embodiments, the auxiliary booms may not be modular. In other words, they may be of a fixed length that is not adjustable.
  • Referring to FIGS. 3-5, the digger chains 40, 46, 48 are described in greater detail. In the depicted embodiment the digger chains are shown as a series of linked together plates 100 with cutting elements 102 and dirt drags 104 attached thereto. The configuration and arrangement of the cutting elements facilitate the transport of the debris from the path of the auxiliary digger chains 46, 48 into the path of the main digger chain 40.
  • In the depicted embodiment the cutting teeth 102 are configured and arranged on the auxiliary digger chains 46, 48 in a pattern that directs the debris cut by the auxiliary digger chains 46, 48 into the path of the main digger chain 40. FIG. 4 illustrates an embodiment of a pattern of teeth 102 and dirt drags 104 that direct cut debris into the path of the main digger chain 40. The dirt drags 104 are angle towards the main digger chain. Some of the dirt drags include a bent therein that that further funnels the debris towards the main digger chain, others are straight. The main digger chain 40 includes two rows of teeth that come together at the center of the digger chain. Between the teeth are larger dirt drags 106 that pull debris into the inlet of the conveyor system 32. In the depicted orientation the teeth in the two rows come together at the proximal end 36 of the boom 34 and are spread apart at the distal end 38 of the boom 34. Referring to FIG. 5, the teeth are arranged so that they are spaced apart along the cut surface of the digger chains. In the depicted embodiment, the spacing between the tips of adjacent teeth is between 1 to 2 inches. The spacing between the teeth on any one plate may be much greater (e.g., 10 inches).
  • Referring to FIGS. 6-9 and 11, the drive shaft arrangement 50 is described in greater detail. In the depicted embodiment, the drive shaft arrangement 50 includes a bearing assembly 70 that is configured to attach to the distal end 38 of the main boom 34 and rotatably support a cylindrical shaft 72. The cylindrical shaft includes a center portion and two opposed end portions. A driving gear assembly 74 is fixedly mounted to the center portion of the cylindrical shaft 72, and driven gears 76, 78 are fixedly mounted to the end portions of the shaft. The driving gear assembly 74 is configured to engage the main digger chain 40 and transmit force to the auxiliary digger chains 46, 48 which are configured to engage the driven gears 76, 78. In the depicted embodiment the driving gear assembly includes two ring gears connected to a spacer arrangement, and each driven gear includes a ring gear attached to a spacer. In the depicted embodiment the ring gears include the same diameter and number of teeth. It should be appreciated that in alternative embodiments, the bearing assembly 70 can include a different configuration. In the depicted embodiment the space between the driven gear 76, 78 can be adjusted via spacer that enable the driven gears to either be mounted closer together or further apart. The driven gears are mounted further apart when the auxiliary booms are spaced away from the main boom.
  • Referring to FIGS. 9 and 10, the system and method for attaching the auxiliary booms 42, 44 to the main boom 34 is described in greater detail. In the depicted embodiment the system includes mounting plates 80 that are attached to the side of the main boom 34. The mounting plates are configured to be aligned and engaged with structural features connected to the auxiliary booms 42, 44 (e.g., post, bolts, pins, apertures). In the depicted embodiment plates 80 are configured so that the spaces between the main boom 34 and auxiliary booms 42, 44 are adjustable. Spacing the auxiliary booms 42, 44 further from the main boom 34 enables wider digger chains to be mounted to the auxiliary booms 42, 44 or enable the same width digger chains to cooperatively dig a wider trench with larger spaces between the chains. The plates 80 can be attached to the auxiliary booms via bolts which are received in apertures on the plates 80. The depicted embodiment includes two mounting plates 80 that engagement plates 82-85 on the auxiliary booms 42, 44. In the depicted embodiment, the mounting plates 80 include a pair of horizontally arranged shear stops that slidably engage a match set of shear stops on engagement plates 82-85. It should be appreciated that many other configurations are also possible. The method of connecting the auxiliary booms includes the step of aligning structural features of the side boom (auxiliary booms) with structural features of the main boom; for example, aligning posts on the auxiliary booms 42, 44 with the apertures on the mounting plates 80 of the main boom 34.
  • Referring to FIGS. 12 and 13, the system and method for connecting the auxiliary digger chains 46, 48 to the auxiliary booms 42, 44 is described. In the depicted embodiment the digger chains 46, 48 are positioned around the auxiliary boom 42, 44 such that they engage the driven gear 76, 78 and the idler gear 62, 63. The idler gear 62, 63 is configured to be adjusted to apply tension to the digger chains 46, 48. In the depicted embodiment the idler gear 62, 63 is mounted to the auxiliary boom via a tension mechanism 90 that allows the idler gear 62, 63 to take up slack in the digger chains 46, 48. The idler gear is connected to a mounting arm 92. The connecting arm 92 is fixed in the vertical direction relative to the auxiliary booms 42, 44, but free to slide in the horizontal direction (direction parallel to the length of the booms). A cylinder 94 (e.g., a hydraulic cylinder) or spring is positioned and configured to normally bias the connecting arm 92 in the proximal direction (i.e., in an outward direction towards the chassis 12). In the depicted embodiment one end of the cylinder 94 engages the connecting arm, and the other end of the cylinder engages a stop block mechanism 96. In the depicted embodiment the cylinder and stop block mechanism are used to apply tension to the chain while the bolts 98 are tightened. In some embodiment, the pressure in the cylinder is released after the bolts 98 are tightened. It should be appreciated that many other alternative tension mechanisms are also possible.
  • The above specification, examples, and data provide a complete description of the manufacture and use of the composition of the invention. Since many embodiments of the invention can be made without departing from the spirit and scope of the invention, the invention resides in the claims hereinafter appended.

Claims (20)

1. A trencher comprising:
a chassis including a first side, second side, first end, and second end;
a pair of spaced apart trencher tracks at each side of the chassis;
a main boom positioned between the trencher tracks, the main boom including a first end and second end, wherein the first end of the boom is connected to the second end of the chassis;
a main digger chain positioned to rotate over the main boom;
a first auxiliary digger chain positioned adjacent a first side of the main digger chain;
a second auxiliary digger chain positioned adjacent a second side of the main digger chain;
wherein the first and second auxiliary digger chains are driven by the main digger chain.
2. The trencher of claim 1, wherein the second end of the main boom includes a drive shaft configured to receive torque from the main digger chain and transfer torque to the first and second auxiliary digger chains.
3. The trencher of claim 2, wherein the first and second auxiliary digger chains are configured and arranged so that cutting surfaces on the lower half of the digger chains are generally aligned with the cutting surface of the lower portion of the main digger chain.
4. The trencher of claim 3, wherein the first and second auxiliary digger chains are configured and arranged such that lower cutting surfaces on the upper portions of the digger chains are retracted relative to the adjacent cutting surface of the main digger chain.
5. The trencher of claim 1, further comprising a first auxiliary boom for supporting the first auxiliary digger chain, the first auxiliary boom being connected to the main boom via a side mounting plate.
6. The trencher of claim 1, wherein the main digger chain includes teeth arranged in two rows that are each angled with respect to an edge of the digger chain.
7. The trencher of claim 1, wherein the first and second auxiliary digger chains include teeth arranged in rows that are at an angle with respect to the edges of the auxiliary digger chains.
8. The trencher of claim 1, wherein the first and second auxiliary digger chains include two or less teeth per plate.
9. The trencher of claim 1, wherein the first and second auxiliary digger chains include dirt drags that overlap adjacent plates.
10. A trencher attachment comprising:
an auxiliary boom configured to be mounted to the mounting plate, the auxiliary boom configured to support an auxiliary digger chain;
a drive axis configured to be attached to a main boom of a trencher, the drive axis including center gears for engaging a main digger chain and side gears for engaging an auxiliary digger chain; and
a first mounting plate configured to be attached to interface between the main boom of a trencher and the auxiliary boom such that the auxiliary boom is aligned with the side gear for engaging the auxiliary digger chain.
11. The trencher attachment of claim 10, wherein the mounting plate is attached to the main boom and includes apertures for receiving bolts that extend from the auxiliary boom.
12. The trencher attachment of claim 10, further comprising an idler gear on an end of the auxiliary boom, wherein the idler gear is configured and arranged on the auxiliary boom to apply tension on an auxiliary digger chain.
13. The trencher attachment of claim 12, further comprising a tensioning mechanism including a plurality of bolts and a hydraulic cylinder.
14. The trencher attachment of claim 10, wherein the auxiliary boom is modular in that the length of the auxiliary boom can be adjusted by removing or adding support sections between the end portions of the auxiliary boom.
15. A method of trenching comprising:
connecting a drive shaft to a distal end of a main boom;
connecting an auxiliary boom to a side of the main boom such that a portion of the drive shaft extends across a portion of the auxiliary boom;
connecting a main digger chain to the main boom such that the main digger chain drives the drive shaft; and
connecting an auxiliary digger chain to the auxiliary boom such that the drive shaft drives the auxiliary digger chain.
16. The method of claim 15, wherein the proximal portions of the auxiliary boom include a pivot for engaging the auxiliary digger chain, and wherein the axis of the pivot is positioned closer to an upper cutting surface of the main digger chain than a lower cutting surface.
17. The method of claim 16, wherein the upper cutting surface of the auxiliary boom is parallel to the upper cutting surface of the main digger chain.
18. The method of claim 16, wherein the proximal end of the auxiliary boom has a curved profile that gradually guides the auxiliary digger chain away from the lower cutting surface of the main digger chain.
19. The method of claim 16, wherein the radius of curvature is greater than the distance between an upper and a lower cutting surface of the main digger chain.
20. The method of claim 17, wherein the teeth on the auxiliary digger chain are configured and arranged to direct cut debris into the path of the main digger chain.
US12/426,864 2008-04-22 2009-04-20 Trencher attachment Abandoned US20090260264A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US12/426,864 US20090260264A1 (en) 2008-04-22 2009-04-20 Trencher attachment
PCT/US2009/041284 WO2009132025A2 (en) 2008-04-22 2009-04-21 Trencher attachment

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US4705208P 2008-04-22 2008-04-22
US12/426,864 US20090260264A1 (en) 2008-04-22 2009-04-20 Trencher attachment

Publications (1)

Publication Number Publication Date
US20090260264A1 true US20090260264A1 (en) 2009-10-22

Family

ID=41199910

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/426,864 Abandoned US20090260264A1 (en) 2008-04-22 2009-04-20 Trencher attachment

Country Status (2)

Country Link
US (1) US20090260264A1 (en)
WO (1) WO2009132025A2 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100088931A1 (en) * 2008-10-09 2010-04-15 Time Machine, Inc. Trenching Chain
US8176662B2 (en) * 2010-06-17 2012-05-15 Larry William Peterson Digging system and method
NL2008177C2 (en) * 2012-01-25 2013-07-29 Sterk Cellar Murum B V DEVICE FOR DIGGING A SLOT.
CN103924971A (en) * 2014-05-05 2014-07-16 湖南科技大学 Chain coal cutter
EP3070206A1 (en) 2015-03-16 2016-09-21 Vermeer Manufacturing Company Wide-end trencher boom
JP6254670B1 (en) * 2016-12-28 2017-12-27 株式会社Kgフローテクノ Continuous wall excavator
US10156058B2 (en) * 2016-10-03 2018-12-18 Kobelco Construction Machinery Co., Ltd. Excavating apparatus and excavating method
US10190285B2 (en) * 2016-10-03 2019-01-29 Kobelco Construction Machinery Co., Ltd. Excavating apparatus, excavation blade plate and excavating method
CN110241872A (en) * 2014-01-31 2019-09-17 勒罗伊·G·哈根布赫 Toolbox with the cutting element freely rotated
JP2020066896A (en) * 2018-10-23 2020-04-30 日立建機株式会社 Work machine
WO2020115484A1 (en) * 2018-12-04 2020-06-11 Drillex Ltd Apparatus for boring and a method of boring
WO2020148632A1 (en) * 2019-01-14 2020-07-23 Lite Access Technologies Inc Trenching assembly with a conveyor system
US20210395974A1 (en) * 2018-10-29 2021-12-23 Mastenbroek Ltd Trenching apparatus and a method of trenching

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392465B (en) * 2011-10-27 2013-07-03 中国矿业大学 Multi-body discontinuous coal petrography cutting equipment
DE102019101305A1 (en) * 2019-01-18 2020-07-23 Liebherr-Werk Nenzing Gmbh Modular trench cutter

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1777439A (en) * 1921-10-17 1930-10-07 Austin Machinery Corp Trenching machine
US3050295A (en) * 1959-04-13 1962-08-21 Joy Mfg Co Mineral disintegrating head mechanism
US5228220A (en) * 1990-07-06 1993-07-20 Bryan Jr John F Bucket chain excavator
US5497567A (en) * 1994-05-19 1996-03-12 Gilbert; Jerry F. Wide trencher with plurality of chain type diggers

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1777439A (en) * 1921-10-17 1930-10-07 Austin Machinery Corp Trenching machine
US3050295A (en) * 1959-04-13 1962-08-21 Joy Mfg Co Mineral disintegrating head mechanism
US5228220A (en) * 1990-07-06 1993-07-20 Bryan Jr John F Bucket chain excavator
US5497567A (en) * 1994-05-19 1996-03-12 Gilbert; Jerry F. Wide trencher with plurality of chain type diggers

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100088931A1 (en) * 2008-10-09 2010-04-15 Time Machine, Inc. Trenching Chain
US8176662B2 (en) * 2010-06-17 2012-05-15 Larry William Peterson Digging system and method
NL2008177C2 (en) * 2012-01-25 2013-07-29 Sterk Cellar Murum B V DEVICE FOR DIGGING A SLOT.
EP2620553A1 (en) * 2012-01-25 2013-07-31 Sterk Cellar Murum B.V. Device for digging a trench
US8966790B2 (en) 2012-01-25 2015-03-03 Sterk Cellar Murum B.V. Device for digging a trench
CN110241872A (en) * 2014-01-31 2019-09-17 勒罗伊·G·哈根布赫 Toolbox with the cutting element freely rotated
CN103924971A (en) * 2014-05-05 2014-07-16 湖南科技大学 Chain coal cutter
US10407863B2 (en) 2015-03-16 2019-09-10 Vermeer Manufacturing Company Wide-end trencher boom
EP3070206A1 (en) 2015-03-16 2016-09-21 Vermeer Manufacturing Company Wide-end trencher boom
AU2016201565B2 (en) * 2015-03-16 2020-11-12 Vermeer Manufacturing Company Wide-End Trencher Boom
US10156058B2 (en) * 2016-10-03 2018-12-18 Kobelco Construction Machinery Co., Ltd. Excavating apparatus and excavating method
US10190285B2 (en) * 2016-10-03 2019-01-29 Kobelco Construction Machinery Co., Ltd. Excavating apparatus, excavation blade plate and excavating method
JP6254670B1 (en) * 2016-12-28 2017-12-27 株式会社Kgフローテクノ Continuous wall excavator
JP2020066896A (en) * 2018-10-23 2020-04-30 日立建機株式会社 Work machine
US20210395974A1 (en) * 2018-10-29 2021-12-23 Mastenbroek Ltd Trenching apparatus and a method of trenching
WO2020115484A1 (en) * 2018-12-04 2020-06-11 Drillex Ltd Apparatus for boring and a method of boring
WO2020148632A1 (en) * 2019-01-14 2020-07-23 Lite Access Technologies Inc Trenching assembly with a conveyor system

Also Published As

Publication number Publication date
WO2009132025A2 (en) 2009-10-29
WO2009132025A3 (en) 2009-12-17

Similar Documents

Publication Publication Date Title
US20090260264A1 (en) Trencher attachment
CA1132148A (en) Trench rock saw
CN101421464B (en) Auger for use with trenching assembly
CN106211904B (en) A kind of Chinese yam harvester
US7096609B2 (en) Trencher unit
US3849999A (en) Trailer type mole unit
US20060117611A1 (en) Excavating machine for rocky and other soils
US6349488B1 (en) Technical field
CN105986586B (en) Wide end trencher boom
US9739033B2 (en) Rotary ditcher attachment for an excavator
US6708430B2 (en) Trencher chain bar and safety guide
US10851651B2 (en) Mesh handling device for mining or tunnelling equipment
US7752780B2 (en) Hydraulic backhoe shift mechanism
CN102062917B (en) Optical cable laying device
EP1975322A2 (en) Cutting chain for a trencher
CA1238928A (en) Rock ditcher
CN201527506U (en) Optical cable layer
JP6447603B2 (en) Drilling device, drilling blade plate and drilling method
CN218952283U (en) Reliable fixed ditcher
CN215211214U (en) Sprocket drive grooving mechanism
EP2454418A2 (en) Shear resistant excavation component
CN202488984U (en) Multipurpose root crop harvester
JP2005307675A (en) Ground improving construction method and ground improving machine
CA2515897C (en) Underground cable or conduit installing apparatus and method
JP2016202004A (en) Digging machine of root crop such as yam

Legal Events

Date Code Title Description
AS Assignment

Owner name: VERMEER MANUFACTURING COMPANY, IOWA

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:COOPER, MARK;HAWKS, ROBERT DANIEL;CUTLER, EDWARD LEE;REEL/FRAME:022881/0234;SIGNING DATES FROM 20090529 TO 20090601

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION