EP3819436B1 - Panier gabion pour gabions à trois chambres - Google Patents

Panier gabion pour gabions à trois chambres Download PDF

Info

Publication number
EP3819436B1
EP3819436B1 EP20000367.1A EP20000367A EP3819436B1 EP 3819436 B1 EP3819436 B1 EP 3819436B1 EP 20000367 A EP20000367 A EP 20000367A EP 3819436 B1 EP3819436 B1 EP 3819436B1
Authority
EP
European Patent Office
Prior art keywords
grids
grid
gabion
partitioning
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP20000367.1A
Other languages
German (de)
English (en)
Other versions
EP3819436A1 (fr
Inventor
Wolfgang Deutschle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE202019004411.6U external-priority patent/DE202019004411U1/de
Application filed by Individual filed Critical Individual
Publication of EP3819436A1 publication Critical patent/EP3819436A1/fr
Application granted granted Critical
Publication of EP3819436B1 publication Critical patent/EP3819436B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0208Gabions

Definitions

  • the invention relates to a gabion basket for a three-chamber gabion, in particular for use as a soundproof gabion with a concrete core, the gabion basket forming three chambers, namely two outer chambers that can be filled with stones and a central chamber in between that can be filled with concrete to form a concrete core.
  • Gabions with a concrete core are already known. From the EP 2 466 011 A1 a three-chamber gabion with a concrete core is known, the two outer chambers of which are filled with stone material and the middle chamber is filled with a concrete core, the concrete core being either made separately and placed in the middle chamber or made by placing the concrete in the middle chamber so that the entire gabion with stone filling and concrete core can be manufactured in the factory.
  • the DE 10 2010 054 364 A1 a method in which in lined-up three-chamber gabions at the construction site, first a filling material is poured into the two outer gabion chambers, then a formwork is placed in the middle chamber and in-situ concrete is poured, and then the formwork is pulled out before the concrete sets and as required concrete is refilled. Then another layer of gabion baskets lined up next to each other is put on and proceed in the same way.
  • EP3214224A discloses a gabion basket having the features of the preamble of independent claim 1.
  • the object of the invention is to create a gabion basket for gabion walls with a continuous in-situ concrete core, which allows a clear advantage in terms of economy compared to the known methods.
  • the construction of the gabion basket according to the invention causes a stiffening of the gabion basket in such a way that bulging and deformation of the separating grids, which separate the middle chamber from the outer chambers, into the middle chamber under the weight and lateral pressure of the filling material located in the outer chambers is excluded is and otherwise a deformation of the gabion basket in the sense of an impairment of the middle chamber when lifting and transporting the gabion basket with factory-filled outer chambers does not take place.
  • the three-chamber gabion basket shown consists of a floor grid 1 and four side wall grids, namely two longitudinal side grids 2 and two narrow side grids 3, and two dividing grids 4.
  • the two dividing grids 4 run parallel to the longitudinal side grids 2 inside the basket at a mutual distance, so that they form a Center chamber MK and form an outer chamber AK between itself and the adjacent longitudinal side grid 2.
  • the two outer chambers AK are used to fill with stones or similar material, while the middle chamber MK is used to hold a concrete core.
  • the gabion basket also contains several support grids 5.
  • a cover grid 6 is also provided, which can be put on after the outer chambers AK have been filled and preferably has large grid openings in the area of the central chamber MK to allow fresh concrete to easily pass through to produce the concrete core.
  • figure 1 shows the gabion basket in a perspective view, with the cover grid omitted.
  • figure 2 shows the gabion basket in an exploded view, the cover grid 6 being shown but the support grids 5 being omitted.
  • the gabion basket according to the invention has the special feature that it is reinforced by a number of support grids 5 .
  • a support grid 5 is in 4 shown separately.
  • Such support grids 5 can, as shown in the exemplary embodiment, be installed with mutual spacing in a vertical orientation along the partition grid 4, i.e. along the length of the gabion basket in the exemplary embodiment, but they can alternatively also be arranged in a horizontal orientation with mutual spacing along the height of the gabion basket .
  • three such support grids 5 are arranged at equal mutual distances in the gabion basket.
  • these support grids 5 are relatively easy to see. But their arrangement is in particular in the plan view 3 and in cross section figure 4 recognizable.
  • FIG 5 shows a support grid 5 in the view as shown in the cross section of the gabion basket figure 4 is evident.
  • the support grid consists of two grid bars 51, which run parallel to the grid surfaces of the longitudinal side grids 2 and the dividing grid 4, and of a number of these crossing transverse bars 52, which extend over the entire width of the gabion basket.
  • the crossbars 52 are at their ends (in figure 5 not visible but in 3 clearly recognizable) bent into hooks, these hooks each encompassing a lattice bar of the respective longitudinal side lattice in the assembled state.
  • the bottom crossbar 52 runs directly above the floor grid, and the top crossbar 52 runs at the upper end of the gabion basket.
  • the two grid bars 51 run perpendicularly along the sides of the separating grid 4 that face the central chamber MK.
  • the support grids can be arranged horizontally, in which case the two grid rods 51 run in the longitudinal direction of the gabion basket along the sides of the partition grids 4 facing the central chamber MK and are connected to the narrow side grids 3 at their ends.
  • the separating grids 4 are each pushed from the outside onto the transverse rods 52 of the supporting grid 5 until they abut against the grid rods 51 .
  • the separating grids 4 run on the outside of the respective grid rod 51 facing one longitudinal side grid 2, so that these grid rods 51 serve as stops for the separating grids 4 and support them against a pressure generated by the filling of the outer chambers AK inward towards the interior of the middle chamber MK.
  • the support grids 5 and the partition grids 4 can also be fixed to one another.
  • the support grid 5 When the gabion basket is assembled, it is reinforced by the support grid 5 so that the outer chambers AK can be filled with filling material at the factory and the basket with the filled outer chambers can be lifted and transported.
  • the transverse rods 52 of the support grids 5 form tie rods which connect the two longitudinal side grids 2 to one another at numerous points and prevent them from bulging due to the pressure of the stone fillings in the outer chambers AK, and the grid rods 51 also support the separating grids 4 against the pressure of the filling material in the outer chambers AK, so that both the filled outer chambers AK stably have the same constant depth over their entire length and height, and the still unfilled central chamber MK has a constant, defined depth over its entire length and height, because the separating grids 4 supported by the grid rods 51 cannot bulge out into the middle chamber MK.
  • the separating grids 4 are connected both to the floor grid 1 and to the narrow side grids 3 by the grid bars being bent at their free ends into a hook and gripping a grid bar of the floor grid 1 and the narrow side grids 3 .
  • the narrow side grilles 3 and the longitudinal side grilles 2 can be connected to one another and to the bottom grille 1 in the same way.
  • lifting brackets 7 for lifting the gabion basket are arranged on the separating grids 4 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Claims (3)

  1. Panier à gabion pour un gabion à trois chambres, avec une grille de fond (1) et quatre grilles de paroi latérale (2, 3) et optionnellement une grille de recouvrement (6), dans lequel les grilles de paroi latérale (2, 3) sont reliées entre elles et avec la grille de fond (1) pour former un pourtour extérieur du panier à gabion, et avec deux grilles de séparation (4) arrangées de manière espacée entre elles à l'intérieur du panier à gabion, parallèlement à deux grilles de paroi latérale (2) parallèles, et reliées à la grille de fond (1) et aux deux grilles de paroi latérale (3) qui sont transversales aux grilles de séparation (4), afin de séparer l'intérieur du panier à gabion en deux chambres extérieures (AK) qui sont respectivement formées entre une grille de séparation (4) et une grille de paroi latérale (2) parallèle et arrangée à distance de celle-ci, et une chambre centrale formée entre les deux grilles de séparation (4) espacées,
    caractérisé en ce qu'il est prévu un nombre de grilles de support (5) respectivement ayant deux barres de grille (51) espacées et parallèles aux faces de grille des grilles de séparation (4) et des grilles de paroi latérale (2) parallèles à celles-ci et dont la distance correspond approximativement à la largeur libre de la chambre centrale (MK), et qui s'étendent de manière reposante sur le côté d'une des grilles de séparation (4) respective qui fait face à la chambre centrale (MK), et présentant un nombre de barres transversales (52) qui s'étendent sur toute l'extension du panier à gabion transversalement aux grilles de séparation (4) et à travers la chambre centrale (MK), et sont reliées, avec leurs extrémités, aux grilles de paroi latérale (2) qui sont parallèles aux grilles de séparation (4).
  2. Panier à gabion selon la revendication 1, dans lequel les grilles de support (5) sont arrangées en orientation verticale de manière espacée entre elles le long des grilles de séparation (4).
  3. Panier à gabion selon la revendication 1, dans lequel les grilles de support (5) sont arrangées en orientation horizontale de manière espacée entre elles le long de la hauteur du panier à gabion, et les extrémités des deux barres de grille (51) qui se déroulent le long des grilles de séparation (4) sont reliées aux grilles de séparation (3) qui sont transversales aux grilles de séparation (4).
EP20000367.1A 2019-10-25 2020-10-09 Panier gabion pour gabions à trois chambres Active EP3819436B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE202019004411.6U DE202019004411U1 (de) 2019-10-25 2019-10-25 Gabionenkorb für Dreikammer-Gabione
DE102019007637.0A DE102019007637A1 (de) 2019-10-25 2019-11-02 Gabionenkorb für Dreikammer-Gabione

Publications (2)

Publication Number Publication Date
EP3819436A1 EP3819436A1 (fr) 2021-05-12
EP3819436B1 true EP3819436B1 (fr) 2022-02-09

Family

ID=72840283

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20000367.1A Active EP3819436B1 (fr) 2019-10-25 2020-10-09 Panier gabion pour gabions à trois chambres

Country Status (1)

Country Link
EP (1) EP3819436B1 (fr)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010054364B4 (de) * 2010-12-13 2012-09-06 Rk Landschaftsbau Dittersdorf Gmbh Verfahren zum Errichten einer Gabionenwand

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002322629A (ja) * 2001-04-27 2002-11-08 Chikuho Kanaami Kogyo Kk フトン篭及びその施工法
DE102006051707A1 (de) 2006-10-30 2008-05-08 Christoph Kirschner Hochabsorbierende Gabionenwand
DE202011005024U1 (de) 2010-12-17 2011-09-15 Bauunternehmen Deutschle Gmbh & Co. Kg Gabione für Schallschutzwände
JP2013194496A (ja) * 2012-03-23 2013-09-30 Unitika Ltd 保形性袋体および土嚢
ES2683552T3 (es) * 2016-03-04 2018-09-26 Omya International Ag Gavión, muro acústico que comprende dicho gavión, y método de implementación de dicho gavión
CN209227558U (zh) * 2018-10-22 2019-08-09 北京工业大学 一种适于高陡岩质边坡生态恢复的格宾支护结构

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010054364B4 (de) * 2010-12-13 2012-09-06 Rk Landschaftsbau Dittersdorf Gmbh Verfahren zum Errichten einer Gabionenwand

Also Published As

Publication number Publication date
EP3819436A1 (fr) 2021-05-12

Similar Documents

Publication Publication Date Title
EP2075387B1 (fr) Module pour fabriquer des pièces en béton
DE60318634T2 (de) Schalung mit erhöhtem widerstand für betonwand
EP0658660A1 (fr) Elément de construction pour isolation thermique
DE102012217689A1 (de) Wandschalung und Wandschalungssystem
EP2798133B1 (fr) Panneau pour un système de coffrage de plafond et système de coffrage de plafond
EP2623435B1 (fr) Conteneur palette empilable
EP2716839B1 (fr) Elément de coffrage
DE202006013627U1 (de) Drahtkorb und aus Drahtkörben erstellte Lärmschutzwand
EP3819436B1 (fr) Panier gabion pour gabions à trois chambres
DE2102380C3 (de) Mehrgeschossiges Gebäude mit einer Tragkonstruktion und vorgefertigten Raumkästen
DE202017101111U1 (de) Porenbeton-Hybrid-Bauelement
DE102019007637A1 (de) Gabionenkorb für Dreikammer-Gabione
DE69312734T2 (de) Wandschallung
DE3210680C2 (fr)
DE102017100392A1 (de) Zum Aufbau einer Wand vorgesehene Gabione sowie Absturzsicherung
DE10103080B4 (de) Schalungsstein
EP3299524B1 (fr) Mur en elements prefabriques et son procede de fabrication
EP0267146B1 (fr) Cage d'armature
DE2219202A1 (de) Verfahren zum herstellen von mehrgeschossigen bauten aus raumzellen
DE2061544B2 (de) Verfahren zum errichten mehrstoeckiger gebaeude unter verwendung von vorgefertigten raumzellen
DE202017106103U1 (de) Drahtkorb und Schutzwand gegen Lärm und/oder Hochwasser
DE1920414A1 (de) Verfahren zur Herstellung einer Bauplatte aus bewehrtem Beton
EP2009183B1 (fr) Elément de coffrage
DE8019562U1 (de) Vorgefertigtes wandbauelement mit hoher waerme- und schalldaemmwirkung
DE2116587C3 (de) Verfahren zum Herstellen von Matratzen aus Drahtgewebe zum Abdecken von erosionsgefährdeten Oberflächen und nach dem Verfahren vorgefertigtes Halbfabrikat zur Ausführung des Verfahrens an Ort und Stelle

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

17P Request for examination filed

Effective date: 20210414

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 29/02 20060101AFI20211008BHEP

INTG Intention to grant announced

Effective date: 20211026

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1467586

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220215

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502020000611

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220609

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220509

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220510

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220609

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502020000611

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20221110

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 502020000611

Country of ref document: DE

Representative=s name: FLEUCHAUS & GALLO PARTNERSCHAFT MBB - PATENT- , DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 502020000611

Country of ref document: DE

Representative=s name: FLEUCHAUS & GALLO PARTNERSCHAFT MBB PATENTANWA, DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221009

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20231023

Year of fee payment: 4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20231023

Year of fee payment: 4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20231023

Year of fee payment: 4

Ref country code: DE

Payment date: 20231012

Year of fee payment: 4

Ref country code: CH

Payment date: 20231102

Year of fee payment: 4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20231023

Year of fee payment: 4

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220209