EP3770295B1 - Manufacturing method for hot stamping component having aluminium-silicon alloy coating - Google Patents
Manufacturing method for hot stamping component having aluminium-silicon alloy coating Download PDFInfo
- Publication number
- EP3770295B1 EP3770295B1 EP19847997.4A EP19847997A EP3770295B1 EP 3770295 B1 EP3770295 B1 EP 3770295B1 EP 19847997 A EP19847997 A EP 19847997A EP 3770295 B1 EP3770295 B1 EP 3770295B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- heating
- aluminum
- silicon alloy
- alloy coating
- temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011248 coating agent Substances 0.000 title claims description 110
- 238000000576 coating method Methods 0.000 title claims description 110
- 238000004519 manufacturing process Methods 0.000 title claims description 18
- 229910000789 Aluminium-silicon alloy Inorganic materials 0.000 title 1
- 238000010438 heat treatment Methods 0.000 claims description 141
- CSDREXVUYHZDNP-UHFFFAOYSA-N alumanylidynesilicon Chemical compound [Al].[Si] CSDREXVUYHZDNP-UHFFFAOYSA-N 0.000 claims description 77
- 229910000676 Si alloy Inorganic materials 0.000 claims description 72
- 238000000034 method Methods 0.000 claims description 33
- 229910000831 Steel Inorganic materials 0.000 claims description 31
- 239000010959 steel Substances 0.000 claims description 31
- 239000000758 substrate Substances 0.000 claims description 24
- 239000000203 mixture Substances 0.000 claims description 15
- 239000012535 impurity Substances 0.000 claims description 13
- 229910052782 aluminium Inorganic materials 0.000 claims description 11
- PCTMTFRHKVHKIS-BMFZQQSSSA-N (1s,3r,4e,6e,8e,10e,12e,14e,16e,18s,19r,20r,21s,25r,27r,30r,31r,33s,35r,37s,38r)-3-[(2r,3s,4s,5s,6r)-4-amino-3,5-dihydroxy-6-methyloxan-2-yl]oxy-19,25,27,30,31,33,35,37-octahydroxy-18,20,21-trimethyl-23-oxo-22,39-dioxabicyclo[33.3.1]nonatriaconta-4,6,8,10 Chemical compound C1C=C2C[C@@H](OS(O)(=O)=O)CC[C@]2(C)[C@@H]2[C@@H]1[C@@H]1CC[C@H]([C@H](C)CCCC(C)C)[C@@]1(C)CC2.O[C@H]1[C@@H](N)[C@H](O)[C@@H](C)O[C@H]1O[C@H]1/C=C/C=C/C=C/C=C/C=C/C=C/C=C/[C@H](C)[C@@H](O)[C@@H](C)[C@H](C)OC(=O)C[C@H](O)C[C@H](O)CC[C@@H](O)[C@H](O)C[C@H](O)C[C@](O)(C[C@H](O)[C@H]2C(O)=O)O[C@H]2C1 PCTMTFRHKVHKIS-BMFZQQSSSA-N 0.000 claims description 5
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 claims description 2
- 238000001816 cooling Methods 0.000 claims description 2
- 238000003754 machining Methods 0.000 claims description 2
- 229910052760 oxygen Inorganic materials 0.000 claims description 2
- 239000001301 oxygen Substances 0.000 claims description 2
- 229910052710 silicon Inorganic materials 0.000 claims description 2
- 229910052717 sulfur Inorganic materials 0.000 claims description 2
- 239000010410 layer Substances 0.000 description 30
- 238000009792 diffusion process Methods 0.000 description 23
- 238000007747 plating Methods 0.000 description 18
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 9
- 238000003466 welding Methods 0.000 description 9
- 229910045601 alloy Inorganic materials 0.000 description 7
- 239000000956 alloy Substances 0.000 description 7
- 238000002844 melting Methods 0.000 description 6
- 230000008018 melting Effects 0.000 description 6
- 230000000052 comparative effect Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000024121 nodulation Effects 0.000 description 4
- 238000005275 alloying Methods 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 229910000734 martensite Inorganic materials 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000000155 melt Substances 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910018125 Al-Si Inorganic materials 0.000 description 1
- 229910021364 Al-Si alloy Inorganic materials 0.000 description 1
- 229910018520 Al—Si Inorganic materials 0.000 description 1
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 1
- 229910001563 bainite Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000008199 coating composition Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052739 hydrogen Inorganic materials 0.000 description 1
- 239000001257 hydrogen Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000010791 quenching Methods 0.000 description 1
- 230000000171 quenching effect Effects 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 230000003746 surface roughness Effects 0.000 description 1
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C2/00—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
- C23C2/04—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
- C23C2/12—Aluminium or alloys based thereon
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D22/00—Shaping without cutting, by stamping, spinning, or deep-drawing
- B21D22/02—Stamping using rigid devices or tools
- B21D22/022—Stamping using rigid devices or tools by heating the blank or stamping associated with heat treatment
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/0081—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for slabs; for billets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D22/00—Shaping without cutting, by stamping, spinning, or deep-drawing
- B21D22/02—Stamping using rigid devices or tools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D37/00—Tools as parts of machines covered by this subclass
- B21D37/16—Heating or cooling
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/18—Hardening; Quenching with or without subsequent tempering
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/62—Quenching devices
- C21D1/673—Quenching devices for die quenching
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/74—Methods of treatment in inert gas, controlled atmosphere, vacuum or pulverulent material
- C21D1/76—Adjusting the composition of the atmosphere
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D11/00—Process control or regulation for heat treatments
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D6/00—Heat treatment of ferrous alloys
- C21D6/005—Heat treatment of ferrous alloys containing Mn
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D7/00—Modifying the physical properties of iron or steel by deformation
- C21D7/13—Modifying the physical properties of iron or steel by deformation by hot working
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/46—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for sheet metals
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/46—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for sheet metals
- C21D9/48—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for sheet metals deep-drawing sheets
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/02—Ferrous alloys, e.g. steel alloys containing silicon
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/04—Ferrous alloys, e.g. steel alloys containing manganese
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/06—Ferrous alloys, e.g. steel alloys containing aluminium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/28—Ferrous alloys, e.g. steel alloys containing chromium with titanium or zirconium
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C2/00—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
- C23C2/26—After-treatment
- C23C2/28—Thermal after-treatment, e.g. treatment in oil bath
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C2/00—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
- C23C2/34—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the shape of the material to be treated
- C23C2/36—Elongated material
- C23C2/40—Plates; Strips
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C28/00—Coating for obtaining at least two superposed coatings either by methods not provided for in a single one of groups C23C2/00 - C23C26/00 or by combinations of methods provided for in subclasses C23C and C25C or C25D
- C23C28/02—Coating for obtaining at least two superposed coatings either by methods not provided for in a single one of groups C23C2/00 - C23C26/00 or by combinations of methods provided for in subclasses C23C and C25C or C25D only coatings only including layers of metallic material
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C28/00—Coating for obtaining at least two superposed coatings either by methods not provided for in a single one of groups C23C2/00 - C23C26/00 or by combinations of methods provided for in subclasses C23C and C25C or C25D
- C23C28/02—Coating for obtaining at least two superposed coatings either by methods not provided for in a single one of groups C23C2/00 - C23C26/00 or by combinations of methods provided for in subclasses C23C and C25C or C25D only coatings only including layers of metallic material
- C23C28/021—Coating for obtaining at least two superposed coatings either by methods not provided for in a single one of groups C23C2/00 - C23C26/00 or by combinations of methods provided for in subclasses C23C and C25C or C25D only coatings only including layers of metallic material including at least one metal alloy layer
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C21/00—Alloys based on aluminium
- C22C21/02—Alloys based on aluminium with silicon as the next major constituent
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/32—Ferrous alloys, e.g. steel alloys containing chromium with boron
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/38—Ferrous alloys, e.g. steel alloys containing chromium with more than 1.5% by weight of manganese
Definitions
- the present invention relates to manufacturing technology of hot stamping components, in particular to a manufacturing method of a hot stamping component having an aluminum-silicon alloy coating and a hot stamping component.
- Chinese patent CN101583486B discloses a method of coated stamping products, including the temperature and time of stamping, wherein the heating rate from room temperature to 700 °C is 4-12 °C/s, which aims at ensuring the spot welding performance of stamping components.
- Chinese patent CN102300707B further discloses a heating method of coated hot stamping components, specifically discloses the heating rate under melting temperature, the holding time under austenitizing temperature, etc.
- this heating method still could not solve the problem of adhesion to the roller and nodulation by aluminum-silicon coating, which causes problems such as the decrease in service life of heat treatment furnace roller and peeling of coating of hot stamping components.
- US 2011/056594 A1 discloses a process for producing a component from a steel product coated with a protective Al-Si coating.
- the purpose of the present invention is to provide a manufacturing method of a hot stamping component having an aluminum-silicon alloy coating and a hot stamping component, which can not only effectively solve the problem of adhesion to the roller by aluminum-silicon coating, reduce the nodulation probability of the heat treatment furnace roller and improve the service life of the roller, but can also ensure the integrity of the coating of the hot stamping component and the mechanical properties, welding performance, coating performance and corrosion resistance of the component.
- the present invention relates to a manufacturing method of a hot stamping component having an aluminum-silicon alloy coating, comprising the following steps: machining a steel plate coated with an aluminum-silicon alloy coating into a blank having a shape required for a part; conducting heat treatment and hot stamping of the blank; wherein, in the heat treatment of the blank, the blank is put into a heat treatment furnace for austenitizing heat treatment, and the heat treatment process of the blank comprises a first heating and holding stage, a second heating and holding stage, and a third heating and holding stage; and wherein:
- the temperature increases stepwise in the order of the first, second, and third heating and holding stages or the temperatures in the first, second, and third heating and holding stages are set to be certain temperatures.
- the heat treatment process can be as follows: the temperature and time of the first heating and holding stage are 800 °C and 60 s, respectively; and the temperature and time of the second heating and holding stage are 930 °C and 120 s, respectively; and the temperature and time of the third heating and holding stage are 940 °C and 60 s, respectively.
- the heat treatment process can also be as follows: multiple temperatures, for example 770 °C for 40 s, 820 °C for 30 s and 770 °C for 50 s are set in the first heating and holding stage; and multiple temperatures, for example 900 °C for 60 s and 930 °C for 60 s are set in the second heating and holding stage; and multiple temperatures, for example 935 °C for 60 s and 940 °C for 60 s are set in the third heating and holding stage.
- the time of the heat treatment process of the blank is not less than 150 s and not more than 600 s. Within this time range, the blank after heat treatment has high surface quality, good coating performance, and good welding performance.
- a heat treatment furnace is used in the heat treatment process of the blank.
- the oxygen content in the furnace's atmosphere is not less than 15% and the dew point in the furnace is not higher than -5 °C.
- the final hot stamping component has a low hydrogen content and an excellent resistance to delayed cracking.
- the heat-treated blank is quickly transferred to a mold for stamping, the transfer time is 4-12 seconds, and the blank is in a temperature of not lower than 600°C before being fed into the mold; the mold is cooled before stamping to ensure that the surface temperature of the mold before stamping is lower than 100 °C, and the cooling rate of the blank is greater than 30 °C/s.
- the microstructure of the hot stamping component obtained through the above process is mainly martensite or bainite, and the hot stamping component has excellent mechanical properties and meets the requirements for use.
- the steel plate coated with an aluminum-silicon alloy coating comprises a substrate and an aluminum-silicon alloy coating on at least one surface of the substrate, and the substrate comprises the following composition in percentage by weight: C: 0.04-0.8%, Si ⁇ 1.2%, Mn: 0.1-5%, P ⁇ 0.3%, S ⁇ 0.1%, Al ⁇ 0.3%, Ti ⁇ 0.5%, B ⁇ 0.1%, Cr ⁇ 3% and the rest being Fe and inevitable impurities.
- the aluminum-silicon alloy coating comprises the following composition in percentage by weight: Si: 4-14%, Fe: 0-4%, and the balance being Al and inevitable impurities.
- the average weight of the aluminum-silicon alloy coating is 58-105 g/m 2 on one side; more preferably, the average weight of the aluminum-silicon alloy coating is 72-88 g/m 2 on one side.
- the final hot stamping component has a uniform appearance and color (no color difference), good coating performance, and good welding performance.
- the aluminum-silicon alloy coating of the hot stamping component obtained by the manufacturing method of the present invention comprises a surface alloy layer and a diffusion layer, and the ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.08-0.5.
- the final hot stamping component has uniform appearance and color, good coating performance and good welding performance.
- the aluminum-silicon alloy coating comprises two layers, the one that is in contact with the substrate is a diffusion layer.
- Al in the aluminum-silicon alloy coating and Fe of the substrate further diffuse to form the diffusion layer.
- Al in the aluminum-silicon alloy coating and Fe of the substrate are alloyed to form a surface alloy layer.
- the ratio of the thickness of the diffusion layer to the total thickness of the aluminum-silicon alloy coating is 0.08-0.5.
- the hot stamping component formed with the method of the present invention has a yield strength of 400-1300 MPa, a tensile strength of 500-2000 MPa, and an elongation of 4% or more.
- the elongation of the hot stamping component according to the present invention is 4 to 20%.
- the hot stamping component no coating peels off, the surface roughness meets the requirements, and the ratio of the thickness of the diffusion layer to the thickness of the coating is between 0.08 and 0.5.
- the coating film is complete and the coating film adhesion is evaluated as grade 0 or higher.
- the thickness of the diffusion layer and the thickness of the coating meet the requirements, the ratio of the thickness of the diffusion layer to the thickness of the coating is between 0.08 and 0.5, and the spot welding performance is excellent with all the spot welding range being 2KA or above.
- the coating on the hot stamping component can well meet the diffusion of the coating and the austenitization of the substrate, and the melting and adhesion to the roller of the coating can be avoided, thereby obtaining the hot stamping component with good coating performance and substrate performance.
- the melting point of Al-Si alloy of the aluminum-silicon alloy coating is between 580 and 600 °C
- the austenitizing temperature of the steel plate is 840 °C or above
- the aluminum-silicon alloy coating will melt during the heat treatment process, and adhere to the furnace roller.
- Al in the coating and Fe of the substrate will diffuse to form an Fe-Al alloy which has a strong heat resistance and a high melting temperature, and will not cause adhesion to the furnace roller.
- the melting of the aluminum-silicon alloy coating, the adhesion of the coating to the heat treatment furnace roller and the nodulation of the furnace roller are avoided as much as possible.
- the production cycle time by ensuring the coating to reach an appropriate alloying degree, obtaining a suitable thickness of the coating and of the diffusion layer, and the surface quality of the coating, the welding performance and coating performance of the component are guaranteed.
- the beneficial effects of the present invention are as follows: By designing the heat treatment process of the blank, the adhesion of the aluminum-silicon alloy coating to the heat treatment furnace roller is reduced, the occurrence rate of nodulation of the heat treatment furnace roller is reduced, and the maintenance cycle and service life of the roller are extended.
- the heat treatment process of the blank according to the present invention can improve the surface quality of the stamping component and prevent the coating from peeling off during the heat treatment process.
- the heat treatment process of the blank according to present invention adopts a stepwise heating mode, fully considers the characteristics of the aluminum-silicon alloy coating, and appropriately adjusts the temperature and time according to the thickness of the blank, so that the energy can be effectively used and a good energy saving effect is achieved.
- Table 1 shows the compositions of the substrates of the steel plates in Examples of the present invention
- Table 2 shows the manufacturing processes and properties of the hot stamping components in Examples of the present invention. Examples 4 and 8 are not according to the present invention.
- a substrate with a thickness of 1.2 mm was subjected to hot dip aluminum plating at 650 °C, the composition of the plating bath is 8% of Si and 2.3% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape.
- the blank was subjected to a heat treatment, and the specific parameters of the heat treatment are shown in Table 2.
- the appearance of the obtained hot stamping component is shown in Figure 2 .
- the cross-sectional microstructure of the aluminum-silicon alloy coating is shown in Figure 3 .
- the aluminum-silicon alloy coating comprises a surface alloy layer and a diffusion layer, and the ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.25.
- a substrate with a thickness of 0.9 mm was subjected to hot dip aluminum plating at 660 °C, the composition of the plating bath is 9% of Si and 2.5% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape. The blank was subjected to a heat treatment, and the specific parameters of the heat treatment are shown in Table 2. The ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.3.
- a substrate with a thickness of 1.0 mm was subjected to hot dip aluminum plating at 660 °C, the composition of the plating bath is 8.5% of Si and 2.5% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape. The blank was subjected to a heat treatment. The ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.15.
- a substrate with a thickness of 1.1 mm was subjected to hot dip aluminum plating at 680 °C, the composition of the plating bath is 9.5% of Si and 2.5% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape. The blank was subjected to a heat treatment. The ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.28.
- a substrate with a thickness of 1.2 mm was subjected to hot dip aluminum plating at 680 °C, the composition of the plating bath is 8.8% of Si and 2.4% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape. The blank was subjected to a heat treatment. The ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.35.
- a substrate with a thickness of 1.5 mm was subjected to hot dip aluminum plating at 680 °C, the composition of the plating bath is 8.8% of Si and 2.4% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape. The blank was subjected to a heat treatment. The ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.35.
- a substrate with a thickness of 1.6 mm was subjected to hot dip aluminum plating at 680 °C, the composition of the plating bath is 8.8% of Si and 2.4% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape. The blank was subjected to a heat treatment.
- the ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.3.
- a substrate with a thickness of 1.8 mm was subjected to hot dip aluminum plating at 680 °C, the composition of the plating bath is 8.8% of Si and 2.4% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape. The blank was subjected to a heat treatment. The ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.35.
- a substrate with a thickness of 2.0 mm was subjected to hot dip aluminum plating at 680 °C, the composition of the plating bath is 8.8% of Si and 2.4% of Fe, with the rest being Al and inevitable impurities.
- the steel plate coated with the aluminum-silicon alloy coating was continuously blanked into a blank with a certain shape. The blank was subjected to a heat treatment. The ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is 0.4.
- Table 1 Composition of the substrate of the steel in percentage by weight (wt %) Examples C Si Mn P S Al Ti B Cr 1 0.22 0.10 2.90 0.059 0.038 0.09 0.090 0.031 0.150 2 0.10 0.02 0.8 0.018 0.007 0.08 0.001 0.001 0.003 3 0.20 0.23 1.19 0.015 0.040 0.08 0.027 0.005 0.200 4 0.39 0.36 3.00 0.044 0.030 0.07 0.050 0.006 0.300 5 0.08 0.05 0.70 0.02 0.010 0.05 0.002 0.220 6 0.25 0.40 2.30 0.059 0.038 0.09 0.090 0.031 0.150 7 0.12 0.20 0.90 0.018 0.007 0.08 0.001 0.001 0.003 8 0.30 0.30 1.70 0.015 0.040 0.08 0.027 0.005 0.200 9 0.50 0.36 3.00 0.044 0.030 0.07 0.050 0.006 0.300 Comparative Example 0.22 0.10 2.90 0.059 0.038 0.09
- Figure 1 shows the surface of the hot stamping component in Comparative Example.
- the aluminum-silicon coating surface melts, which causes the coating to adhere to the roller.
- Figure 2 shows the surface of the hot stamping component in Example 1 of the present invention.
- the aluminum-silicon alloy coating surface shows no sign of melting, and the alloying is sufficient.
- Figure 3 is a cross-sectional view of the coating of the hot stamping component in Example 1 of the present invention. It can be seen from the Figure that the aluminum-silicon alloy coating comprises two layers, i.e. a surface alloy layer and a diffusion layer. The ratio of the thickness of the diffusion layer to the thickness of the aluminum-silicon alloy coating is about 0.25.
- the substrate mainly consists of martensite.
- Figure 4 shows the ranges of the first, the second and the third heating and holding stages when the thickness of the steel plate coated with an aluminum-silicon alloy coating according to the present invention is less than 1.5 mm.
- the temperature and time of heating and holding in the first heating and holding stage lie within a graph ABCD
- the temperature and time of heating and holding in the second heating and holding stage lie within a graph EFGH
- the temperature and time of heating and holding in the third heating and holding stage lie within a graph IJKL.
- Figure 5 shows the ranges of the first, the second and the third heating and holding stages when the thickness of the steel plate coated with an aluminum-silicon alloy coating according to the present invention is 1.5 mm or more.
- the temperature and time of heating and holding in the first heating and holding stage lie within a graph A'B'C'D'
- the temperature and time of heating and holding in the second heating and holding stage lie within a graph E'F'G'H'
- the temperature and time of heating and holding in the third heating and holding stage lie within a graph I'J'K'L'.
- Figure 6 is a schematic diagram of the temperature and time ranges of heating and holding in the first and the third heating and holding stages of the heat treatment process (two-stage heating and holding) of the blank not according to the present invention, the heating and holding time in the second heating and holding stage is zero, which forms a two-stage heating and holding.
- the temperature and time of heating and holding in the first heating and holding stage lie within a graph abcd
- the temperature and time of heating and holding in the third heating and holding stage lie within a graph ijkl.
- the temperature and time of heating and holding in the first heating and holding section lie within a graph a'b'c'd'
- the temperature and time of heating and holding in the third heating and holding stage lie within a graph i'j'k'l'.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Organic Chemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Thermal Sciences (AREA)
- Physics & Mathematics (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Crystallography & Structural Chemistry (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Coating With Molten Metal (AREA)
- Heat Treatment Of Articles (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810896744 | 2018-08-08 | ||
CN201811035118.2A CN109518114A (zh) | 2018-08-08 | 2018-09-06 | 带铝硅合金镀层的热冲压部件的制造方法及热冲压部件 |
PCT/CN2019/104708 WO2020030200A1 (zh) | 2018-08-08 | 2019-09-06 | 带铝硅合金镀层的热冲压部件的制造方法及热冲压部件 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3770295A1 EP3770295A1 (en) | 2021-01-27 |
EP3770295A4 EP3770295A4 (en) | 2022-03-09 |
EP3770295B1 true EP3770295B1 (en) | 2023-08-16 |
Family
ID=65770861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19847997.4A Active EP3770295B1 (en) | 2018-08-08 | 2019-09-06 | Manufacturing method for hot stamping component having aluminium-silicon alloy coating |
Country Status (11)
Country | Link |
---|---|
US (1) | US20210252579A1 (da) |
EP (1) | EP3770295B1 (da) |
CN (2) | CN109518114A (da) |
DK (1) | DK3770295T3 (da) |
ES (1) | ES2962214T3 (da) |
FI (1) | FI3770295T3 (da) |
HU (1) | HUE063894T2 (da) |
PL (1) | PL3770295T3 (da) |
PT (1) | PT3770295T (da) |
RU (1) | RU2764729C1 (da) |
WO (1) | WO2020030200A1 (da) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518114A (zh) * | 2018-08-08 | 2019-03-26 | 宝山钢铁股份有限公司 | 带铝硅合金镀层的热冲压部件的制造方法及热冲压部件 |
CN112877590A (zh) * | 2019-11-29 | 2021-06-01 | 宝山钢铁股份有限公司 | 一种性能优异的带涂层热成形部件及其制造方法 |
CN112877592B (zh) * | 2019-11-29 | 2022-06-28 | 宝山钢铁股份有限公司 | 具有优异漆膜附着力的热成形部件及其制造方法 |
DE202019107269U1 (de) * | 2019-12-30 | 2020-01-23 | C4 Laser Technology GmbH | Verschleiß- und Korrosionsschutzschicht aufweisende Bremseinheit |
CN111647802B (zh) * | 2020-05-11 | 2021-10-22 | 首钢集团有限公司 | 一种涂覆铝硅合金镀层的热冲压构件的制备方法及其产品 |
KR102240850B1 (ko) * | 2020-07-10 | 2021-04-16 | 주식회사 포스코 | 생산성, 용접성 및 성형성이 우수한 열간 프레스 성형 부재의 제조 방법 |
CN114807739A (zh) | 2021-01-28 | 2022-07-29 | 宝山钢铁股份有限公司 | 一种镀铝钢板、热成形部件及制造方法 |
CN115673074A (zh) * | 2021-07-28 | 2023-02-03 | 宝山钢铁股份有限公司 | 一种1500MPa以上的铝硅镀层热冲压钢零件制备方法及零件 |
CN113814654A (zh) * | 2021-08-20 | 2021-12-21 | 首钢集团有限公司 | 一种使用含铝镀层热成形板制备热成形零件的方法 |
CN116000169A (zh) * | 2021-10-21 | 2023-04-25 | 香港大学 | 一种用于预涂覆钢板的热冲压成形方法 |
CN116851528A (zh) * | 2022-03-28 | 2023-10-10 | 宝山钢铁股份有限公司 | 用于生产高冷弯性能的高强度热冲压部件的方法、热冲压部件 |
CN115156845A (zh) * | 2022-06-16 | 2022-10-11 | 唐山钢铁集团高强汽车板有限公司 | 一种防止镀层粘辊的镀锌热成形钢生产方法 |
CN116219271B (zh) * | 2022-07-22 | 2024-01-09 | 宝山钢铁股份有限公司 | 一种铝硅镀层钢板、热成形部件及其制造方法 |
CN115318912A (zh) * | 2022-07-28 | 2022-11-11 | 苏州普热斯勒先进成型技术有限公司 | 热冲压成型零件的制备装置及方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1642991A1 (en) | 2003-05-28 | 2006-04-05 | Sumitomo Metal Industries, Ltd. | Method for hot forming and hot formed member |
WO2008053273A1 (en) | 2006-10-30 | 2008-05-08 | Arcelormittal France | Coated steel strips, methods of making the same, methods of using the same, stamping blanks prepared from the same, stamped products prepared from the same, and articles of manufacture which contain such a stamped product |
US20110056594A1 (en) | 2008-01-30 | 2011-03-10 | Thyssenkrupp Steel Europe Ag | Process for producing a component from a steel product provided with an al-si coating and intermediate product of such a process |
CN106466697A (zh) | 2016-08-12 | 2017-03-01 | 宝山钢铁股份有限公司 | 一种带铝或者铝合金镀层的钢制热冲压产品及其制造方法 |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3446794C1 (de) * | 1984-12-21 | 1986-01-02 | BWG Butzbacher Weichenbau GmbH, 6308 Butzbach | Verfahren zur Waermebehandlung perlitischer Schienenstaehle |
CN100457956C (zh) * | 2007-08-31 | 2009-02-04 | 成都银河动力股份有限公司 | Al-Si合金活塞材料双温热处理工艺 |
WO2009090443A1 (en) * | 2008-01-15 | 2009-07-23 | Arcelormittal France | Process for manufacturing stamped products, and stamped products prepared from the same |
WO2010085983A1 (en) * | 2009-02-02 | 2010-08-05 | Arcelormittal Investigacion Y Desarrollo S.L. | Fabrication process of coated stamped parts and parts prepared from the same |
ES2635765T5 (es) * | 2011-03-10 | 2020-09-28 | Schwartz Gmbh | Sistema de horno y procedimiento para el calentamiento parcial de piezas de chapa de acero |
US9677145B2 (en) * | 2011-08-12 | 2017-06-13 | GM Global Technology Operations LLC | Pre-diffused Al—Si coatings for use in rapid induction heating of press-hardened steel |
CN102605308A (zh) * | 2012-04-19 | 2012-07-25 | 南京工程学院 | 钢帘线直接热镀铜锌合金环保生产工艺及装置 |
KR101318060B1 (ko) * | 2013-05-09 | 2013-10-15 | 현대제철 주식회사 | 인성이 향상된 핫스탬핑 부품 및 그 제조 방법 |
RU2655421C2 (ru) * | 2013-12-25 | 2018-05-28 | Ниппон Стил Энд Сумитомо Метал Корпорейшн | Высокопрочная деталь автомобиля с коррозионно-стойким покрытием и способ ее производства |
DE102015016656A1 (de) * | 2015-12-19 | 2017-06-22 | GM Global Technology Operations LLC (n. d. Ges. d. Staates Delaware) | Verfahren zur Herstellung eines beschichteten, durch Warmumformung gehärteten Körpers sowie ein nach dem Verfahren hergestellter Körper |
DE102016201025A1 (de) * | 2016-01-25 | 2017-07-27 | Schwartz Gmbh | Wärmebehandlungsverfahren und Wärmebehandlungsvorrichtung |
CN105886750A (zh) * | 2016-04-18 | 2016-08-24 | 河北钢铁股份有限公司 | 1180MPa级Q&P钢的连续热镀锌方法 |
CN106734470B (zh) * | 2017-01-05 | 2018-10-16 | 广东科学技术职业学院 | 汽车覆盖件热冲压成型方法 |
US20180237878A1 (en) * | 2017-02-17 | 2018-08-23 | GM Global Technology Operations LLC | Systems, methods and devices for hot forming of steel alloy parts |
DE102017115755A1 (de) * | 2017-07-13 | 2019-01-17 | Schwartz Gmbh | Verfahren und Vorrichtung zur Wärmebehandlung eines metallischen Bauteils |
CN109518114A (zh) * | 2018-08-08 | 2019-03-26 | 宝山钢铁股份有限公司 | 带铝硅合金镀层的热冲压部件的制造方法及热冲压部件 |
-
2018
- 2018-09-06 CN CN201811035118.2A patent/CN109518114A/zh active Pending
- 2018-09-06 CN CN202311026106.4A patent/CN117483561A/zh active Pending
-
2019
- 2019-09-06 WO PCT/CN2019/104708 patent/WO2020030200A1/zh unknown
- 2019-09-06 EP EP19847997.4A patent/EP3770295B1/en active Active
- 2019-09-06 PL PL19847997.4T patent/PL3770295T3/pl unknown
- 2019-09-06 US US17/049,547 patent/US20210252579A1/en active Pending
- 2019-09-06 FI FIEP19847997.4T patent/FI3770295T3/fi active
- 2019-09-06 PT PT198479974T patent/PT3770295T/pt unknown
- 2019-09-06 ES ES19847997T patent/ES2962214T3/es active Active
- 2019-09-06 RU RU2020133922A patent/RU2764729C1/ru active
- 2019-09-06 DK DK19847997.4T patent/DK3770295T3/da active
- 2019-09-06 HU HUE19847997A patent/HUE063894T2/hu unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1642991A1 (en) | 2003-05-28 | 2006-04-05 | Sumitomo Metal Industries, Ltd. | Method for hot forming and hot formed member |
WO2008053273A1 (en) | 2006-10-30 | 2008-05-08 | Arcelormittal France | Coated steel strips, methods of making the same, methods of using the same, stamping blanks prepared from the same, stamped products prepared from the same, and articles of manufacture which contain such a stamped product |
US20110056594A1 (en) | 2008-01-30 | 2011-03-10 | Thyssenkrupp Steel Europe Ag | Process for producing a component from a steel product provided with an al-si coating and intermediate product of such a process |
CN106466697A (zh) | 2016-08-12 | 2017-03-01 | 宝山钢铁股份有限公司 | 一种带铝或者铝合金镀层的钢制热冲压产品及其制造方法 |
Non-Patent Citations (5)
Title |
---|
ANONYMOUS: "Advancements in furnace design improve hot stamping", STAMPING JOURNAL, 28 February 2017 (2017-02-28), pages 1 - 7, XP055883524, [retrieved on 20220125] |
ANONYMOUS: "Standard Specification for Steel Sheet, Aluminum-Coated, by the Hot-Dip Process (A 463/A 463M - 06)", ATSM INTERNATIONAL, 1 January 2006 (2006-01-01), pages 1 - 7, XP093166263 |
KAMALPREET SINGH JHAJJ: "Heat Transfer Modeling of Roller Hearth and Muffle Furnace", THESIS, 1 January 2015 (2015-01-01), pages 1 - 65, XP093166258 |
MASAYOSHI SUEHIRO, JUN MAKI , KAZUHISA KUSUMI , MASAHIRO OHGAMI , TOSHIHIRO MIYAKOSHI: "Properties of Aluminum-coated Steels for Hot-forming", NIPPON STEEL TECHNICAL REPORT, no. 88, 1 January 2003 (2003-01-01), pages 16 - 21, XP093166267 |
MERKLEIN MARION, PITZ MATTHIAS, HOFF CORNELIA, LECHLER JURGEN: "Neuere Entwicklungen zur Umformung hôchstfester Stahlwerkstoffe", EFB KOLLOQUIUM, 1 January 2005 (2005-01-01), pages 119 - 133, XP055909853 |
Also Published As
Publication number | Publication date |
---|---|
RU2764729C1 (ru) | 2022-01-19 |
PL3770295T3 (pl) | 2024-01-22 |
WO2020030200A1 (zh) | 2020-02-13 |
US20210252579A1 (en) | 2021-08-19 |
CN117483561A (zh) | 2024-02-02 |
PT3770295T (pt) | 2023-11-06 |
ES2962214T3 (es) | 2024-03-18 |
FI3770295T3 (fi) | 2023-11-01 |
HUE063894T2 (hu) | 2024-02-28 |
EP3770295A4 (en) | 2022-03-09 |
DK3770295T3 (en) | 2023-10-30 |
EP3770295A1 (en) | 2021-01-27 |
CN109518114A (zh) | 2019-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3770295B1 (en) | Manufacturing method for hot stamping component having aluminium-silicon alloy coating | |
WO2020108594A1 (zh) | 一种冷弯性能优良的锌系镀覆热成型钢板或钢带及其制造方法 | |
CN106466697B (zh) | 一种带铝或者铝合金镀层的钢制热冲压产品及其制造方法 | |
KR101569505B1 (ko) | 내박리성이 우수한 hpf 성형부재 및 그 제조방법 | |
JP4724780B2 (ja) | 急速加熱ホットプレス用アルミめっき鋼板、その製造方法、及びこれを用いた急速加熱ホットプレス方法 | |
KR20180048614A (ko) | 항복강도500MPa급 고연신율 용융 알루미늄-아연 도금 및 칼라코팅 강판과 그의 제조방법 | |
CN112877592A (zh) | 具有优异漆膜附着力的热成形部件及其制造方法 | |
EP2659019B1 (en) | Aluminum coated steel sheet having excellent oxidation resistance and heat resistance | |
JP2006037141A (ja) | 耐液体金属脆性に優れた熱処理用鋼板 | |
CN111647802B (zh) | 一种涂覆铝硅合金镀层的热冲压构件的制备方法及其产品 | |
JP2008214681A (ja) | 塗装鮮映性とプレス成形性に優れた合金化溶融亜鉛メッキ鋼板およびその製造方法 | |
EP4067529A1 (en) | High-performance thermoformed component provided with coating, and manufacturing method therefor | |
CN108642425B (zh) | 热冲压用Al-Si-Ti合金镀层钢板及其生产方法 | |
CN116334470A (zh) | 一种高强结构钢sgc570的生产方法 | |
JP3931859B2 (ja) | 熱間成形用亜鉛系めっき鋼材と熱間成形方法 | |
CN112553522B (zh) | 一种折弯性能优良的冷轧热镀铝锌钢板及其制造方法 | |
CN114761602A (zh) | 加工性和耐蚀性优异的铝基合金镀覆钢板及其制造方法 | |
CN115125439B (zh) | 一种锌基镀层1800Mpa级热冲压成型钢及制备方法 | |
CN111434405B (zh) | 一种热冲压件的制备方法及装置 | |
TWI788080B (zh) | 熱成形硬化鋁基鍍覆鋼板及其製造方法 | |
CN115478233B (zh) | 一种锌基热成型钢及其制备方法 | |
CN112877607B (zh) | 一种高强度低合金热镀铝合金钢带及其制造方法 | |
KR100815811B1 (ko) | 도금 젖음성 및 밀착성이 우수한 용융아연 도금강판의제조방법 | |
CN117702000A (zh) | 低强度热冲压用镀锌钢板及其热成型钢构件的制造方法 | |
CN105274301A (zh) | 一种屈服强度≥220MPa铁锌合金镀层钢板的生产方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
TPAC | Observations filed by third parties |
Free format text: ORIGINAL CODE: EPIDOSNTIPA |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20200916 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
TPAA | Information related to observations by third parties modified |
Free format text: ORIGINAL CODE: EPIDOSCTIPA |
|
TPAC | Observations filed by third parties |
Free format text: ORIGINAL CODE: EPIDOSNTIPA |
|
TPAC | Observations filed by third parties |
Free format text: ORIGINAL CODE: EPIDOSNTIPA |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20220203 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B21D 22/02 20060101ALI20220128BHEP Ipc: C23C 28/02 20060101ALI20220128BHEP Ipc: C23C 2/28 20060101ALI20220128BHEP Ipc: C22C 38/38 20060101ALI20220128BHEP Ipc: C21D 9/48 20060101ALI20220128BHEP Ipc: C21D 7/13 20060101ALI20220128BHEP Ipc: C21D 6/00 20060101ALI20220128BHEP Ipc: C21D 1/76 20060101ALI20220128BHEP Ipc: C21D 1/673 20060101ALI20220128BHEP Ipc: C21D 1/18 20060101ALI20220128BHEP Ipc: C22C 38/32 20060101ALI20220128BHEP Ipc: C22C 38/28 20060101ALI20220128BHEP Ipc: C22C 38/06 20060101ALI20220128BHEP Ipc: C22C 38/04 20060101ALI20220128BHEP Ipc: C22C 38/02 20060101ALI20220128BHEP Ipc: C23C 2/12 20060101AFI20220128BHEP |
|
TPAC | Observations filed by third parties |
Free format text: ORIGINAL CODE: EPIDOSNTIPA |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20221021 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: FANG, XUEHUA Inventor name: HONG, JIYAO Inventor name: FU, JIANG Inventor name: TAN, NING |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
INTC | Intention to grant announced (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20230324 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230526 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602019035286 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20231027 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LU Payment date: 20230926 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Ref document number: 3770295 Country of ref document: PT Date of ref document: 20231106 Kind code of ref document: T Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20231027 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20230907 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20230816 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231117 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20231129 Year of fee payment: 5 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20231204 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231216 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230816 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231116 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230816 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230816 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230816 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231216 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230816 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231117 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: RO Payment date: 20230906 Year of fee payment: 5 Ref country code: PT Payment date: 20231204 Year of fee payment: 5 Ref country code: HU Payment date: 20231020 Year of fee payment: 5 Ref country code: FI Payment date: 20231025 Year of fee payment: 5 Ref country code: DK Payment date: 20231026 Year of fee payment: 5 Ref country code: CZ Payment date: 20230915 Year of fee payment: 5 Ref country code: CH Payment date: 20231004 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A Ref document number: E063894 Country of ref document: HU |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 1600124 Country of ref document: AT Kind code of ref document: T Effective date: 20230816 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2962214 Country of ref document: ES Kind code of ref document: T3 Effective date: 20240318 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230816 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230816 |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
REG | Reference to a national code |
Ref country code: SK Ref legal event code: T3 Ref document number: E 43826 Country of ref document: SK |