EP3156529A1 - Luftdüsenwebmaschine mit einer schussfadeneinführungssteuerungsvorrichtung - Google Patents
Luftdüsenwebmaschine mit einer schussfadeneinführungssteuerungsvorrichtung Download PDFInfo
- Publication number
- EP3156529A1 EP3156529A1 EP16190583.1A EP16190583A EP3156529A1 EP 3156529 A1 EP3156529 A1 EP 3156529A1 EP 16190583 A EP16190583 A EP 16190583A EP 3156529 A1 EP3156529 A1 EP 3156529A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- weft
- timing
- sub
- air injection
- weft yarn
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003780 insertion Methods 0.000 title claims abstract description 101
- 230000037431 insertion Effects 0.000 title claims abstract description 101
- 238000002347 injection Methods 0.000 claims abstract description 85
- 239000007924 injection Substances 0.000 claims abstract description 85
- 238000001514 detection method Methods 0.000 claims abstract description 26
- 239000004744 fabric Substances 0.000 claims abstract description 12
- 238000009941 weaving Methods 0.000 description 9
- 238000011144 upstream manufacturing Methods 0.000 description 5
- 235000014676 Phragmites communis Nutrition 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 3
- 238000004804 winding Methods 0.000 description 2
- 238000012905 input function Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Images
Classifications
-
- D—TEXTILES; PAPER
- D03—WEAVING
- D03D—WOVEN FABRICS; METHODS OF WEAVING; LOOMS
- D03D47/00—Looms in which bulk supply of weft does not pass through shed, e.g. shuttleless looms, gripper shuttle looms, dummy shuttle looms
- D03D47/28—Looms in which bulk supply of weft does not pass through shed, e.g. shuttleless looms, gripper shuttle looms, dummy shuttle looms wherein the weft itself is projected into the shed
- D03D47/30—Looms in which bulk supply of weft does not pass through shed, e.g. shuttleless looms, gripper shuttle looms, dummy shuttle looms wherein the weft itself is projected into the shed by gas jet
- D03D47/3026—Air supply systems
- D03D47/3033—Controlling the air supply
- D03D47/304—Controlling of the air supply to the auxiliary nozzles
-
- D—TEXTILES; PAPER
- D03—WEAVING
- D03D—WOVEN FABRICS; METHODS OF WEAVING; LOOMS
- D03D47/00—Looms in which bulk supply of weft does not pass through shed, e.g. shuttleless looms, gripper shuttle looms, dummy shuttle looms
- D03D47/28—Looms in which bulk supply of weft does not pass through shed, e.g. shuttleless looms, gripper shuttle looms, dummy shuttle looms wherein the weft itself is projected into the shed
- D03D47/30—Looms in which bulk supply of weft does not pass through shed, e.g. shuttleless looms, gripper shuttle looms, dummy shuttle looms wherein the weft itself is projected into the shed by gas jet
- D03D47/3066—Control or handling of the weft at or after arrival
- D03D47/3073—Detection means therefor
Definitions
- the present invention relates to a weft insertion control device in an air jet loom.
- Japanese Patent Application Publication No. S62-117853 discloses a weft insertion control device of an air jet loom that controls the timing at which a weft stop pin is disengaged from a weft yarn measuring and storage device and the timing at which a weft insertion nozzle is actuated to release a weft yarn thereby to prevent weft insertion failure.
- the weft insertion failure may occur from irregular measurement of weft yarn length or variation of traveling speed due to ballooning of weft yarn or varying resistance to a weft yarn being released.
- the photoelectric sensor is provided at a detecting position between the weft supply side and the opposite side thereto in the weft passage.
- the photoelectric sensor measures the timing at which a weft yarn reaches the detecting position.
- the value of the timing measured by the photoelectric sensor or the averaged measured value is compared with a reference value of timing. Based on the result of the comparison, the timing at which the weft stop pin is disengaged from the weft yarn measuring and storage device or the timing at which the weft insertion nozzle is actuated to release a weft yarn is automatically controlled.
- the timing at which the weft yarn reaches the target position opposite side to the weft supply side can be controlled to fall within a predetermined range without changing the air injection pressure of the weft insertion nozzle and the timing at which the injection from the weft insertion nozzle is completed.
- the air injection of sub-nozzles that carries the weft yarn in the weft insertion passage significantly influences the stability of the weft insertion.
- the air injection of the weft insertion nozzle has a larger influence on weft yarn traveling condition than that of the sub-nozzles, it is difficult to figure out the influence of the air injection of the sub-nozzles on the weft yarn traveling condition.
- the traveling speed of a weft yarn has been increased with an increase of the operation of the air jet loom.
- the shock applied to the weft yarn at the end of the weft insertion is also increased and there may occur a problem associated with a break in a weft yarn.
- air jet looms use a brake to brake a weft yarn before the end of the weft insertion.
- the weft yarn arrival timing detected by the photoelectric sensor between the weft supply side and the opposite side thereto in the weft passage may not be used effectively to control the air injection of the sub-nozzles.
- the present invention which has been made in light of the above-described problems, is directed to providing a weft insertion control device in an air jet loom that permits effective use of weft yarn arrival timing detected by a weft sensor disposed at an intermediate position within the weaving width to control the air injection of sub-nozzles.
- a weft insertion control device in an air jet loom including a weft insertion nozzle, a plurality of sub-nozzles and a brake braking a weft yarn before weft insertion ends.
- the weft insertion control device includes a sensor provided within a width of cloth to be woven by the air jet loom so as to detect the weft yarn and a correction unit correcting air injection start timing of the sub-nozzles.
- the sensor is disposed between a leading end position of the weft yarn that is located at air injection end timing of the weft insertion nozzle and a leading end position of the weft yarn that is located at brake timing of the brake.
- the correction unit estimates a weft traveling curve based on weft detection timing of the sensor and corrects the air injection start timing of the sub-nozzles in accordance with the estimated weft traveling curve.
- upstream and downstream will be used to indicate the directions with respect to the movement of a weft yarn for insertion through a warp shed. Specifically, upstream indicates the direction in which a weft yarn is inserted and travels in a shed, while downstream indicates the opposite direction.
- the weft insertion device 1 includes a weft insertion nozzle 2, a weft yarn supply 3 that is disposed upstream of the weft insertion nozzle 2 and from which a weft yarn Y is supplied, a weft measuring and storage device 4 having a winding arm (not shown) and a storage drum 8, a reed 5 that is disposed downstream of the weft insertion nozzle 2 and has a plurality of dents and a weft passage 6 formed by the dents, and a plurality of sub-nozzles 7 that are arranged along the weft passage 6 of the reed 5.
- the weft measuring and storage device 4 includes a weft stop pin 9 and a balloon sensor 10 that detects a release of a weft yarn Y.
- the weft stop pin 9 and the balloon sensor 10 of the weft measuring and storage device 4 are shown only schematically in FIG. 1 .
- the weft stop pin 9 and the balloon sensor 10 are arranged around the storage drum 8.
- the balloon sensor 10 is disposed on the weft releasing side of the weft measuring and storage device 4 in proximity to and in side-by-side relation to the weft stop pin 9.
- the weft stop pin 9 is electrically connected to a control device 16 via a wire 20, and the weft yarn Y stored on the storage drum 8 is released when the air jet loom is rotated to a predetermined angular position that is preset in the control device 16.
- the weft insertion start timing IF shown in FIG. 2B at which the weft stop pin 9 is actuated to be disengaged from the storage drum 8 thereby to allow the weft yarn Y to be released from the storage drum 8 corresponds to a start of weft insertion.
- the balloon sensor 10 is electrically connected to the control device 16 via a wire 21.
- the balloon sensor 10 detects a weft yarn Y being released from the storage drum 8 with the shape of yarn balloon during the weft insertion and generates a weft yarn release signal to the control device 16.
- the control device 16 causes the weft stop pin 9 to engage with the storage drum 8 so as to stop the release of a weft yarn Y from the storage drum 8, thus the weft insertion of a weft yarn being ended.
- the operation timing of the weft stop pin 9 to stop the weft yarn Y is set depending on the number of turns of a weft yarn Y wound around the storage drum 8 that is required for the storage of a predetermined length of the weft yarn Y corresponding to the width of cloth to be woven by the air jet loom.
- three turns of a weft yarn Y around the storage drum 8 corresponds to the width of cloth to be woven by the air jet loom and the control device 16 is configured to send a signal to the weft stop pin 9 to stop the weft yarn Y upon receiving three weft yarn release signals from the balloon sensor 10.
- the weft insertion nozzle 2 includes a tandem nozzle 11 that pulls out a weft yarn Y from the storage drum 8 and a main nozzle 12 that inserts the weft yarn Y into the weft passage 6 and has a function for releasing the weft yarn Y.
- the sub-nozzles 7 assist the inserted weft yarn Y in flying through the weft passage 6.
- a brake 13 is disposed upstream of the tandem nozzle 11 to brake the traveling weft yarn Y before the weft insertion ends. Any conventional brake such as a mechanical brake or air brake may be used for the brake 13.
- the main nozzle 12, sub-nozzles 7 and the reed 5 are mounted to a slay (not shown) and make reciprocating back and forth motion.
- the tandem nozzle 11, the brake 13, the weft measuring and storage device 4, and the weft yarn supply 3 are fixed to a bracket (not shown) that is mounted to a frame (not shown) of the air jet loom or to the floor surface (not shown).
- An end sensor 14 is provided at a downstream end position of the weft passage 6 corresponding to the side of a woven cloth that is opposite from the main nozzle 12.
- the end sensor 14 detects the arrival of the leading end of a weft yarn Y at the downstream end.
- the end sensor 14 is electrically connected via a wire 15 to the control device 16 that determines whether the weft insertion has been made successful or failed based on the presence or absence of a weft detection signal from the end sensor 14.
- the weft detection signal from the end sensor 14 indicates the arrival of a weft yarn Y at the downstream end position of the woven cloth and the control device 16 recognizes the detected signal as the weft insertion end timing IE ( FIG. 2 ) based on a signal generated by the encoder 17 and representing the angular position of the air jet loom when the leading end of the weft yarn Y has arrived at the downstream end position.
- a weft middle sensor 18 is disposed at an intermediate position of the weft passage 6 within the weaving width TL ( FIG. 2 ) that is upstream of the end sensor 14.
- the weft middle sensor 18 is electrically connected to the control device 16 via a wire 19.
- the control device 16 recognizes the weft detection signal from the weft middle sensor 18 as the weft detection timing IS ( FIG. 2 ) at which the leading end of a weft yarn Y has arrived at the position YX of the weft middle sensor 18 based on the signal generated by the encoder 17 and representing the angular position of the air jet loom when the position YX has been reached by the leading end of a weft yarn Y.
- the present embodiment is described as having only one set of the weft insertion device 1, two or more weft insertion devices may be used to provide a multicolor weft insertion device. It is noted that the multicolor weft insertion device may include plural sets of weft insertion device inserting different weft yarns of the same color. In such multicolor weft insertion device, the sub-nozzles such as 7 are used in common in plural sets of weft insertion device.
- the main nozzle 12 is connected via a pipe 23 to a main valve 22 that controls the supply of compressed air to the main nozzle 12.
- the tandem nozzle 11 is connected via a pipe 25 to a tandem valve 24 that controls the supply of compressed air to the tandem nozzle 11.
- the main valve 22 and the tandem valve 24 are connected to a main air tank 27 via pipes 26, 28, respectively.
- the main air tank 27 is connected through a main pressure meter 29, a main regulator 30, a source pressure meter 31 and a filter 32 to a common air compressor 33 that is installed in a weaving factory. Compressed air supplied from the air compressor 33 is adjusted to a specific pressure by the main regulator 30 and stored in the main air tank 27. The pressure of the compressed air being supplied to the main air tank 27 is constantly monitored by the main pressure meter 29.
- the sub-nozzles 7 are divided into six groups each including four sub-nozzles 7, and a sub-valve 34 is connected to the sub-nozzles 7 of each group via a pipe 35. It is noted that the number of the sub-nozzle groups is not limited to six, but any suitable number of sub-nozzle groups may be provided depending on the weaving width TL and that a plurality of sub-valves 34 may be provided for each sub-nozzle group.
- the sub-valves 34 are connected to a common sub-air tank 36.
- the sub-air tank 36 is connected to a sub-regulator 39 via a pipe 37 and a sub-pressure meter 38.
- the sub-regulator 39 is connected via a pipe 40 to a pipe 41 that provides a connection between the main pressure meter 29 and the main regulator 30.
- Compressed air from the air compressor 33 is adjusted to a specific pressure by the sub-regulator 39 and stored in the sub-air tank 36.
- the pressure of the compressed air being supplied to the sub-air tank 36 is constantly monitored by the sub-pressure meter 38.
- the main valve 22, the tandem valve 24, the sub-valve 34, the source pressure meter 31, the main pressure meter 29, the sub-pressure meter 38, and the brake 13 are electrically connected to the control device 16 via the wires 42, 43, 44, 45, 46, 47, 48, respectively.
- Data of operating timings of the main valve 22, the tandem valve 24, the sub-valve 34, and the brake 13 and the duration of operating time are preset in the control device 16.
- the control device 16 receives detection signals from the source pressure meter 31, the main pressure meter 29, and the sub-pressure meter 38.
- the control device 16 generates a command signal to the main valve 22 and the tandem valve 24 before the weft insertion start timing IF at which the weft stop pin 9 is actuated to release a weft yarn Y, so that air from the main nozzle 12 and the tandem nozzle 11 is injected.
- the control device 16 also generates a signal to the brake 13 at brake timing BT before the weft insertion end timing IE at which the weft stop pin 9 is actuated to stop the weft yarn Y on the storage drum 8.
- the brake 13 applies brake to the weft yarn Y traveling at high speed and reduces its speed so as to decrease the impact on the weft yarn Y at the weft insertion end timing IE.
- the control device 16 is equipped with a display device 49 having a display and input functions.
- the display device 49 has a display screen(not shown) on which various line charts shown in FIGS. 2 through 5 , various information and data are displayed and entry and update of the information and data can be made on the display screen.
- FIG. 2A shows various positions in the weaving width TL, namely the position of the end sensor 14, the position YX at which the weft middle sensor 18 is located, the position YE at which the leading end of an inserted weft yarn Y arrives at the air injection end timing ME ( FIG. 2B ), and the position YB at which the leading end of the weft yarn Y arrives at the brake timing BT ( FIG. 2A ).
- FIG. 2B shows various timings in the weaving width TL, namely weft insertion start timing IF, the air injection end timing ME of the weft insertion nozzle 2, the weft detection timing IS of the weft middle sensor 18, the brake timing BT of the brake 13, and the weft insertion end timing IE that is detected by the end sensor 14 are shown.
- the weft insertion start timing IF indicates the timing at which the weft stop pin 9 is actuated to disengage from the storage drum 8 thereby to release the weft yarn Y from the drum 8.
- the weft insertion start timing IF may be obtained based from angular position signals from the encoder 17. The timings which will be described later may be also obtained based from angular position signals from the encoder 17.
- the weft insertion end timing IE corresponds to the angular position of the loom when the end sensor 14 generates a weft detection signal and the weft stop pin 9 is actuated to stop the weft yarn Y.
- the air injection end timing ME of the weft insertion nozzle 2 is preset in the control device 16 so that the air injection from the main nozzle 12 and the tandem nozzle 11 is stopped at an elapsed time after the start of air injection.
- the brake timing BT is preset in the control device 16 so that the traveling weft yarn Y is braked before the weft insertion end timing IE.
- the weft middle sensor 18 is disposed at an appropriate position in the weft passage 6 within the weaving width TL so as to detect the leading end of a weft yarn Y between the air injection end timing ME of the weft insertion nozzle 2 and the brake timing BT of the brake 13.
- the weft middle sensor 18 is disposed at a position in the weft passage 6 between the position YE corresponding to the air injection end timing ME of the weft insertion nozzle 2 and the position YB corresponding to the brake timing BT at which the brake 13 is actuated.
- the positions YE and YB are kept substantially constant irrespective of the air injection pressure of the sub-nozzles 7.
- the weft yarn Y is carried only by air injected from the sub-nozzles 7 in the weft passage 6 between the position YE corresponding to the air injection end timing ME and the position YB corresponding to the brake timing BT.
- the weft yarn Y travels irrespective of the influence of air jet injected from the weft insertion nozzle 2 and braking of the brake 13.
- the chart of FIG. 3 shows three different weft traveling curves A, B, C as examples, which are obtained from trial weaving operations using different air injection pressures of the sub-nozzles 7 and stored in the control device 16.
- weft insertion control devices of air jet looms used actually, data of many weft traveling curves is stored in the control device 16 to control the weft insertion.
- the weft middle sensor 18 constantly or continually detects a weft yarn Y and transmits a weft detection signal to the control device 16.
- the control device 16 receives from the weft middle sensor 18 a signal of the weft detection timing IS of the weft yarn Y arriving at the position YX and compares the weft detection timing IS with the reference timing A1, B1 or C1 stored for its corresponding curve A, B or C.
- the weft detection timing IS is coincide with the timing A1, so that the control device 16 recognizes control based on the current curve A.
- the curves A, B, and C show the weft traveling under the highest pressure, the lowest pressure, and the intermediate pressure between the highest and the lowest pressures of the sub-nozzles 7, respectively.
- the leading end of the weft yarn Y arrives at the position YX of the weft middle sensor 18 at the timing A1.
- the leading end of the weft yarn Y arrives at the position YX of the weft middle sensor 18.
- the curves A and B being compared, an angular position difference ⁇ occurs between the timing A1 and the timing B1, and an angular position difference ⁇ occurs between the timing A2 and the timing B2.
- the angular position difference ⁇ is clearly larger than the angular position difference ⁇ .
- the difference between the angular position difference ⁇ and the angular position difference ⁇ occurs because the weft yarn Y is subjected to the braking by the brake 13 after the brake timing BT. That is, before the brake timing BT, the angular position difference ⁇ is due to the influence of the air injection pressure of the sub-nozzle 7. After the brake timing BT, on the other hand, the angular position difference ⁇ is smaller than the angular position difference ⁇ because the braking by the brake 13 reduces the influence of the pressure difference of air injection pressure of the sub-nozzles 7 between the curves A and B.
- the timings in the curves A, B, C at which the leading end of the weft yarn Y arrives at the position YE, do not tend to differ from one another because the influence of air injection of the weft insertion nozzle 2 is greater than that of the pressure difference of air injection pressure of the sub-nozzles 7. That is, the difference among the curves A, B and C in the traveling condition of the weft yarn Y between the air injection end timing ME and the brake timing BT is clearly due to the influence of air injection from the sub-nozzles 7.
- the traveling condition of the weft yarn Y is largely varied as shown among the curves A, B, C. For this reason, the air injection timing of the sub-nozzles 7 is set so as to cover various traveling conditions of different weft yarns Y.
- the air injection start timing D1 of each sub-valves 34 is set so as to include the timings A1, A2 of the curve A at which the weft yarn Y arrives earliest at the air injection position of the sub-nozzles 7.
- the air injection end timing D2 of the sub-nozzles 7 is set so that the air injection time of the sub-nozzles 7 becomes constant irrespective of the pressure difference of air injected from the sub-nozzles 7.
- the control device 16 stores data for the plural curves A, B, C.
- the weft middle sensor 18 detects the weft yarn Y and the control device 16 determines the weft detection timing IS based on the detection signal from weft middle sensor 18. If the weft detection timing IS coincides, for example, with the timing A1, the control device 16 estimates that the weft traveling condition is being performed based on the curve A that is same as the timing IS. IF the weft detection timing IS fails to coincide with any of the timings A1, B1, C1 of the plural curves A, B, C, the control device 16 determines the weft traveling curve having the timing that is closed to the timing IS as the current weft traveling curve.
- the control device 16 serves also as a correction unit in the present invention and controls so as to maintain the air injection timing of the sub-nozzles 7 to the air injection start timing D1 and the air injection end timing D2 based on the air injection timing D of the curve A. If the weft detection timing IS coincides with the timing B1, the control device 16 chooses the curve B having the timing B1 at which the leading end of the weft yarn Y arrives at the position YX of the weft middle sensor 18 and corrects the air injection timing of the sub-nozzles 7 in accordance with the curve B.
- the weft middle sensor 18 detects the leading end of the weft yarn Y traveling without the influence of air jet from the weft insertion nozzle 2 and the braking by the brake 13, so that the air injection timing D of the sub-nozzles 7 may be corrected depending on the traveling condition of different weft yarns based on the pressure of air injected from the sub-nozzles 7. Therefore, the sub-valves 34 may effectively control the air injection timing of the sub-nozzles 7, with the result that the consumption of compressed air may be reduced.
- the duration time of air injection from the sub-nozzles 7 is appropriately set in accordance with the traveling condition of the weft yarn Y.
- the weft middle sensor 18 constantly detects the leading end of the weft yarn Y during the weft insertion.
- the curve E in FIG. 4 is obtained through by calculation and estimation in the case when the weft detection timing IS detected by the weft middle sensor 18 coincides with timing E1.
- the timing E1 is compared with the timing S1 at which the leading end of the weft yarn Y arrives at the position YX of the weft middle sensor 18 in the reference weft traveling curve S that is stored in the control device 16 for a start of the air jet loom.
- the timings E2, E3, E4 are estimated by calculating shifted timing at which the leading end of the weft yarn Y arrives at any other position in the weft passage 6 based on the difference between the timing E1 and the timing S1.
- the positions of the leading end of the weft yarn Y corresponding to the weft insertion start timing IF and to the weft insertion end timing IE are set so as to coincide with each other.
- the timings E2, E3, E4 may be easily estimated by calculation based on the traveling condition of the weft yarn Y that is obtained empirically and experimentally.
- the estimated curve E is obtained by plotting the timing E1 and other calculated timings E2, E3, E4.
- the air injection timing F of the sub-nozzles 7 is set in accordance with the estimated curve E shown in FIG. 4 . Specifically, the air injection start timing F1 of the sub-nozzles 7 is corrected in accordance with the timings E1, E2, E3, E4 in the weft traveling curve E.
- the air injection end timing F2 is corrected to a loom angular position after elapse of a certain time in accordance with the characteristics of the weft yarn Y that forms the curve E.
- the air injection end timing F2 may be set in terms of time by a timer.
- the curve G in FIG. 5 shows an example in which the traveling speed of the weft yarn Y is lower than that in the case of the reference weft traveling curve S.
- the timing G1 is detected as the weft detection timing IS by the weft middle sensor 18.
- the timing G1 is compared with the timing S1 at which the leading end of the weft yarn Y arrives at the position YX of the weft middle sensor 18 in the reference weft traveling curve S. If the timing G1 is different from the timing S1 in the reference weft traveling curve S, the timings G2, G3, G4 are estimated by calculating the difference from the timing at which the leading end of the weft yarn Y arrives at other positions in the weft passage 6 based on the amount of the difference between the timing G1 and the timing S1.
- the estimated curve G is obtained by plotting the timing G1 and the calculated timings G2, G3, G4.
- Air injection start timing H1 of the sub-nozzles 7 is corrected according to the timings G2, G3, G4 in the curve G.
- Air injection end timing H2 is corrected to a timing or a loom angular position that is after a certain time depending on the characteristics of the weft yarn Y that is shown in the curve G.
- the air injection start timing H1 may be set with less in air consumption as compared with the air injection timing in the reference weft traveling curve S. As a result, the amount of air injected from the sub-nozzles 7 may be reduced while the traveling condition of the weft yarn Y being kept stable.
- the weft middle sensor 18 detects the leading end of the weft yarn Y traveling without the influence of air injected from the weft insertion nozzle 2 and the braking by the brake 13 , so that as in the first embodiment, the air injection timings F, H of the sub-nozzles 7 may be corrected depending on the traveling condition of the weft yarn Y by air jets from the sub-nozzles 7. Therefore, the sub-valves 34 may be set so as to control the air injection timing of the sub-nozzles 7, with the result that the consumption of compressed air may be reduced.
- the curves E, G may be properly estimated and obtained based on the traveling condition of the weft yarn Y obtained empirically and experimentally, and the difference between the timings E1, G1 that is detected at at least one position.
- the period of air injection time may be properly set in accordance with the traveling condition of the weft yarn Y by adjusting both the air injection start timings F1, H1 and the air injection end timings F2, H2.
- the weft insertion control device includes the weft middle sensor 18 provided in the weft passage 6 within a width of cloth to be woven by the air jet loom so as to detect the weft yarn Y and the control device 16 as the correction unit correcting air injection start timings D1, F1, H1 of the sub-nozzles 7.
- a weft insertion control device in an air jet loom including a weft insertion nozzle, a plurality of sub-nozzles and a brake braking a weft yarn before weft insertion ends.
- the weft insertion control device includes a sensor provided within a width of cloth to be woven by the air jet loom so as to detect the weft yarn and a correction unit correcting air injection start timing of the sub-nozzles.
- the sensor is disposed between a leading end position of the weft yarn that is located at air injection end timing of the weft insertion nozzle and a leading end position of the weft yarn that is located at brake timing of the brake.
- the correction unit estimates a weft traveling curve based on weft detection timing of the sensor and corrects the air injection start timing of the sub-nozzles in accordance with the estimated weft traveling curve.
Landscapes
- Engineering & Computer Science (AREA)
- Textile Engineering (AREA)
- Looms (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015201667A JP6319262B2 (ja) | 2015-10-12 | 2015-10-12 | エアジェット織機における緯入れ制御装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3156529A1 true EP3156529A1 (de) | 2017-04-19 |
EP3156529B1 EP3156529B1 (de) | 2019-11-06 |
Family
ID=56997392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16190583.1A Active EP3156529B1 (de) | 2015-10-12 | 2016-09-26 | Luftdüsenwebmaschine mit einer schussfadeneinführungssteuerungsvorrichtung |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3156529B1 (de) |
JP (1) | JP6319262B2 (de) |
CN (1) | CN107034576B (de) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3470562A1 (de) * | 2017-10-11 | 2019-04-17 | Tsudakoma Kogyo Kabushiki Kaisha | Verfahren zum einstellen von schussfadenlaufinformationen für luftdüsenwebmaschinen |
EP3498900A1 (de) * | 2017-12-15 | 2019-06-19 | Tsudakoma Kogyo Kabushiki Kaisha | Verfahren zum einstellen von schussfadenlaufinformationen für luftdüsenwebmaschinen |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6994377B2 (ja) * | 2017-12-13 | 2022-01-14 | 株式会社豊田自動織機 | エアジェット織機における緯入れ診断方法 |
JP7099329B2 (ja) * | 2019-01-07 | 2022-07-12 | 株式会社豊田自動織機 | エアジェット織機の緯糸検知装置 |
JP7184675B2 (ja) * | 2019-03-06 | 2022-12-06 | 株式会社豊田自動織機 | エアジェット織機の緯入れ装置 |
JP7156201B2 (ja) * | 2019-07-30 | 2022-10-19 | 株式会社豊田自動織機 | 織機の緯糸欠点判定装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0164773A1 (de) * | 1984-05-16 | 1985-12-18 | Picanol N.V. | Verstellbare Steuerung des Schussfadens in Webmaschinen |
JPS62117853A (ja) | 1985-11-15 | 1987-05-29 | 津田駒工業株式会社 | よこ入れ制御方法およびその装置 |
EP0554222A1 (de) * | 1992-01-28 | 1993-08-04 | Kabushiki Kaisha Toyoda Jidoshokki Seisakusho | Verfahren zur Steuerung des Schusseintrages in einer Düsenwebmaschine |
JPH0693534A (ja) * | 1992-09-10 | 1994-04-05 | Toyota Autom Loom Works Ltd | ジェットルームにおける緯入れ制御装置 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05302238A (ja) * | 1992-04-27 | 1993-11-16 | Tsudakoma Corp | ジェットルームにおける緯糸の制動装置 |
JP3262888B2 (ja) * | 1993-04-02 | 2002-03-04 | 津田駒工業株式会社 | 織機における緯糸の制御装置 |
JPH1112890A (ja) * | 1997-06-17 | 1999-01-19 | Toyota Autom Loom Works Ltd | エアジェット織機におけるサブノズルタイミングの設定方法および設定装置 |
JP2002227059A (ja) * | 2001-02-01 | 2002-08-14 | Tsudakoma Corp | 織機における糸制動装置 |
JP2004052171A (ja) * | 2002-07-22 | 2004-02-19 | Tsudakoma Corp | エアジェットルームにおける緯入れ制御方法 |
JP4023346B2 (ja) * | 2003-03-12 | 2007-12-19 | 株式会社豊田自動織機 | ジェットルームにおける緯入れ装置 |
EP1473391B1 (de) * | 2003-04-29 | 2006-11-08 | Sultex AG | System und verfahren zum eintragen eines schussfadens |
BE1018324A3 (nl) * | 2008-10-22 | 2010-09-07 | Picanol Nv | Werkwijze en inrichting voor het controleren van een insertiesysteem voor een weefmachine. |
JP5592239B2 (ja) * | 2010-11-29 | 2014-09-17 | 津田駒工業株式会社 | 空気噴射式織機におけるサブノズルの噴射期間設定方法 |
-
2015
- 2015-10-12 JP JP2015201667A patent/JP6319262B2/ja active Active
-
2016
- 2016-09-26 EP EP16190583.1A patent/EP3156529B1/de active Active
- 2016-10-10 CN CN201610884297.1A patent/CN107034576B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0164773A1 (de) * | 1984-05-16 | 1985-12-18 | Picanol N.V. | Verstellbare Steuerung des Schussfadens in Webmaschinen |
JPS62117853A (ja) | 1985-11-15 | 1987-05-29 | 津田駒工業株式会社 | よこ入れ制御方法およびその装置 |
EP0554222A1 (de) * | 1992-01-28 | 1993-08-04 | Kabushiki Kaisha Toyoda Jidoshokki Seisakusho | Verfahren zur Steuerung des Schusseintrages in einer Düsenwebmaschine |
JPH0693534A (ja) * | 1992-09-10 | 1994-04-05 | Toyota Autom Loom Works Ltd | ジェットルームにおける緯入れ制御装置 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3470562A1 (de) * | 2017-10-11 | 2019-04-17 | Tsudakoma Kogyo Kabushiki Kaisha | Verfahren zum einstellen von schussfadenlaufinformationen für luftdüsenwebmaschinen |
CN109652901A (zh) * | 2017-10-11 | 2019-04-19 | 津田驹工业株式会社 | 空气喷射式织机的纬纱飞行信息的设定方法 |
CN109652901B (zh) * | 2017-10-11 | 2022-01-04 | 津田驹工业株式会社 | 空气喷射式织机的纬纱飞行信息的设定方法 |
EP3498900A1 (de) * | 2017-12-15 | 2019-06-19 | Tsudakoma Kogyo Kabushiki Kaisha | Verfahren zum einstellen von schussfadenlaufinformationen für luftdüsenwebmaschinen |
JP2019105017A (ja) * | 2017-12-15 | 2019-06-27 | 津田駒工業株式会社 | 空気噴射式織機における緯糸飛走情報の設定方法 |
Also Published As
Publication number | Publication date |
---|---|
JP2017075409A (ja) | 2017-04-20 |
CN107034576B (zh) | 2018-11-02 |
EP3156529B1 (de) | 2019-11-06 |
CN107034576A (zh) | 2017-08-11 |
JP6319262B2 (ja) | 2018-05-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3156529B1 (de) | Luftdüsenwebmaschine mit einer schussfadeneinführungssteuerungsvorrichtung | |
EP3144422B1 (de) | Verfahren zum überwachen der schusstransportbedingung in einer luftdüsenwebmaschine | |
EP2873759B1 (de) | Luftdüsen-Webmaschine mit Schussfadendetektor | |
JP2008190108A (ja) | 織機内に横糸を挿入する方法及び装置 | |
CN108070949B (zh) | 喷气织机中的纬纱飞行状态检测装置 | |
EP3404132B1 (de) | Schussfadenerfassungsvorrichtung für eine luftdüsenwebmaschine | |
JP2004505182A (ja) | よこ糸偏向ブレーキおよび織機へのよこ糸挿入制御方法 | |
EP2733242A2 (de) | Vorrichtung zur Schussfadeneintragungsbedingung in einer Luftdüsenwebmaschine | |
EP4019678B1 (de) | Luftdüsenwebmaschine mit schusseintragssteuergerät | |
US7055554B2 (en) | Method for controlling weft insertion in air jet type loom | |
EP3470562B1 (de) | Verfahren zum einstellen von schussfadenlaufinformationen für luftdüsenwebmaschinen | |
EP2765229B1 (de) | Luftdüsenwebmaschine mit einer Anzeigevorrichtung | |
EP1630272A2 (de) | Schussfadenbremsvorrichtung und Verfahren zur Steuerung einer Schussfadenbremsvorrichtung | |
EP3348688B1 (de) | Verfahren zur diagnose des schusseintrags in einer luftdüsenwebmaschine und vorrichtung zur diagnose des schusseintrags in einer luftdüsenwebmaschine | |
EP3819413B1 (de) | Luftdüsenwebmaschine | |
EP3498902B1 (de) | Verfahren zur diagnose der schussfadeneinführung in einer luftdüsenwebmaschine | |
EP3896203B1 (de) | Verfahren zur erkennung von abnormalitäten in einer luftdüsenwebmaschine und luftdüsenwebmaschine | |
EP2435609A1 (de) | Verfahren zur einführung eines schussfadens sowie luftstrahlwebmaschine | |
JP7359049B2 (ja) | エアジェット織機の緯糸ブレーキ制御装置 | |
JP7424234B2 (ja) | エアジェット織機 | |
JP2001234450A (ja) | 流体噴射式織機の緯入れ方法とその装置 | |
JP2003213545A (ja) | 織機の空気噴射装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20160926 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20190430 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1198846 Country of ref document: AT Kind code of ref document: T Effective date: 20191115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016023678 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20191106 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200207 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200306 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200206 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200206 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200306 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602016023678 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1198846 Country of ref document: AT Kind code of ref document: T Effective date: 20191106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20200807 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200926 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200926 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200926 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200926 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191106 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230519 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20230810 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240730 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20240816 Year of fee payment: 9 |