EP2891753A1 - Building made of special blocks - Google Patents
Building made of special blocks Download PDFInfo
- Publication number
- EP2891753A1 EP2891753A1 EP15150383.6A EP15150383A EP2891753A1 EP 2891753 A1 EP2891753 A1 EP 2891753A1 EP 15150383 A EP15150383 A EP 15150383A EP 2891753 A1 EP2891753 A1 EP 2891753A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- blocks
- recesses
- building according
- block
- supports
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011810 insulating material Substances 0.000 claims abstract description 3
- 238000010276 construction Methods 0.000 claims description 11
- 239000002023 wood Substances 0.000 claims description 8
- 239000004033 plastic Substances 0.000 claims description 4
- 229920003023 plastic Polymers 0.000 claims description 4
- 239000010902 straw Substances 0.000 claims description 4
- 150000001875 compounds Chemical class 0.000 claims description 3
- 238000005266 casting Methods 0.000 claims description 2
- 239000004570 mortar (masonry) Substances 0.000 claims description 2
- 238000000465 moulding Methods 0.000 claims description 2
- 239000003415 peat Substances 0.000 claims description 2
- 238000003825 pressing Methods 0.000 claims description 2
- 239000002131 composite material Substances 0.000 claims 1
- 239000000463 material Substances 0.000 description 9
- ZINJLDJMHCUBIP-UHFFFAOYSA-N ethametsulfuron-methyl Chemical compound CCOC1=NC(NC)=NC(NC(=O)NS(=O)(=O)C=2C(=CC=CC=2)C(=O)OC)=N1 ZINJLDJMHCUBIP-UHFFFAOYSA-N 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 210000002023 somite Anatomy 0.000 description 2
- 240000006829 Ficus sundaica Species 0.000 description 1
- 229910000806 Latten Inorganic materials 0.000 description 1
- 239000004793 Polystyrene Substances 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000012237 artificial material Substances 0.000 description 1
- -1 blocks Substances 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 235000013312 flour Nutrition 0.000 description 1
- 239000003779 heat-resistant material Substances 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000005445 natural material Substances 0.000 description 1
- 229920002223 polystyrene Polymers 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/04—Walls having neither cavities between, nor in, the solid elements
- E04B2/06—Walls having neither cavities between, nor in, the solid elements using elements having specially-designed means for stabilising the position
- E04B2/10—Walls having neither cavities between, nor in, the solid elements using elements having specially-designed means for stabilising the position by filling material with or without reinforcements in small channels in, or in grooves between, the elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2/04—Walls having neither cavities between, nor in, the solid elements
- E04B2/06—Walls having neither cavities between, nor in, the solid elements using elements having specially-designed means for stabilising the position
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/10—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/10—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products
- E04C2/12—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of wood, fibres, chips, vegetable stems, or the like; of plastics; of foamed products of solid wood
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
- E04B2002/0202—Details of connections
- E04B2002/0204—Non-undercut connections, e.g. tongue and groove connections
- E04B2002/0206—Non-undercut connections, e.g. tongue and groove connections of rectangular shape
Definitions
- the invention relates to the field of building houses in half-timbered construction. This construction method has been known for centuries.
- a wall is erected by placing supports on a foundation and fills the spaces between two adjacent columns.
- the supports are generally made of wood.
- the compartments can be filled with any materials, such as bricks or clay or plastic.
- the invention has for its object to provide a building that is of extremely simple construction, which can be created quickly and without expertise, the components are inexpensive, and has a low energy consumption.
- a particularly advantageous embodiment of the invention is the following:
- the recesses in the blocks are formed as edge-open recesses. This means that the supports can be inserted from the side, that is in the horizontal direction, in the recesses, and not need to be threaded from above into the relevant support.
- the material of the blocks is an insulating one. Here everything comes into consideration - straw, plastic, pressed wood flour, etc.
- the block can be designed so that it has no carrying properties, but only performs a thermal insulation function. But it can also have wearing properties.
- the invention can be applied to any kind of buildings, thus residential buildings, holiday homes, multi-family houses, stables, houses with any roof shape.
- the invention is particularly applicable to kits for playing for children or adolescents or adults.
- the in the FIGS. 1 to 3 shown block 1 is made of a heat-resistant material. Natural materials such as straw, cut wood, pressed wood chips, but also artificial materials such as polystyrene or other plastics are considered.
- the block 1 can be produced by any kind of production, for example by molding, pressing, casting.
- Each block 1 has two recesses 2 in the present case. Each recess 2 is passed through the block 1 and thus connects two opposing surfaces of the block with each other. Out FIG. 1 it can be seen that the block 1 forms the contour of an S. FIG. 1 also indicates that the block is twice as long as it is wide. See the dimensions a and b.
- FIGS. 4 and 5 illustrate the use of the blocks 1 in plan view.
- the two figures differ from each other by a different arrangement of the blocks. 1
- FIGS. 6 and 7 show a wall composed of a plurality of blocks 1 and a number of supports 3.
- the supports 3 are passed through said recesses.
- the recesses 2 must therefore be aligned.
- the supports 3 can be made of any material. It's best to use wood. But other materials such as steel are possible.
- the supports 3 can be inserted into the recesses 2 such that they are closely enclosed by the material of the blocks 1. There is thus between the blocks 1 and the supports 3 a non-positive connection. Instead, a small gap between the individual support 3 and the blocks 1 prevail.
- the support will generally be anchored in the foundation, not shown here. But it is also conceivable that she is held alone by the blocks 1.
- the upper ends of the supports 3 form supports 4 for horizontal beams. Since the recesses 2 are offset in a block 1 against each other - see FIG. 1 -, Are also the supports 4 of the supports 3 offset from each other. If this were not so, then the storage of said horizontal bars would be statically indefinite.
- FIG. 8 shows the wall according to the FIGS. 6 and 7 in plan view. Again, a number of blocks 1 and supports 3 passed through the recesses 2 can be seen.
- FIG. 9 again shows a wall according to the FIGS. 6 and 7 On the wall a plurality of diagonally extending slats 5 are fixed, for example by nailing to the supports 3.
- the slats attack with their lower ends on the foundation, not shown, and with their upper ends on the roof construction, for example, on one here shown ceiling, which rests on the supports 3.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
- Joining Of Building Structures In Genera (AREA)
- Toys (AREA)
Abstract
Die Erfindung betrifft ein Gebäude, umfassend ein Fundament, von diesem getragene Wände, die wandhohe Stützen (3) aufweisen; die Zwischenräume zwischen den Stützen (3) sind von Blöcken (1) ausgefüllt, die isolierendes Material enthalten oder aus solchem bestehen; die Blöcke (1) sind rechteckig. Einige der Blöcke (1) weisen wenigstens eine vertikale Aussparung (2) auf, die einander gegenüberliegende Flächen des Blockes (1) miteinander verbinden; die Stützen (3) sind in die Aussparungen (2) eingesteckt und die Aussparungen (2) von aufeinanderliegenden Blöcken (1) fluchten miteinander.The invention relates to a building comprising a foundation, supported by this walls having wall-high supports (3); the spaces between the supports (3) are filled by blocks (1) containing or consisting of insulating material; the blocks (1) are rectangular. Some of the blocks (1) have at least one vertical recess (2) interconnecting opposing surfaces of the block (1); the supports (3) are inserted into the recesses (2) and the recesses (2) of superimposed blocks (1) are aligned with each other.
Description
Die Erfindung betrifft das Gebiet des Bauens von Häusern in Fachwerkbauweise. Diese Bauweise ist seit Jahrhunderten bekannt. Hierbei wird eine Wand dadurch errichtet, dass man Stützen auf ein Fundament stellt und die Zwischenräume (Gefache) zwischen zwei einander benachbarten Stützen ausfüllt. Die Stützen bestehen im Allgemeinen aus Holz. Die Gefache können ausgefüllt werden mit beliebigen Materialien, beispielsweise mit Ziegelsteinen oder Lehm oder Kunststoff.The invention relates to the field of building houses in half-timbered construction. This construction method has been known for centuries. Here, a wall is erected by placing supports on a foundation and fills the spaces between two adjacent columns. The supports are generally made of wood. The compartments can be filled with any materials, such as bricks or clay or plastic.
Die Fachwerkbauweise hat sich bis in die Neuzeit hinein bewährt. Sie ist einfach im Aufbau.The half-timbered construction has proven itself into modern times. She is just under construction.
Der Erfindung liegt die Aufgabe zugrunde, ein Gebäude anzugeben, das von extrem einfacher Konstruktion ist, das sich schnell und ohne Sachkenntnis erstellen lässt, dessen Bestandteile kostengünstig sind, und das einen geringen Energiebedarf aufweist.The invention has for its object to provide a building that is of extremely simple construction, which can be created quickly and without expertise, the components are inexpensive, and has a low energy consumption.
Diese Aufgabe wird durch die Merkmale von Anspruch 1 gelöst.This object is solved by the features of
Der Grundgedanke besteht demgemäß in den folgenden Merkmalen:
- Wenigstens eine der Wände umfasst radiale Stützen mit dazwischen befindlichen Blöcken.
- Jeder Block enthält ein isolierendes Material oder besteht aus einem solchen.
- Wenigstens einige Blöcke weisen wenigstens eine vertikale Aussparung auf, die sich durch den Block hindurch erstreckt.
- Die Stützen sind in die Aussparungen eingesteckt.
- At least one of the walls comprises radial supports with blocks therebetween.
- Each block contains or consists of an insulating material.
- At least some blocks have at least one vertical recess extending through the block.
- The supports are inserted in the recesses.
Die genannten Vorgänge lassen sich höchst einfach von ungelernten Personen ausführen. Zunächst werden mehrere Blockreihen übereinander angeordnet, und zwar derart, dass die vertikalen Aussparungen miteinander fluchten. Sodann werden Stützen in die Aussparungen gesteckt. Die Positionen, an welchen die Stützen eingesteckt werden, sind somit zwingend vorgegeben. Hierdurch wird das Montieren einer Mauer höchst einfach. Auch ein Laie kann nichts falsch machen; er muss lediglich in jede vertikale Aussparung eine Stütze einstecken.The processes mentioned can be carried out very easily by unskilled persons. First, a plurality of rows of blocks are arranged one above the other, in such a way that the vertical recesses are aligned with each other. Then posts are inserted into the recesses. The positions at which the supports are inserted, are therefore mandatory. This makes mounting a wall extremely easy. Even a layman can not go wrong; he only has to insert a support into each vertical recess.
Bei herkömmlichen Fachwerkkonstruktionen ist dies anders. Hier muss zunächst die Holzstruktur errichtet werden. Erst dann werden die Zwischenräume zwischen der Holzstruktur mit irgendeinem Material ausgefüllt, beispielsweise mit Blöcken, Steinen usw.This is different in conventional truss constructions. Here first the wood structure must be built. Only then are the spaces between the wood structure filled with any material, such as blocks, stones, etc.
Bei Anwendung der Erfindung bedarf es keiner Verbindungsmasse zwischen den Blöcken. Durch die maßgenaue Orientierung der Blöcke werden diese zusammengefügt, sodass sie eng aneinander anliegen.When using the invention, there is no need for bonding compound between the blocks. Due to the dimensionally accurate orientation of the blocks they are joined together, so that they fit tightly against each other.
Eine besonders vorteilhafte Ausführungsform der Erfindung ist die Folgende: Die Aussparungen in den Blöcken sind als randoffene Aussparungen ausgebildet. Dies bedeutet, dass die Stützen von der Seite her, das heißt in horizontaler Richtung, in die Aussparungen eingeführt werden können, und nicht von oben her in die betreffende Stütze eingefädelt werden müssen.A particularly advantageous embodiment of the invention is the following: The recesses in the blocks are formed as edge-open recesses. This means that the supports can be inserted from the side, that is in the horizontal direction, in the recesses, and not need to be threaded from above into the relevant support.
Das Material der Blöcke ist ein isolierendes. Hier kommt alles Mögliche in Betracht - Stroh, Kunststoff, gepresstes Holzmehl usw. Der Block kann derart beschaffen sein, dass er keinerlei Trageigenschaften aufweist, sondern nur eine Wärmedämmfunktion ausübt. Es kann aber auch durchaus Trageigenschaften aufweisen.The material of the blocks is an insulating one. Here everything comes into consideration - straw, plastic, pressed wood flour, etc. The block can be designed so that it has no carrying properties, but only performs a thermal insulation function. But it can also have wearing properties.
Die Erfindung lässt sich anwenden bei jeglicher Art von Gebäuden, somit Wohnhäuser, Ferienhäuser, Mehrfamilienhäuser, Ställen, Häuser mit jeglicher Dachform. Die Erfindung ist insbesondere auch anwendbar für Bausätze zum Spielen für Kinder oder Jugendliche oder Erwachsene.The invention can be applied to any kind of buildings, thus residential buildings, holiday homes, multi-family houses, stables, houses with any roof shape. The invention is particularly applicable to kits for playing for children or adolescents or adults.
Die Erfindung ist anhand der Zeichnung näher erläutert. Darin ist im Einzelnen folgendes dargestellt:
Figur 1- zeigt einen Block in Draufsicht.
Figur 2- zeigt einen Block in Vorderansicht.
Figur 3- zeigt einen Block in einer Ansicht von hinten.
Figur 4- ist eine Draufsicht auf Blöcke, die nach einem ersten Muster zusammengefügt sind.
Figur 5- ist eine Draufsicht auf Blöcke, die nach einem zweiten Muster zusammengefügt sind.
- Figur 6
- ist eine Seitenansicht einer Wand aus Blöcken und Stützen, von der Außenseite her gesehen.
- Figur 7
- zeigt die Wand von der anderen Seite aus gesehen.
- Figur 8
- ist eine Draufsicht auf die Wand gemäß der
Figuren 6 und 7 . - Figur 9
- zeigt die Wand gemäß der
Figuren 6 und 7 mit diagonal angebrachten Latten.
- FIG. 1
- shows a block in plan view.
- FIG. 2
- shows a block in front view.
- FIG. 3
- shows a block in a view from behind.
- FIG. 4
- is a plan view of blocks that are joined together according to a first pattern.
- FIG. 5
- is a plan view of blocks that are joined together according to a second pattern.
- FIG. 6
- is a side view of a wall of blocks and columns, seen from the outside.
- FIG. 7
- shows the wall as seen from the other side.
- FIG. 8
- is a plan view of the wall according to the
FIGS. 6 and 7 , - FIG. 9
- shows the wall according to the
FIGS. 6 and 7 with diagonally mounted slats.
Der in den
Der Block 1 kann durch jegliche Herstellungsart erzeugt werden, beispielsweise durch Formen, Pressen, Gießen.The
Jeder Block 1 weist im vorliegenden Falle zwei Aussparungen 2 auf. Jede Aussparung 2 ist durch den Block 1 hindurchgeführt und verbindet somit zwei einander gegenüberliegende Flächen des Blockes miteinander. Aus
Die
Die
Die Stützen 3 können aus jeglichem Material bestehen. Am besten verwendet man Holz. Aber auch andere Materialien wie Stahl sind möglich. Die Stützen 3 können derart in die Aussparungen 2 eingesteckt sein, dass sie vom Material der Blöcke 1 eng umschlossen sind. Es herrscht somit zwischen den Blöcken 1 und den Stützen 3 eine kraftschlüssige Verbindung. Stattdessen kann auch zwischen der einzelnen Stütze 3 und den Blöcken 1 ein geringer Spaltraum herrschen.The
Die Stütze wird im Allgemeinen im hier nicht gezeigten Fundament verankert sein. Es ist hier aber auch denkbar, dass sie alleine von den Blöcken 1 gehalten wird.The support will generally be anchored in the foundation, not shown here. But it is also conceivable that she is held alone by the
Die oberen Enden der Stützen 3 bilden Auflager 4 für horizontale Balken. Da die Aussparungen 2 in einem Block 1 gegeneinander versetzt sind - siehe
Die Erfindung bringt zahlreiche Vorteile:
- Die Montage ist extrem einfach und kann von Laien durchgeführt werden.
- Die Baukosten sind daher extrem niedrig.
- Sind die Aussparungen randoffen, so lassen sich die Stützen in die Aussparungen einlegen, sodass die Außenflächen der Stützen und die Außenflächen der Blöcke miteinander bündig sind. Die Stützen stehen somit nicht vor.
- Bei der Wand lassen sich die Funktionen "Tragen" und "Isolieren" voneinander trennen. Bei der Auswahl der Blöcke kann man sich daher voll und ganz auf die Isolationseigenschaften konzentrieren.
- Die erfindungsgemäße Gestaltung erlaubt es ohne weiteres, in der Wand Freiflächen vorzusehen, beispielsweise für Fenster oder Türen.
- Eine erfindungsgemäße Konstruktion ist erdbebensicher aufgrund der guten Verriegelung zwischen Blöcken und Stützen.
- Besonders dann, wenn die Blöcke aus leichtem natürlichem Material bestehen, beispielsweise aus gepresstem Stroh, gepresstem Torf usw., ist das Gewicht einer erfindungsgemäßen Mauerkonstruktion gering. Solche Blöcke können ganz einfach durch Fügen vereinigt werden, somit ohne jegliche Verbindungsmasse wie Mörtel. Deswegen können auch die Fundamente einfach und von geringer Tragfähigkeit sein.
- The assembly is extremely simple and can be done by laymen.
- The construction costs are therefore extremely low.
- If the recesses are open at the edge, the supports can be inserted into the recesses, so that the outer surfaces of the supports and the outer surfaces of the blocks are flush with each other. The supports are therefore not available.
- For the wall, the functions "carry" and "isolate" can be separated. When selecting the blocks you can therefore concentrate fully on the insulation properties.
- The design according to the invention makes it readily possible to provide free spaces in the wall, for example for windows or doors.
- A construction according to the invention is earthquake-proof due to the good locking between blocks and supports.
- Especially when the blocks are made of lightweight natural material, such as pressed straw, pressed peat, etc., the weight of a wall construction according to the invention is low. Such blocks can be easily combined by joining, thus without any bonding compound such as mortar. Therefore, the foundations can be simple and of low load capacity.
- 11
- Blockblock
- 22
- Aussparungrecess
- 33
- Stützesupport
- 44
- AuflagerIn stock
- 55
- Lattebar
Claims (13)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL15150383T PL2891753T3 (en) | 2014-01-07 | 2015-01-07 | Timber frame building made of special blocks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102014200044.0A DE102014200044A1 (en) | 2014-01-07 | 2014-01-07 | building |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2891753A1 true EP2891753A1 (en) | 2015-07-08 |
EP2891753B1 EP2891753B1 (en) | 2019-10-02 |
Family
ID=52345048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15150383.6A Active EP2891753B1 (en) | 2014-01-07 | 2015-01-07 | Timber frame building made of special blocks |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2891753B1 (en) |
DE (1) | DE102014200044A1 (en) |
ES (1) | ES2751410T3 (en) |
PL (1) | PL2891753T3 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113931344A (en) * | 2021-10-26 | 2022-01-14 | 李鹏 | Square brick and building method thereof |
DE102022200474A1 (en) | 2022-01-18 | 2023-07-20 | André Bonamour du Tartre | Half-timbered house in timber frame construction |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102021001225A1 (en) | 2021-03-09 | 2022-09-15 | Sonnleitner Holzbauwerke Gmbh & Co. Kg | Multi-layer wall element |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US872364A (en) * | 1906-09-24 | 1907-12-03 | James Stanwood Pierce | Cement block. |
AT163275B (en) * | 1946-04-23 | 1949-06-10 | Alexander Wuensch | Load-bearing wall made of large-area stones joined together within a frame and arranged offset |
US3112578A (en) * | 1961-11-24 | 1963-12-03 | Morton M Rosenfeld | Wall structure |
US3196582A (en) * | 1962-01-17 | 1965-07-27 | Morton M Rosenfeld | Wall and block therefor |
DE19611477A1 (en) * | 1996-03-22 | 1997-09-25 | Markus Lutz | Process to form concrete and pillar system |
DE19859438A1 (en) * | 1998-12-22 | 2000-07-27 | Josef Schmidt Gmbh & Co Tonwer | Wall brick as divided block with reinforcement and insulation cavities gives cavity areas as thirds of outer wall spacing for offset brick courses and their continuous reinforcement. |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3230679A (en) * | 1962-03-23 | 1966-01-25 | Morton M Rosenfeld | Wall structure having prefab joist sections |
DE29804074U1 (en) * | 1998-03-07 | 1998-06-04 | Großmann, Klaus, 12047 Berlin | Compound system for erecting dry masonry |
DE202011110256U1 (en) * | 2010-07-20 | 2013-04-02 | Björn Winkler | Building block, in particular for the construction of buildings |
DE102011009113A1 (en) * | 2011-01-21 | 2012-07-26 | Zoltán Boldizsár | Wall brick has vertical and horizontal through holes that are formed in legs such that horizontal through hole is arranged between side surfaces of brick and vertical through hole is arranged between deck and bottom surface |
-
2014
- 2014-01-07 DE DE102014200044.0A patent/DE102014200044A1/en not_active Withdrawn
-
2015
- 2015-01-07 ES ES15150383T patent/ES2751410T3/en active Active
- 2015-01-07 PL PL15150383T patent/PL2891753T3/en unknown
- 2015-01-07 EP EP15150383.6A patent/EP2891753B1/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US872364A (en) * | 1906-09-24 | 1907-12-03 | James Stanwood Pierce | Cement block. |
AT163275B (en) * | 1946-04-23 | 1949-06-10 | Alexander Wuensch | Load-bearing wall made of large-area stones joined together within a frame and arranged offset |
US3112578A (en) * | 1961-11-24 | 1963-12-03 | Morton M Rosenfeld | Wall structure |
US3196582A (en) * | 1962-01-17 | 1965-07-27 | Morton M Rosenfeld | Wall and block therefor |
DE19611477A1 (en) * | 1996-03-22 | 1997-09-25 | Markus Lutz | Process to form concrete and pillar system |
DE19859438A1 (en) * | 1998-12-22 | 2000-07-27 | Josef Schmidt Gmbh & Co Tonwer | Wall brick as divided block with reinforcement and insulation cavities gives cavity areas as thirds of outer wall spacing for offset brick courses and their continuous reinforcement. |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113931344A (en) * | 2021-10-26 | 2022-01-14 | 李鹏 | Square brick and building method thereof |
CN113931344B (en) * | 2021-10-26 | 2023-01-06 | 上海炽盛装饰工程有限公司 | Square brick and building method thereof |
DE102022200474A1 (en) | 2022-01-18 | 2023-07-20 | André Bonamour du Tartre | Half-timbered house in timber frame construction |
Also Published As
Publication number | Publication date |
---|---|
DE102014200044A1 (en) | 2015-07-09 |
PL2891753T3 (en) | 2020-02-28 |
ES2751410T3 (en) | 2020-03-31 |
EP2891753B1 (en) | 2019-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AT413713B (en) | BUILDING | |
WO2007068297A1 (en) | Wooden building element for constructing the walls of a building | |
EP2891753B1 (en) | Timber frame building made of special blocks | |
EP1705302A2 (en) | Element of brick material for making prefabricated panels for the construction industry | |
EP1995387B1 (en) | Wood component and wall element composed of same | |
EP0882849A2 (en) | Construction element for walls | |
DE102013002104A1 (en) | Supporting structure made of wood with a first rod-shaped or planar support element and at least one second rod-shaped or sheet-like support element | |
AT413836B (en) | ISOLATION MASONRY PART | |
DE4215081A1 (en) | Light and simple wall panel structure for building - incorporates lightweight non-structural filling material held by vertical and cross-bracing struts | |
DE102015122919A1 (en) | Wood brick | |
EP1960611A1 (en) | Wooden building element for constructing the walls of a building | |
DE3213953A1 (en) | Wall bond system | |
DE10219981A1 (en) | Wooden construction panel for ceilings, walls and roofs comprises interconnected layers with at least one cross layer connected with force locking engagement to adjoining ribbed layer for stability | |
CH691982A5 (en) | Prefabricated element unit to construct house; has floor and ceiling forming regular hexagon in cross-section and connected by six equally sized rectangular side walls | |
DE2139967A1 (en) | WOOD BASED COMPONENT FOR SMALL BUILDINGS | |
EP0955419A2 (en) | Framework system for prefabricated buildings | |
DE2607533A1 (en) | Toy model construction kit - contains interlocking building elements erected on screened construction plate | |
DE102007019251B4 (en) | Easy coupling plate-shaped insulation elements for heat and sound on outer walls and a wall structure with these | |
DE2065437A1 (en) | RESIDENTIAL BUILDING WITH SEVERAL SINGLE BUILDINGS CONSISTING OF PRE-FABRICATED ROOMS | |
DE69103063T2 (en) | Manufacturing process for support units for the construction of buildings. | |
EP4257768A1 (en) | Set of building elements for a building made of wood | |
DE2144659A1 (en) | Building with prefabricated components | |
DE102010020660A1 (en) | Toy building block set for setting up of buildings, has coupling units provided at coupling section and formed as raisers, where main section and coupling section are firmly connected with one another | |
DE20015805U1 (en) | Truss, especially for miniature houses with a gable roof | |
AT15787U1 (en) | Construction element for a building as well as building made of it, in particular prefabricated house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20150107 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
R17P | Request for examination filed (corrected) |
Effective date: 20150722 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180502 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04C 2/10 20060101ALI20190606BHEP Ipc: E04B 2/06 20060101AFI20190606BHEP Ipc: E04B 2/10 20060101ALI20190606BHEP Ipc: E04C 2/12 20060101ALI20190606BHEP Ipc: E04B 2/02 20060101ALN20190606BHEP |
|
INTG | Intention to grant announced |
Effective date: 20190628 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1186314 Country of ref document: AT Kind code of ref document: T Effective date: 20191015 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502015010489 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20191002 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20191002 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2751410 Country of ref document: ES Kind code of ref document: T3 Effective date: 20200331 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: NE Effective date: 20200327 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200103 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200102 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200203 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200224 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502015010489 Country of ref document: DE |
|
PG2D | Information on lapse in contracting state deleted |
Ref country code: IS |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200202 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
26N | No opposition filed |
Effective date: 20200703 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200107 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200131 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200131 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200107 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1186314 Country of ref document: AT Kind code of ref document: T Effective date: 20200107 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP Ref country code: NL Ref legal event code: NG |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200107 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 |
|
PGRI | Patent reinstated in contracting state [announced from national office to epo] |
Ref country code: NL Effective date: 20210409 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191002 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20221228 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20230123 Year of fee payment: 9 Ref country code: FI Payment date: 20230124 Year of fee payment: 9 Ref country code: ES Payment date: 20230201 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20230122 Year of fee payment: 9 Ref country code: GB Payment date: 20230122 Year of fee payment: 9 Ref country code: DE Payment date: 20230118 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20230125 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240126 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502015010489 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20240201 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20240107 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240107 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240801 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240107 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240131 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240201 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240107 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240107 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240801 |