EP2878415B1 - Method and manufacturing facility for casting concrete products - Google Patents
Method and manufacturing facility for casting concrete products Download PDFInfo
- Publication number
- EP2878415B1 EP2878415B1 EP14190202.3A EP14190202A EP2878415B1 EP 2878415 B1 EP2878415 B1 EP 2878415B1 EP 14190202 A EP14190202 A EP 14190202A EP 2878415 B1 EP2878415 B1 EP 2878415B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- circulating line
- casting process
- manufacturing facility
- line casting
- reinforcements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 238000005266 casting Methods 0.000 title claims description 65
- 238000004519 manufacturing process Methods 0.000 title claims description 50
- 239000004567 concrete Substances 0.000 title claims description 27
- 238000000034 method Methods 0.000 title claims description 14
- 230000002787 reinforcement Effects 0.000 claims description 54
- 239000000463 material Substances 0.000 claims description 9
- 238000004140 cleaning Methods 0.000 description 4
- 238000009413 insulation Methods 0.000 description 3
- FFBHFFJDDLITSX-UHFFFAOYSA-N benzyl N-[2-hydroxy-4-(3-oxomorpholin-4-yl)phenyl]carbamate Chemical compound OC1=C(NC(=O)OCC2=CC=CC=C2)C=CC(=C1)N1CCOCC1=O FFBHFFJDDLITSX-UHFFFAOYSA-N 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 238000005406 washing Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000004381 surface treatment Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B5/00—Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping
- B28B5/04—Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B5/00—Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping
- B28B5/04—Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations
- B28B2005/048—Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations in moulds carried on a conveyor of the endless-belt type
Definitions
- the present invention relates to casting of concrete products with a circulating line casting process. More precisely the present invention relates to a method and manufacturing facility used in the circulating line casting process.
- Circulating line casting process is a casting process where the mold tables, on which the casting molds are built, are mounted on tracks and circulate through the phases of the casting process, after which the mold tables are returned for a new cycle.
- the circulating line is formed of a plurality work stations between which the casting mold is transferred in different stages of the casting process.
- the mold table In the first stage of the circulation line the mold table is cleaned.
- the mold table In next stage the mold table is furnished with fixed and detachable mold sidewalls to form the casting mold in the mold table and other required equipment, such as reinforcements etc., are set on the mold.
- the casting of concrete mass into the mold can be carried out in different stages if for example different layers need to be added to the product to be cast such as insulation layers in cases of insulated wall elements.
- the upper surface of the product to be cast is leveled and other required surface treatment steps are carried out.
- the mold together with the fresh cast product is moved to curing stage, which generally takes place at a curing chamber where temperature during the curing can be monitored and adjusted if required.
- the mold is taken to demolding, where the cast product is removed from the mold generally together with tilting of the mold and the mold sidewalls are removed from the mold table. After this stage the mold is ready for new cleaning stage and for the process of casting a new product.
- the required reinforcements such as one or more metal lattice structures
- These required reinforcements are generally prefabricated in a separate reinforcement shop and taken to the reinforcement work station of the circulating line.
- the prefabrication of the reinforcements allows for varying reinforcements to be prefabricated for each mold and each product to be cast, and thus minimizes the work and time required in the reinforcement work station of the circulating line.
- the reinforcement shop is generally located at one end of the circulating line production facility, and the prefabricated reinforcements are moved to the reinforcement work station of the circulating line with a transfer carriage moving on track or rails extending along one side of the circulating line.
- Publication WO 2013/161064 A1 discloses a manufacturing site for precast concrete articles and related conveyance system, where materials required for the casting process are conveyed to fixed workstations where the casting process is carried out.
- EP 2 017 049 A2 discloses a method and a manufacturing facility for casting concrete products according to the preamble of claims 1 and 4.
- the area left inside of the circulating line is utilized for moving the reinforcements from the reinforcement shop to the reinforcement work station of the circulating line. This allows space savings in relation to the prior art solutions where the reinforcements are moved along the side of the circulation line.
- the track and rails formed in the area inside the circulating line can also be utilized for other purposes, such as moving sidewall units from storage or from washing station to the furnishing station.
- the present invention also allows for moving required material in the area inside the circulating line with a carriage along the floor level of the manufacturing facility and without the need for lifting material over the circulation line, which enhances work safety and does not require or tie up a crane for the lifting.
- concrete products are cast with a circulating line casting process, where molds, or mold tables, are transferred through production stages along a circulating line, and reinforcements for the concrete products to be cast are prefabricated in a separate reinforcement shop and transferred to the circulating line, wherein the reinforcements are transferred from the reinforcement shop with a carriage to the area located inside the circulating line.
- the transfer of the reinforcements is achieved without any lifting.
- the carriage is advantageously moved along a track extending on a straight line from the reinforcements shop to the area located inside the circulating line.
- the method of the invention may also include utilizing the track in the area located inside the circulating line for transferring material between production stages and work stations of the circulating line process.
- the manufacturing facility of the present invention for casting concrete products with a circulating line casting process comprises a plurality of molds, or mold tables, a plurality of transfer tracks for transferring the molds along the circulating line from a work station to another, a reinforcement shop for prefabricating reinforcements for the concrete for the concrete products to be cast, and means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line, wherein the means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line comprises a carriage moved along a track extending from the reinforcement shop to an area located inside the circulating line.
- the circulating line casting process is generally, and also in the present invention, formed of two straight and parallel production lines of production phases or work stations, which production lines are connected to each other with transversal transfer tracks at the ends of the production lines.
- the reinforcement shop is located typically at or near one end of the circulating line.
- the manufacturing facility of the invention advantageously comprises another carriage on the track in the area located inside the circulating line for transferring material between work stations of the circulating line.
- the area and track inside the circulating line can be utilized further.
- the carriage for transferring the reinforcements comprises advantageously at least four pairs of wheels along its length for crossing the track of the of the circulating line.
- the transversal transfer tracks are generally located below the tracks extending along the production lines of the circulating line and the floor level of the manufacturing facility.
- this type of carriage can advantageously cross the gap along its track at the area of the transversal transfer track without any further special structures for crossing the gap.
- the circulating line casting process comprises at least two straight and parallel production lines formed of a plurality of workstations located next to each other in the direction of the production lines, and at least two transversal transfer tracks connecting the production lines.
- two parallel productions lines connected to each other at their ends with transversal transfer tracks is all that is required.
- more complex circulating line casting processes may require additional work stations located transversally outside the production lines together with additional transversal transfer tracks or means for transferring the molds or mod tables to these additional work stations, for example.
- more complex circulating route for the mold or mold table may be required, depending on the area available for the circulating line casting process, for example.
- the manufacturing facility of the invention comprises equipment for simultaneously implementing a plurality of circulating line casting processes with separate circulating line casting process lines, for example.
- Figure 1 shows schematically a layout of a manufacturing plant, which comprises two circulating line casting processes 1, 1' and a reinforcement shop 2.
- the circulating line casting processes 1, 1' comprises plurality of work phases or work stations which are located side by side in the lengthwise direction of the processes in two separate work station lines, which two work station lines are connected to each other at transversal transfer tracks 3, 3' and 4, 4' located at the both ends of the work station lines.
- the mold tables or molds are transferred from one work station to another along a tracks extending along the work station lines, and from one work station line to another with the transversal transfer tracks 3, 3' and 4, 4'.
- the first work phase carried out in first work station 5, 5' is the cleaning of the mold table, after which the mold table is moved to furnishing stage where mold sidewalls are fixed to the mold table to form the casting mold, which is carried out in work stations 6, 6' and 7, 7'.
- the required reinforcements are added and installed in the mold in work stations 8, 8', 9, 9', 10, 10' and 11, 11'.
- the casting of the concrete mass is carried out in work station 12, 12', after which the molds with cast products are moved to a curing chamber 13, 13'.
- the molds are stacked is stacks so that plurality of concrete products in their molds can be cured simultaneously.
- the curing chamber is also equipped with separate walls to form enclosed area, and the temperature and humidity inside the curing chamber modified in order to enhance the curing of the concrete products.
- the casting of the concrete mass into the mold can also be carried in two stages, first at reinforcements work station 9' and then casting work station 12'.
- This allows casting of insulated wall elements, for example, where the wall element to be cast comprises an insulation layer that is added on top of the first cast concrete layer before another layer of concrete is cast on top of the insulation layer. Both of these concrete layers in the insulated wall element often also require separate reinforcements for each concrete layer.
- the molds are moved out of the curing chamber 13, 13' to work stations 14, 14' and 15, 15' for demoulding, where the mold sidewalls are removed from the mold table.
- additional buffer place 16, 16' which can alternatively also used as an additional demoulding work station.
- the cured concrete products are removed from the mold table in work station 17, 17', which is implemented by tilting the mold table, fixing lifting hooks to lifting lugs located in the products and lifting the concrete products with a crane from the work stations to a separate removal carriages 23, 23', the tracks of which are shown in the figure extending from the circulating line casting process lines, and moved to storage.
- the mold table is moved to the work station 5, 5' for cleaning and for a new casting process.
- the reinforcements added and fixed to the molds are prefabricated in the reinforcement shop 2, and taken to the reinforcement work stations 8, 8', 9, 9', 10, 10' and 11, 11' of the circulating line casting processes 1, 1' with carriages 18, 18', which carriages move along a straight tracks extending from the reinforcement shop to the area inside the circulating line casting processes.
- carriages 18, 18' which carriages move along a straight tracks extending from the reinforcement shop to the area inside the circulating line casting processes.
- the manufacturing facility also comprises bridge cranes 20, 20' and 21, for lifting and moving reinforcements and other material from the carriages 18, 18' and 19 to the work stations of the circulating line casting processes 1, 1'.
- the track of the carriages 18, 18' and 19 crosses the transversal transfer tracks 3, 3', which are generally located in a depressions formed on the floor of the manufacturing facility.
- the carriages 18, 18' and 19 advantageously comprises four or more pairs of wheels, so that there are always at least two wheels carrying the weight of the carriage when the carriage crosses over the transversal tracks 3, 3'.
- the carriages 18, 18' and 19 can also be used for moving other material than reinforcements to and between the work stations of the circulating line casting processes 1, 1'.
- the carriages 18, 18', 19 can be used to move detachable mold sidewall units from washing and cleaning stations 22, 22' to work stations 6, 6' and 7, 7' to be used in building of the mold on the mold table.
- the track of the carriages 18, 18' and 19 also extends over the other transversal transfer tracks 4, 4' so that the carriages can be moved next to a mold table for moving detachable sidewall units during demolding from the mold tables to the carriages.
- the circulating line processes 1, 1' shown are more simple circulating casting processes. More complex circulating line casting processes may require additional work stations located transversally outside the production lines together with additional transversal transfer tracks or means for transferring the molds or mod tables to these additional work stations, for example. Further, more complex circulating route for the mold or mold table may be required, depending on the area available for the circulating line casting process, for example.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
- Casting Devices For Molds (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
- The present invention relates to casting of concrete products with a circulating line casting process. More precisely the present invention relates to a method and manufacturing facility used in the circulating line casting process.
- Circulating line casting process is a casting process where the mold tables, on which the casting molds are built, are mounted on tracks and circulate through the phases of the casting process, after which the mold tables are returned for a new cycle.
- The circulating line is formed of a plurality work stations between which the casting mold is transferred in different stages of the casting process. In the first stage of the circulation line the mold table is cleaned. In next stage the mold table is furnished with fixed and detachable mold sidewalls to form the casting mold in the mold table and other required equipment, such as reinforcements etc., are set on the mold. After the furnishing stage casting of the concrete mass to the mold is carried out, together with required vibrating actions during the casting. The casting of concrete mass into the mold can be carried out in different stages if for example different layers need to be added to the product to be cast such as insulation layers in cases of insulated wall elements. When casting of concrete mass to the mold is done, the upper surface of the product to be cast is leveled and other required surface treatment steps are carried out. Next the mold together with the fresh cast product is moved to curing stage, which generally takes place at a curing chamber where temperature during the curing can be monitored and adjusted if required. When the cast product is cured, the mold is taken to demolding, where the cast product is removed from the mold generally together with tilting of the mold and the mold sidewalls are removed from the mold table. After this stage the mold is ready for new cleaning stage and for the process of casting a new product.
- In the furnishing stage the required reinforcements, such as one or more metal lattice structures, are added and fixed in the mold after the mold is built in the mold table with mold sidewalls. These required reinforcements are generally prefabricated in a separate reinforcement shop and taken to the reinforcement work station of the circulating line. The prefabrication of the reinforcements allows for varying reinforcements to be prefabricated for each mold and each product to be cast, and thus minimizes the work and time required in the reinforcement work station of the circulating line.
- The reinforcement shop is generally located at one end of the circulating line production facility, and the prefabricated reinforcements are moved to the reinforcement work station of the circulating line with a transfer carriage moving on track or rails extending along one side of the circulating line. Publication
WO 2013/161064 A1 discloses a manufacturing site for precast concrete articles and related conveyance system, where materials required for the casting process are conveyed to fixed workstations where the casting process is carried out. -
EP 2 017 049 A2claims - In the method of the present invention concrete products are cast with a circulating line casting process, where molds, or mold tables, are transferred through production stages along a circulating line, and reinforcements for the concrete products to be cast are prefabricated in a separate reinforcement shop and transferred to the circulating line, wherein the reinforcements are transferred from the reinforcement shop with a carriage to the area located inside the circulating line. Thus the transfer of the reinforcements is achieved without any lifting.
- In the method of the invention the carriage is advantageously moved along a track extending on a straight line from the reinforcements shop to the area located inside the circulating line.
- The method of the invention may also include utilizing the track in the area located inside the circulating line for transferring material between production stages and work stations of the circulating line process.
- The manufacturing facility of the present invention for casting concrete products with a circulating line casting process comprises a plurality of molds, or mold tables, a plurality of transfer tracks for transferring the molds along the circulating line from a work station to another, a reinforcement shop for prefabricating reinforcements for the concrete for the concrete products to be cast, and means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line, wherein the means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line comprises a carriage moved along a track extending from the reinforcement shop to an area located inside the circulating line.
- The circulating line casting process is generally, and also in the present invention, formed of two straight and parallel production lines of production phases or work stations, which production lines are connected to each other with transversal transfer tracks at the ends of the production lines. The reinforcement shop is located typically at or near one end of the circulating line.
- The manufacturing facility of the invention advantageously comprises another carriage on the track in the area located inside the circulating line for transferring material between work stations of the circulating line. Thus the area and track inside the circulating line can be utilized further.
- In the manufacturing facility of the invention the carriage for transferring the reinforcements comprises advantageously at least four pairs of wheels along its length for crossing the track of the of the circulating line. The transversal transfer tracks are generally located below the tracks extending along the production lines of the circulating line and the floor level of the manufacturing facility. Thus this type of carriage can advantageously cross the gap along its track at the area of the transversal transfer track without any further special structures for crossing the gap.
- In the manufacturing facility of the invention the circulating line casting process comprises at least two straight and parallel production lines formed of a plurality of workstations located next to each other in the direction of the production lines, and at least two transversal transfer tracks connecting the production lines. In the more simple circulating casting processes two parallel productions lines connected to each other at their ends with transversal transfer tracks is all that is required. However, more complex circulating line casting processes may require additional work stations located transversally outside the production lines together with additional transversal transfer tracks or means for transferring the molds or mod tables to these additional work stations, for example. Further, more complex circulating route for the mold or mold table may be required, depending on the area available for the circulating line casting process, for example.
- Advantageously the manufacturing facility of the invention comprises equipment for simultaneously implementing a plurality of circulating line casting processes with separate circulating line casting process lines, for example.
- The features of a method according to the present invention are more precisely presented in
claim 1, and the features of a manufacturing facility of the present invention are more precisely presented inclaim 4. Dependent claims present advantageous features and embodiments of the invention. - Exemplifying embodiment of the invention and its advantages are explained in greater detail below in the sense of example and with reference to accompanying drawings, where
Figure 1 shows schematically a layout of a manufacturing plant, which comprises two circulatingline casting processes 1, 1' and areinforcement shop 2. - The circulating
line casting processes 1, 1' comprises plurality of work phases or work stations which are located side by side in the lengthwise direction of the processes in two separate work station lines, which two work station lines are connected to each other attransversal transfer tracks transversal transfer tracks - In the circulating
line casting processes 1, 1', the first work phase carried out infirst work station 5, 5' is the cleaning of the mold table, after which the mold table is moved to furnishing stage where mold sidewalls are fixed to the mold table to form the casting mold, which is carried out inwork stations work stations work station 12, 12', after which the molds with cast products are moved to acuring chamber 13, 13'. In thecuring chamber 13, 13' the molds are stacked is stacks so that plurality of concrete products in their molds can be cured simultaneously. Further, the curing chamber is also equipped with separate walls to form enclosed area, and the temperature and humidity inside the curing chamber modified in order to enhance the curing of the concrete products. - In the circulating line process 1', the casting of the concrete mass into the mold can also be carried in two stages, first at reinforcements work station 9' and then casting work station 12'. This allows casting of insulated wall elements, for example, where the wall element to be cast comprises an insulation layer that is added on top of the first cast concrete layer before another layer of concrete is cast on top of the insulation layer. Both of these concrete layers in the insulated wall element often also require separate reinforcements for each concrete layer.
- Once the concrete products in their molds are cured, the molds are moved out of the
curing chamber 13, 13' towork stations demoulding work stations additional buffer place 16, 16', which can alternatively also used as an additional demoulding work station. In the last phase the cured concrete products are removed from the mold table inwork station 17, 17', which is implemented by tilting the mold table, fixing lifting hooks to lifting lugs located in the products and lifting the concrete products with a crane from the work stations to aseparate removal carriages 23, 23', the tracks of which are shown in the figure extending from the circulating line casting process lines, and moved to storage. When the cast concrete product is moved from the mold table, the mold table is moved to thework station 5, 5' for cleaning and for a new casting process. - The reinforcements added and fixed to the molds are prefabricated in the
reinforcement shop 2, and taken to thereinforcement work stations line casting processes 1, 1' withcarriages 18, 18', which carriages move along a straight tracks extending from the reinforcement shop to the area inside the circulating line casting processes. There can be more than one carriage located in the same track, as is shown with acarriage 19 in the area located inside the circulating line casting process 1'. The manufacturing facility also comprisesbridge cranes carriages line casting processes 1, 1'. - As can be seen from the figure, the track of the
carriages transversal transfer tracks 3, 3', which are generally located in a depressions formed on the floor of the manufacturing facility. Thus thecarriages transversal tracks 3, 3'. - The
carriages line casting processes 1, 1'. For example, thecarriages cleaning stations 22, 22' towork stations carriages transversal transfer tracks 4, 4' so that the carriages can be moved next to a mold table for moving detachable sidewall units during demolding from the mold tables to the carriages. - In relation to the embodiment shown in
figure 1 and discussed above its should be noted, that the circulating line processes 1, 1' shown are more simple circulating casting processes. More complex circulating line casting processes may require additional work stations located transversally outside the production lines together with additional transversal transfer tracks or means for transferring the molds or mod tables to these additional work stations, for example. Further, more complex circulating route for the mold or mold table may be required, depending on the area available for the circulating line casting process, for example. - The specific exemplifying embodiment of the invention shown in figures and discussed above should not be construed as limiting. A person skilled in the art can amend and modify the embodiment in many evident ways within the scope of the attached claims. Thus the invention is not limited merely to the embodiments described above.
Claims (9)
- A method for casting concrete products with a circulating line casting process (1, 1') comprising at least two straight and parallel production lines of production phases or work stations, which production lines are connected to each other with transversal transfer tracks at the ends of the production lines, where molds are transferred through production stages along a circulating line, and reinforcements for the concrete products to be cast are prefabricated in a separate reinforcement shop (2) and transferred to the circulating line casting process, characterized in that the reinforcements are transferred from the reinforcement shop (2) with a carriage (18, 18', 19) to the area located inside the circulating line casting process (1, 1') and left inside of the circulating line.
- A method according to claim 1, wherein the carriage (18, 18', 19) is moved along a track extending on a straight line from the reinforcements shop (2) to the area located inside the circulating line casting process (1, 1').
- A method according to claim 2, wherein the track located in the area inside the circulating line casting process (1, 1') is also used to move material between the production stages and work stations of the circulating line casting process.
- A manufacturing facility for casting concrete products with a circulating line casting process (1, 1') comprising at least two straight and parallel production lines of production phases or work stations, which production lines are connected to each other with transversal transfer tracks at the ends of the production lines, which facility comprises a plurality of molds or mold tables, a plurality of transfer tracks (3, 3', 4, 4') for transferring the molds along the circulating line casting process from a work station to another, a reinforcement shop (2) for prefabricating reinforcements for the concrete products to be cast, and means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line casting process, characterized in that the means for transferring prefabricated reinforcements from the reinforcement shop (2) to a work station of the circulating line casting process (1, 1') comprises a carriage (18, 18', 19) moved along a track extending from the reinforcement shop to an area located inside the circulating line casting process and left inside of the circulating line.
- A manufacturing facility according to claim 4, wherein the manufacturing facility comprises another carriage (19) on the said track for transferring material between work stations of the circulating line casting process (1, 1').
- A manufacturing facility according to claim 4 or 5, wherein the carriage (18, 18', 19) comprises at least four pairs of wheels along its length for crossing the track (3, 3') of the circulating line casting process (1, 1').
- A manufacturing facility according to any of claims 4-6, wherein the facility comprises at least one crane (20, 20', 21) for moving reinforcements from the carriage (18, 18', 19) to a reinforcement work station or work stations of the circulating line casting process (1, 1').
- A manufacturing facility according to any of claims 4-7, wherein the circulating line casting process (1, 1') in the manufacturing facility comprises at least two straight and parallel production lines of work stations, and at least two transversal transfer tracks (3, 3', 4, 4') connecting the production lines.
- A manufacturing facility according to any of claims 4-8, wherein the manufacturing facility comprises equipment for simultaneously implementing a plurality of circulating line casting processes (1, 1').
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20136126A FI124656B (en) | 2013-11-15 | 2013-11-15 | Process and manufacturing plant for casting concrete products |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2878415A2 EP2878415A2 (en) | 2015-06-03 |
EP2878415A3 EP2878415A3 (en) | 2015-10-28 |
EP2878415B1 true EP2878415B1 (en) | 2018-08-15 |
Family
ID=51862099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14190202.3A Not-in-force EP2878415B1 (en) | 2013-11-15 | 2014-10-24 | Method and manufacturing facility for casting concrete products |
Country Status (6)
Country | Link |
---|---|
US (1) | US20150137418A1 (en) |
EP (1) | EP2878415B1 (en) |
CN (1) | CN104647578B (en) |
ES (1) | ES2696827T3 (en) |
FI (1) | FI124656B (en) |
RU (1) | RU2666833C2 (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106799847A (en) * | 2017-03-30 | 2017-06-06 | 冯栓良 | Structure wall winding tube continuous production device and its production technology |
DE102017127283A1 (en) * | 2017-11-20 | 2019-05-23 | Vollert Anlagenbau Gmbh | Process and plant for the production of hollow concrete elements |
CN109719843A (en) * | 2018-05-31 | 2019-05-07 | 宁波联城住工科技有限公司 | It concrete prefabricated element production line and its pours and smashes device |
CN108762189B (en) * | 2018-06-12 | 2021-10-01 | 浙江精功科技股份有限公司 | PC component mould platform control system based on PLC control |
CN109129872B (en) * | 2018-10-15 | 2023-08-22 | 六安远大住宅工业有限公司 | Prefabricated component production line |
CN109986691B (en) * | 2019-05-05 | 2022-06-24 | 广州羊城管桩有限公司 | Tubular pile double-production-line circulating production line and production method |
CN111186009A (en) * | 2019-11-29 | 2020-05-22 | 广西建工集团建筑产业投资有限公司 | Preparation method of PC prefabricated part double-circulation production line |
CN113001741B (en) * | 2021-03-31 | 2022-06-03 | 广东博智林机器人有限公司 | Prefabricated component production line |
CN113306002A (en) * | 2021-05-28 | 2021-08-27 | 中铁四局集团第三建设有限公司 | Layout construction method and application of prefabricated bridge prefabricated part production base |
CN114454326A (en) * | 2022-02-28 | 2022-05-10 | 中铁建(无锡)工程科技发展有限公司 | Concrete member production line |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4098562A (en) * | 1976-12-14 | 1978-07-04 | Energy Conservation Techniques Inc. | Reinforced concrete block making machine |
US4372906A (en) * | 1978-09-14 | 1983-02-08 | Master Modular Homes, Inc. | Method and apparatus for pre-casting steel reinforced concrete box-like modules |
US4279583A (en) * | 1980-03-17 | 1981-07-21 | Martin Sr A Eugene | Apparatus for the automated manufacture of heavy concrete objects |
DE29905905U1 (en) * | 1999-03-31 | 2000-08-10 | Kaspar Röckelein KG, 96193 Wachenroth | Device for producing reinforced plate-shaped prefabricated concrete parts that can be used as wall or roof elements |
RU2268141C2 (en) * | 2001-07-20 | 2006-01-20 | Чтс Ди А.Маффиолетти Энд Ч. С.А.С. | Method and a device of concrete casting for manufacture of concrete products |
RU2277047C2 (en) * | 2001-11-16 | 2006-05-27 | Ассоушиэйтед Проперти Инвестментс Ллс | Installation for production of the reinforced concrete articles |
AT505691A1 (en) * | 2007-07-17 | 2009-03-15 | Progress Maschinen & Automatio | APPARATUS FOR PRODUCING CONCRETE PREPARATION ELEMENTS WITH ONE MANUFACTURING ROAD |
CN201143725Y (en) * | 2007-12-27 | 2008-11-05 | 中铁四局集团有限公司 | Rapid prefabricating production line for box girder of passenger special line |
KR101480778B1 (en) * | 2010-10-22 | 2015-01-12 | 지 컹 제임스 림 | Mobile production system for cement panel |
AT510888A1 (en) * | 2011-01-05 | 2012-07-15 | Progress Maschinen & Automation Ag | PRODUCTION PLANT WITH TIME INDEXED HISTORICAL DISPLAY |
CN102275219B (en) * | 2011-08-18 | 2012-10-31 | 广东建华管桩有限公司 | Automatic production line for pipe pile |
CN202241569U (en) * | 2011-08-22 | 2012-05-30 | 中山建华墙体材料有限公司 | Motor train unit circulating system used for producing light wallboards |
WO2013161064A1 (en) * | 2012-04-27 | 2013-10-31 | 前田建設工業株式会社 | Manufacturing site for precast concrete article, conveyance system for precast concrete article, and conveyance system |
CN202702384U (en) * | 2012-07-16 | 2013-01-30 | 江苏建华新型墙材有限公司 | Automatic circulating production system for wall plates |
-
2013
- 2013-11-15 FI FI20136126A patent/FI124656B/en not_active IP Right Cessation
-
2014
- 2014-10-24 ES ES14190202T patent/ES2696827T3/en active Active
- 2014-10-24 EP EP14190202.3A patent/EP2878415B1/en not_active Not-in-force
- 2014-11-12 RU RU2014145304A patent/RU2666833C2/en not_active IP Right Cessation
- 2014-11-14 CN CN201410645998.0A patent/CN104647578B/en not_active Expired - Fee Related
- 2014-11-14 US US14/541,217 patent/US20150137418A1/en not_active Abandoned
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
EP2878415A3 (en) | 2015-10-28 |
US20150137418A1 (en) | 2015-05-21 |
CN104647578B (en) | 2017-12-12 |
EP2878415A2 (en) | 2015-06-03 |
ES2696827T3 (en) | 2019-01-18 |
RU2014145304A3 (en) | 2018-03-28 |
RU2014145304A (en) | 2016-06-10 |
CN104647578A (en) | 2015-05-27 |
FI20136126A (en) | 2014-11-28 |
RU2666833C2 (en) | 2018-09-12 |
FI124656B (en) | 2014-11-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2878415B1 (en) | Method and manufacturing facility for casting concrete products | |
CN109203215A (en) | Concrete prefabricated element production line | |
CN206085314U (en) | Prefabricated component flexible production line | |
WO2020232744A1 (en) | Prefabricated component production line having temporary storage function | |
CN204382485U (en) | Prefabricated components production system | |
CN104589476B (en) | Precuring storehouse, the production line containing the precuring storehouse and its control method | |
CN113548409A (en) | Plate lifting and transferring equipment and method for truss laminated slab production line | |
US10603816B2 (en) | Arrangement for casting concrete products | |
CN209350532U (en) | Concrete prefabricated element production line | |
CN208629675U (en) | Concrete prefabricated element process units | |
EP2942171B1 (en) | Method for casting concrete products | |
EP2942170B1 (en) | Method for casting concrete products | |
CN109719843A (en) | It concrete prefabricated element production line and its pours and smashes device | |
US6841110B2 (en) | Method and plant for manufacturing prestressed concrete products | |
CN211541707U (en) | Curing kiln | |
CN113001741B (en) | Prefabricated component production line | |
CN210732776U (en) | Unit type maintenance system for CRTS III type ballastless track slab | |
CN111975973A (en) | Plate-shaped member production line and production method | |
CN212288116U (en) | Prefabricated part production line | |
CN111993563A (en) | Prefabricated component production system | |
CN106142329A (en) | The method of casting concrete goods | |
CN217834090U (en) | Prefabricated part production line | |
CN215150288U (en) | Assembly type production component production line | |
KR20110027984A (en) | Structure of girder manufacturing site | |
CN219522514U (en) | Prefabricated component production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20141024 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B28B 5/04 20060101AFI20150918BHEP Ipc: B28B 15/00 20060101ALI20150918BHEP Ipc: B28B 23/02 20060101ALI20150918BHEP |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: ELEMATIC OYJ |
|
R17P | Request for examination filed (corrected) |
Effective date: 20160127 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
17Q | First examination report despatched |
Effective date: 20161124 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20180518 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: GB Ref legal event code: FG4D Ref country code: AT Ref legal event code: REF Ref document number: 1029237 Country of ref document: AT Kind code of ref document: T Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014030343 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20181019 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1029237 Country of ref document: AT Kind code of ref document: T Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2696827 Country of ref document: ES Kind code of ref document: T3 Effective date: 20190118 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181215 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181115 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181116 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181115 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20181019 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20181019 Year of fee payment: 5 Ref country code: BE Payment date: 20181019 Year of fee payment: 5 Ref country code: FR Payment date: 20181023 Year of fee payment: 5 Ref country code: ES Payment date: 20181123 Year of fee payment: 5 Ref country code: IT Payment date: 20181217 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602014030343 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181024 |
|
26N | No opposition filed |
Effective date: 20190516 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181031 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181031 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181024 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181024 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602014030343 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20191101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20141024 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180815 Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180815 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200501 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20191031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191031 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191101 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20191024 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191024 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191024 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191031 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20210301 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191025 |