EP2878415B1 - Method and manufacturing facility for casting concrete products - Google Patents

Method and manufacturing facility for casting concrete products Download PDF

Info

Publication number
EP2878415B1
EP2878415B1 EP14190202.3A EP14190202A EP2878415B1 EP 2878415 B1 EP2878415 B1 EP 2878415B1 EP 14190202 A EP14190202 A EP 14190202A EP 2878415 B1 EP2878415 B1 EP 2878415B1
Authority
EP
European Patent Office
Prior art keywords
circulating line
casting process
manufacturing facility
line casting
reinforcements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP14190202.3A
Other languages
German (de)
French (fr)
Other versions
EP2878415A3 (en
EP2878415A2 (en
Inventor
Jani Eilola
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elematic Oyj
Original Assignee
Elematic Oyj
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elematic Oyj filed Critical Elematic Oyj
Publication of EP2878415A2 publication Critical patent/EP2878415A2/en
Publication of EP2878415A3 publication Critical patent/EP2878415A3/en
Application granted granted Critical
Publication of EP2878415B1 publication Critical patent/EP2878415B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B5/00Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping
    • B28B5/04Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B5/00Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping
    • B28B5/04Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations
    • B28B2005/048Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations in moulds carried on a conveyor of the endless-belt type

Definitions

  • the present invention relates to casting of concrete products with a circulating line casting process. More precisely the present invention relates to a method and manufacturing facility used in the circulating line casting process.
  • Circulating line casting process is a casting process where the mold tables, on which the casting molds are built, are mounted on tracks and circulate through the phases of the casting process, after which the mold tables are returned for a new cycle.
  • the circulating line is formed of a plurality work stations between which the casting mold is transferred in different stages of the casting process.
  • the mold table In the first stage of the circulation line the mold table is cleaned.
  • the mold table In next stage the mold table is furnished with fixed and detachable mold sidewalls to form the casting mold in the mold table and other required equipment, such as reinforcements etc., are set on the mold.
  • the casting of concrete mass into the mold can be carried out in different stages if for example different layers need to be added to the product to be cast such as insulation layers in cases of insulated wall elements.
  • the upper surface of the product to be cast is leveled and other required surface treatment steps are carried out.
  • the mold together with the fresh cast product is moved to curing stage, which generally takes place at a curing chamber where temperature during the curing can be monitored and adjusted if required.
  • the mold is taken to demolding, where the cast product is removed from the mold generally together with tilting of the mold and the mold sidewalls are removed from the mold table. After this stage the mold is ready for new cleaning stage and for the process of casting a new product.
  • the required reinforcements such as one or more metal lattice structures
  • These required reinforcements are generally prefabricated in a separate reinforcement shop and taken to the reinforcement work station of the circulating line.
  • the prefabrication of the reinforcements allows for varying reinforcements to be prefabricated for each mold and each product to be cast, and thus minimizes the work and time required in the reinforcement work station of the circulating line.
  • the reinforcement shop is generally located at one end of the circulating line production facility, and the prefabricated reinforcements are moved to the reinforcement work station of the circulating line with a transfer carriage moving on track or rails extending along one side of the circulating line.
  • Publication WO 2013/161064 A1 discloses a manufacturing site for precast concrete articles and related conveyance system, where materials required for the casting process are conveyed to fixed workstations where the casting process is carried out.
  • EP 2 017 049 A2 discloses a method and a manufacturing facility for casting concrete products according to the preamble of claims 1 and 4.
  • the area left inside of the circulating line is utilized for moving the reinforcements from the reinforcement shop to the reinforcement work station of the circulating line. This allows space savings in relation to the prior art solutions where the reinforcements are moved along the side of the circulation line.
  • the track and rails formed in the area inside the circulating line can also be utilized for other purposes, such as moving sidewall units from storage or from washing station to the furnishing station.
  • the present invention also allows for moving required material in the area inside the circulating line with a carriage along the floor level of the manufacturing facility and without the need for lifting material over the circulation line, which enhances work safety and does not require or tie up a crane for the lifting.
  • concrete products are cast with a circulating line casting process, where molds, or mold tables, are transferred through production stages along a circulating line, and reinforcements for the concrete products to be cast are prefabricated in a separate reinforcement shop and transferred to the circulating line, wherein the reinforcements are transferred from the reinforcement shop with a carriage to the area located inside the circulating line.
  • the transfer of the reinforcements is achieved without any lifting.
  • the carriage is advantageously moved along a track extending on a straight line from the reinforcements shop to the area located inside the circulating line.
  • the method of the invention may also include utilizing the track in the area located inside the circulating line for transferring material between production stages and work stations of the circulating line process.
  • the manufacturing facility of the present invention for casting concrete products with a circulating line casting process comprises a plurality of molds, or mold tables, a plurality of transfer tracks for transferring the molds along the circulating line from a work station to another, a reinforcement shop for prefabricating reinforcements for the concrete for the concrete products to be cast, and means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line, wherein the means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line comprises a carriage moved along a track extending from the reinforcement shop to an area located inside the circulating line.
  • the circulating line casting process is generally, and also in the present invention, formed of two straight and parallel production lines of production phases or work stations, which production lines are connected to each other with transversal transfer tracks at the ends of the production lines.
  • the reinforcement shop is located typically at or near one end of the circulating line.
  • the manufacturing facility of the invention advantageously comprises another carriage on the track in the area located inside the circulating line for transferring material between work stations of the circulating line.
  • the area and track inside the circulating line can be utilized further.
  • the carriage for transferring the reinforcements comprises advantageously at least four pairs of wheels along its length for crossing the track of the of the circulating line.
  • the transversal transfer tracks are generally located below the tracks extending along the production lines of the circulating line and the floor level of the manufacturing facility.
  • this type of carriage can advantageously cross the gap along its track at the area of the transversal transfer track without any further special structures for crossing the gap.
  • the circulating line casting process comprises at least two straight and parallel production lines formed of a plurality of workstations located next to each other in the direction of the production lines, and at least two transversal transfer tracks connecting the production lines.
  • two parallel productions lines connected to each other at their ends with transversal transfer tracks is all that is required.
  • more complex circulating line casting processes may require additional work stations located transversally outside the production lines together with additional transversal transfer tracks or means for transferring the molds or mod tables to these additional work stations, for example.
  • more complex circulating route for the mold or mold table may be required, depending on the area available for the circulating line casting process, for example.
  • the manufacturing facility of the invention comprises equipment for simultaneously implementing a plurality of circulating line casting processes with separate circulating line casting process lines, for example.
  • Figure 1 shows schematically a layout of a manufacturing plant, which comprises two circulating line casting processes 1, 1' and a reinforcement shop 2.
  • the circulating line casting processes 1, 1' comprises plurality of work phases or work stations which are located side by side in the lengthwise direction of the processes in two separate work station lines, which two work station lines are connected to each other at transversal transfer tracks 3, 3' and 4, 4' located at the both ends of the work station lines.
  • the mold tables or molds are transferred from one work station to another along a tracks extending along the work station lines, and from one work station line to another with the transversal transfer tracks 3, 3' and 4, 4'.
  • the first work phase carried out in first work station 5, 5' is the cleaning of the mold table, after which the mold table is moved to furnishing stage where mold sidewalls are fixed to the mold table to form the casting mold, which is carried out in work stations 6, 6' and 7, 7'.
  • the required reinforcements are added and installed in the mold in work stations 8, 8', 9, 9', 10, 10' and 11, 11'.
  • the casting of the concrete mass is carried out in work station 12, 12', after which the molds with cast products are moved to a curing chamber 13, 13'.
  • the molds are stacked is stacks so that plurality of concrete products in their molds can be cured simultaneously.
  • the curing chamber is also equipped with separate walls to form enclosed area, and the temperature and humidity inside the curing chamber modified in order to enhance the curing of the concrete products.
  • the casting of the concrete mass into the mold can also be carried in two stages, first at reinforcements work station 9' and then casting work station 12'.
  • This allows casting of insulated wall elements, for example, where the wall element to be cast comprises an insulation layer that is added on top of the first cast concrete layer before another layer of concrete is cast on top of the insulation layer. Both of these concrete layers in the insulated wall element often also require separate reinforcements for each concrete layer.
  • the molds are moved out of the curing chamber 13, 13' to work stations 14, 14' and 15, 15' for demoulding, where the mold sidewalls are removed from the mold table.
  • additional buffer place 16, 16' which can alternatively also used as an additional demoulding work station.
  • the cured concrete products are removed from the mold table in work station 17, 17', which is implemented by tilting the mold table, fixing lifting hooks to lifting lugs located in the products and lifting the concrete products with a crane from the work stations to a separate removal carriages 23, 23', the tracks of which are shown in the figure extending from the circulating line casting process lines, and moved to storage.
  • the mold table is moved to the work station 5, 5' for cleaning and for a new casting process.
  • the reinforcements added and fixed to the molds are prefabricated in the reinforcement shop 2, and taken to the reinforcement work stations 8, 8', 9, 9', 10, 10' and 11, 11' of the circulating line casting processes 1, 1' with carriages 18, 18', which carriages move along a straight tracks extending from the reinforcement shop to the area inside the circulating line casting processes.
  • carriages 18, 18' which carriages move along a straight tracks extending from the reinforcement shop to the area inside the circulating line casting processes.
  • the manufacturing facility also comprises bridge cranes 20, 20' and 21, for lifting and moving reinforcements and other material from the carriages 18, 18' and 19 to the work stations of the circulating line casting processes 1, 1'.
  • the track of the carriages 18, 18' and 19 crosses the transversal transfer tracks 3, 3', which are generally located in a depressions formed on the floor of the manufacturing facility.
  • the carriages 18, 18' and 19 advantageously comprises four or more pairs of wheels, so that there are always at least two wheels carrying the weight of the carriage when the carriage crosses over the transversal tracks 3, 3'.
  • the carriages 18, 18' and 19 can also be used for moving other material than reinforcements to and between the work stations of the circulating line casting processes 1, 1'.
  • the carriages 18, 18', 19 can be used to move detachable mold sidewall units from washing and cleaning stations 22, 22' to work stations 6, 6' and 7, 7' to be used in building of the mold on the mold table.
  • the track of the carriages 18, 18' and 19 also extends over the other transversal transfer tracks 4, 4' so that the carriages can be moved next to a mold table for moving detachable sidewall units during demolding from the mold tables to the carriages.
  • the circulating line processes 1, 1' shown are more simple circulating casting processes. More complex circulating line casting processes may require additional work stations located transversally outside the production lines together with additional transversal transfer tracks or means for transferring the molds or mod tables to these additional work stations, for example. Further, more complex circulating route for the mold or mold table may be required, depending on the area available for the circulating line casting process, for example.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Casting Devices For Molds (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

  • The present invention relates to casting of concrete products with a circulating line casting process. More precisely the present invention relates to a method and manufacturing facility used in the circulating line casting process.
  • Circulating line casting process is a casting process where the mold tables, on which the casting molds are built, are mounted on tracks and circulate through the phases of the casting process, after which the mold tables are returned for a new cycle.
  • The circulating line is formed of a plurality work stations between which the casting mold is transferred in different stages of the casting process. In the first stage of the circulation line the mold table is cleaned. In next stage the mold table is furnished with fixed and detachable mold sidewalls to form the casting mold in the mold table and other required equipment, such as reinforcements etc., are set on the mold. After the furnishing stage casting of the concrete mass to the mold is carried out, together with required vibrating actions during the casting. The casting of concrete mass into the mold can be carried out in different stages if for example different layers need to be added to the product to be cast such as insulation layers in cases of insulated wall elements. When casting of concrete mass to the mold is done, the upper surface of the product to be cast is leveled and other required surface treatment steps are carried out. Next the mold together with the fresh cast product is moved to curing stage, which generally takes place at a curing chamber where temperature during the curing can be monitored and adjusted if required. When the cast product is cured, the mold is taken to demolding, where the cast product is removed from the mold generally together with tilting of the mold and the mold sidewalls are removed from the mold table. After this stage the mold is ready for new cleaning stage and for the process of casting a new product.
  • In the furnishing stage the required reinforcements, such as one or more metal lattice structures, are added and fixed in the mold after the mold is built in the mold table with mold sidewalls. These required reinforcements are generally prefabricated in a separate reinforcement shop and taken to the reinforcement work station of the circulating line. The prefabrication of the reinforcements allows for varying reinforcements to be prefabricated for each mold and each product to be cast, and thus minimizes the work and time required in the reinforcement work station of the circulating line.
  • The reinforcement shop is generally located at one end of the circulating line production facility, and the prefabricated reinforcements are moved to the reinforcement work station of the circulating line with a transfer carriage moving on track or rails extending along one side of the circulating line. Publication WO 2013/161064 A1 discloses a manufacturing site for precast concrete articles and related conveyance system, where materials required for the casting process are conveyed to fixed workstations where the casting process is carried out.
  • EP 2 017 049 A2 discloses a method and a manufacturing facility for casting concrete products according to the preamble of claims 1 and 4. In the present invention the area left inside of the circulating line is utilized for moving the reinforcements from the reinforcement shop to the reinforcement work station of the circulating line. This allows space savings in relation to the prior art solutions where the reinforcements are moved along the side of the circulation line. Further, the track and rails formed in the area inside the circulating line can also be utilized for other purposes, such as moving sidewall units from storage or from washing station to the furnishing station. The present invention also allows for moving required material in the area inside the circulating line with a carriage along the floor level of the manufacturing facility and without the need for lifting material over the circulation line, which enhances work safety and does not require or tie up a crane for the lifting.
  • In the method of the present invention concrete products are cast with a circulating line casting process, where molds, or mold tables, are transferred through production stages along a circulating line, and reinforcements for the concrete products to be cast are prefabricated in a separate reinforcement shop and transferred to the circulating line, wherein the reinforcements are transferred from the reinforcement shop with a carriage to the area located inside the circulating line. Thus the transfer of the reinforcements is achieved without any lifting.
  • In the method of the invention the carriage is advantageously moved along a track extending on a straight line from the reinforcements shop to the area located inside the circulating line.
  • The method of the invention may also include utilizing the track in the area located inside the circulating line for transferring material between production stages and work stations of the circulating line process.
  • The manufacturing facility of the present invention for casting concrete products with a circulating line casting process comprises a plurality of molds, or mold tables, a plurality of transfer tracks for transferring the molds along the circulating line from a work station to another, a reinforcement shop for prefabricating reinforcements for the concrete for the concrete products to be cast, and means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line, wherein the means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line comprises a carriage moved along a track extending from the reinforcement shop to an area located inside the circulating line.
  • The circulating line casting process is generally, and also in the present invention, formed of two straight and parallel production lines of production phases or work stations, which production lines are connected to each other with transversal transfer tracks at the ends of the production lines. The reinforcement shop is located typically at or near one end of the circulating line.
  • The manufacturing facility of the invention advantageously comprises another carriage on the track in the area located inside the circulating line for transferring material between work stations of the circulating line. Thus the area and track inside the circulating line can be utilized further.
  • In the manufacturing facility of the invention the carriage for transferring the reinforcements comprises advantageously at least four pairs of wheels along its length for crossing the track of the of the circulating line. The transversal transfer tracks are generally located below the tracks extending along the production lines of the circulating line and the floor level of the manufacturing facility. Thus this type of carriage can advantageously cross the gap along its track at the area of the transversal transfer track without any further special structures for crossing the gap.
  • In the manufacturing facility of the invention the circulating line casting process comprises at least two straight and parallel production lines formed of a plurality of workstations located next to each other in the direction of the production lines, and at least two transversal transfer tracks connecting the production lines. In the more simple circulating casting processes two parallel productions lines connected to each other at their ends with transversal transfer tracks is all that is required. However, more complex circulating line casting processes may require additional work stations located transversally outside the production lines together with additional transversal transfer tracks or means for transferring the molds or mod tables to these additional work stations, for example. Further, more complex circulating route for the mold or mold table may be required, depending on the area available for the circulating line casting process, for example.
  • Advantageously the manufacturing facility of the invention comprises equipment for simultaneously implementing a plurality of circulating line casting processes with separate circulating line casting process lines, for example.
  • The features of a method according to the present invention are more precisely presented in claim 1, and the features of a manufacturing facility of the present invention are more precisely presented in claim 4. Dependent claims present advantageous features and embodiments of the invention.
  • Exemplifying embodiment of the invention and its advantages are explained in greater detail below in the sense of example and with reference to accompanying drawings, where
    Figure 1 shows schematically a layout of a manufacturing plant, which comprises two circulating line casting processes 1, 1' and a reinforcement shop 2.
  • The circulating line casting processes 1, 1' comprises plurality of work phases or work stations which are located side by side in the lengthwise direction of the processes in two separate work station lines, which two work station lines are connected to each other at transversal transfer tracks 3, 3' and 4, 4' located at the both ends of the work station lines. The mold tables or molds are transferred from one work station to another along a tracks extending along the work station lines, and from one work station line to another with the transversal transfer tracks 3, 3' and 4, 4'.
  • In the circulating line casting processes 1, 1', the first work phase carried out in first work station 5, 5' is the cleaning of the mold table, after which the mold table is moved to furnishing stage where mold sidewalls are fixed to the mold table to form the casting mold, which is carried out in work stations 6, 6' and 7, 7'. Once the mold is ready, the required reinforcements are added and installed in the mold in work stations 8, 8', 9, 9', 10, 10' and 11, 11'. Next the casting of the concrete mass is carried out in work station 12, 12', after which the molds with cast products are moved to a curing chamber 13, 13'. In the curing chamber 13, 13' the molds are stacked is stacks so that plurality of concrete products in their molds can be cured simultaneously. Further, the curing chamber is also equipped with separate walls to form enclosed area, and the temperature and humidity inside the curing chamber modified in order to enhance the curing of the concrete products.
  • In the circulating line process 1', the casting of the concrete mass into the mold can also be carried in two stages, first at reinforcements work station 9' and then casting work station 12'. This allows casting of insulated wall elements, for example, where the wall element to be cast comprises an insulation layer that is added on top of the first cast concrete layer before another layer of concrete is cast on top of the insulation layer. Both of these concrete layers in the insulated wall element often also require separate reinforcements for each concrete layer.
  • Once the concrete products in their molds are cured, the molds are moved out of the curing chamber 13, 13' to work stations 14, 14' and 15, 15' for demoulding, where the mold sidewalls are removed from the mold table. Between the demoulding work stations 14, 14' and 15, 15' is arranged additional buffer place 16, 16', which can alternatively also used as an additional demoulding work station. In the last phase the cured concrete products are removed from the mold table in work station 17, 17', which is implemented by tilting the mold table, fixing lifting hooks to lifting lugs located in the products and lifting the concrete products with a crane from the work stations to a separate removal carriages 23, 23', the tracks of which are shown in the figure extending from the circulating line casting process lines, and moved to storage. When the cast concrete product is moved from the mold table, the mold table is moved to the work station 5, 5' for cleaning and for a new casting process.
  • The reinforcements added and fixed to the molds are prefabricated in the reinforcement shop 2, and taken to the reinforcement work stations 8, 8', 9, 9', 10, 10' and 11, 11' of the circulating line casting processes 1, 1' with carriages 18, 18', which carriages move along a straight tracks extending from the reinforcement shop to the area inside the circulating line casting processes. There can be more than one carriage located in the same track, as is shown with a carriage 19 in the area located inside the circulating line casting process 1'. The manufacturing facility also comprises bridge cranes 20, 20' and 21, for lifting and moving reinforcements and other material from the carriages 18, 18' and 19 to the work stations of the circulating line casting processes 1, 1'.
  • As can be seen from the figure, the track of the carriages 18, 18' and 19 crosses the transversal transfer tracks 3, 3', which are generally located in a depressions formed on the floor of the manufacturing facility. Thus the carriages 18, 18' and 19 advantageously comprises four or more pairs of wheels, so that there are always at least two wheels carrying the weight of the carriage when the carriage crosses over the transversal tracks 3, 3'.
  • The carriages 18, 18' and 19 can also be used for moving other material than reinforcements to and between the work stations of the circulating line casting processes 1, 1'. For example, the carriages 18, 18', 19 can be used to move detachable mold sidewall units from washing and cleaning stations 22, 22' to work stations 6, 6' and 7, 7' to be used in building of the mold on the mold table. Thus, as can be seen from the figure, the track of the carriages 18, 18' and 19 also extends over the other transversal transfer tracks 4, 4' so that the carriages can be moved next to a mold table for moving detachable sidewall units during demolding from the mold tables to the carriages.
  • In relation to the embodiment shown in figure 1 and discussed above its should be noted, that the circulating line processes 1, 1' shown are more simple circulating casting processes. More complex circulating line casting processes may require additional work stations located transversally outside the production lines together with additional transversal transfer tracks or means for transferring the molds or mod tables to these additional work stations, for example. Further, more complex circulating route for the mold or mold table may be required, depending on the area available for the circulating line casting process, for example.
  • The specific exemplifying embodiment of the invention shown in figures and discussed above should not be construed as limiting. A person skilled in the art can amend and modify the embodiment in many evident ways within the scope of the attached claims. Thus the invention is not limited merely to the embodiments described above.

Claims (9)

  1. A method for casting concrete products with a circulating line casting process (1, 1') comprising at least two straight and parallel production lines of production phases or work stations, which production lines are connected to each other with transversal transfer tracks at the ends of the production lines, where molds are transferred through production stages along a circulating line, and reinforcements for the concrete products to be cast are prefabricated in a separate reinforcement shop (2) and transferred to the circulating line casting process, characterized in that the reinforcements are transferred from the reinforcement shop (2) with a carriage (18, 18', 19) to the area located inside the circulating line casting process (1, 1') and left inside of the circulating line.
  2. A method according to claim 1, wherein the carriage (18, 18', 19) is moved along a track extending on a straight line from the reinforcements shop (2) to the area located inside the circulating line casting process (1, 1').
  3. A method according to claim 2, wherein the track located in the area inside the circulating line casting process (1, 1') is also used to move material between the production stages and work stations of the circulating line casting process.
  4. A manufacturing facility for casting concrete products with a circulating line casting process (1, 1') comprising at least two straight and parallel production lines of production phases or work stations, which production lines are connected to each other with transversal transfer tracks at the ends of the production lines, which facility comprises a plurality of molds or mold tables, a plurality of transfer tracks (3, 3', 4, 4') for transferring the molds along the circulating line casting process from a work station to another, a reinforcement shop (2) for prefabricating reinforcements for the concrete products to be cast, and means for transferring prefabricated reinforcements from the reinforcement shop to a work station of the circulating line casting process, characterized in that the means for transferring prefabricated reinforcements from the reinforcement shop (2) to a work station of the circulating line casting process (1, 1') comprises a carriage (18, 18', 19) moved along a track extending from the reinforcement shop to an area located inside the circulating line casting process and left inside of the circulating line.
  5. A manufacturing facility according to claim 4, wherein the manufacturing facility comprises another carriage (19) on the said track for transferring material between work stations of the circulating line casting process (1, 1').
  6. A manufacturing facility according to claim 4 or 5, wherein the carriage (18, 18', 19) comprises at least four pairs of wheels along its length for crossing the track (3, 3') of the circulating line casting process (1, 1').
  7. A manufacturing facility according to any of claims 4-6, wherein the facility comprises at least one crane (20, 20', 21) for moving reinforcements from the carriage (18, 18', 19) to a reinforcement work station or work stations of the circulating line casting process (1, 1').
  8. A manufacturing facility according to any of claims 4-7, wherein the circulating line casting process (1, 1') in the manufacturing facility comprises at least two straight and parallel production lines of work stations, and at least two transversal transfer tracks (3, 3', 4, 4') connecting the production lines.
  9. A manufacturing facility according to any of claims 4-8, wherein the manufacturing facility comprises equipment for simultaneously implementing a plurality of circulating line casting processes (1, 1').
EP14190202.3A 2013-11-15 2014-10-24 Method and manufacturing facility for casting concrete products Not-in-force EP2878415B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FI20136126A FI124656B (en) 2013-11-15 2013-11-15 Process and manufacturing plant for casting concrete products

Publications (3)

Publication Number Publication Date
EP2878415A2 EP2878415A2 (en) 2015-06-03
EP2878415A3 EP2878415A3 (en) 2015-10-28
EP2878415B1 true EP2878415B1 (en) 2018-08-15

Family

ID=51862099

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14190202.3A Not-in-force EP2878415B1 (en) 2013-11-15 2014-10-24 Method and manufacturing facility for casting concrete products

Country Status (6)

Country Link
US (1) US20150137418A1 (en)
EP (1) EP2878415B1 (en)
CN (1) CN104647578B (en)
ES (1) ES2696827T3 (en)
FI (1) FI124656B (en)
RU (1) RU2666833C2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106799847A (en) * 2017-03-30 2017-06-06 冯栓良 Structure wall winding tube continuous production device and its production technology
DE102017127283A1 (en) * 2017-11-20 2019-05-23 Vollert Anlagenbau Gmbh Process and plant for the production of hollow concrete elements
CN109719843A (en) * 2018-05-31 2019-05-07 宁波联城住工科技有限公司 It concrete prefabricated element production line and its pours and smashes device
CN108762189B (en) * 2018-06-12 2021-10-01 浙江精功科技股份有限公司 PC component mould platform control system based on PLC control
CN109129872B (en) * 2018-10-15 2023-08-22 六安远大住宅工业有限公司 Prefabricated component production line
CN109986691B (en) * 2019-05-05 2022-06-24 广州羊城管桩有限公司 Tubular pile double-production-line circulating production line and production method
CN111186009A (en) * 2019-11-29 2020-05-22 广西建工集团建筑产业投资有限公司 Preparation method of PC prefabricated part double-circulation production line
CN113001741B (en) * 2021-03-31 2022-06-03 广东博智林机器人有限公司 Prefabricated component production line
CN113306002A (en) * 2021-05-28 2021-08-27 中铁四局集团第三建设有限公司 Layout construction method and application of prefabricated bridge prefabricated part production base
CN114454326A (en) * 2022-02-28 2022-05-10 中铁建(无锡)工程科技发展有限公司 Concrete member production line

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4098562A (en) * 1976-12-14 1978-07-04 Energy Conservation Techniques Inc. Reinforced concrete block making machine
US4372906A (en) * 1978-09-14 1983-02-08 Master Modular Homes, Inc. Method and apparatus for pre-casting steel reinforced concrete box-like modules
US4279583A (en) * 1980-03-17 1981-07-21 Martin Sr A Eugene Apparatus for the automated manufacture of heavy concrete objects
DE29905905U1 (en) * 1999-03-31 2000-08-10 Kaspar Röckelein KG, 96193 Wachenroth Device for producing reinforced plate-shaped prefabricated concrete parts that can be used as wall or roof elements
RU2268141C2 (en) * 2001-07-20 2006-01-20 Чтс Ди А.Маффиолетти Энд Ч. С.А.С. Method and a device of concrete casting for manufacture of concrete products
RU2277047C2 (en) * 2001-11-16 2006-05-27 Ассоушиэйтед Проперти Инвестментс Ллс Installation for production of the reinforced concrete articles
AT505691A1 (en) * 2007-07-17 2009-03-15 Progress Maschinen & Automatio APPARATUS FOR PRODUCING CONCRETE PREPARATION ELEMENTS WITH ONE MANUFACTURING ROAD
CN201143725Y (en) * 2007-12-27 2008-11-05 中铁四局集团有限公司 Rapid prefabricating production line for box girder of passenger special line
KR101480778B1 (en) * 2010-10-22 2015-01-12 지 컹 제임스 림 Mobile production system for cement panel
AT510888A1 (en) * 2011-01-05 2012-07-15 Progress Maschinen & Automation Ag PRODUCTION PLANT WITH TIME INDEXED HISTORICAL DISPLAY
CN102275219B (en) * 2011-08-18 2012-10-31 广东建华管桩有限公司 Automatic production line for pipe pile
CN202241569U (en) * 2011-08-22 2012-05-30 中山建华墙体材料有限公司 Motor train unit circulating system used for producing light wallboards
WO2013161064A1 (en) * 2012-04-27 2013-10-31 前田建設工業株式会社 Manufacturing site for precast concrete article, conveyance system for precast concrete article, and conveyance system
CN202702384U (en) * 2012-07-16 2013-01-30 江苏建华新型墙材有限公司 Automatic circulating production system for wall plates

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
EP2878415A3 (en) 2015-10-28
US20150137418A1 (en) 2015-05-21
CN104647578B (en) 2017-12-12
EP2878415A2 (en) 2015-06-03
ES2696827T3 (en) 2019-01-18
RU2014145304A3 (en) 2018-03-28
RU2014145304A (en) 2016-06-10
CN104647578A (en) 2015-05-27
FI20136126A (en) 2014-11-28
RU2666833C2 (en) 2018-09-12
FI124656B (en) 2014-11-28

Similar Documents

Publication Publication Date Title
EP2878415B1 (en) Method and manufacturing facility for casting concrete products
CN109203215A (en) Concrete prefabricated element production line
CN206085314U (en) Prefabricated component flexible production line
WO2020232744A1 (en) Prefabricated component production line having temporary storage function
CN204382485U (en) Prefabricated components production system
CN104589476B (en) Precuring storehouse, the production line containing the precuring storehouse and its control method
CN113548409A (en) Plate lifting and transferring equipment and method for truss laminated slab production line
US10603816B2 (en) Arrangement for casting concrete products
CN209350532U (en) Concrete prefabricated element production line
CN208629675U (en) Concrete prefabricated element process units
EP2942171B1 (en) Method for casting concrete products
EP2942170B1 (en) Method for casting concrete products
CN109719843A (en) It concrete prefabricated element production line and its pours and smashes device
US6841110B2 (en) Method and plant for manufacturing prestressed concrete products
CN211541707U (en) Curing kiln
CN113001741B (en) Prefabricated component production line
CN210732776U (en) Unit type maintenance system for CRTS III type ballastless track slab
CN111975973A (en) Plate-shaped member production line and production method
CN212288116U (en) Prefabricated part production line
CN111993563A (en) Prefabricated component production system
CN106142329A (en) The method of casting concrete goods
CN217834090U (en) Prefabricated part production line
CN215150288U (en) Assembly type production component production line
KR20110027984A (en) Structure of girder manufacturing site
CN219522514U (en) Prefabricated component production line

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20141024

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: B28B 5/04 20060101AFI20150918BHEP

Ipc: B28B 15/00 20060101ALI20150918BHEP

Ipc: B28B 23/02 20060101ALI20150918BHEP

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ELEMATIC OYJ

R17P Request for examination filed (corrected)

Effective date: 20160127

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

17Q First examination report despatched

Effective date: 20161124

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20180518

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: GB

Ref legal event code: FG4D

Ref country code: AT

Ref legal event code: REF

Ref document number: 1029237

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180815

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602014030343

Country of ref document: DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20181019

Year of fee payment: 5

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1029237

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180815

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2696827

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20190118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181215

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181115

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181116

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181115

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20181019

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20181019

Year of fee payment: 5

Ref country code: BE

Payment date: 20181019

Year of fee payment: 5

Ref country code: FR

Payment date: 20181023

Year of fee payment: 5

Ref country code: ES

Payment date: 20181123

Year of fee payment: 5

Ref country code: IT

Payment date: 20181217

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602014030343

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181024

26N No opposition filed

Effective date: 20190516

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181031

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181031

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181024

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181024

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602014030343

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20191101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20141024

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180815

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180815

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200501

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20191031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191031

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191101

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20191024

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191024

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191024

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191031

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20210301

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191025