CN209350532U - Concrete prefabricated element production line - Google Patents

Concrete prefabricated element production line Download PDF

Info

Publication number
CN209350532U
CN209350532U CN201821850743.8U CN201821850743U CN209350532U CN 209350532 U CN209350532 U CN 209350532U CN 201821850743 U CN201821850743 U CN 201821850743U CN 209350532 U CN209350532 U CN 209350532U
Authority
CN
China
Prior art keywords
station
production line
track
vibrates
die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821850743.8U
Other languages
Chinese (zh)
Inventor
刘庆彪
朱文波
陈奇志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Mingyang Machinery Manufacturing Co Ltd
Original Assignee
Changsha Mingyang Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Mingyang Machinery Manufacturing Co Ltd filed Critical Changsha Mingyang Machinery Manufacturing Co Ltd
Priority to CN201821850743.8U priority Critical patent/CN209350532U/en
Application granted granted Critical
Publication of CN209350532U publication Critical patent/CN209350532U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model provides a kind of concrete prefabricated element production line, the die station moved including delivery track and on delivery track;Further include be laid in the scribing line station that die station can be made successively to circulate on delivery track, die-filling station, the first cloth muscle station, pre-buried station, first pour the station that vibrates, plate installation station, the second cloth muscle station, second pour the station that vibrates, first surface catches up with flat station, the first precuring station, first surface troweling station, the first maintenance station, demoulding station and rollover lifting station;Die-filling station and demoulding station are set to the same side of maintenance station;First, which pours the station that vibrates, pours the station that vibrates with second and is oppositely arranged.The concrete prefabricated element production line will not because conserve equipment that station is placed it is too high due to the transport of mold bring obstruction, shorten the transport distance of mold;Shorten the transport distance of concrete slurry;Production efficiency is effectively improved, production cost is reduced.In addition, above-mentioned production line realizes the production of a variety of different prefabricated components.

Description

Concrete prefabricated element production line
Technical field
The utility model relates to the technical field of concrete prefabricated element production, in particular to a kind of concrete prefabricated elements Production line.
Background technique
With building industrialization, the continuous propulsion of housing industrialization and development and Resources for construction economizing type, environmental-friendly Prefabrication is just widelyd popularize in the requirement of the requirement of type society, energy-saving and emission-reduction and civilized construction etc., country and place, because And the system Construction of prefabricated assembled concrete component becomes hot spot.Concrete prefabricated element is in advance in factory's production with mixed Solidifying soil is the building element, including beam, plate, column and construction and decoration accessory etc. of basic material, assembles and uses for construction site.In advance There are mainly two types of the production models of component processed, i.e., fixed die station production system and mechanized production system, wherein automated production System principal mode is annular closed type and two kinds of long line method.The characteristics of fixed die station production system is that die station is fixed, from mold Installation, steel reinforcement cage, installation of embedded parts, production processes are all in workshop the same position such as concreting is vibrated, maintenance demoulds, And in order to easy for construction, the space of the movements such as hanging device, concrete placing installation will be reserved between adjacent die station, And whole operation process is complicated, and many processes needs take a substantial amount of time, artificial and electric energy.The master of mechanized production system Wanting feature is that station and automation equipment are fixed, and die station is mobile by production link, and operating process becomes than fixed die station production system It obtains simply, saves a large amount of time cost and human cost;But there is also many problems, such as work for current mechanized production system The design unreasonable process for leading to operation in position complicates, and the installation of mold, disassembly station distance are remote, it has not been convenient to the transport of mold; The transport and installation of concrete slurry and component product are inconvenient;Production line is both for single product or some single kind Concrete prefabricated element etc., these problems are urgently to be resolved to improve production efficiency, reduce production cost.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of concrete prefabricated element production line, it is existing to solve Low, at high cost, product the is single technical problem of mechanized production system production efficiency in technology.
In order to achieve the above objectives, the technical solution of the utility model is achieved in that
The utility model provides a kind of concrete prefabricated element production line, including delivery track and in the delivery track The die station of upper movement, the concrete prefabricated element production line further include be laid on the delivery track can make the die station according to The scribing line station of secondary circulation, die-filling station, the first cloth muscle station, pre-buried station, first pour the station that vibrates, plate erector Position, the second cloth muscle station, second pour the station that vibrates, first surface catches up with flat station, the first precuring station, first surface troweling Station, the first maintenance station, demoulding station and rollover lifting station;The delivery track includes the first cross track, the second cross To track, first longitudinal direction track and second longitudinal direction track;First cross track and second cross track are separately connected In the opposite both ends of the opposite both ends of the first longitudinal direction track, second longitudinal direction track;The die-filling station and the demoulding work Position is set to the same side of the maintenance station in order to the transport of mold;Described first pours the station that vibrates pours with described second It builds the station that vibrates to be oppositely arranged, to shorten the transport distance of concrete slurry.
Further, the die-filling station and the demoulding station are oppositely arranged or are at most staggered a station.
Further, the concrete prefabricated element production line further includes clear die worker position, the side of the clear die worker position with The demoulding station is adjacent, and the other side and the rollover lifting station are adjacent.
Further, the concrete prefabricated element production line further includes mixing plant, for transporting sending for concrete slurry Expect that track and the apparatus for distributing for containing simultaneously casting concrete slurry, the apparatus for distributing move on the feeding track, The feeding track connection mixing plant pours the station and described second that vibrates with described first and pours the station that vibrates.
Further, the mixing plant is set to the outside of the delivery track, poured with described first vibrate station or Second to pour the station that vibrates neighbouring described in person, pours the station and described second that vibrates to described first by the feeding track and pours It builds the station that vibrates and transports concrete slurry.
Further, the scribing line station, the die-filling station, the first cloth muscle station, the pre-buried station, described First pours the station that vibrates, plate installation station is arranged on first cross track, the second cloth muscle station, institute It states and second pours the station that vibrates, the first surface catches up with flat station, the first precuring station, the first surface troweling work Position, the first maintenance station, the demoulding station and the rollover lifting station are arranged on second cross track;Institute Stating delivery track further includes third cross track, and the concrete prefabricated element production line further includes being laid in the third transverse direction The third cloth muscle station that the die station can be made successively to circulate on track, third pours the station that vibrates, second surface catches up with flat station, Two precuring stations, second surface troweling station and the second maintenance station, the third cloth muscle station and the plate erector Position is adjacent, and the second maintenance station and the demoulding station are adjacent, and the third pours the station that vibrates and pours with described second The station that vibrates is oppositely arranged.
Further, the third cloth muscle station and the second cloth muscle station, the second surface catch up with flat station and institute It states first surface and catches up with flat station, the second precuring station and the first precuring station, the second surface troweling work Position is oppositely arranged respectively with the first surface troweling station.
Further, the quantity of the first precuring station and the second precuring station is equal and is 1~4 It is a;And/or the quantity of the die-filling station and the demoulding station is equal and be 1~6.
Further, the concrete prefabricated element production line further includes plucking equipment, and the plucking equipment is set to institute After stating first surface troweling station and/or the second surface troweling station, in the first maintenance station and/or described the Before two maintenance stations.
Further, the concrete prefabricated element production line further includes curing kilns and stacking machine, first maintainer Position and the second maintenance station place the curing kilns, place a stacking between two curing kilns Machine.
Die-filling station and demoulding station are set to maintainer in concrete prefabricated element production line provided by the utility model The same side of position, will not because conserve equipment that station is placed it is too high due to the transport of mold bring obstruction, shorten the fortune of mold Send distance;First, which pours the station that vibrates, pours the station that vibrates with second and is oppositely arranged on delivery track, shortens two and pours Vibrate the distance between station, so as to shorten the transport distance of concrete slurry, while being also convenient for concrete slurry and transporting rail The setting and installation in road and Transporting equipment;The production efficiency for effectively increasing concrete prefabricated element above, reduces and is produced into This;In addition, above-mentioned concrete prefabricated element production line can according to actual scheduling of production, select to enable suitable station or Adjustment, removable parts station, realize the production of a variety of different prefabricated components, adjustability and versatile.
Detailed description of the invention
Fig. 1 is the schematic layout pattern for the concrete prefabricated element production line that the preferred embodiment of the utility model provides.
Description of symbols: 10, the first cross track;11, scribing line station;12, die-filling station;13, the first cloth muscle station; 14, pre-buried station;15, first the station that vibrates is poured;16, plate installs station;20, the second cross track;21, the second cloth muscle work Position;22, second the station that vibrates is poured;23, first surface catches up with flat station;24, the first precuring station;25, first surface troweling Station;26, the first maintenance station;261, curing kilns;262, stacking machine;27, demoulding station;28, rollover lifting station;29, clear Die worker position;30, third cross track;31, third cloth muscle station;32, third pours the station that vibrates;33, second surface catches up with flat work Position;34, the second precuring station;35, second surface troweling station;36, the second maintenance station;40, first longitudinal direction track;41, Buffer station;50, second longitudinal direction track;60, plucking equipment;70, mixing plant;71, feeding track.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is further described in more detail the utility model.In the utility model In " first ", " second ", the description such as " third ", be used for description purposes only, it is relatively heavy to be not understood to indicate or imply its The property wanted or the quantity or sequence for implicitly indicating indicated technical characteristic." first ", " second ", " third " are defined as a result, Feature can express or implicitly include at least one this feature.In the description of the present invention, the meaning of " plurality " is At least two, such as two, three etc., unless otherwise specifically defined.
Referring to Fig.1, a kind of concrete prefabricated element production line is present embodiments provided comprising delivery track (not shown) With the die station (not shown) moved on delivery track, concrete prefabricated element production line further includes being laid in energy on delivery track The scribing line station 11 that makes die station successively circulate, die-filling station 12, the first cloth muscle station 13, pre-buried station 14, first, which pour, vibrates Station 15, plate installation station 16, the second cloth muscle station 21, second pour vibrate station 22, first surface and catch up with flat station 23, the One precuring station 24, first surface troweling station 25, first conserve station 26, demoulding station 27 and rollover lifting station 28. Delivery track includes the first cross track 10, the second cross track 20, first longitudinal direction track 40 and second longitudinal direction track 50;First Cross track 10 and the second cross track 20 are connected to the opposite both ends of first longitudinal direction track 40,50 phase of second longitudinal direction track Pair both ends.Die-filling station 12 is set to the same side of the first maintenance station 26 with demoulding station 27 in order to the transport of mold; First, which pours the station 15 that vibrates, pours the station 22 that vibrates with second and is oppositely arranged, to shorten the transport distance of concrete slurry.
When the automatic production line of concrete prefabricated element is rectangular closed arrangement, die-filling station and the general position of demoulding station In on different lateral transfer tracks.Die-filling station and demoulding station are laid in maintenance station by many production lines in the prior art Two sides, mold needs are transported from demoulding station to die-filling station in production process, and due to the equipment of maintenance station generally compared with The transport of height, mold can be highly difficult, time-consuming and laborious, such as due to die-filling station and demoulding station distance are farther out, manipulator can not It uses, is used cooperatively if being also required to two drivings using driving transport.Therefore, by each on concrete prefabricated element production line The reasonable setting of station, the application make die-filling station 12 be in the ipsilateral of the first maintenance station 26 with demoulding station 27, are convenient for mould Tool is transported to die-filling station 12 from demoulding station 27.Preferably, die-filling station 12 is oppositely arranged or at most with demoulding station 27 Be staggered a station.It is more conducive to the transport of mold, thus to improve production efficiency.Meanwhile first pours the station that vibrates 15, which pour the station 22 that vibrates with second, is also oppositely arranged, and greatly shortens the transport distance of concrete slurry, simplifies production work Skill.In addition, above-mentioned concrete prefabricated element Production Line Configured rationally, it is complete, by the production technology to different prefabricated components into Row integration, rearrangement station position can be realized the diversification production of prefabricated components.
More preferably, referring to Fig.1, on the second cross track 20 of concrete prefabricated element production line, demoulding station 27 Clear die worker position 29 can also be set between rollover lifting station 28, and the side of clear die worker position 29 and demoulding station 27 are adjacent, separately Side and rollover lifting station 28 are adjacent.Clear die worker position 29 is used to clear up the residual slurry of die surface, in order to following for mold Ring uses.At this point, scribing line station 11, die-filling station 12, the first cloth muscle station 13, pre-buried station 14, first pouring the station that vibrates 15, plate installation station 16 is arranged on the first cross track 10, and the second cloth muscle station 21, second pour the station 22 that vibrates, the Flat station 23, the first precuring station 24, first surface troweling station 25, first is caught up with to conserve station 26, demoulding station in one surface 27 are arranged on the second cross track 20 with rollover lifting station 28.In such cases, rollover lifting station 28 can be set The left side of second longitudinal direction track 50, after prefabricated components are hung away, die station returns clear die worker position 29, then loops to router Position 11, starts the production process of next prefabricated components product.The quantity of above-mentioned each station is according to respective handling need on station The aggregated capacity of the actual frequency and production line wanted arranges.For example, the part category needed when first time cloth muscle is three kinds, then It can generally arrange three the first cloth muscle stations 13;Pre-buried part category is two kinds, then can generally arrange two pre-buried works Position 14, but if the time required for pre-buried part is longer, it may be considered that more pre-buried stations 14 are set, to improve pre-buried work The production capacity of position 14, cooperate remaining station of itself and production line can preferably in time.
Die-filling station 12 is set to the first maintenance station 26 with demoulding station 27 in above-mentioned concrete prefabricated element production line The same side, to the transport of mold bring obstruction due to the equipment that will not be placed by the first maintenance station 26 is too high, shorten mold Transport distance;First, which pours the station 15 and second that vibrates, pours the station 22 that vibrates and is oppositely arranged on delivery track or at most wrong A station is opened, two is shortened and pours the distance between the station that vibrates, so as to shorten the transport distance of concrete slurry, together When be also convenient for concrete slurry transport track and Transporting equipment setting and installation;Above technical scheme effectively increases concrete The production efficiency of prefabricated components, reduces production cost.In addition, above-mentioned concrete prefabricated element production line can be according to actual Scheduling of production, selection enable suitable station, realize the production of a variety of different prefabricated components, adjustability and versatile.
In some embodiments, concrete prefabricated element production line further includes mixing plant 70, for transporting concrete slurry Feeding track 71 and for contain and casting concrete slurry apparatus for distributing (not shown), apparatus for distributing is in feeding track 71 Upper movement, feeding track 71 connect mixing plant 70 and first and pour the station 15 and second that vibrates and pour the station 22 that vibrates.It is above-mentioned mixed The transport of concrete slurry and cloth are realized by feeding track 71 and apparatus for distributing in solidifying soil prefabricated components production line, feeding rail Road 71 links together mixing plant 70 with the station that vibrates is poured, and keeps the convenient transportation of concrete slurry quick.Apparatus for distributing will Concrete slurry, which is transported to, pours vibrate station and cloth in die station.Concrete prefabricated element production line further includes being located to pour Vibrate the vibration device (not shown) of station, and die station moves to pour to be located on vibration device when vibrating station, when cloth is set After standby cloth starts, vibration device vibration is completed the jolt ramming to prefabricated components and is processed.Preferably, mixing plant 70 is set to conveying The outside of track pours the station 15 or second to pour the station 22 that vibrates neighbouring of vibrating with first, by feeding track 71 to the One, which pours the station 15 and second that vibrates, pours the transport concrete slurry of station 22 that vibrates.Mixing plant 70 is neighbouring to be poured the station that vibrates and sets It sets, reasonable arrangement not only has been carried out to the layout in workshop, while also bringing convenience for the transport of concrete slurry.
In some embodiments, delivery track further includes third cross track 30, and concrete prefabricated element production line also wraps Include and be laid in the third cloth muscle station 31 that die station can be made successively to circulate on third cross track 30, third pours the station 32 that vibrates, Second surface catches up with flat station 33, the second precuring station 34, second surface troweling station 35 and the second maintenance station 36, third cloth Muscle station 31 and plate installation station 16 are adjacent, and the second maintenance station 36 and demoulding station 27 are adjacent, and third pours the station that vibrates 32, which pour the station 22 that vibrates with second, is oppositely arranged.Institute on each station and the second cross track 20 that third cross track 30 is arranged A part of station being arranged can be identical.Preferably, third cloth muscle station 31 and the second cloth muscle station 21, second surface catch up with flat work Flat station 23, the second precuring station 34 and the first precuring station 24, second surface troweling station are caught up with first surface in position 33 35 are oppositely arranged respectively with first surface troweling station 25.Second cross track 20 is arranged same each with third cross track 30 A station avoids the normal operation that other stations are influenced due to precuring overlong time.More preferably, the first precuring station 24 is identical with the quantity of the second precuring station 34 and be 1~4;And/or the quantity of die-filling station 12 and demoulding station 27 It is identical and be 1~6.Due to consideration that the time of precuring is longer, third cross track 30 is provided in the present embodiment, with Convenient for when the first precuring station 24 is occupied, other stations can be run incessantly;In addition, third cross track 30 Setting can also make above-mentioned concrete prefabricated element production line while produce multiple prefabricated components, can be same kind of prefabricated Component can also arrange to produce while different types of prefabricated components according to the setting of station.First longitudinal direction track 40 and Buffer station 41 and ferry bus (not shown) is respectively set on two long rails 50, by ferry bus carry die station, make die station from For the circulation of first cross track 10 to the second cross track 20 or circulation to third cross track 30, independent electrical is can be used in ferry bus Power transmission system.Three buffer stations 41 are that reserved station can arrange to buffer when high production efficiency or larger output Station 41 is any needs and suitable treatment process.
First cross track 10, the second cross track 20 are connected to the opposite both ends of first longitudinal direction track 40, second The opposite both ends of long rails 50, second longitudinal direction track 50 are also connect with one end of third cross track 30.According to die station defeated The direction of travel on track is sent, each station is sequentially arranged on each cross track according to process sequence, and each station is equipped with Corresponding production equipment carries out corresponding process processing when die station runs to corresponding station.Third cross track 30 is set as The delivery track that process is overlapped with the process portion of the second cross track 20, can be realized carried out within the same time it is multiple prefabricated On the one hand the production of component improves production efficiency and equipment turnover rate, on the other hand saves site area.The above-mentioned same time into Multiple prefabricated components of row production, can be same kind of prefabricated components, can also be arranged according to the setting of station not of the same race It is produced while the prefabricated components of class.
In some embodiments, concrete prefabricated element production line further includes plucking equipment 60, and plucking equipment 60 is set to After first surface troweling station 25 and/or second surface troweling station 35, in the first maintenance station 26 and/or the second maintainer Before position 36.Concrete prefabricated element is after the troweling of surface, binding performance when in order to increase use between other components, It is provided with plucking equipment 60 before conserving to concrete prefabricated element, plucking is carried out to prefabricated components.
First maintenance station 26 of above-mentioned concrete prefabricated element production line and the second maintenance station 36 are placed one and are supported Kiln 261 is protected, stacking machine 262 is placed between 2 curing kilns 261.Curing kilns 261 are three-dimensional maintenance of equipment, concrete die station and Prefabricated components are stored in curing kilns 261, are realized the steam curing to prefabricated components, are kept prefabricated components in curing kilns 261 quick Solidification is to guarantee its intensity requirement.Curing kilns 261 include kiln body, vapour system, cooling fin system and temperature and humidity control system etc., Curing kilns 261 use steel structure support and insulation board enclosing, and installation idler wheel is for conveying and supporting die station, curing kilns 261 in kiln Bottom has mold transfer passage;Specific maintenance quantity at location can be arranged in the curing kilns 261 according to production requirement.Stacking machine 262 is used In sending die station and prefabricated components to the designated position of curing kilns 261 and by the prefabricated components conserved and die station from curing kilns It is taken out in 261, is delivered to designated position;Stacking machine 262 by horizontal walking device, lifting system, pallet conveying device, take/give The composition such as mold device, longitudinal positioning device, horizontal positioning device and electrical system.
Concrete prefabricated element production line in the embodiments of the present invention can be used for producing needs concrete twice The prefabricated components product poured, such as sandwich heat preservation Side fascia and/or hollow lining.The direction of travel of production line is lateral from first The starting point of track 10 starts, and when marching to end, is moved to the second cross track 20 or third along second longitudinal direction track 50 Cross track 30, then march to along first longitudinal direction track 40 starting point of first cross track 10.Below to produce sandwich heat preservation For Side fascia, referring to Fig.1, the course of work of production line in the present embodiment is specifically introduced.
Multiple die station production line is started to move by the starting point of the first cross track 10 and be sequentially completed scribing process, Die-filling process first time reinforcing process, pre-buried process, pours process of vibrating, insulation board installation procedure for the first time, then passes through ferry-boat Vehicle is traversing to the second cross track 20 or third cross track 30, carries out second of reinforcing process in the second cloth muscle station 21, so After be sequentially completed and pour process of vibrating for the second time, catch up with flat process, precuring process, troweling process, after plucking equipment 60 Curing kilns 261 are sent by stacking machine 262;After maintenance terminates, stacking machine 262 takes out die station out of curing kilns 261, further Demoulding process, rollover lifting process are completed, is finally hung away prefabricated components, the empty die station after demoulding is traversing again by ferry bus Scribing line station 11 to 10 starting point of the first cross track carries out scribing process, into next production cycle.Die station can root It is traversing to the second cross track 20 or third cross track 30 by ferry bus according to the instruction of set-up of control system, until first is pre- It conserves station 24 and the second precuring station 34 is all occupied.It, can be with according to the difference of the precuring time of every kind of prefabricated components Design the precuring station of different number on cross track.In addition, being set according to the production capacity of prefabricated components different on production line The quantity of each station.Second cross track 20 handles the quantity of die station with third cross track 30 than existing within the same time One times more in technology, production efficiency doubles.In other embodiments, if above-mentioned concrete prefabricated element production line is used for Produce hollow internal partition wall, it is only necessary to which the process for installing insulation board is replaced with to the process for installing hollow interlayer.It is understood that , above-mentioned concrete prefabricated element production line can also be used to produce different types of prefabricated components product simultaneously, it is only necessary to root According to prefabricated components structure produced, adjusts, replaces corresponding station and can be realized.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model and different limit In this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in variation Or replacement, it should be covered within the scope of the utility model.Also, the skill between each embodiment of the utility model Art scheme can be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when technical solution It will be understood that the combination of this technical solution is not present in conjunction with there is conflicting or cannot achieve when, also not in the utility model It is required that protection scope within.Therefore, the protection scope of the utility model should be based on the protection scope of the described claims.

Claims (10)

1. a kind of concrete prefabricated element production line, it is characterised in that: the concrete prefabricated element production line includes conveyor track Road and the die station moved on the delivery track, the concrete prefabricated element production line further include being laid in the conveyor track The scribing line station that the die station can be made successively to circulate on road, die-filling station, the first cloth muscle station, pre-buried station, first pour vibration Smash station, plate installation station, the second cloth muscle station, second pour the station that vibrates, first surface catches up with flat station, the first precuring Station, first surface troweling station, the first maintenance station, demoulding station and rollover lifting station;
The delivery track includes the first cross track, the second cross track, first longitudinal direction track and second longitudinal direction track;It is described First cross track and second cross track are connected to the opposite both ends of the first longitudinal direction track, second longitudinal direction rail The opposite both ends in road;
The die-filling station and the demoulding station are set to the same side of the maintenance station in order to the transport of mold;It is described First, which pours the station that vibrates, pours the station that vibrates with described second and is oppositely arranged, to shorten the transport distance of concrete slurry.
2. concrete prefabricated element production line according to claim 1, which is characterized in that the die-filling station is torn open with described Die worker position is oppositely arranged or the station that is at most staggered.
3. concrete prefabricated element production line according to claim 1, which is characterized in that the concrete prefabricated element is raw Producing line further includes clear die worker position, and the side of the clear die worker position and the demoulding station are adjacent, and the other side and the rollover lift Station is adjacent.
4. concrete prefabricated element production line according to claim 1, which is characterized in that the concrete prefabricated element is raw Producing line further includes mixing plant, the feeding track for transporting concrete slurry and the cloth for containing simultaneously casting concrete slurry Equipment, the apparatus for distributing move on the feeding track, and the feeding track connection mixing plant and described first pours vibration It smashes station and described second and pours the station that vibrates.
5. concrete prefabricated element production line according to claim 4, which is characterized in that the mixing plant is set to described The outside of delivery track pours the station or described second to pour the station that vibrates neighbouring of vibrating with described first, is sent by described Material track pours the station and described second that vibrates to described first and pours the station transport concrete slurry that vibrates.
6. concrete prefabricated element production line according to claim 1, which is characterized in that the scribing line station, the dress Die worker position, the first cloth muscle station, the pre-buried station, described first pour the station that vibrates, the plate installation station set Set on first cross track, the second cloth muscle station, described second pour the station that vibrates, the first surface catch up with it is flat Station, the first precuring station, the first surface troweling station, it is described first maintenance station, the demoulding station and The rollover lifting station is arranged on second cross track;
The delivery track further includes third cross track, and the concrete prefabricated element production line further includes being laid in described The third cloth muscle station that the die station can be made successively to circulate on three cross tracks, third pour the station that vibrates, second surface catch up with it is flat Station, the second precuring station, second surface troweling station and the second maintenance station, the third cloth muscle station and the plate It is adjacent that station is installed, the second maintenance station and the demoulding station are adjacent, and the third pours vibrate station and described the Two, which pour the station that vibrates, is oppositely arranged.
7. concrete prefabricated element production line according to claim 6, which is characterized in that the third cloth muscle station and institute State the second cloth muscle station, the second surface catches up with flat station and the first surface catches up with flat station, the second precuring station It is oppositely arranged respectively with the first precuring station, the second surface troweling station and the first surface troweling station.
8. concrete prefabricated element production line according to claim 6 or 7, which is characterized in that the first precuring nurse Position is equal with the quantity of the second precuring station and is 1~4;And/or the die-filling station and the demoulding station Quantity it is equal and be 1~6.
9. concrete prefabricated element production line according to claim 6 or 7, which is characterized in that the concrete prefabricated structure Part production line further includes plucking equipment, and the plucking equipment is set to the first surface troweling station and/or second table After the troweling station of face, before the first maintenance station and/or the second maintenance station.
10. concrete prefabricated element production line according to claim 6 or 7, which is characterized in that the concrete prefabricated structure Part production line further includes curing kilns and stacking machine, and the first maintenance station and the second maintenance station are placed described in one A stacking machine is placed in curing kilns between two curing kilns.
CN201821850743.8U 2018-11-09 2018-11-09 Concrete prefabricated element production line Active CN209350532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821850743.8U CN209350532U (en) 2018-11-09 2018-11-09 Concrete prefabricated element production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821850743.8U CN209350532U (en) 2018-11-09 2018-11-09 Concrete prefabricated element production line

Publications (1)

Publication Number Publication Date
CN209350532U true CN209350532U (en) 2019-09-06

Family

ID=67782562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821850743.8U Active CN209350532U (en) 2018-11-09 2018-11-09 Concrete prefabricated element production line

Country Status (1)

Country Link
CN (1) CN209350532U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110900815A (en) * 2019-12-23 2020-03-24 东莞市中机建科实业有限公司 Multipurpose concrete prefabricated part production line and using method thereof
CN114012882A (en) * 2021-11-16 2022-02-08 中铁建设集团建筑发展有限公司 Three-dimensional intensive PC component production system and process thereof
CN116477266A (en) * 2023-05-19 2023-07-25 山东威宝节能科技集团有限公司 Production line of form removal-free plate

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110900815A (en) * 2019-12-23 2020-03-24 东莞市中机建科实业有限公司 Multipurpose concrete prefabricated part production line and using method thereof
CN114012882A (en) * 2021-11-16 2022-02-08 中铁建设集团建筑发展有限公司 Three-dimensional intensive PC component production system and process thereof
CN116477266A (en) * 2023-05-19 2023-07-25 山东威宝节能科技集团有限公司 Production line of form removal-free plate

Similar Documents

Publication Publication Date Title
CN109203215A (en) Concrete prefabricated element production line
CN105082346B (en) A kind of prefabricated intelligent flow production line of shield duct piece
CN209350532U (en) Concrete prefabricated element production line
CN208788804U (en) Concrete precast pile automatic production line workshop and production system
CN104723449B (en) A kind of automatic assembly line of building industrialization concrete prefabricated element
CN108058266A (en) Prefabricated components integrated production line
CN108890850A (en) A kind of intelligent production line and production technology producing multi items standard PC component
CN206085314U (en) Prefabricated component flexible production line
CN103128847A (en) Double-block type sleeper production line and production process thereof
EP2878415B1 (en) Method and manufacturing facility for casting concrete products
WO2020232744A1 (en) Prefabricated component production line having temporary storage function
CN102632548A (en) Production method of foam slurry core-filled building block capable of being quickly condensed under steam-curing-free condition
CN212919859U (en) Nomadic three-dimensional production system of concrete prefabricated part
CN109968516A (en) A kind of PC component integrated manufacturing system (IMS) and its production method
CN208163960U (en) The production system of concrete precast pile automatic production line workshop and prefabricated pile
CN208629675U (en) Concrete prefabricated element process units
CN109719843A (en) It concrete prefabricated element production line and its pours and smashes device
CN207888889U (en) Prefabricated components integrated production line
CN103128846A (en) Automatic mechanical production line device of waste residue cement foam battens or building blocks
CN103290973B (en) Manufacturing process for concrete compound self-heat-preservation building block
CN212795365U (en) Prefabricated part pedestal method production line for assembly type bridge deck auxiliary structure of high-speed railway
CN104669430A (en) PC (poly carbonate) wall board production system
CN114789505A (en) Compact type small mold table full-automatic laminated slab production line
CN211590665U (en) Double-sided laminated concrete prefabricated part production system
CN210732776U (en) Unit type maintenance system for CRTS III type ballastless track slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Production line of precast concrete components

Effective date of registration: 20210402

Granted publication date: 20190906

Pledgee: Bank of Communications Co.,Ltd. Hunan Branch

Pledgor: Changsha Mingyang Machinery Manufacturing Co.,Ltd.

Registration number: Y2021980002393

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231218

Granted publication date: 20190906

Pledgee: Bank of Communications Co.,Ltd. Hunan Branch

Pledgor: Changsha Mingyang Machinery Manufacturing Co.,Ltd.

Registration number: Y2021980002393