EP2644778A2 - Pierre de fondation pour mât d'éclairage - Google Patents

Pierre de fondation pour mât d'éclairage Download PDF

Info

Publication number
EP2644778A2
EP2644778A2 EP13450009.9A EP13450009A EP2644778A2 EP 2644778 A2 EP2644778 A2 EP 2644778A2 EP 13450009 A EP13450009 A EP 13450009A EP 2644778 A2 EP2644778 A2 EP 2644778A2
Authority
EP
European Patent Office
Prior art keywords
foundation stone
light tower
tower foundation
light
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP13450009.9A
Other languages
German (de)
English (en)
Other versions
EP2644778A3 (fr
EP2644778B1 (fr
Inventor
Rudolf Bauer
Christian Pusnik
Christian Nageler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kirchdorfer Fertigteilholding GmbH
Original Assignee
Tiba Austria GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiba Austria GmbH filed Critical Tiba Austria GmbH
Priority to SI201331577T priority Critical patent/SI2644778T1/sl
Publication of EP2644778A2 publication Critical patent/EP2644778A2/fr
Publication of EP2644778A3 publication Critical patent/EP2644778A3/fr
Application granted granted Critical
Publication of EP2644778B1 publication Critical patent/EP2644778B1/fr
Priority to HRP20191748TT priority patent/HRP20191748T1/hr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • E04H12/2269Mounting poles or posts to the holder in a socket

Definitions

  • the invention relates to a light tower foundation stone according to the preamble of claim 1.
  • a light pole foundation stone serves to anchor a light pole reliably in the ground.
  • the light tower foundation stone is buried in the ground and a light pole anchored in the light tower foundation stone.
  • connection cables which supply power to the lighting columns of the light tower.
  • these connection cables are designed as underground cables, which are inserted laterally by the light tower foundation stone at a depth of about 40 cm in the light pole.
  • a conventional light tower foundation stone therefore has laterally cable through-openings, wherein the light tower in this area has lateral openings through which the electrical connection cables can be supplied to the electrical connections in the light tower.
  • the object of the invention is therefore to provide a light tower foundation stone of the type mentioned, with which the mentioned disadvantages can be avoided, and with which a replacement of a light pole can be performed easier.
  • the electrical connection cable can thereby be buried deeper into the ground, since it is not necessary to excavate the tick to replace the light pole, as a result of which the electrical connection cable is better protected against external influences and theft. Furthermore, such a trained Lichtmast foundation stone is easier to manufacture.
  • Fig. 1 to 6 show preferred embodiments of a light tower foundation stone 1 with a receptacle 2 for receiving area by area of a light tower.
  • a light tower foundation stone 1 is designed to reliably anchor a light tower in the ground, soil or soil.
  • the light tower foundation stone 1 is designed to be buried in the ground.
  • the orientation in which the light tower foundation stone 1 is normally used in the ground is referred to as the use position of the light tower foundation stone 1.
  • a light tower foundation stone 1 may preferably be made of concrete, in particular of reinforced concrete and / or reinforced concrete. Furthermore, it can be provided in particular that the light tower foundation stone 1 is formed in one piece.
  • a light tower is a mast, so a pier-like support in which electrical lines, in particular electrical connection cable, to an electrical load, in particular lighting fixture, are performed.
  • the term light tower is in this sense representative of all masts, over which electrical loads can be supplied with electricity.
  • These electrical consumers can be, for example, lighting fixtures, in particular for street lighting, but also for neon signs or traffic lights.
  • the electrical load is not limited to lighting fixtures, but may for example be a speaker, which is powered by the mast with power.
  • a light pole may be particularly preferably formed of concrete or metal.
  • light poles are generally hollow inside, that is to say in particular substantially as a tube, whereby electrical conductors, in particular electrical connecting cables, can be guided well in a light tower with a simple design.
  • the receptacle 2 has an opening 3 for insertion of the light mast in the receptacle 2, wherein the opening 3 is arranged in the region of a head end 4 of the light tower foundation stone 1.
  • the receptacle 2 may be formed here in particular as a blind hole. It can also be provided in particular that the opening 3 has substantially the same cross-section as the underlying area of the receptacle 2. However, it can also be provided that the cross-section widens the receptacles 2 towards the opening, that is, the area of the Recording 2 is funnel-shaped in the head, whereby the light pole can be easily inserted.
  • the head of the light tower foundation stone 1 is that end which points upwards in the position of use. In particular, it may further be provided that an area of the light mast foundation stone 1, which embraces the head end, still protrudes out of the subsurface, in particular essentially 10 cm, in the buried state.
  • a cable duct opening 5 is arranged at one of the opening 3 opposite end of the receptacle 2 .
  • the electrical connection cable can be buried deeper into the ground, since it is not necessary to excavate the tick of the replacement of the light tower, whereby the electrical connection cable is better protected against external influences and theft. Furthermore, such a trained Lichtmast foundation stone is easier to manufacture.
  • the cable feed-through opening 5 serves to allow electrical connection cables to be routed through the light tower foundation stone 1 into the light tower in order to be connected there, for example, to terminals of the light tower, or directly to an electrical consumer.
  • the cable bushing opening 5 can therefore be designed as at least one, in particular rectilinear, opening, which is arranged on one of the opening 3 of the receptacle 2 opposite end, ie a bottom of the receptacle 2.
  • a corresponding plurality of apertures for the cable feed-through opening 5 is provided, or the aperture has a corresponding size.
  • the light tower foundation stone 1 can be produced particularly easily.
  • the receptacle 2 has a substantially circular cross-section.
  • the light pole can be used independently of the orientation of the light tower foundation stone 1.
  • the outer shape of the light tower foundation stone 1 has a substantially circular cross-section.
  • the receptacle 2 has a cross section in the form of a polygon, in particular rectangle or triangle. It can also be provided that the receptacle 2 has a complex shaped cross section, which is composed of straight lines and / or conic sections.
  • a longitudinal axis 12 of the receptacle 2 with a foundation stone longitudinal axis of the light tower foundation stone. 1 coincides.
  • the light tower foundation stone 1 in all directions to a homogeneous mechanical load capacity. Furthermore, the light tower foundation stone 1 is thereby easier to manufacture.
  • the cable feed-through opening 5 is arranged substantially centrally in the end of the receptacle 2 opposite the opening 3. As a result, the electrical connection cable can be easily guided into the light pole regardless of the diameter of the light pole.
  • the cable feed-through opening 5 is designed as an opening with an oval cross-section.
  • an oval cross-section designates a cross-section normal to the longitudinal axis 12, the first longitudinal extent of which is greater than its second longitudinal extent normal to the first longitudinal extent.
  • the first longitudinal extent runs along the line B or D, while the second longitudinal extent runs along the line A or C.
  • the first longitudinal extent of the oval cross section is substantially twice as large as the second longitudinal extent. This can be achieved in an advantageous manner that one and the same light tower foundation stone 1 can be used for a wide range of light tower diameters and cable thicknesses of the electrical connection cable.
  • two electrical connection cables are provided, which must be passed through the cable duct opening 5. Owing to the oval cross section of the cable feed opening 5, on the one hand, two electrical connection cables can easily be guided side by side through the cable feed opening 5. If, however, a light mast with a small diameter is used, the light mast can be prevented from slipping through the cable feed-through opening 5 due to the smaller second longitudinal extent. As a result, both light poles with thick electrical connection cables and those with small diameters can be used in one and the same light tower foundation stone 1.
  • the cross-section of the receptacle 2 in the region of the cable feed-through opening 5 extends in the direction of the cable feed-through opening 5, especially conical, tapered.
  • the end of the receptacle 2 opposite the opening 3 is formed as a taper 13.
  • the cable bushing opening 5 is formed as a straight opening, which ends at a newly formed foot 6 of the light tower foundation stone 1.
  • the light tower foundation stone 1 can be made particularly simple.
  • the cable duct opening 5 is formed as an opening, which leads out laterally from the light tower foundation stone 1.
  • the cable feed-through opening 5 may comprise a channel which is arranged below the receptacle 2, and in particular transversely to the longitudinal axis 12.
  • the head end 4 of the light tower foundation stone 1 opposite foot 6 of the light tower foundation stone 1 has a, in particular continuous groove 7, and that the cable duct opening 5 opens into this groove 7.
  • the groove 7 has the advantage over a channel that it is open-edged and thus easier to design. Furthermore, the electrical connection cables do not have to be inconveniently inserted into a channel. Nevertheless, the groove offers the advantage that the weight of the light tower foundation stone 1 does not bear on the electrical connection cables.
  • This groove 7 may be formed in particular continuously. As a result, multiple light poles can be arranged in a line without detours of the electrical connection cables are necessary. Furthermore, it can be provided that the groove 7 has a bulge in that area in which the Cable passage opening 5 opens into the groove 7. In the case of a cable feed-through opening 5 with an oval cross-section, it can be provided in particular that the groove 7 runs in the direction of the first, that is to say longer, longitudinal extent of the cross-section of the cable feed-through opening 5.
  • the outer contour of the light tower foundation stone 1 is substantially cylindrical. As a result, a lift with only a small diameter is necessary to use the light tower foundation stone 1.
  • the outer contour of the light tower foundation stone 1 has a shape, wherein a base of the shape of lines and / or conic lines is composed, and the lateral surface of the form is normal to the base.
  • this base can be a triangle or a square.
  • the light tower foundation stone 1 has Verhebebügel 14.
  • the Verhebebügel 14 may be arranged laterally on the light tower foundation stone 1 according to the first preferred embodiment. If one Socket widening 9 is present may also be provided that the Verhebebügel 14 are arranged on this base widening 9.
  • the at least one blind opening 11 serves to enable light masts, which are adapted for a conventional light tower foundation stone 1, to likewise be inserted into the objective light tower foundation stone 1.
  • the blind opening 11 may be formed in particular as a blind hole.
  • the blind opening 11 can simply be pierced or broken if necessary, to use the subject light tower foundation stone 1 also for conventional lighting masts, which provide a lateral feed of the electrical connection cables.
  • the blind opening 11 further prevents penetration of dirt and soil into the receptacle 2.
  • two blind openings 11 may be provided, which are arranged opposite one another, and in particular have an oval cross-section.
  • the least one blind opening 11 on the outside of the side wall 10, that is outside, is formed.
  • the side wall 10 may still have a remaining residual thickness of 5 mm to 40 mm, in particular 15 mm to 25 mm, in the region of the at least one blind opening 11.
  • a light pole arrangement comprising a light tower, a light tower foundation stone 1 and at least one electrical connection cable can be provided, wherein the light tower foundation stone 1 according to the above embodiments and / or developments is advantageously designed. It is provided that the light tower is arranged in regions in the receptacle 2, where by area that part of the light pole is meant, which is intended to be received in the receptacle 2 of the light tower foundation stone 1.
  • the electrical connection cable leads through the cable passage opening 5 of the light tower foundation stone 1 in the light pole.
  • the electrical cable can either lead directly to the electrical load, or arranged in the light pole electrical connections, these connections are connected by circuitry with the electrical load. In particular, it can therefore be provided that the electrical connection cable is connected to terminals of the light tower.
  • the light pole arrangement may in particular also comprise fastening devices for fixing the light tower in the light tower foundation stone 1.
  • the light pole arrangement may comprise a sealing device which seals the receptacle 2 toward the outside in the case of a light mast inserted in the receptacle 2.

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Non-Portable Lighting Devices Or Systems Thereof (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)
  • Walking Sticks, Umbrellas, And Fans (AREA)
  • Road Signs Or Road Markings (AREA)
EP13450009.9A 2012-03-28 2013-02-18 Pierre de fondation pour mât d'éclairage Active EP2644778B1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SI201331577T SI2644778T1 (sl) 2012-03-28 2013-02-18 Temeljni kamen kandelabra
HRP20191748TT HRP20191748T1 (hr) 2012-03-28 2019-09-26 Kamen temeljac za rasvjetni stup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ATA374/2012A AT512301B1 (de) 2012-03-28 2012-03-28 Lichtmast-Fundamentstein

Publications (3)

Publication Number Publication Date
EP2644778A2 true EP2644778A2 (fr) 2013-10-02
EP2644778A3 EP2644778A3 (fr) 2017-03-15
EP2644778B1 EP2644778B1 (fr) 2019-08-21

Family

ID=47891570

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13450009.9A Active EP2644778B1 (fr) 2012-03-28 2013-02-18 Pierre de fondation pour mât d'éclairage

Country Status (5)

Country Link
EP (1) EP2644778B1 (fr)
AT (1) AT512301B1 (fr)
HR (1) HRP20191748T1 (fr)
HU (1) HUE046675T2 (fr)
SI (1) SI2644778T1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113843901A (zh) * 2021-09-15 2021-12-28 浙江富乐德石英科技有限公司 一种石英环类产品加工方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2620514A1 (fr) * 1987-09-11 1989-03-17 Eclairage Tech Sa Appareil d'eclairage exterieur
KR100535826B1 (ko) * 2003-08-14 2005-12-12 주식회사 현암전설 가로등 기초
DE102009016503A1 (de) * 2009-04-08 2010-10-14 Rwe Ag Ladesäulensockel für elektrische Ladesäulen

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113843901A (zh) * 2021-09-15 2021-12-28 浙江富乐德石英科技有限公司 一种石英环类产品加工方法
CN113843901B (zh) * 2021-09-15 2023-12-29 浙江富乐德石英科技有限公司 一种石英环类产品加工方法

Also Published As

Publication number Publication date
EP2644778A3 (fr) 2017-03-15
EP2644778B1 (fr) 2019-08-21
AT512301A4 (de) 2013-07-15
HRP20191748T1 (hr) 2019-12-27
SI2644778T1 (sl) 2019-11-29
AT512301B1 (de) 2013-07-15
HUE046675T2 (hu) 2020-03-30

Similar Documents

Publication Publication Date Title
DE69221296T2 (de) Pfosteneinrichtung
EP2417679A2 (fr) Socle de colonne de rechargement pour des colonnes de rechargement électrique
DE1750663A1 (de) Ankerschraube mit Sprengring
DE3881285T2 (de) Vorrichtung und Erdungsstab.
EP2644778B1 (fr) Pierre de fondation pour mât d'éclairage
EP2367251B1 (fr) Support pour installations électriques
DE102006019167B3 (de) Hohlkörper für die Betonbauinstallation
WO2018114664A2 (fr) Procédé d'installation d'un élément de serrage dans un support de bloc d'ancrage, destiné notamment à la mise en oeuvre du procédé et combinaison d'un support avec un élément de serrage
DE202014102748U1 (de) Bodendübel zum Befestigen von stabförmigen Gegenständen, insbesondere von Pfosten im urbanen Bereich (Umfeld)
DE102007041762A1 (de) Sicherungselement, Vorrichtung und Verfahren zur Sicherung von Freileitungen
DE69711549T2 (de) Eine Bohrvorrichtung enthaltende Bohranlage
DE2518873A1 (de) Mittel zur anordnung von unterputzdosen in formen zur herstellung von vorgefertigten gebaeudewandelementen
CH713190A2 (de) Vorrichtung und Verfahren zur Verbindung von zwei Bauteilen in einer bestimmten relativen Ausrichtung sowie damit erstelltes Betonbauwerk.
DE102015213036A1 (de) Endkörper für ein Tragseil
DE202018107162U1 (de) Kabelschacht
DE202005006000U1 (de) Einziehvorrichtung
EP3012931B1 (fr) Support pour installations electriques
CH432022A (de) Messpunktmarkiervorrichtung für unterirdische Vermarkung
DE19934562C2 (de) Kabelschelle
WO1994004780A1 (fr) Dispositif de fixation au sol d'appareils
DE4428181C1 (de) Sicherungseinrichtung für elektrische Kabel
DE3232221A1 (de) Verbindung eines kunststoffummantelten stahlrohres mit einem kunststoffrohr
DE102023118310A1 (de) Erdungsteilstück-Baugruppe, Erdungsvorrichtung, Kathodisches Korrosionsschutzsystem und Kit
CH715902A1 (de) Installationsdose für elektrische Geräte.
DE655946C (de) Mastfuss fuer Lautsprechermasten

Legal Events

Date Code Title Description
AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: KIRCHDORFER FERTIGTEILHOLDING GMBH

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 27/32 20060101AFI20170207BHEP

Ipc: E04H 12/22 20060101ALI20170207BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170915

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 27/32 20060101AFI20190430BHEP

Ipc: E04H 12/22 20060101ALI20190430BHEP

INTG Intention to grant announced

Effective date: 20190516

RIN1 Information on inventor provided before grant (corrected)

Inventor name: BAUER, RUDOLF

Inventor name: NAGELER, CHRISTIAN

Inventor name: PUSNIK, CHRISTIAN

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502013013403

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1169907

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190915

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: HR

Ref legal event code: TUEP

Ref document number: P20191748

Country of ref document: HR

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: BOVARD AG PATENT- UND MARKENANWAELTE, CH

REG Reference to a national code

Ref country code: SK

Ref legal event code: T3

Ref document number: E 32276

Country of ref document: SK

REG Reference to a national code

Ref country code: HR

Ref legal event code: T1PR

Ref document number: P20191748

Country of ref document: HR

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191121

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191223

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191121

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20191748

Country of ref document: HR

Payment date: 20191230

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191221

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191122

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

REG Reference to a national code

Ref country code: HU

Ref legal event code: AG4A

Ref document number: E046675

Country of ref document: HU

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200224

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502013013403

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG2D Information on lapse in contracting state deleted

Ref country code: IS

26N No opposition filed

Effective date: 20200603

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20200218

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200218

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200218

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200218

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20191748

Country of ref document: HR

Payment date: 20210114

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 1169907

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200218

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200218

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20191748

Country of ref document: HR

Payment date: 20220111

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190821

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20191748

Country of ref document: HR

Payment date: 20230207

Year of fee payment: 11

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230512

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20191748

Country of ref document: HR

Payment date: 20240206

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: RO

Payment date: 20240212

Year of fee payment: 12

Ref country code: HU

Payment date: 20240207

Year of fee payment: 12

Ref country code: DE

Payment date: 20240216

Year of fee payment: 12

Ref country code: CZ

Payment date: 20240205

Year of fee payment: 12

Ref country code: CH

Payment date: 20240301

Year of fee payment: 12

Ref country code: SK

Payment date: 20240212

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SI

Payment date: 20240202

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20240229

Year of fee payment: 12

Ref country code: HR

Payment date: 20240206

Year of fee payment: 12