EP2103752A1 - Roof - Google Patents

Roof Download PDF

Info

Publication number
EP2103752A1
EP2103752A1 EP08405086A EP08405086A EP2103752A1 EP 2103752 A1 EP2103752 A1 EP 2103752A1 EP 08405086 A EP08405086 A EP 08405086A EP 08405086 A EP08405086 A EP 08405086A EP 2103752 A1 EP2103752 A1 EP 2103752A1
Authority
EP
European Patent Office
Prior art keywords
ceiling according
interface
bolts
obliquely
concrete layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP08405086A
Other languages
German (de)
French (fr)
Other versions
EP2103752B1 (en
Inventor
Hermann Blumer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fensterfabrik Albisrieden AG
Original Assignee
Fensterfabrik Albisrieden AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fensterfabrik Albisrieden AG filed Critical Fensterfabrik Albisrieden AG
Priority to EP08405086A priority Critical patent/EP2103752B1/en
Priority to PCT/EP2009/001943 priority patent/WO2009115286A1/en
Publication of EP2103752A1 publication Critical patent/EP2103752A1/en
Application granted granted Critical
Publication of EP2103752B1 publication Critical patent/EP2103752B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/12Load-carrying floor structures formed substantially of prefabricated units with wooden beams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B2005/232Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with special provisions for connecting wooden stiffening ribs or other wooden beam-like formations to the concrete slab

Definitions

  • the invention relates to a blanket, e.g. an intermediate ceiling in a building according to the preamble of claim 1.
  • the invention is based on the object to provide a ceiling in which the concrete layer is surrounded by a wooden frame and the concrete layer is reliably connected to the same and is mainly supported by him. This object is solved by the features in the characterizing part of claim 1.
  • connection of the concrete layer to the frame in the inventive cover has proved to be extremely sustainable. In many cases, fractures occur even in the concrete layer itself rather than at the interface between the wooden frame and the concrete layer.
  • the compound can also be easily made from easily procurable, relatively cheap standard parts.
  • the blanket includes ( Fig. 1
  • the latter consists for example of straight beams 3 and corner pieces 4, which are each connected to two beams 3 in such a way that they enclose a right angle.
  • the connection between a beam 3 and a corner piece 4 adjoining the same is produced in each case by an inner connecting plate 5 and an outer connecting plate 6, which are respectively in adjoining recesses on the beam 3 and the corner piece 4 are.
  • the inner connecting plate 5 and the outer connecting plate 6 in turn are connected by round rods 7, each congruent adjoining transverse bores in the beam 3 or the corner piece 4 and the inner connecting plate 5 and the outer connecting plate 6, with the beam 3 and the corner piece 4.
  • the wood frame can also have a more complex shape than shown, with projections and projections, acute and obtuse angles and curved sections.
  • the concrete layer 1 can be reinforced. It can also be supported on the remote from the wooden frame 2 places.
  • the bar 3 consists ( Fig. 2 ) Each of a composite material with thin wood panels and is, for example, as shown formed as a multi-layer plate 8 or as a veneer layer board or plywood.
  • the corner pieces 4 are constructed similarly.
  • the beams 3 and the corner pieces 4 form a peripheral boundary surface 9, which in the example is piecewise flat and perpendicular and to which the wood panels of the beam 3 are parallel.
  • An edge surface of the concrete layer 1 immediately adjoins the interface 9.
  • the wooden frame 2 successively in the circumferential direction, groups 10 of connecting parts attached, each as a straight pin 11a -d (s. Fig. 2, 3rd , the concrete layer is in Fig. 2 only hinted at and in Fig. 3 omitted) are formed.
  • the bolts 11a-d are each formed as one-piece bolts, e.g. SFS WT-T 8.2x245.
  • Each of the bolts 11a-d has a tip thread 12 formed as a cutting thread.
  • a rear thread follows 13, which is pulled through to a head 14 and whose courses form a series of slightly oblique transverse grooves.
  • the head 14 is designed so that the engagement of a turning tool is possible, e.g. he is provided with a slot or other depression.
  • Each of the bolts 11a-d is provided with an anchoring portion extending from the tip to about the middle, i.
  • the rear end protrudes from the wooden beam 3 at the interface 9 and forms a holding portion that is completely embedded in the concrete layer 1.
  • the transverse grooves formed by the rear thread 13 thereby make a firm, in particular also tensile connection with the same safe.
  • a group 10 consists in each case of four bolts 11a-d, of which two bolts 11a, b are arranged perpendicular to the interface 9, ie horizontally aligned in the example and at a distance of between 10cm and 15cm, in the example of about 14cm, one above the other.
  • On the one side of the bolt 11a, b preferably by between 0.5 cm and 2.5 cm, in the example offset by about 1cm laterally, an obliquely upwardly facing, in a plane perpendicular to the boundary surface 9 bolt 11c arranged. He pierces the interface 9 on a lying in the middle between the height of the bolt 11 a and 11 b height and closes with it an angle of about 45 °.
  • the bolt 11a, b On the other side of the bolt 11a, b is, in the same way laterally offset as the bolt 11c, an obliquely downward pointing, also in a plane perpendicular to the boundary surface 9 bolt 11d attached. He pierces the interface 9 at about the same height as the obliquely upwardly directed bolt 11c and also encloses with it an angle of about 45 °.
  • the angles between the interface 9 and the pins 11c, 11d may deviate from 45 °, preferably between 30 ° and 60 °.
  • the wooden frame 2 is first constructed. It may be wholly or partially supported on an outer wall, which preferably also consists of wood, for example, arranged side by side vertical square posts. Subsequently, or even before assembly, the connecting parts are attached to the wooden frame 2, that is screwed in the example, the bolts 11a-d of the groups 10 by means of a suitable tool in the beam 3 and created a formwork, which in the usual way by means of supports on a floor or a already finished lower ceiling supported boards can be made, which are arranged at the height of the boundary surface 9 on the underside bordering the lower edge of the wooden frame 2.

Abstract

A concrete layer (1) links to a wooden frame around it via groups (10) of bolts (11a-11d) each attached with a 50-cm clearance on a level limiting surface (9) bordered by the concrete layer. The bolts are each anchored in a timber (3) in the wooden frame with an anchoring section carrying a forward thread (12). Protruding from the timber,a retaining section is infused in the concrete layer.

Description

Technisches GebietTechnical area

Die Erfindung betrifft eine Decke, z.B. eine Zwischendecke in einem Gebäude gemäss dem Oberbegriff des Anspruchs 1.The invention relates to a blanket, e.g. an intermediate ceiling in a building according to the preamble of claim 1.

Stand der TechnikState of the art

Aus einer gegossenen Betonschicht bestehende Decken anzulegen und fest mit tragendem Mauerwerk oder Betonmauern zu verbinden, ist gewöhnlich unproblematisch, da die Decke bis zur Aussenseite durchgezogen werden kann und somit ihr Randbereich direkt auf den sie tragenden Mauern aufliegt. Dagegen hat es sich als schwierig erwiesen, eine Betonschicht in einen sie tragenden Holzrahmen einzugiessen und mit demselben hinreichend zuverlässig zu verbinden. Dies ist jedoch erforderlich, wenn etwa die Aussenwand eines Gebäudes aus Holz besteht und ein Durchziehen der Betonschicht bis zur Aussenseite vermieden werden soll, z.B. zur Vermeidung von Kältebrücken.Laying existing ceilings from a poured concrete layer and connecting them firmly with load-bearing masonry or concrete walls is usually unproblematic, as the ceiling can be pulled through to the outside and thus its edge area rests directly on the walls supporting it. By contrast, it has proved difficult to pour a concrete layer into a wooden frame carrying it and to connect it with sufficient reliability. However, this is necessary if, for example, the outer wall of a building is made of wood and pulling through the concrete layer to the outside is to be avoided, e.g. to avoid cold spots.

Darstellung der ErfindungPresentation of the invention

Der Erfindung liegt die Aufgabe zu Grunde, eine Decke anzugeben, bei der die Betonschicht von einem Holzrahmen umgeben ist und die Betonschicht zuverlässig mit demselben verbunden ist und überwiegend von ihm getragen wird. Diese Aufgabe wird durch die Merkmale im Kennzeichen des Anspruchs 1 gelöst.The invention is based on the object to provide a ceiling in which the concrete layer is surrounded by a wooden frame and the concrete layer is reliably connected to the same and is mainly supported by him. This object is solved by the features in the characterizing part of claim 1.

Die Verbindung der Betonschicht mit dem Rahmen bei der erfindungsgemässen Decke hat sich als äusserst tragfähig erwiesen. In vielen Fällen treten sogar eher in der Betonschicht selbst Brüche auf als an der Grenzfläche zwischen Holzrahmen und Betonschicht. Die Verbindung kann ausserdem aus leicht beschaffbaren, verhältnismässig billigen Standardteilen sehr einfach hergestellt werden.The connection of the concrete layer to the frame in the inventive cover has proved to be extremely sustainable. In many cases, fractures occur even in the concrete layer itself rather than at the interface between the wooden frame and the concrete layer. The compound can also be easily made from easily procurable, relatively cheap standard parts.

Kurze Beschreibung der ZeichnungenBrief description of the drawings

Im folgenden wird die Erfindung anhand von Figuren, welche lediglich ein Ausführungsbeispiel darstellen, näher erläutert. Es zeigen

Fig. 1
eine Draufsicht auf einen Teil einer erfindungsgemässen Decke,
Fig. 2
vergrössert einen Schnitt längs II-II in Fig. 1 und
Fig. 3
eine Draufsicht längs III auf den in Fig. 2 dargestellten Teil der erfindungsgemässen Decke.
In the following the invention will be explained in more detail with reference to figures, which represent only one embodiment. Show it
Fig. 1
a plan view of a part of a cover according to the invention,
Fig. 2
enlarges a section along II-II in Fig. 1 and
Fig. 3
a plan view along III on the in Fig. 2 shown part of the inventive ceiling.

Wege zur Ausführung der ErfindungWays to carry out the invention

Die Decke umfasst (Fig. 1) eine waagrechte Betonschicht 1 und einen dieselbe vorzugsweise lückenlos umgebenden Holzrahmen 2. Letzterer besteht z.B. wie dargestellt aus geraden Balken 3 und Eckstücken 4, welche jeweils mit zwei Balken 3 so verbunden sind, dass diese einen rechten Winkel einschliessen. Die Verbindung zwischen einem Balken 3 und einem an denselben anschliessenden Eckstück 4 wird jeweils durch eine innere Verbindungsplatte 5 und eine äussere Verbindungsplatte 6 hergestellt, welche jeweils in aneinander anschliessenden Ausnehmungen am Balken 3 und am Eckstück 4 liegen. Die innere Verbindungsplatte 5 und die äussere Verbindungsplatte 6 wiederum sind durch Rundstäbe 7, die jeweils deckungsgleich aneinander anschliessende Querbohrungen im Balken 3 oder dem Eckstück 4 und der inneren Verbindungsplatte 5 und der äusseren Verbindungsplatte 6 ausfüllen, mit dem Balken 3 und dem Eckstück 4 verbunden. Der Holzrahmen kann bei grundsätzlich gleichem Aufbau auch komplexere Form haben als dargestellt, mit Vorsprüngen und Einsprüngen, spitzen und stumpfen Winkeln und gebogenen Abschnitten. Die Betonschicht 1 kann armiert sein. Sie kann auch an vom Holzrahmen 2 entfernten Stellen zusätzlich gestützt sein.The blanket includes ( Fig. 1 The latter consists for example of straight beams 3 and corner pieces 4, which are each connected to two beams 3 in such a way that they enclose a right angle. The connection between a beam 3 and a corner piece 4 adjoining the same is produced in each case by an inner connecting plate 5 and an outer connecting plate 6, which are respectively in adjoining recesses on the beam 3 and the corner piece 4 are. The inner connecting plate 5 and the outer connecting plate 6 in turn are connected by round rods 7, each congruent adjoining transverse bores in the beam 3 or the corner piece 4 and the inner connecting plate 5 and the outer connecting plate 6, with the beam 3 and the corner piece 4. The wood frame can also have a more complex shape than shown, with projections and projections, acute and obtuse angles and curved sections. The concrete layer 1 can be reinforced. It can also be supported on the remote from the wooden frame 2 places.

Der Balken 3 besteht (Fig. 2) jeweils aus einem Verbundmaterial mit dünnen Holzplatten und ist z.B. wie dargestellt als Mehrschichtplatte 8 ausgebildet oder auch als Furnierschichtplatte oder Sperrholzplatte. Die Eckstücke 4 sind ähnlich aufgebaut.The bar 3 consists ( Fig. 2 ) Each of a composite material with thin wood panels and is, for example, as shown formed as a multi-layer plate 8 or as a veneer layer board or plywood. The corner pieces 4 are constructed similarly.

An der Innenseite bilden die Balken 3 und die Eckstücke 4 eine umlaufende Grenzfläche 9, die im Beispiel stückweise eben und senkrecht ist und zu der die Holzplatten des Balkens 3 parallel sind. Eine Randfläche der Betonschicht 1 schliesst unmittelbar an die Grenzfläche 9 an. Mit Abständen, die je nach der lokalen Belastung unterschiedlich sein können, aber in der Regel zwischen 10cm und 30cm liegen und vorzugsweise ca. 25cm betragen, sind am Holzrahmen 2, in Umlaufrichtung aufeinanderfolgend, Gruppen 10 von Verbindungsteilen angebracht, welche jeweils als gerade Bolzen 11a-d (s. Fig. 2, 3, die Betonschicht ist in Fig. 2 nur angedeutet und in Fig. 3 weggelassen) ausgebildet sind.On the inside, the beams 3 and the corner pieces 4 form a peripheral boundary surface 9, which in the example is piecewise flat and perpendicular and to which the wood panels of the beam 3 are parallel. An edge surface of the concrete layer 1 immediately adjoins the interface 9. With distances that may vary depending on the local load, but are usually between 10cm and 30cm and preferably be about 25cm, the wooden frame 2, successively in the circumferential direction, groups 10 of connecting parts attached, each as a straight pin 11a -d (s. Fig. 2, 3rd , the concrete layer is in Fig. 2 only hinted at and in Fig. 3 omitted) are formed.

Die Bolzen 11a-d sind jeweils als einstückige Schraubenbolzen ausgebildet, z.B. SFS WT-T 8.2x245. Jeder der Bolzen 11a-d weist ein von einer Spitze ausgehendes vorderes Gewinde 12 auf, das als Schneidgewinde ausgebildet ist. Mit Abstand folgt ein hinteres Gewinde 13, das bis zu einem Kopf 14 durchgezogen ist und dessen Gänge eine Folge von leicht schrägen Querrillen bilden. Der Kopf 14 ist so ausgebildet, dass der Eingriff eines Drehwerkzeugs möglich ist, z.B. ist er mit einem Schlitz oder einer anderen Vertiefung versehen. Jeder der Bolzen 11a-d ist mit einem Verankerungsabschnitt, der von der Spitze bis etwa zur Mitte, d.h. etwas über das Ende des vorderen Gewindes 12 hinaus reicht, in einem Balken 3 des Holzrahmens 2 versenkt und durch das vordere Gewinde 12 an demselben zuverlässig festgehalten. Das hintere Ende ragt an der Grenzfläche 9 aus dem Holzbalken 3 und bildet einen Halteabschnitt, der vollständig in der Betonschicht 1 eingebettet ist. Die vom hinteren Gewinde 13 gebildeten Querrillen stellen dabei eine feste, insbesondere auch zugfeste Verbindung mit derselben sicher.The bolts 11a-d are each formed as one-piece bolts, e.g. SFS WT-T 8.2x245. Each of the bolts 11a-d has a tip thread 12 formed as a cutting thread. By far, a rear thread follows 13, which is pulled through to a head 14 and whose courses form a series of slightly oblique transverse grooves. The head 14 is designed so that the engagement of a turning tool is possible, e.g. he is provided with a slot or other depression. Each of the bolts 11a-d is provided with an anchoring portion extending from the tip to about the middle, i. extends slightly beyond the end of the front thread 12 out, sunk in a bar 3 of the timber frame 2 and reliably held by the front thread 12 at the same. The rear end protrudes from the wooden beam 3 at the interface 9 and forms a holding portion that is completely embedded in the concrete layer 1. The transverse grooves formed by the rear thread 13 thereby make a firm, in particular also tensile connection with the same safe.

Eine Gruppe 10 besteht jeweils aus vier Bolzen 11a-d, von denen zwei Bolzen 11a,b senkrecht zur Grenzfläche 9, d.h. im Beispiel waagrecht ausgerichtet und mit einem Abstand von zwischen 10cm und 15cm, im Beispiel von ca. 14cm, übereinander angeordnet sind. Auf der einen Seite der Bolzen 11a,b ist, vorzugsweise um zwischen 0,5cm und 2,5cm, im Beispiel um ca. 1cm seitlich versetzt, ein schräg nach oben weisender, in einer zur Grenzfläche 9 senkrechten Ebene liegender Bolzen 11c angeordnet. Er durchstösst die Grenzfläche 9 auf einer in der Mitte zwischen der Höhe der Bolzen 11a und 11b liegenden Höhe und schliesst mit ihr einen Winkel von ca. 45° ein. Auf der anderen Seite der Bolzen 11a,b ist, in gleicher Weise seitlich versetzt wie der Bolzen 11c, ein schräg nach unten weisender, ebenfalls in einer zur Grenzfläche 9 senkrechten Ebene liegender Bolzen 11d angebracht. Er durchstösst die Grenzfläche 9 etwa auf der gleichen Höhe wie der schräg nach oben gerichtete Bolzen 11c und schliesst mit ihr ebenfalls einen Winkel von ca. 45° ein. Die Winkel zwischen der Grenzfläche 9 und den Bolzen 11c, 11d können von 45° abweichen, vorzugsweise liegen sie zwischen 30° und 60°.A group 10 consists in each case of four bolts 11a-d, of which two bolts 11a, b are arranged perpendicular to the interface 9, ie horizontally aligned in the example and at a distance of between 10cm and 15cm, in the example of about 14cm, one above the other. On the one side of the bolt 11a, b, preferably by between 0.5 cm and 2.5 cm, in the example offset by about 1cm laterally, an obliquely upwardly facing, in a plane perpendicular to the boundary surface 9 bolt 11c arranged. He pierces the interface 9 on a lying in the middle between the height of the bolt 11 a and 11 b height and closes with it an angle of about 45 °. On the other side of the bolt 11a, b is, in the same way laterally offset as the bolt 11c, an obliquely downward pointing, also in a plane perpendicular to the boundary surface 9 bolt 11d attached. He pierces the interface 9 at about the same height as the obliquely upwardly directed bolt 11c and also encloses with it an angle of about 45 °. The angles between the interface 9 and the pins 11c, 11d may deviate from 45 °, preferably between 30 ° and 60 °.

Bei der Herstellung der Decke wird zuerst der Holzrahmen 2 aufgebaut. Er kann ganz oder teilweise auf einer Aussenwand abgestützt sein, welche vorzugsweise ebenfalls aus Holz besteht, z.B. aus nebeneinander angeordneten senkrechten Vierkantpfosten. Anschliessend oder auch schon vor dem Zusammenbau werden die Verbindungsteile am Holzrahmen 2 befestigt, also im Beispiel die Bolzen 11a-d der Gruppen 10 mittels eines geeigneten Werkzeugs in die Balken 3 eingeschraubt und eine Schalung angelegt, welche aus in üblicher Weise mittels Stützen auf einem Boden oder einer bereits fertigen unteren Decke abgestützten Brettern bestehen kann, die auf der Höhe der die Grenzfläche 9 an der Unterseite berandenden Unterkante des Holzrahmens 2 angeordnet sind. Anschliessend wird, gegebenenfalls nach Einbringen der Armierung, Betonmasse auf die Schalung gegossen, die den Holzrahmen 2 ausfüllt und die Verbindungsteile vollständig umgibt. Nach Aushärtung des Betons wird die Schalung entfernt. Die Betonschicht 1 ist nun durch die eingegossenen Verbindungsteile zuverlässig mit dem Holzrahmen 2, in dem dieselben verankert sind, verbunden.In the production of the ceiling, the wooden frame 2 is first constructed. It may be wholly or partially supported on an outer wall, which preferably also consists of wood, for example, arranged side by side vertical square posts. Subsequently, or even before assembly, the connecting parts are attached to the wooden frame 2, that is screwed in the example, the bolts 11a-d of the groups 10 by means of a suitable tool in the beam 3 and created a formwork, which in the usual way by means of supports on a floor or a already finished lower ceiling supported boards can be made, which are arranged at the height of the boundary surface 9 on the underside bordering the lower edge of the wooden frame 2. Subsequently, if necessary after introducing the reinforcement, poured concrete mass on the formwork, which fills the wooden frame 2 and completely surrounds the connecting parts. After hardening of the concrete, the formwork is removed. The concrete layer 1 is now reliably connected by the cast-in connection parts with the wooden frame 2, in which they are anchored.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
Betonschichtconcrete layer
22
Holzrahmenwooden frame
33
Balkenbar
44
Eckstückcorner
55
innere Verbindungsplatteinner connection plate
66
äussere Verbindungsplatteouter connection plate
77
Rundstabround bar
88th
MehrschichtplatteMultilayer board
99
Grenzflächeinterface
1010
Gruppe von VerbindungsteilenGroup of connecting parts
11a-d11a-d
Bolzenbolt
1212
vorderes Gewindefront thread
1313
hinteres Gewinderear thread
1414
Kopfhead

Claims (16)

Decke mit einer waagrechten gegossenen Betonschicht (1), dadurch gekennzeichnet, dass sie ausserdem einen die Betonschicht (1) umgebenden Holzrahmen (2) aufweist, welcher eine umlaufende Grenzfläche (9) bildet, an die eine Randfläche der Betonschicht (1) unmittelbar anschliesst und aus welcher, über sie verteilt, im Holzrahmen (2) verankerte Verbindungsteile ragen, die in die Betonschicht (1) eingegossen sind.Ceiling with a horizontal cast concrete layer (1), characterized in that it also has a concrete layer (1) surrounding the wooden frame (2), which forms a peripheral boundary surface (9) to which an edge surface of the concrete layer (1) immediately adjoins and from which, distributed over them, in the wooden frame (2) anchored connecting parts protrude, which are cast in the concrete layer (1). Decke nach Anspruch 1, dadurch gekennzeichnet, dass die Verbindungsteile jeweils im Holzrahmen (2) versenkte Verankerungsabschnitte und einstückig an diese anschliessende in der Betonschicht (1) eingegossene Halteabschnitte umfassen.Ceiling according to claim 1, characterized in that the connecting parts in each case in the wooden frame (2) recessed anchoring sections and integrally to this subsequent in the concrete layer (1) cast-in holding sections. Decke nach Anspruch 2, dadurch gekennzeichnet, dass der Verankerungsabschnitt des Verbindungsteils jeweils ein Gewinde (12) aufweist.Ceiling according to claim 2, characterized in that the anchoring portion of the connecting part in each case has a thread (12). Decke nach Anspruch 2 oder 3, dadurch gekennzeichnet, dass die Verbindungsteile jeweils als gerade Bolzen (11a, 11b, 11c, 11d) ausgebildet sind und der Halteabschnitt jeweils Querrillen aufweist.Ceiling according to claim 2 or 3, characterized in that the connecting parts in each case as a straight bolt (11a, 11b, 11c, 11d) are formed and the holding portion each having transverse grooves. Decke nach Anspruch 4, dadurch gekennzeichnet, dass der Halteabschnitt jeweils ein Gewinde (13) aufweist, welches die Querrillen bildet.Ceiling according to claim 4, characterized in that the holding portion each having a thread (13) which forms the transverse grooves. Decke nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Grenzfläche (9) eben ist.Ceiling according to one of claims 1 to 5, characterized in that the boundary surface (9) is flat. Decke nach Anspruch 4 oder 5 und Anspruch 6, dadurch gekennzeichnet, dass mindestens ein Teil der Bolzen (11a, 11b) jeweils senkrecht zur Grenzfläche (9) ausgerichtet ist.Ceiling according to claim 4 or 5 and claim 6, characterized in that at least a part of the bolts (11a, 11b) is aligned in each case perpendicular to the interface (9). Decke nach Anspruch 4 oder 5 und Anspruch 6 oder 7, dadurch gekennzeichnet, dass mindestens ein Teil der Bolzen (11c, 11d) jeweils schräg zur Grenzfläche (9) ausgerichtet ist.Ceiling according to claim 4 or 5 and claim 6 or 7, characterized in that at least a part of the bolts (11c, 11d) is oriented obliquely to the interface (9). Decke nach Anspruch 8, dadurch gekennzeichnet, dass die schräg zur Grenzfläche (9) ausgerichteten Bolzen (11c, 11d) mit derselben jeweils einen Winkel von zwischen 30° und 60° einschliessen.Ceiling according to claim 8, characterized in that the obliquely to the interface (9) aligned bolts (11c, 11d) with the same each enclose an angle of between 30 ° and 60 °. Decke nach Anspruch 8 oder 9, dadurch gekennzeichnet, dass die schräg zur Grenzfläche (9) ausgerichteten Bolzen (11c, 11d) zum Teil schräg nach oben und zum Teil schräg nach unten gerichtet sind.Ceiling according to claim 8 or 9, characterized in that the obliquely to the interface (9) aligned bolts (11c, 11d) are directed partly obliquely upwards and partly obliquely downwards. Decke nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass die Verbindungsteile jeweils Gruppen (10) von nahe beisammen angeordneten Verbindungsteilen bilden, welche in Umlaufrichtung der Grenzfläche (9) voneinander beabstandet sind.Ceiling according to one of claims 1 to 10, characterized in that the connecting parts each form groups (10) of close together arranged connecting parts which are spaced apart in the circumferential direction of the interface (9). Decke nach Anspruch 11, dadurch gekennzeichnet, dass der Abstand zwischen zwei benachbarten Gruppen (10) jeweils zwischen 10cm und 30cm liegt.Ceiling according to claim 11, characterized in that the distance between two adjacent groups (10) is in each case between 10cm and 30cm. Decke nach Anspruch 7 und einem der Ansprüche 8 bis 10 sowie Anspruch 11 oder 12, dadurch gekennzeichnet, dass jede Gruppe (10) mindestens einen zur Grenzfläche senkrechten Bolzen (11a, 11b) und je mindestens einen schräg nach oben gerichteten Bolzen (11c) und einen schräg nach unten gerichteten Bolzen (11d) umfasst.Ceiling according to claim 7 and one of claims 8 to 10 and claim 11 or 12, characterized in that each group (10) at least one perpendicular to the interface bolts (11a, 11b) and at least one obliquely upwardly directed bolt (11c) and an obliquely downwardly directed bolt (11d). Decke nach Anspruch 13, dadurch gekennzeichnet, dass jede Gruppe (10) zwei mit Abstand übereinander angeordnete zur Grenzfläche (9) senkrechte Bolzen (11a, 11b) umfasst und, auf mittlerer Höhe zwischen den besagten Bolzen (11a, 11b) angeordnet, je einen schräg nach oben weisenden Bolzen (11c) und einen schräg nach unten weisenden Bolzen (11d).Ceiling according to claim 13, characterized in that each group (10) comprises two spaced superimposed bolts (11a, 11b) perpendicular to the interface (9) and, arranged at mid-height between said bolts (11a, 11b), one each obliquely upwardly facing bolt (11c) and an obliquely downwardly facing bolt (11d). Decke nach einem der Ansprüche 1 bis 14, dadurch gekennzeichnet, dass die Grenzfläche (9) senkrecht ist.Ceiling according to one of claims 1 to 14, characterized in that the boundary surface (9) is vertical. Decke nach einem der Ansprüche 1 bis 15, dadurch gekennzeichnet, dass der Holzrahmen (2) Balken (3) umfasst, welche jeweils aus einem Verbundmaterial aus zur Grenzfläche (9) parallelen Holzplatten bestehen.Ceiling according to one of claims 1 to 15, characterized in that the wooden frame (2) beams (3), each consisting of a composite material to the interface (9) parallel wood panels.
EP08405086A 2008-03-20 2008-03-20 Roof Not-in-force EP2103752B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP08405086A EP2103752B1 (en) 2008-03-20 2008-03-20 Roof
PCT/EP2009/001943 WO2009115286A1 (en) 2008-03-20 2009-03-17 Cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP08405086A EP2103752B1 (en) 2008-03-20 2008-03-20 Roof

Publications (2)

Publication Number Publication Date
EP2103752A1 true EP2103752A1 (en) 2009-09-23
EP2103752B1 EP2103752B1 (en) 2012-06-13

Family

ID=39650480

Family Applications (1)

Application Number Title Priority Date Filing Date
EP08405086A Not-in-force EP2103752B1 (en) 2008-03-20 2008-03-20 Roof

Country Status (2)

Country Link
EP (1) EP2103752B1 (en)
WO (1) WO2009115286A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3426857B1 (en) * 2015-03-13 2022-09-28 Nevoga Immo S.r.o. Reinforced concrete construction element

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE353082C (en) 1922-05-12 A C Pohlmann Fa Hollow build plate
DE1559438A1 (en) 1965-10-21 1969-10-16 Horst Schaefer Prefabricated house
DE4029134A1 (en) * 1989-11-16 1991-05-23 Stadler Heerbrugg Holding Ag Composite structure of timber beam and concrete slab - has concrete reinforcing bolts screwed into timber beam at acute angle to surface
EP1867799A2 (en) * 2006-06-16 2007-12-19 Andrea Bonelli A prefabricated panel for the manufacture of floors and roofs
EP1947255A2 (en) * 2007-01-17 2008-07-23 Pino Albanese Reinforcement for stop end panels

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE353082C (en) 1922-05-12 A C Pohlmann Fa Hollow build plate
DE1559438A1 (en) 1965-10-21 1969-10-16 Horst Schaefer Prefabricated house
DE4029134A1 (en) * 1989-11-16 1991-05-23 Stadler Heerbrugg Holding Ag Composite structure of timber beam and concrete slab - has concrete reinforcing bolts screwed into timber beam at acute angle to surface
EP1867799A2 (en) * 2006-06-16 2007-12-19 Andrea Bonelli A prefabricated panel for the manufacture of floors and roofs
EP1947255A2 (en) * 2007-01-17 2008-07-23 Pino Albanese Reinforcement for stop end panels

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3426857B1 (en) * 2015-03-13 2022-09-28 Nevoga Immo S.r.o. Reinforced concrete construction element

Also Published As

Publication number Publication date
EP2103752B1 (en) 2012-06-13
WO2009115286A1 (en) 2009-09-24

Similar Documents

Publication Publication Date Title
EP0164330B1 (en) Reinforced-concrete floor
DE202006015693U1 (en) Wood-concrete connecting unit for use in building construction, has slab and support units connected with each other by connection unit that is embedded in slab unit, where slab unit is made of concrete and support unit is made of wood
AT520303B1 (en) Method for producing composite ceilings
DE102011110918B4 (en) Building construction with wall construction for load-bearing walls in a multi-storey building and method for producing a building structure
EP2281959A1 (en) Connector element for cantilever slab
EP2103752B1 (en) Roof
EP2405070A2 (en) Steel beam for prefabricated floors
DE2319190A1 (en) DEVICE FOR PRODUCING RECESSES IN CAST CONCRETE
DE102004001638A1 (en) Process for producing a composite element
DE1800425C2 (en) Detachable connection for two stacked, roughly floor-high chimney fittings
DE10205205B4 (en) wall element
EP2989263A1 (en) Storey ceiling construction and building made of wood
DE102017113047B4 (en) Anchoring device for attaching a side bracket of a support beam
EP0365834B1 (en) Flectional resistant angle connection between a wood beam and a pillar
DE102006050046A1 (en) Wärmedämmverbundsystem
AT522177B1 (en) Base for a wooden wall
EP2360327A2 (en) Construction element for wall and ceiling systems
EP2256262A1 (en) Wood structure module, method for its manufacture and application
DE102016103982B4 (en) An element
WO2020064899A1 (en) Composite ceiling construction
EP3130713B1 (en) Structure and method for construction of a structure
DE102015017166B4 (en) Edge formwork element with a formwork panel serving as permanent formwork for the production of a concrete slab
DE102014007124A1 (en) Building Fund Office
DE202014004059U1 (en) finished basement
AT512182B1 (en) BLANKET

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA MK RS

17P Request for examination filed

Effective date: 20100323

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20100811

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 562097

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120615

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502008007422

Country of ref document: DE

Effective date: 20120816

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: ZIMMERLI, WAGNER & PARTNER AG

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20120613

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120913

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

Effective date: 20120613

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120914

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121013

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121015

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120924

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

26N No opposition filed

Effective date: 20130314

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502008007422

Country of ref document: DE

Effective date: 20130314

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120913

BERE Be: lapsed

Owner name: FENSTERFABRIK ALBISRIEDEN A.G.

Effective date: 20130331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130331

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20130320

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20131129

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130320

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130402

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130331

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130320

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: WAGNER PATENT AG, CH

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20150327

Year of fee payment: 8

Ref country code: DE

Payment date: 20150320

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20150320

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120613

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130320

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20080320

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502008007422

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 562097

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160320

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160331

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161001

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160320