EP2072648B1 - Procédé de fonctionnement d'une machine textile - Google Patents
Procédé de fonctionnement d'une machine textile Download PDFInfo
- Publication number
- EP2072648B1 EP2072648B1 EP20080021334 EP08021334A EP2072648B1 EP 2072648 B1 EP2072648 B1 EP 2072648B1 EP 20080021334 EP20080021334 EP 20080021334 EP 08021334 A EP08021334 A EP 08021334A EP 2072648 B1 EP2072648 B1 EP 2072648B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- malfunction
- maintenance
- maintenance unit
- workstations
- activity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H13/00—Other common constructional features, details or accessories
- D01H13/005—Service carriages travelling along the machines
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H13/00—Other common constructional features, details or accessories
- D01H13/14—Warning or safety devices, e.g. automatic fault detectors, stop motions ; Monitoring the entanglement of slivers in drafting arrangements
- D01H13/145—Warning or safety devices, e.g. automatic fault detectors, stop motions ; Monitoring the entanglement of slivers in drafting arrangements set on carriages travelling along the machines; Warning or safety devices pulled along the working unit by a band or the like
Definitions
- the present invention relates to a method of operating a textile machine comprising a plurality of work stations serviced by at least one maintenance unit performing at least one maintenance operation on a requesting workstation comprising at least one task for performing the maintenance worksite unit is requested via a communication system of the textile machine for performing the maintenance activity, wherein the feasibility of the maintenance activity is detected for checking the functionality of the maintenance unit.
- Such a method is known from DE 10 2004 041 051 A1 known.
- a maintenance unit which has been requested to perform a maintenance activity of a spinning unit of a spinning machine, in the event of a malfunction in the execution of a subtask of maintenance activity, the maintenance device initiates an independent approach to the interrupted by the disturbance to be performed activity successfully terminate or at least restore the maintenance device to a ready for use state.
- the maintenance unit can take different measures, one of which provides that in case of a malfunction occurring on the maintenance unit itself, the partial task affected by this malfunction will no longer be carried out by the maintenance unit in the future.
- a disadvantage of this method turns out that the spinning stations the maintenance unit to carry out a Request maintenance regardless of the presence of a malfunction on the service unit. This process is repeated for each request of a spinning station, regardless of whether the requested maintenance of the spinning unit by the maintenance unit is still feasible or not.
- Object of the present invention is therefore to increase the efficiency in operating the textile machine and the maintenance units.
- the inventive method has the advantage that existing requirements for the maintenance unit for the maintenance of jobs can be canceled, which are no longer or not completely feasible due to the present malfunction.
- the maintenance unit can get to the requesting jobs faster whose specific requirement for a maintenance activity allows at least a partial implementation of the maintenance activity.
- the requesting jobs can modify their request to the maintenance unit in such a way that the maintenance activity is carried out at least partially, omitting the subtask concerned by the malfunction on the maintenance unit.
- requirements for the maintenance unit are maintained, which despite the malfunction can be completely processed.
- the method according to the invention thus avoids the method of the maintenance unit to a workstation for performing a maintenance operation, which is not feasible in the knowledge of a present malfunction by the maintenance unit.
- the workstations in the absence of the malfunction, maintain the requirement for the maintenance unit, although the maintenance activity is not feasible.
- it is the decision as to whether a request for the maintenance unit affected by a malfunction by the workstations makes sense, ie the workstations themselves or a higher-level central control unit of the textile machine, so that production losses due to the futile start-up of workstations are reduced can be.
- the check of the presence of a malfunction on the maintenance unit can be done automatically by the Maintenance unit to be performed. Only when a malfunction is detected by the maintenance unit itself is a corresponding message sent via the communication system of the textile machine. The data volume to be transmitted by the communication system is thus kept smaller.
- the check for the presence of a malfunction in the maintenance unit can be carried out by a central control device of the textile machine.
- the central control device of the textile machine is in communication with all workstations and with the maintenance unit via the communication system so that information about whether a maintenance activity or a partial task of the maintenance activity has been successfully carried out can be forwarded to the central control device for evaluation.
- the data volume to be transmitted is slightly larger, but the resources of the central control device are used more intensively.
- the number of immediately consecutive failed attempts of a subtask or a maintenance operation to be performed can be added, whereby the exceeding of a predeterminable total number of failed attempts is classified as a malfunction on the maintenance aggregate, while in the meantime a successful completion of a task before exceeding the total number of failed task counts is reset to an initial value.
- the successive failure of the execution of a subtask or the maintenance activity allows the conclusion that the failure is not due to a fault at the respective work site but to a malfunction of the maintenance unit.
- the result of the count of failed attempts is evaluated either by the maintenance facility itself or by the central control device of the textile machine to inform the jobs about an existing malfunction of the maintenance unit.
- the workstations or the central control device evaluate whether the relevant maintenance unit is still suitable for performing the task at the workstation and is to be requested.
- the workstations may modify the requirements made up to the moment of notification of a malfunction that the maintenance unit performs at least the subtasks or maintenance activities as such, which are feasible independently of the present malfunction.
- the operation of the textile machine is improved so far that the malfunction of the maintenance unit does not have the immediate stoppage of all requesting jobs result, because a single subtask of a maintenance activity is not feasible.
- requests made by the workplaces up to the time of the detection of a malfunction which include subtasks or maintenance activities which are not feasible by the maintenance unit due to the malfunction, may be canceled. This is particularly advantageous if the subtasks or maintenance activities to be performed are so-called optional tasks or activities whose non-implementation does not mean that the actual production process is prevented or that the quality of the production process is not directly and sustainably influenced.
- information about the deletion of the requirements of the affected jobs can be sent. This information is used to cause the workstations, regardless of the request to the maintenance unit to resume or continue the manufacturing process, if this allows their operating condition.
- the affected workstation can be initiated automatically or by a control by the central control device of the textile machine by the workstation sends a suitable request to the maintenance unit, for example, to resolve a break in the threadline by a piecing or splicing.
- the information about the deletion of the requirements can be forwarded directly from the relevant maintenance unit to the affected jobs via the communication system of the textile machine.
- the information can be sent indirectly via the central control device.
- the workstations can send requests to the maintenance unit which comprise a preparatory execution of at least one partial task of a maintenance activity not affected by the malfunction.
- the maintenance unit For example, if the operation of the rotor cleaning is affected by the malfunction on the maintenance unit of an open-end spinning machine, which preferably takes place during a bobbin change, the maintenance unit would only be requested by a spinning station to perform the bobbin change with the omission of the rotor cleaning.
- a purely preventive cleaning of the rotor by the spinning stations is no longer required.
- the maintenance unit can be transferred to a maintenance position.
- the maintenance position should be chosen so that the maintenance unit for an operator is easy and accessible.
- the activity for the duration of the maintenance can be taken over by another maintenance unit.
- This temporary measure reduces the production down time of the textile machine during the period of maintenance work on the malfunctioning maintenance unit by an operator.
- information about the communication system of the textile machine can be sent to all workstations after a successful elimination of the malfunction. Sending this information will result in the affected jobs being in the workspace of the Maintenance aggregates, which are in turn due to the malfunction of the maintenance unit in turn are at a standstill, can formulate new requirements for the maintenance unit in order to resume the manufacturing process after a maintenance performed maintenance of the unit. Sending the information about the elimination of the malfunction can be done directly by the maintenance unit.
- the information can be sent indirectly via the central control device.
- the spinning machine comprises a central control device which is set up to detect a malfunction on a maintenance unit, which prevents the execution of at least one maintenance activity or at least a partial task of maintenance activity, and that affected by the malfunction maintenance unit or the central control device sends information about the communication system of the spinning machine to all spinning stations on the extent of the malfunction.
- the spinning machine (1) comprises a central control device (17) which is adapted to detect a malfunction on the maintenance unit (5a, 5b, 6a, 6b), the execution of at least one maintenance activity or at least one subtask prevents the maintenance activity, and that the malfunctioning maintenance unit (5A, 5B, 6A, 6B) or the central control device (17) for sending information via the communication system (18, 20) of the spinning machine (1) to all spinning stations (2 ) about the existence of the malfunction and that the spinning station (2) is arranged to evaluate the information on the existence of a malfunction in order to decide whether a request made to the maintenance unit (5a, 5b, 6a, 6b) prior to the detection of the malfunction persists is received, modified or canceled, or that the spinning station (2) is arranged to evaluate the information on the existence of a malfunction in order to decide whether after the detection of the malfunction, the maintenance unit (5a, 5b, 6a, 6b) to the Implementation of a at a spinning station (2) pending maintenance activity is called.
- Fig. 1 is a schematic plan view of a textile machine, such as an open-end spinning machine, shown, which is generally designated by the reference numeral 1.
- a spinning machine 1 has between its end frames 11 and 12 a plurality of in series juxtaposed jobs 2.
- These two sides of the long sides of the Open-end spinning machine 1 arranged jobs 2 are supplied by automatically operating maintenance units 5A, 5B, 6A, 6B, which are guided on a running rail 13 along the spinning machine 1 and a communication system 18, such as a CAN bus, both with each other and with Control devices of the work stations 2 and a central control device 17 of the spinning machine 1 are connected.
- a communication system 18 such as a CAN bus
- the workstations 2 are divided into working areas 3A, 3A and 4A, 4B, which are each supplied by one of the maintenance units 5A, 5B and 6A, 6B.
- the work areas 3A and 3B as well as 4A and 4B may be characterized by an area limiter 14, for example, in order to avoid that the maintenance unit 5A responsible for the working area 3A is moved into the workstation area 3B of the maintenance unit 5B, which leads to a collision between the two maintenance units 5A and 5B could come.
- the working areas 3A, 3B, 4A, 4B may have so-called end markers 19 which can not be passed by the maintenance units 5A, 5B, 6A, 6B.
- end markers 19 which can not be passed by the maintenance units 5A, 5B, 6A, 6B.
- the maintenance units 5A, 5B, 6A, 6B are equipped with a data transmission device 20, which enables the setting of a call, the reception of a call, a dialog and a bidirectional wireless data transmission. Wired communication is also possible.
- a data transmission device 20 is associated with Maintenance units known and in the DE 38 414 064 A1 described in detail.
- the maintenance units 5A, 5B, 6A, 6B have a signal device 15, for example a signal lamp, in order to make the operating personnel aware of this in the event of a malfunction.
- FIG. 2 shows a side view of the job 2 of the open-end rotor pin machine 1 according to Fig. 1 ,
- the work station 2 has, inter alia, in each case an open-end spinning device 24 and a winding device 30.
- sliver 23 which is stored in a sliver can 22 and the spinning device 24 is presented, spun into threads 27, which subsequently on the winding device 30th are wound into a cheese 28.
- the winding device 30 is equipped with a coil frame 29 for rotatably supporting a cheese package and with a winding shaft or winding drum 31 for frictionally driving the cheese 28 and the cheese package.
- Such open-end rotor spinning machines 1 generally also have a cross-coil transport device 32 for the removal of cheeses 28, which have reached their intended diameter.
- the change of the cheeses 28 is performed by one of the maintenance units 5A, 5B, 6A, 6B, in whose area of responsibility the respective spinning station 2 falls.
- Step 41 represents a request of the spinning station 2 to the servicing unit 6A responsible for this working area 4A, which is based on the requirement of a cross-coil change or reel sleeve replacement.
- a rotor cleaning of the spinning device 24 is carried out at the same time to exploit the run-related stoppage of the job 2.
- a rotor cleaning is also carried out preventively, if, for example, a change in the thread quality is detected. This can be done at the respective spinning station 2 by querying the current CV value.
- the result of the evaluation of the query causes the spinning station 2, if necessary, to formulate a request for preventive rotor cleaning to the maintenance unit 6A.
- This request is forwarded via the communication system 18 to the maintenance unit 6A and categorized by the latter in a step 42 in terms of its priority.
- the requirements of the spinning stations 2 in the order management of the maintenance device 6A, the requirements of the spinning stations 2 in Depending on order type sorted by priority. Accordingly, a requirement that has been triggered to remedy the production stoppage at the spinning station 2, a higher priority than, for example, an exclusive preventive cleaning of the spin agent.
- an optimization of the travel path of the maintenance unit 6A is aimed at by first approaching the respective spinning station 2 closest to the maintenance device 6A.
- step 43 it is checked whether the request of the spinning station 2 has been processed by the maintenance unit 6A. If the processing has been carried out successfully, the subsequent request is carried out according to the step 41 of another spinning station 2 by the maintenance unit 6A within the working area 4A. If the request was processed without or only with partial success, in a step 44, a functional test for determining a malfunction on the maintenance unit 6A is performed and evaluated. Step 45 symbolizes the query as to whether a malfunction has been detected in step 44 or not. In the absence of a malfunction, the process branches back to step 41, and a further request for another spinning station 2 within the workstation area 4A is processed.
- step 46 all spinning stations 2 belonging to the working area 4A of the maintenance unit 6A are directly from the relevant maintenance unit 6A or indirectly from the central control unit 17 of the spinning machine 1 via the presence of a malfunction and their nature and extent informed.
- the malfunction as already mentioned, the non-feasibility of the rotor cleaning, regardless of whether the rotor cleaning takes place as a purely preventive measure or in the course of a cheese change.
- step 47 the modification of the spinning stations 2 of the work area 4A already made demands on the maintenance unit 6a by the spinning units 2. For this existing orders are canceled, if they concern the preventive rotor cleaning alone, existing requirements are adjusted, insofar as the rotor cleaning as Partial task of a more extensive maintenance task is provided as the cheese change, and it will be from this point by the spinning stations 2 of the affected work area 4A all new requirements adapted to the effect that a rotor cleaning by the maintenance unit 6A is not possible.
- step 48 it is checked whether the maintenance unit 6A can process the modified requirements or the adapted new requirements despite the existence of a malfunction. If a processing of further maintenance activities regardless of the existence of the malfunction is possible, the processing by the maintenance unit 6A is continued according to the priority list adapted to the modifications of the requirements carried out by the spinning stations 2.
- the maintenance unit 6A is transferred to a maintenance position, which is indicated by step 49 .
- the emptying of a thread reserve spool on the maintenance unit 6A causes at least the removal of the full cross-wound bobbin 28 from the creel 29, although neither the Rotor cleaning nor the insertion of an empty tube in the coil frame 29 are possible.
- step 50 the maintenance unit 6A is parked in a maintenance position, where it is positioned as easily as possible for the operator to perform the required maintenance.
- step 51 it is cyclically queried whether the malfunction has already been corrected. If it is determined in step 51 that the malfunction no longer exists, then in a subsequent step 52 a message is sent to all spinning stations 2 located in the working area 4A of the maintenance unit 6A.
- the triggering of the information of the elimination of the malfunction is carried out by an operator who has transferred the maintenance unit 6A in a functional operating condition.
- the transmission of this information to all jobs 2 can be done directly by the affected maintenance unit 6A itself or via the central control device 17.
- the maintenance unit 6A resume its normal activity and accept all requests according to the step 41.
- the spinning stations 2 can modify their requirements made up to the time when the malfunction is remedied so that all partial tasks or maintenance activities of the maintenance unit 6A can be requested again.
- the example of a malfunction of the maintenance unit 6A in the working area 4A of the spinning machine 1 described method is equally applicable to the other working areas 3A, 3B and 4B. This also does not affect the option that a maintenance device 6B temporarily the maintenance of the working area 4A of the maintenance device 6A assumes if it is in the maintenance position according to the step 50.
- a counter is initialized in a first step 61, wherein the counter initially preferably assumes the value "0".
- the counter is designed as software or hardware implemented in a control device of the maintenance unit 6A.
- the counter can also be designed as part of the control device 17 of the spinning machine.
- Step 62 symbolizes the execution or a required repetition of a subtask or, if appropriate, of the entire maintenance order, the success of which is checked in the subsequent step 63.
- step 64 the counter is reset to its initial value "0" according to step 61 or not incremented. If, on the other hand, it is determined that the execution of the maintenance order or the partial task has failed, then in step 65 the counter is incremented.
- a query is made in step 66 as to whether a predefined, maximum count has been reached in successive repetitions of the same partial task or the same maintenance task. If the maximum counter reading has not yet been reached, the partial task or the maintenance order is repeated until its successful execution or when the maximum counter reading is reached.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Spinning Or Twisting Of Yarns (AREA)
- Looms (AREA)
Claims (15)
- Procédé d'exploitation d'une machine textile (1) comprenant une pluralité de postes de travail (2) dont la maintenance est assurée par au moins une unité de maintenance (5a, 5b, 6a, 6b) qui effectue au moins une opération de maintenance sur un poste de travail requérant (2), opération qui comprend au moins une sous-tâche pour l'exécution de laquelle l'unité de maintenance (5a, 5b, 6a, 6b) est requise pour effectuer une opération de maintenance par le poste de travail (2) par l'intermédiaire d'un système de communication (18, 20) de la machine textile (1), sachant qu'afin de vérifier le bon état de fonctionnement de l'unité de maintenance (5a, 5b, 6a, 6b), on détecte la capacité d'exécuter l'opération de maintenance,
caractérisé- en ce que, en cas d'identification au niveau de l'unité de maintenance (5a, 5b, 6a, 6b) d'une défaillance fonctionnelle qui empêche l'exécution de l'opération de maintenance au moins unique ou au moins d'une sous-tâche de l'opération de maintenance, une information sur la présence de la défaillance fonctionnelle est envoyée via le système de communication (18, 20) de la machine textile (1) à tous les postes de travail concernés (2),- et en ce que cette information est interprétée au niveau des postes de travail (2) afin de décider si une requête déjà posée à l'unité de maintenance (5a, 5b, 6a, 6b) avant l'identification de la défaillance fonctionnelle est maintenue, modifiée ou annulée,- ou en ce que cette information est interprétée au niveau des postes de travail (2) afin de décider si, après l'identification de la défaillance fonctionnelle, l'unité de maintenance concernée (5a, 5b, 6a, 6b) est appelée pour effectuer une opération de maintenance en souffrance à un poste de travail (2). - Procédé selon la revendication 1, caractérisé en ce que la vérification de la présence d'une défaillance fonctionnelle au niveau de l'unité de maintenance (5a, 5b, 6a, 6b) est effectuée automatiquement par l'unité de maintenance (5a, 5b, 6a, 6b).
- Procédé selon la revendication 1, caractérisé en ce que la vérification de la présence d'une défaillance fonctionnelle au niveau de l'unité de maintenance (5a, 5b, 6a, 6b) est effectuée par un dispositif central de commande (17) de la machine textile (1).
- Procédé selon l'une des revendications 1 à 3, caractérisé en ce que, pour vérifier la présence d'une défaillance fonctionnelle, on additionne le nombre de tentatives infructueuses immédiatement consécutives d'une sous-tâche à effectuer, sachant que le dépassement d'un nombre total prédéterminable de tentatives infructueuses est classé comme défaillance fonctionnelle au niveau de l'unité de maintenance (5a, 5b, 6a, 6b), tandis que si une exécution fructueuse d'une sous-tâche s'y intercale avant le dépassement du nombre total, le comptage des tentatives infructueuses de la sous-tâche est ramené à une valeur initiale.
- Procédé selon l'une des revendications 1 à 4, caractérisé en ce que les requêtes posées par les postes de travail (2) jusqu'à l'instant de l'identification d'une défaillance fonctionnelle sont modifiées en ceci que l'unité de maintenance (5a, 5b, 6a, 6b) effectue uniquement les sous-tâches d'une opération de maintenance qui peuvent être effectuées indépendamment de la défaillance fonctionnelle existante.
- Procédé selon l'une des revendications 1 à 4, caractérisé en ce que les requêtes posées par les postes de travail (2) jusqu'à l'instant de l'identification d'une défaillance fonctionnelle qui comprennent des sous-tâches ou des opérations de maintenance qui ne peuvent pas être effectuées par l'unité de maintenance (5a, 5b, 6a, 6b) en raison de la défaillance fonctionnelle, sont annulées.
- Procédé selon l'une des revendications 1 à 4, caractérisé en ce que les requêtes déjà posées par les postes de travail (2) jusqu'à l'instant de l'identification de la défaillance fonctionnelle sont effacées par l'unité de maintenance (5a, 5b, 6a, 6b).
- Procédé selon la revendication 7, caractérisé en ce qu'une information sur l'effacement des requêtes est envoyée aux postes de travail (2) concernés par cet effacement.
- Procédé selon la revendication 7, caractérisé en ce que l'information est directement envoyée par l'unité de maintenance (5a, 5b, 6a, 6b).
- Procédé selon la revendication 7, caractérisé en ce que l'information est envoyée indirectement par l'intermédiaire du dispositif central de commande (17).
- Procédé selon l'une des revendications 6 à 10, caractérisé en ce que les postes de travail (2) envoient à l'unité de maintenance (5a, 5b, 6a, 6b), après l'identification d'une défaillance fonctionnelle, des requêtes qui comprennent une exécution préparatoire d'au moins une sous-tâche d'une opération de maintenance qui n'est pas concernée par la défaillance fonctionnelle.
- Procédé selon l'une des revendications 1 à 11, caractérisé en ce que l'unité de maintenance (5a, 5b, 6a, 6b) est transférée dans une position de maintenance.
- Procédé selon la revendication 12, caractérisé en ce que, à la suite du transfert de l'unité de maintenance concernée (5a, 5b, 6a, 6b) dans la position de maintenance, l'activité est prise en charge pendant la durée de la maintenance par une autre unité de maintenance (5a, 5b, 6a, 6b).
- Procédé selon l'une des revendications 1 à 13, caractérisé en ce qu'une fois réussie la suppression de la défaillance fonctionnelle sur l'unité de maintenance (5a, 5b, 6a, 6b), une information à ce sujet est envoyée via le système de communication (18, 20) de la machine textile (1) à tous les postes de travail (2).
- Métier à filer (1) pour la mise en oeuvre du procédé selon l'une des revendications 1 à 14, caractérisé en ce que le métier à filer (1) comprend un dispositif central de commande (17) qui est conçu pour identifier, sur l'unité de maintenance (5a, 5b, 6a, 6b), une défaillance fonctionnelle qui empêche l'exécution de l'opération de maintenance au moins unique ou au moins d'une sous-tâche de l'opération de maintenance, et en ce que l'unité de maintenance (5a, 5b, 6a, 6b) concernée par la défaillance fonctionnelle ou le dispositif central de commande (17) est conçu(e) pour envoyer une information concernant la présence de la défaillance fonctionnelle à tous les postes de filature (2) via le système de communication (18, 20) du métier à filer (1),
et en ce que le poste de filature (2) est conçu pour interpréter les informations sur la présence d'une défaillance fonctionnelle, afin de décider si une requête déjà posée à l'unité de maintenance (5a, 5b, 6a, 6b) avant l'identification de la défaillance fonctionnelle est maintenue, modifiée ou annulée,- ou en ce que le poste de filature (2) est conçu pour interpréter les informations sur la présence d'une défaillance fonctionnelle, afin de décider si, après l'identification de la défaillance fonctionnelle, l'unité de maintenance (5a, 5b, 6a, 6b) est appelée pour effectuer une opération de maintenance en souffrance à un poste de filature (2).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102007062630A DE102007062630A1 (de) | 2007-12-22 | 2007-12-22 | Verfahren zum Betreiben einer Textilmaschine |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102007062630 Previously-Filed-Application | 2007-12-22 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2072648A2 EP2072648A2 (fr) | 2009-06-24 |
EP2072648A3 EP2072648A3 (fr) | 2011-05-18 |
EP2072648B1 true EP2072648B1 (fr) | 2012-05-30 |
Family
ID=40361511
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20080021334 Expired - Fee Related EP2072648B1 (fr) | 2007-12-22 | 2008-12-09 | Procédé de fonctionnement d'une machine textile |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2072648B1 (fr) |
CN (1) | CN101463514B (fr) |
DE (1) | DE102007062630A1 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CZ303829B6 (cs) * | 2012-06-01 | 2013-05-15 | Rieter Cz S.R.O. | Zpusob a zarízení k zaprádání príze na doprádacím stroji |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011010988B4 (de) * | 2011-02-11 | 2019-01-10 | Saurer Spinning Solutions Gmbh & Co. Kg | Verfahren zum Betreiben eines Serviceaggregats und Textilmaschine mit einem Serviceaggregat |
JP2013067886A (ja) * | 2011-09-21 | 2013-04-18 | Murata Mach Ltd | 繊維機械 |
JP2013067884A (ja) * | 2011-09-21 | 2013-04-18 | Murata Mach Ltd | 繊維機械システム及び繊維機械 |
DE102012007683A1 (de) * | 2012-04-17 | 2013-10-17 | Oerlikon Textile Gmbh & Co. Kg | Verfahren zum Betreiben einer Spulmaschine und Spulmaschine |
CN103161006B (zh) * | 2013-03-27 | 2014-05-07 | 吴江市金平华纺织有限公司 | 一种循环式织机维护通道 |
JP2017109833A (ja) * | 2015-12-16 | 2017-06-22 | 村田機械株式会社 | 糸巻取装置及び糸巻取システム |
DE102016111841A1 (de) * | 2016-06-28 | 2017-12-28 | Rieter Ingolstadt Gmbh | Verfahren zum Betreiben einer Arbeitsstelle einer Textilmaschine |
DE102017104337A1 (de) * | 2017-03-02 | 2018-09-06 | Maschinenfabrik Rieter Ag | Verfahren zur Wartung von Arbeitsstellen einer Textilmaschine |
CH715390A1 (de) * | 2018-09-27 | 2020-03-31 | Rieter Ag Maschf | Verfahren zum Betreiben einer Ringspinnmaschine. |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3543572C2 (de) * | 1985-12-10 | 1995-05-18 | Schlafhorst & Co W | Vorrichtung zum Abwickeln und anschließendem Wiederaufwickeln eines Fadens anläßlich der Behebung eines Fadenbruches |
AT389547B (de) | 1987-12-17 | 1989-12-27 | Leitl Werke Bauhuette | Waermedaemm-verbundelement |
DE3902820A1 (de) * | 1988-11-24 | 1990-06-07 | Zinser Textilmaschinen Gmbh | Verfahren und vorrichtung zum uebermitteln von informationen ueber betriebszustaende an einer ringspinnmaschine |
JPH05500838A (ja) * | 1990-04-24 | 1993-02-18 | マシーネンファブリーク リーテル アクチエンゲゼルシャフト | 特に紡績機械におけるトラブルの除去法 |
DE4422523A1 (de) * | 1994-06-28 | 1996-01-04 | Schlafhorst & Co W | Codierung von mehreren gleichgearteten Arbeitsstellen an einer Textilmaschine |
DE19917971B4 (de) * | 1998-05-20 | 2009-11-19 | Rieter Ingolstadt Gmbh | Verfahren und Vorrichtung zum Warten einer Arbeitsstelle einer Textilmaschine mit Hilfe einer verfahrbaren Wartungsvorrichtung |
DE19916270A1 (de) * | 1999-04-12 | 2000-10-19 | Schlafhorst & Co W | Verfahren zum Auswechseln von Kreuzspulen an Spulstellen eines Spulautomaten und Spulautomat |
DE19930644A1 (de) * | 1999-07-02 | 2001-01-04 | Rieter Ingolstadt Spinnerei | Vorrichtung zum Warten einer verfahrbaren Wartungseinrichtung oder einer Arbeitsstelle einer Textilmaschine |
DE19930714C5 (de) * | 1999-07-02 | 2015-04-09 | Rieter Ingolstadt Gmbh | Textilmaschine mit einer Vielzahl gleichartiger Arbeitsstellen |
DE102004041051B4 (de) * | 2003-10-22 | 2017-02-09 | Rieter Ingolstadt Gmbh | Intelligentes Störungsmanagement |
DE10349094A1 (de) * | 2003-10-22 | 2005-05-25 | Rieter Ingolstadt Spinnereimaschinenbau Ag | Textilmaschine und Verfahren zur Verbesserung deren Produktionsablaufs |
-
2007
- 2007-12-22 DE DE102007062630A patent/DE102007062630A1/de not_active Withdrawn
-
2008
- 2008-12-09 EP EP20080021334 patent/EP2072648B1/fr not_active Expired - Fee Related
- 2008-12-19 CN CN2008101856659A patent/CN101463514B/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CZ303829B6 (cs) * | 2012-06-01 | 2013-05-15 | Rieter Cz S.R.O. | Zpusob a zarízení k zaprádání príze na doprádacím stroji |
Also Published As
Publication number | Publication date |
---|---|
CN101463514A (zh) | 2009-06-24 |
CN101463514B (zh) | 2012-02-15 |
EP2072648A3 (fr) | 2011-05-18 |
EP2072648A2 (fr) | 2009-06-24 |
DE102007062630A1 (de) | 2009-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2072648B1 (fr) | Procédé de fonctionnement d'une machine textile | |
EP2304086B1 (fr) | Machine textile équipée d'un module de service mobile | |
EP3802927B1 (fr) | Ligne de filature à anneau et son procédé de fonctionnement | |
EP2468670B1 (fr) | Procédé de fonctionnement d'un bobinoir et bobinoir | |
EP3052416B1 (fr) | Épurateur de fil et poste de filage d'un métier à filer équipé dudit épurateur, ainsi que procédé permettant de faire fonctionner un poste de filage | |
EP3202963A1 (fr) | Procédé de nettoyage d'une machine textile | |
EP2606166B1 (fr) | Machine textile | |
EP3498896A1 (fr) | Procédé de fonctionnement d'un module de service | |
DE19923047A1 (de) | Verfahren und Vorrichtung zur Steuerung einer Komponente einer eine Vielzahl gleichartiger Arbeitstellen nebeneinander aufweisenden Textilmaschine | |
DE3917055C2 (de) | Verfahren und Einrichtung zum Überwachen des Produktionsvorgangs der Spuleinrichtungen einer Kreuzspulen herstellenden Maschine | |
EP1953648B1 (fr) | Methode de controle d'une machine textile produisant des bobines croisées comprenant des sous-groupes reliés par un bus-machine | |
DE102013014195A1 (de) | Behebung einer Fadenunterbrechung beim Wickeln eines Fadens auf eine Kreuzspule | |
EP2952462A1 (fr) | Procédé et dispositif destinés à la surveillance de la qualité de tubes vides | |
DE102004041051B4 (de) | Intelligentes Störungsmanagement | |
EP3720996A1 (fr) | Procédé pour faire fonctionner une bobineuse pour bobiner les canettes d'une machine à filer à anneaux | |
DE19547068B4 (de) | Serviceeinrichtung an einer Spinnmaschine | |
EP4215655A1 (fr) | Procédé de fonctionnement d'un poste de filage d'un métier à filer à rotor et métier à filer à rotor | |
EP3904253B1 (fr) | Machine textile, ainsi que chariot de service pour machines textiles | |
DE19642222A1 (de) | Vorrichtung zum Herstellen von Coregarn | |
EP3967797A1 (fr) | Machine textile, ainsi que procédé de fonctionnement d'une telle machine textile | |
DE102011010988B4 (de) | Verfahren zum Betreiben eines Serviceaggregats und Textilmaschine mit einem Serviceaggregat | |
DE102016115249A1 (de) | Verfahren zum Betreiben eines Verbundsystems aus mindestens einer Ringspinnmaschine und mindestens einer Spulmaschine und Spulmaschine für ein Verbundsystem | |
EP3957783B1 (fr) | Machine textile dotée d'une pluralité de postes de travail similaires | |
EP3527703B1 (fr) | Procédé de fonctionnement d'un poste de filage d'un métier à filer continu à anneaux après un processus de levée | |
DE3742252A1 (de) | Verfahren zum wechseln von kannen an textilmaschinen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA MK RS |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA MK RS |
|
17P | Request for examination filed |
Effective date: 20111118 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
AKX | Designation fees paid |
Designated state(s): DE IT TR |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: GOEBBELS, HEINZ-DIETER Inventor name: DEMANDT, HEINZ |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE IT TR |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502008007298 Country of ref document: DE Effective date: 20120802 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20130301 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502008007298 Country of ref document: DE Effective date: 20130301 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502008007298 Country of ref document: DE Owner name: SAURER GERMANY GMBH & CO. KG, DE Free format text: FORMER OWNER: OERLIKON TEXTILE GMBH & CO. KG, 42897 REMSCHEID, DE Effective date: 20130918 Ref country code: DE Ref legal event code: R081 Ref document number: 502008007298 Country of ref document: DE Owner name: SAURER SPINNING SOLUTIONS GMBH & CO. KG, DE Free format text: FORMER OWNER: OERLIKON TEXTILE GMBH & CO. KG, 42897 REMSCHEID, DE Effective date: 20130918 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20121209 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502008007298 Country of ref document: DE Owner name: SAURER SPINNING SOLUTIONS GMBH & CO. KG, DE Free format text: FORMER OWNER: SAURER GERMANY GMBH & CO. KG, 42897 REMSCHEID, DE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20191231 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20200102 Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502008007298 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210701 |