EP1994328A1 - Bord-wiederverdampfung von flüssigem erdgas - Google Patents

Bord-wiederverdampfung von flüssigem erdgas

Info

Publication number
EP1994328A1
EP1994328A1 EP07701553A EP07701553A EP1994328A1 EP 1994328 A1 EP1994328 A1 EP 1994328A1 EP 07701553 A EP07701553 A EP 07701553A EP 07701553 A EP07701553 A EP 07701553A EP 1994328 A1 EP1994328 A1 EP 1994328A1
Authority
EP
European Patent Office
Prior art keywords
vessel
receiving vessel
lng
delivery
receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP07701553A
Other languages
English (en)
French (fr)
Other versions
EP1994328A4 (de
Inventor
Solomon Aladja Faka
Robert Hannan
David Wynne Jones
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Woodside Energy Ltd
Original Assignee
Woodside Energy Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/559,136 external-priority patent/US20070214804A1/en
Application filed by Woodside Energy Ltd filed Critical Woodside Energy Ltd
Publication of EP1994328A1 publication Critical patent/EP1994328A1/de
Publication of EP1994328A4 publication Critical patent/EP1994328A4/de
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C9/00Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
    • F17C9/02Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure with change of state, e.g. vaporisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C7/00Methods or apparatus for discharging liquefied, solidified, or compressed gases from pressure vessels, not covered by another subclass
    • F17C7/02Discharging liquefied gases
    • F17C7/04Discharging liquefied gases with change of state, e.g. vaporisation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • B63B25/16Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed heat-insulated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/24Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L3/00Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L3/00Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
    • C10L3/06Natural gas; Synthetic natural gas obtained by processes not covered by C10G, C10K3/02 or C10K3/04
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/06Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures for filling with compressed gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0107Single phase
    • F17C2225/0123Single phase gaseous, e.g. CNG, GNC
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/03Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
    • F17C2225/035High pressure, i.e. between 10 and 80 bars
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/01Propulsion of the fluid
    • F17C2227/0128Propulsion of the fluid with pumps or compressors
    • F17C2227/0135Pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0302Heat exchange with the fluid by heating
    • F17C2227/0309Heat exchange with the fluid by heating using another fluid
    • F17C2227/0311Air heating
    • F17C2227/0313Air heating by forced circulation, e.g. using a fan
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0302Heat exchange with the fluid by heating
    • F17C2227/0309Heat exchange with the fluid by heating using another fluid
    • F17C2227/0323Heat exchange with the fluid by heating using another fluid in a closed loop
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0302Heat exchange with the fluid by heating
    • F17C2227/033Heat exchange with the fluid by heating using solar energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/04Reducing risks and environmental impact
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/04Reducing risks and environmental impact
    • F17C2260/048Refurbishing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/05Regasification
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/06Fluid distribution
    • F17C2265/061Fluid distribution for supply of supplying vehicles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/011Barges
    • F17C2270/0113Barges floating

Definitions

  • the present invention relates to a method for onboard regasification of liquefied natural gas ("LNG").
  • LNG liquefied natural gas
  • the present invention further relates to a receiving vessel for onboard regasification of LNG.
  • Natural gas is the cleanest burning fossil fuel as it produces less emissions and pollutants than either coal or oil. Natural gas (“NG”) is routinely transported from one location to another location in its liquid state as “Liquefied Natural Gas (“LNG”)).
  • LNG Liquefied Natural Gas
  • Liquefaction of the natural gas makes it more economical to transport as LNG occupies only about 1 /600 th of the volume that the same amount of natural gas does in its gaseous state.
  • Transportation of LNG from one location to another is most commonly achieved using double-hulled ocean-going vessels with cryogenic storage capability referred to as "LNGCs".
  • LNG is typically stored in cryogenic storage tanks onboard the LNGC, the storage tanks being operated either at or slightly above atmospheric pressure.
  • the majority of existing LNGCs have an LNG cargo storage capacity in the size range of 120,000 m 3 to 150,000 m 3 , with some LNGCs having a storage capacity of up to 264,000 m 3 .
  • LNG is normally regasified before distribution to end users through a pipeline or other distribution network at a temperature and pressure that meets the delivery requirements of the end users. Regasification of the LNG is most commonly achieved by raising the temperature of the LNG above the LNG boiling point for a given pressure. It is common for an LNGC to receive its cargo of LNG at an export terminal located in one country and then sail across the ocean to deliver its cargo to an import terminal located in another country.
  • the LNGC berths at a pier or jetty and offloads the LNG as a liquid to an onshore storage and regasification facility located at the import terminal
  • the regasification facility typically comprises a plurality of heat exchangers or vaporisers, pumps and compressors.
  • Such onshore storage and regasification facilities are typically large and the costs associated with building and operating such facilities are significant.
  • US Patent 6,089,022 described a system and a method for regasifying LNG aboard a carrier vessel before the re-vaporized natural gas is transferred to shore.
  • Seawater taken from the body of water surrounding said vessel is flowed through the vaporizer to heat and vaporize the LNG back into natural gas before the natural gas is off-loaded to onshore facilities.
  • Regasification takes place onboard an LNGC which has been modified so that the regasification facility travels with the LNGC all of the way from the export terminal to the import terminal.
  • the LNG onboard the converted LNGC is regasified and delivered to shore through a sub-sea pipeline connected by risers to the mooring buoy.
  • the use of seawater is problematic and expensive due its highly corrosive nature.
  • an offshore regasification terminal which includes a non-propelled barge fitted with cryogenic storage tanks.
  • the barge is permanently moored to and able to weathervane around a mooring buoy but cannot travel under its own steam.
  • the barge is typically longer than an LNGC to assist in side-by-side berthing of the LNGC alongside the barge so that the LNG can be offloaded from the LNGC into the storage tanks onboard the permanently moored barge.
  • the barge includes at least one regasification unit which is typically built adjacent to and forward of the storage tanks. Regasified natural gas flows from the barge to shore through a sub-sea pipeline which is connected to the barge through a marine riser connected to the mooring buoy.
  • US Patent 4,170,115 describes an apparatus for vaporizing liquefied natural gas using estuarine water.
  • the apparatus comprises a series of heat exchangers of the indirect heating, intermediate fluid type.
  • the LNG is vaporised using a heating medium being a refrigerant vaporized using estuarine water as a heat source and having a temperature not higher than the freezing point of the estuarine water.
  • a multi-tubular concurrent heat exchanger is used to bring the low-temperature vaporized natural gas from the heat exchanger into concurrent contact with estuarine water serving as a heat source to heat the vaporized natural gas.
  • US Patent 4,224,802 describes a variation on this type of apparatus that also uses estuarine water in a multi-tubular heat exchanger.
  • US Patent 4,331,129 describes the utilization of solar energy for LNG vaporization. Solar energy is used to heat an intermediate fluid such as water. The heated water is then used to regasify the LNG. The water contains an anti-freeze additive so as to prevent freezing of the water during the vaporization process.
  • US Patent 4,399,660 describes an atmospheric vaporizer suitable for vaporizing cryogenic liquids on a continuous basis.
  • the vaporiser employs heat absorbed from the ambient air and comprises at least three substantially vertical passes are piped together. Each pass includes a centre tube with a plurality of fins substantially equally spaced around the tube.
  • US Patent 5,251 ,452 also describes an ambient air vaporizer and heater for cryogenic liquids.
  • This apparatus utilizes a plurality of vertically mounted and parallel connected heat exchange tubes.
  • Each tube has a plurality of external fins and a plurality of internal peripheral passageways symmetrically arranged in fluid communication with a central opening.
  • a solid bar extends within the central opening for a predetermined length of each tube to increase the rate of heat transfer between the cryogenic fluid in its vapor phase and the ambient air.
  • the fluid is raised from its boiling point at the bottom of the tubes to a temperature at the top suitable for manufacturing and other operations.
  • US Patent 6,622,492 describes apparatus and process for vaporizing liquefied natural gas including the extraction of heat from ambient air to heat circulating water.
  • the heat exchange process includes a heat exchanger for the vaporization of liquefied natural gas, a circulating water system, and a water tower extracting heat from the ambient air to heat the circulating water. To make the process work throughout the year the process may be supplemented by a submerged fired heater connected to the water tower basin.
  • US Patent 6,644,041 describes a process for vaporizing liquefied natural gas including passing water into a water tower so as to elevate a temperature of the water, pumping the elevated temperature water through a first heat exchanger, passing a circulating fluid through the first heat exchanger so as to transfer heat from the elevated temperature water into the circulating fluid, passing the liquefied natural gas into a second heat exchanger, pumping the heated circulating fluid from the first heat exchanger into the second heat exchanger so as to transfer heat from the circulating fluid to the liquefied natural gas, and discharging vaporized natural gas from the second heat exchanger.
  • US Patent 5,819,542 describes a heat exchange device having a first heat exchanger for evaporation of LNG and a second heat exchanger for superheating of gaseous natural gas.
  • the heat exchangers are arranged for heating these fluids by means of a heating medium and having an outlet which is connected to a mixing device for mixing the heated fluids with the corresponding unheated fluids.
  • the heat exchangers comprise a common housing in which they are provided with separate passages for the fluids.
  • the mixing device constitutes a unit together with the housing and has a single mixing chamber with one single fluid outlet. In separate passages, there are provided valves for the supply of LNG in the housing and in the mixing chamber.
  • a method for offshore regasification of liquid natural gas (LNG) for delivery onshore as a gas comprising: offloading LNG from a delivery vessel to a receiving vessel at a ship- to-ship transfer location; moving the receiving vessel under its own power from the ship-to-ship transfer location to a mooring location, the mooring location being closer to shore than the ship-to-ship transfer location; regasifying the LNG using a regasification facility onboard the receiving vessel to form natural gas at the mooring location; and, transferring the natural gas to an onshore gas distribution facility for delivery to an end user.
  • LNG liquid natural gas
  • the method further comprises the step of mooring the delivery vessel to the receiving vessel prior to the step of offloading LNG from the delivery vessel to the receiving vessel.
  • the less manoeuvrable of the delivery vessel or the receiving vessel may be underway at a pre-agreed speed, with a heading selected such that the less manoeuvrable of the two vessels has the dominant swell on the aft port quarter and the heading is maintained until the delivery vessel has been moored to the receiving vessel.
  • the less manoeuvrable of the delivery vessel or the receiving vessel is underway at a pre-agreed speed, with a heading selected such that the more manoeuvrable of the two vessels is heading directly into the prevailing weather and the heading is maintained until the delivery vessel has been moored to the receiving vessel.
  • the delivery and receiving vessels are moored together and are underway whilst traveling side-by-side when LNG is offloaded from the delivery vessel to the receiving vessel.
  • the delivery and receiving vessels are moored together and drifting side-by-side when LNG is offloaded from the delivery vessel to the receiving vessel.
  • the delivery and receiving vessels are traveling in tandem when LNG is offloaded from the delivery vessel to the receiving vessel by tandem offloading.
  • the LNG may be stored in the hull of the receiving vessel in slosh tolerant tanks and the receiving vessel has an associated supporting hull structure.
  • the receiving vessel has reduced engine capacity compared with the engine capacity of the delivery vessel.
  • the receiving vessel has a propulsion system and the propulsion system may comprise dual fuel gas turbines, dual fuel diesel, or duel fuel diesel-electric systems.
  • the power requirement for the propulsion system of the receiving vessel is shared with the power requirement for regasification onboard the receiving vessel.
  • the propulsion system of the receiving vessel is fitted with twin screw, fixed pitch propellers with transverse thrusters located both forward and aft that provide the receiving vessel with superior mooring and position capability compared with the delivery vessel.
  • the mooring location includes a submersible, disconnectable mooring buoy for mooring the receiving vessel at the mooring location, the mooring buoy being locatable within a recess disposed within the hull and towards the bow of the receiving vessel.
  • the LNG may be regasified using ambient air as a source of heat to the onboard regasification facility.
  • the LNG is regasified through heat exchange with an intermediate fluid and the intermediate fluid is heated using ambient air as a source of heat.
  • heat exchange between the ambient air and the LNG or intermediate fluid is encouraged through use of forced draft fans
  • a receiving vessel for offshore regasification of liquid natural gas (LNG) for delivery onshore as a gas comprising: a propulsion system for moving the receiving vessel under its own power to and from a ship-to-ship transfer location for receiving LNG from a delivery vessel, to a mooring location, the mooring location being closer to shore than the ship-to-ship transfer location; a regasification facility onboard the receiving vessel for regasifying the LNG to form natural gas; and, an onshore gas distribution facility for receiving the natural gas for delivery to an end user.
  • LNG liquid natural gas
  • the LNG may be stored in the hull of the receiving vessel in slosh tolerant tanks and the receiving vessel has an associated supporting hull structure.
  • the receiving vessel has reduced engine capacity compared with the engine capacity of the delivery vessel.
  • the propulsion system of the receiving vessel may comprise dual fuel gas turbines, dual fuel diesel, or duel fuel diesel-electric systems.
  • the power requirement for the propulsion system of the receiving vessel may be shared with the power requirement for regasification onboard the receiving vessel.
  • the propulsion system of the receiving vessel may be fitted with twin screw, fixed pitch propellers with transverse thrusters located both forward and aft.
  • the receiving vessel includes a recess disposed within the hull and towards the bow of the receiving vessel for receiving a submersible, disconnectable mooring buoy for mooring the receiving vessel at the regasification location.
  • the onboard regasification facility may use ambient air as a source of heat.
  • the LNG is regasified through heat exchange with an intermediate fluid and the intermediate fluid is heated using ambient air as a source of heat to the onboard regasification facility.
  • heat exchange between the ambient air and the LNG or between ambient air and an intermediate fluid may be encouraged through use of forced draft fans.
  • Figure 1 is a schematic plan view of a delivery vessel underway whilst a receiving vessel makes an approach
  • Figure 2 is a schematic plan view of the delivery and receiving vessels of Figure 1 as the receiving vessel manoeuvres closer to the delivery vessel;
  • Figure 3 is a schematic plan view of a first embodiment of the present invention illustrating the delivery and receiving vessels positioned at an ship-to-ship transfer location during transfer of the LNG from the delivery vessel to the receiving vessel, the receiving vessel being fitted with an onboard regasification facility;
  • Figure 4 is a schematic plan view of a regasification location and sub- sea pipeline for delivering gas to an onshore distribution facility;
  • Figure 5 is a schematic side view of the receiving vessel moored at a turret mooring buoy as the LNG is regasified onboard the receiving vessel and transferred through one or more marine riser(s) and associated sub-sea pipeline(s) to shore;
  • Figure 6 illustrates one possible flow diagram for the regasification facility onboard the receiving vessel
  • Figure 7 is a schematic plan view of a vessel with an onboard regasification facility which is underway whilst an LNGC makes an approach;
  • Figure 8 is a schematic plan view of the vessels of Figure 7 as the LNGC vessel manoeuvres closer to the delivery vessel;
  • Figure 9 is a schematic plan view of a second embodiment of the present invention illustrating the vessels of Figure 8 positioned at a ship-to-ship transfer location during transfer of the LNG from the delivery vessel to the receiving vessel, the receiving vessel being fitted with the onboard regasification facility.
  • Lightering is used in the petroleum industry art to describe the process of ship-to-ship transfer of liquid cargoes, such as oil, ammonia and liquefied petroleum gas (LPG).
  • Lightering is a process that is used to unload crude oil cargoes from very large crude carriers (VLCCs) or from ultra large crude carriers (ULCCs) to smaller vessels in situations where ports are not deep enough or not wide enough to allow berthing of tankers of this size. Whilst lightering is an established practice in relation to crude oil carriers, ship-to-ship transfers of LNG at cryogenic temperatures as a part of normal operations have never been attempted in the past.
  • a delivery vessel 12 is loaded with a cargo of LNG at an onshore or offshore liquefaction facility associated with natural gas wells or pipelines.
  • the delivery vessel 12 is a traditional LNG Carrier fitted with Moss-style tanks.
  • the loaded delivery vessel 12 then travels towards a receiving terminal located typically in a different country to the country of origin where the liquefaction facility is located.
  • a receiving vessel 14 is dispatched to dock with the delivery vessel 12 at a ship-to-ship transfer location (generally designated by the reference numeral 16).
  • the ship-to-ship transfer location 16 can be any location where the delivery and receiving vessels 12 and 14 respectively, can be moored together to facilitate transfer of LNG from the delivery vessel 12 to the receiving vessel 14.
  • the selection of the ship-to-ship transfer location depends on a number of relevant factors including water depth, sea conditions, prevailing winds, regulatory requirements and traffic.
  • the distance of the ship-to-ship transfer location 16 from the coast may vary widely but is preferably outside the territorial sea of the delivery country, at a distance in the range of 12 to 200 nautical miles off the coast.
  • local regulations may require a government agency to provide control of each of the two vessels during mooring and transfer operations.
  • a support vessel 28 is used to deliver a Mooring Master to the delivery or receiving vessel with a Mooring Master Assistant stationed on the other vessel.
  • ship-to-ship transfer may take place in international waters under the control of the captains of each of the vessels.
  • the receiving vessel 14 can be a modified ocean-going LNG vessel or a vessel that is custom built to include a regasification facility 30.
  • the delivery vessel 12 should travel the larger part of the distance between the liquefaction facility and the receiving facility, leaving the receiving vessel 14 to travel as short a distance as possible between the ship-to-ship transfer location 16 and a regasification location 20.
  • the receiving vessel 14 can be fitted with a power system that enables it to travel under its own power across an ocean or sea between an import terminal and an export terminal if required.
  • the receiving vessel 14 is provided with one or more dual fuelled engines, for example a combination of gas and diesel engines which are more suitable than steam turbines as they do not require the specialised operating and maintenance crew that is otherwise required for steam turbines.
  • dual fuelled diesel engines are direct coupled to generators, and electrical power so generated is directed to electric motors to drive the propeller shafts as well as to drive any electrically powered LNG pumps, fans or other equipment associated with an onboard regasification facility 30. Electricity is also used for the hotel load associated with an accommodation unit 38 onboard the receiving vessel 14.
  • a key advantage of the use of a receiving vessel 14 over a permanently moored offshore storage structure is that the receiving vessel 14 can travel under its own power offshore or up and down a coastline to avoid extreme weather conditions or to avoid a threat of terrorism or to transit to a dockyard or to transit to another LNG import or export terminal. In this event, the receiving vessel 14 may do so with or without LNG stored onboard during this journey. Similarly, if demand for gas no longer exists at a particular location, the receiving vessel 14 can sail under its own power to another location where demand is higher.
  • the manner in which the two vessels approach and are moored is now described. If required, Mooring Masters and their assistants are stationed aboard the vessels in order to manage the approach, mooring and disconnect operations. In most situations, it is safest for the larger of the two vessels to be underway at a pre- agreed speed, with a heading selected such that the larger of the two vessels has the prevailing weather on the stern quarter opposite to the intended mooring side or with the larger of the two vessels heading directly into the prevailing weather. This heading is maintained until the two vessels have been moored to each other. In this way, the larger of the two vessels provides a lee for the smaller vessel and thus acts as a weather shield which makes it safer for the smaller of the two vessels to approach the larger one.
  • the larger of the two vessels can be either the delivery vessel 12 or the receiving vessel 14.
  • the preferred speed during final approach and mooring is in the range of 3 to 6 knots.
  • the speed is adjusted in each case to optimize the manoeuvrability of both vessels and to take into account such relevant factors as the engine idle speed of each vessel and the prevailing environmental conditions (winds, waves and currents).
  • Either the deliver vessel 12 or the receiving vessel 14 may be more manoeuvrable.
  • the receiving vessel 14 when the receiving vessel 14 is fitted with an electric propulsion system and high manoeuvrability characteristics, it may idle at any speed including 0 knots.
  • the delivery vessel 12 maintains a set course and is underway at a pre-agreed speed heading directly into the prevailing weather. It is equally possible to perform the approach with both vessels heading with the prevailing conditions.
  • the receiving vessel 14 comes alongside the delivery vessel 12 by manoeuvring closer to the delivery vessel 12 until the course and speed of the receiving vessel 14 matches the course and speed of the delivery vessel 12.
  • the approach angle between the two vessels generally decreases as the parallel distance between the two vessels decreases with the relative heading angle being nominally 2 to 5 degrees. Either vessel can then perform a heading change to bring the vessels parallel.
  • the receiving vessel 14 maintains a set course with the dominant swell on the aft port quarter 22 and the delivery vessel 12 approaches the receiving vessel 14 from the leeward side 24. It is equally possible to perform the approach with both vessels heading into the prevailing conditions.
  • the delivery vessel 12 comes alongside the receiving vessel 14 by manoeuvring closer to the receiving vessel 14 until the course and speed of the delivery vessel 12 matches the course and speed of the receiving vessel 14.
  • the approach angle between the two vessels generally decreases as the parallel distance between the two vessels decreases with the relative heading angle being nominally 2 to 5 degrees.
  • the propulsion system 18 of the receiving vessel 14 includes twin screw, fixed pitch propellers with transverse thrusters 48 located both forward and aft or just forward that provides the receiving vessel 14 with mooring and positioning capability. This high level of manoeuvrability comes is useful during the approach, mooring and unmooring operations or if the receiving vessel 14 transits to a dry dock (not shown).
  • the delivery or receiving vessel 12 or 14 is provided with fendering equipment 26 to absorb the forces associated with bringing the two vessels together.
  • the fendering equipment is of a similar type to that used during oil lightering operations, for example a plurality of air-inflated rubber "cushions", covered with rubber tyres, so that the cushions float on water between the two vessels. As the two vessels come closer together, the vessels are manoeuvred in such a way that the load of the impact is shared as evenly as possible across the fendering equipment 26.
  • the fendering equipment 26 may equally be provided on and travel with the delivery or receiving vessel 12 or 14, or be delivered to the ship-to-ship transfer location 16 using a separate support vessel 28 which assists in positioning the fendering equipment 26 on the delivery or receiving vessel 12 or 14 or between the two vessels.
  • the delivery vessel 12 is moored to the receiving vessel 14 using a suitable arrangement of mooring lines 31.
  • the arrangement includes spring lines 32, stern lines 34 and bow lines 36.
  • Transfer of LNG from the delivery vessel 12 to the receiving vessel 14 can be conducted while the two vessels are underway, drifting, or at anchor depending on such relevant factors as the weather, sea currents, the relative sizes of the vessels, the arrangement mooring lines and fenders, the type of manifold configuration that will allow the LNG transfer system to be connected, the motion characteristics in certain sea states and the manoeuvring characteristics.
  • Ballasting devices (not shown) can be used to ensure that the freeboard of the receiving vessel 14 is maintained substantially the same as that of the delivery vessel 12 during LNG transfer operations if desired.
  • Ship-to-ship transfer of LNG from the delivery vessel 12 to the receiving vessel 14 is conducted using any suitable LNG transfer equipment 40, for example, the system for offshore transfer of LNG described in US Patent 6,637,479, which system comprises a coupling head mounted at one end of a flexible pipe means and arranged for attachment on a platform at one end of one vessel when it is not in use, and a connection unit mounted at one end of the other vessel and comprising a pull-in funnel shaped for guided pull-in of the coupling head to a locking position in which the pipe means can be connected to transfer pipes on the other vessel via a valve means arranged in the coupling head.
  • the system for offshore transfer of LNG described in US Patent 6,637,479, which system comprises a coupling head mounted at one end of a flexible pipe means and arranged for attachment on a platform at one end of one vessel when it is not in use, and a connection unit mounted at one end of the other vessel and comprising a pull-in funnel shaped for guided pull-in of the coupling head to a locking
  • the coupling head is provided with a guide means and is connected to at least one pull-in wire for guided pull-in of the coupling head into the connection unit by a winch means on the other vessel.
  • the system of US Patent 6,637,479 is constructed and dimensioned for a normal rate of transfer of 10,000 m 3 LNG per hour via a flexible pipe or other LNG transfer means mounted on the quarter-deck of the LNG vessel. Because of the fact that the primary couplers will be subjected to strong icing at the extremely low temperature (-163 0 C) in the cryogenic transfer, it is desirable to have an emergency disconnection system ensuring quick disconnection of in an emergency situation.
  • the LNG transfer equipment 40 or hoses are provided on either the delivery or receiving vessels 12 or 14, respectively.
  • the LNG transfer equipment 40 can equally be delivered to the ship-to-ship transfer location 16 using a support vessel, either the same support vessel as the support vessel that delivers the fendering equipment or another support vessel.
  • the transfer rate is initially set at a slow rate until it is confirmed that flow has been established without leaks, with the transfer rate then being increased to a higher rate.
  • the moored vessels it may be necessary for the moored vessels to be turned around during the transfer operation. In any event, if a long enough run is not available at a particular ship-to-ship transfer location, the vessels can be caused to travel in circular pattern during the transfer operation.
  • LNG is stored aboard the delivery vessel 12 in one or more cryogenic storage tanks 42.
  • the receiving vessel 14 is similarly provided with one or more cryogenic storage tank(s) 46 (best seen in Figure 5). After the receiving vessel 14 moors alongside delivery vessel 12, LNG from the storage tank(s) 42 aboard the delivery vessel 12 is transferred into the storage tank(s) 46 aboard the receiving vessel 14.
  • the most common type of self-supporting tanks are the spherical aluminium tanks referred to in the art as a "Moss tank” and the prismatic self-supporting tanks developed by Ishikawajima-Harima Heavy Industries (“IHI").
  • the most well known types of membrane tank are the TGZ Mark III developed by Technigaz which includes a stainless steel membrane with 'waffles' to absorb the thermal contraction when the tank is cooled down, and the GT NO96 developed by Gaz Transport which consists of a primary and secondary thin membranes made of the iron-nickel alloy FeNi36, which has almost no thermal contraction.
  • the insulation is constructed of plywood boxes filled with a lightweight insulating material such as perlite.
  • suitable storage systems include the cryogenic storage systems described in US Patent 6,378,722; US Patent 6,263,818; US Patent 5,727,492; US Patent 5,529,239; or US Patent 5,099,779, the contents of which are incorporated herein by reference.
  • the receiving vessel 14 has a supporting hull structure 44 capable of withstanding the loads imposed from intermediate filling levels when the receiving vessel 14 is subject to harsh, multi-directional environmental conditions.
  • the storage tank(s) 46 onboard the receiving vessel 14 are robust to or reduce sloshing of the LNG when the storage tanks 46 are partly filled or when the receiving vessel 14 is riding out a storm whilst positioned at a regasification location 20 whilst transferring natural gas to the onshore distribution facility 62.
  • the storage tank(s) 46 can be provided with a plurality of internal baffles and/or a reinforced membrane with SPB type B membrane tanks being a preferred option.
  • Self supporting spherical cryogenic storage tanks for example Moss type tanks, are not considered to be suitable if the receiving vessel 14 is fitted with an onboard regasification facility 30, as Moss tanks reduce the deck area available to position the regasification facility 30 on the deck of the receiving vessel 14.
  • the holding capacity of the storage tank(s) 46 onboard the receiving vessel 14 may be the same, similar to or greater than the holding capacity of the storage tank(s) 42 aboard the delivery vessel 12, so that the entire payload of LNG onboard the delivery vessel 12 can be transferred to the receiving vessel 14. Whilst it is preferable to empty the delivery vessel 12 in a single ship-to-ship transfer operation, it is equally possible for the holding capacity of the storage tank(s) 46 onboard the receiving vessel 14 to be greater than the holding capacity of the storage tank(s) 42 aboard the delivery vessel 12. In this scenario, the receiving vessel 14 may receive LNG from more than one delivery vessel 12.
  • the receiving vessel 14 is provided with 4 or 7 storage tanks, each storage tank having a gross storage capacity in the range of 30,000 to 50,000m 3 .
  • transfer volumes are in the range of 125,000 - 220,000m 3 depending on the relative size of the storage tanks onboard the two vessels.
  • the receiving vessel 14 After offloading of the LNG from the delivery vessel 12 to the receiving vessel 14 is complete, the receiving vessel 14 is unmoored and unberthed from the delivery vessel 12 and travels under its own steam from the ship-to-ship transfer location 16 to a regasification location 20 closer to the shore 60.
  • the receiving vessel 14 is provided with an onboard regasification facility 30 and the LNG stored onboard the receiving vessel 14 is regasified onboard the receiving vessel 14 to form natural gas (NG) which is then transferred to an onshore gas distribution facility 62 as described in greater detail below.
  • NG natural gas
  • the natural gas that is produced in the regasification facility 30 provided onboard the receiving vessel 14 is transferred via the gas delivery line 72 to the turret mooring buoy 64.
  • a flexible marine riser(s) 66 (best seen in Figure 5) is used to transfer natural gas from the regasification facility 30 to the onshore gas distribution facility 62.
  • the marine riser(s) 66 is fluidly connected at its upper end to the turret mooring buoy 64 and is fluidly connected at its lower end to a sub-sea pipeline(s) 68 that travels across a beach crossing 70 to the onshore gas distribution facility 62.
  • the receiving vessel 14 is designed or retrofitted to include a recess or "moonpool” 74 to facilitate docking of the receiving vessel 14 with an internal turret mooring buoy 64. This is done in a manner that permits the receiving vessel 14 to weathervane around the turret mooring buoy 64. To facilitate weathervaning, the moonpool 74 is positioned towards the bow 58 of the receiving vessel 14.
  • a suitable type of turret mooring systems is described in US Patent 6,688,114, the contents of which are incorporated herein by reference.
  • the mooring buoy 64 is moored by anchor lines 76 to the seabed 78.
  • the mooring buoy 64 is provided with one or more marine risers 66 which serve as conduits for the delivery of regasified natural gas through the mooring buoy 64 to the sub-sea pipeline(s) 68. Fluid connections are made between the inlet of the marine risers
  • the regasification facility 30 is disposed on the deck 56 of the receiving vessel 14.
  • a high pressure onboard piping system 33 is used to convey LNG from the storage tanks 46 to the regasification facility 30 via at least one cryogenic pump 80 per tank.
  • suitable cryogenic pumps include a centrifugal pump, a positive-displacement pumps, a screw pump, a velocity-head pump, a rotary pump, a gear pump, a plunger pump, a piston pump, a vane pump, a radial-plunger pumps, a swash-plate pump, a smooth flow pump, a pulsating flow pump, or other pumps that meet the discharge head and flow rate requirements of the vaporizers.
  • the capacity of the pump is selected based upon the type and quantity of vaporizers installed, the surface area and efficiency of the vaporizers and the degree of redundancy desired. They are also sized such that the receiving vessel 14 can discharge its cargo at a conventional import terminal at a rate of 10,00um7hr (nominal) with a peak of 12,000m 3 /hr.
  • the regasification facility 30 includes at least one vaporizer 82 for regasifying LNG to natural gas.
  • LNG is regasified in the vaporiser 82 and exits the vaporiser 82 in the form of natural gas (NG).
  • NG natural gas
  • the heat necessary for onboard regasification can come from a number of possible sources. Vaporizers that use ambient air as the source of heat are preferred to reduce environmental impact and to keep emissions of nitrous oxide, sulphur dioxide, carbon dioxide and particulate matter to a minimum.
  • the vaporiser 82 is preferably arranged on the deck 56 of the receiving vessel 14. Ambient air may be used as the primary or only source of heat for regasification of the LNG or can be used in combination with a secondary source of heat.
  • the secondary source of heat can be used either for regasification of the LNG during cold weather or to superheat the natural gas that has already been regasified.
  • Suitable secondary sources of heat include waste heat recovery from the propulsion system, steam from a boiler or other source, a submerged combustion vaporizer, solar energy, electric water heaters using the excess electric generating capacity of the propulsion plant when the receiving vessel 14 is moored, exhaust gas heat exchangers fitted to the combustion exhausts of the diesel engines and gas turbines, or natural gas fired hot water or thermal oil heaters.
  • the secondary source can equally be generated by direct firing of fuel gas when additional heat is needed.
  • the secondary source of heat may equally be used to heat an intermediate fluid that exchanges heat with the LNG or the natural gas.
  • Suitable intermediate fluids are glycol, propane, salt water or fresh water or any other fluid with an acceptable heat capacity and boiling point that is commonly known to a person skilled in the art.
  • the vaporizer 82 can be arranged such that ambient air exchanges heat directly with the LNG or the ambient air can be used to heat an intermediate fluid in a separate heat exchanger 84, with the heated intermediate fluid then being pumped to the vaporizer where it exchanges heat with the LNG being regasified.
  • an intermediate fluid is circulated around a closed loop through the vaporizer 82 using a pump 86. Heat exchange between the intermediate fluid and the LNG results in regasification of the LNG to natural gas and significant cooling of the intermediate fluid.
  • the intermediate fluid is reheated in a heat exchanger 84 using ambient air or another source of heat, for example any of the secondary sources of heat referred to above. This makes it easy to add heat into the intermediate fluid and so limit freezing of vaporizer 82. Heat exchange between the ambient air and the intermediate fluid can be encouraged using one or more forced draft fans 85.
  • the vaporizers are designed to withstand the structural loads associated with being disposed on the deck of an LNG vessel that transits or is moored offshore.
  • the fans for the forced system are similarly designed to withstand the loads associated with the vessel moving while vaporizing during a storm including the loads associated with motions and possibly green water loads.
  • the size and surface area of the vaporizer 82 can vary widely, depending upon the volume and flow rate of LNG being regasified for delivery and the type of heat source being used. When ambient air is being used as a source of heat, the temperature of the ambient air can vary according to the seasons. To provide sufficient surface area for heat exchange, a plurality of vaporizers 82 can be arranged in a variety of configurations, for example in series or in banks.
  • the type of vaporizer could equally be a shell and tube heat exchanger, a finned tube heat exchanger, a bent-tube fixed-tube-sheet exchanger, a spiral tube exchanger, a plate-type heat exchanger, an intermediate fluid vaporizer, a submerged combustion vaporizer or any other heat exchanger commonly known by those skilled in the art that meets the temperature, volumetric and heat absorption requirements for LNG to be regasified.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
EP07701553.5A 2006-03-15 2007-02-28 Bord-wiederverdampfung von flüssigem erdgas Withdrawn EP1994328A4 (de)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US78228206P 2006-03-15 2006-03-15
US84339506P 2006-09-11 2006-09-11
US11/559,136 US20070214804A1 (en) 2006-03-15 2006-11-13 Onboard Regasification of LNG
PCT/AU2007/000226 WO2007104078A1 (en) 2006-03-15 2007-02-28 Onboard regasification of lng

Publications (2)

Publication Number Publication Date
EP1994328A1 true EP1994328A1 (de) 2008-11-26
EP1994328A4 EP1994328A4 (de) 2018-03-07

Family

ID=38508948

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07701553.5A Withdrawn EP1994328A4 (de) 2006-03-15 2007-02-28 Bord-wiederverdampfung von flüssigem erdgas

Country Status (5)

Country Link
EP (1) EP1994328A4 (de)
JP (2) JP5283514B2 (de)
KR (1) KR20080111463A (de)
AU (1) AU2007224992B2 (de)
WO (1) WO2007104078A1 (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107826230A (zh) * 2017-10-23 2018-03-23 王金昌 巨型远洋运输系统

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2045506A1 (de) * 2007-10-04 2009-04-08 Shell Internationale Researchmaatschappij B.V. System auf offener See zur Verdampfung eines Flüssigkohlenwasserstoffstroms, Verfahren zur Bereitstellung eines derartigen Systems sowie Verfahren zur Verdampfung eines Flüssigkohlenwasserstoffstroms
WO2009143261A1 (en) * 2008-05-20 2009-11-26 Charles Neill Delivery system for liquefied natural gas
WO2009143263A1 (en) * 2008-05-20 2009-11-26 Charles Neill Lng terminal apparatus and operations
WO2009143256A2 (en) * 2008-05-20 2009-11-26 Charles Neill Cryogenic articulated barge
FI125813B (fi) * 2009-08-28 2016-02-29 Wã Rtsilã Finland Oy Polttomoottorisovitelma
KR101239341B1 (ko) 2010-09-03 2013-03-06 삼성중공업 주식회사 액화천연가스의 재기화 장치 및 방법
KR101281636B1 (ko) 2011-03-25 2013-07-15 삼성중공업 주식회사 선박
KR101281639B1 (ko) 2011-03-31 2013-07-03 삼성중공업 주식회사 선박
RU2458283C1 (ru) * 2011-07-05 2012-08-10 Общество с ограниченной ответственностью "Научно-исследовательский институт природных газов и газовых технологий - Газпром ВНИИГАЗ" Способ газоснабжения населенных пунктов
US20150367917A1 (en) * 2012-12-11 2015-12-24 Nautilus Minerals Pacific Pty Production Support and Storage Vessel
KR101475004B1 (ko) * 2013-10-11 2014-12-22 삼성중공업 주식회사 육상 인프라를 이용한 lng 처리시스템
KR101952978B1 (ko) 2014-11-12 2019-02-27 현대중공업 주식회사 부유식 해상구조물
JP6470568B2 (ja) * 2015-01-06 2019-02-13 株式会社神戸製鋼所 熱交換装置
KR20160124505A (ko) 2015-04-20 2016-10-28 현대중공업 주식회사 부유식 해상구조물
KR20160003728U (ko) 2015-04-20 2016-10-28 현대중공업 주식회사 부유식 해상구조물
KR20170029177A (ko) 2015-09-07 2017-03-15 현대중공업 주식회사 부유식 해상구조물
US10823335B2 (en) 2016-02-01 2020-11-03 Hyundai Heavy Industries Co., Ltd. Ship including gas re-vaporizing system
CN108698672A (zh) * 2016-04-07 2018-10-23 现代重工业株式会社 具有气体再汽化系统的船舶
KR101801824B1 (ko) * 2016-04-29 2017-11-27 삼성중공업 주식회사 해양구조물
JP2018034668A (ja) 2016-08-31 2018-03-08 三菱重工業株式会社 ガス移送施設、発電施設
KR102521169B1 (ko) 2017-12-11 2023-04-13 대우조선해양 주식회사 부유식 발전플랜트의 lng 재기화열을 이용한 육상 hvac 냉매 순환 시스템
FR3078328B1 (fr) * 2018-02-23 2021-05-21 Gaztransport Et Technigaz Ensemble pour le ravitaillement d'un navire comprenant un barrage flottant
FR3078327B1 (fr) * 2018-02-23 2020-02-28 Gaztransport Et Technigaz Ensemble pour le ravitaillement d'un navire comprenant un dispositif flottant de recouvrement
KR200494974Y1 (ko) * 2018-07-27 2022-02-08 현대중공업 주식회사 가스 재기화 장치 및 이를 구비하는 선박
WO2023073101A1 (en) * 2021-10-27 2023-05-04 Höegh Lng As Floating vessel comprising a regasification facility and an ammonia conversion facility and method of use thereof

Family Cites Families (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0370696A (ja) * 1989-08-09 1991-03-26 Senzo Hanaue 急旋回・急停止及び横移動可能な船舶
US4995234A (en) 1989-10-02 1991-02-26 Chicago Bridge & Iron Technical Services Company Power generation from LNG
JP2659822B2 (ja) 1989-10-13 1997-09-30 三菱重工業株式会社 スカートで支持された舶用lngタンク
JPH058788A (ja) * 1990-10-29 1993-01-19 Furuno Electric Co Ltd 土運船の接舷装置
DE4105772A1 (de) 1991-02-23 1992-08-27 Cassella Ag Verfahren zum faerben von leder mit wasserunloeslichen schwefelfarbstoffen
US5129848A (en) 1991-06-21 1992-07-14 Sofec, Inc. Controllable variable depth mooring system and method
US5356321A (en) 1991-09-27 1994-10-18 Sofec, Inc. Disconnectable mooring system
US5316509A (en) 1991-09-27 1994-05-31 Sofec, Inc. Disconnectable mooring system
FI922191A (fi) 1992-05-14 1993-11-15 Kvaerner Masa Yards Oy Sfaerisk lng-tank och dess framstaellningsfoerfarande
WO1995016105A1 (en) 1993-12-10 1995-06-15 Cabot Corporation An improved liquefied natural gas fueled combined cycle power plant
BR9400639A (pt) 1994-02-22 1995-10-24 Bluewater Terminal Systems Nv Sistema de amarração de ponto único
CN1112505C (zh) 1995-06-01 2003-06-25 特雷克特贝尔Lng北美公司 液化天然气作燃料的混合循环发电装置及液化天然气作燃料的燃气轮机
JP2877098B2 (ja) 1995-12-28 1999-03-31 株式会社日立製作所 ガスタービン,コンバインドサイクルプラント及び圧縮機
US5727492A (en) 1996-09-16 1998-03-17 Marinex International Inc. Liquefied natural gas tank and containment system
US5944840A (en) 1997-09-10 1999-08-31 Bluewater Systems, Inc. Continuous monitor for interrupt latency in real time systems
GB2330157B (en) 1997-10-07 2001-11-07 Bluewater Terminal Systems Nv Riser system for connecting a seabed installation with a floating vessel
EP0947464A1 (de) 1998-04-01 1999-10-06 Single Buoy Moorings Inc. Ladeausleger für Flüssigkeiten mit koaxialen Flüssigkeitsleitungen
JP4035566B2 (ja) * 1998-04-13 2008-01-23 西部瓦斯株式会社 強制循環型空温式液化ガス気化装置
US6263818B1 (en) 1998-04-24 2001-07-24 Exmar Offshore Company Split monohull vessel
EP0962384A1 (de) 1998-06-05 1999-12-08 Single Buoy Moorings Inc. Einrichtung zum Laden eines Schiffes
GB2347724B (en) 1999-03-11 2001-01-17 Bluewater Terminal Systems Nv Apparatus for transferring fluid between the seabed and a floating vessel
EP1208293A4 (de) 1999-07-22 2005-10-05 Bechtel Corp Verfahren und vorrichtung zur verdampfung eines flüssiggases in einem kombikraftwerk
NL1013075C1 (nl) 1999-09-17 2001-03-20 Bluewater Terminal Systems Nv Stelsel voor het afmeren van een op een watermassa drijvend lichaam.
FR2813111B1 (fr) 2000-08-18 2002-11-29 Gaz Transport & Technigaz Cuve etanche et thermiquement isolante aretes longitudinales ameliorees
NO20011524L (no) 2001-03-23 2002-09-24 Leif Hoeegh & Co Asa Fartöy og lossesystem
JP2002340296A (ja) * 2001-05-16 2002-11-27 Sumitomo Precision Prod Co Ltd 液化ガス気化・加熱装置
US6546739B2 (en) * 2001-05-23 2003-04-15 Exmar Offshore Company Method and apparatus for offshore LNG regasification
US6829901B2 (en) * 2001-12-12 2004-12-14 Exxonmobil Upstream Research Company Single point mooring regasification tower
US20030162543A1 (en) * 2002-02-28 2003-08-28 Nokia Corporation System and method for interrupt-free hand-over in a mobile terminal
US6851994B2 (en) 2002-03-08 2005-02-08 Fmc Technologies, Inc. Disconnectable mooring system and LNG transfer system and method
US6688114B2 (en) 2002-03-29 2004-02-10 El Paso Corporation LNG carrier
US6692192B2 (en) 2002-05-03 2004-02-17 Single Buoy Moorings Inc. Spread moored midship hydrocarbon loading and offloading system
JP4228608B2 (ja) * 2002-07-23 2009-02-25 株式会社Ihi 液化ガス運搬船の推進装置
CA2494181C (en) 2002-08-06 2008-10-14 Fmc Technologies, Inc. Duplex yoke mooring-system
AU2003287647A1 (en) 2002-11-12 2004-06-03 Fmc Technologies, Inc. Retrieval and connection system for a disconnectable mooring yoke
EP1667898A4 (de) 2003-08-12 2010-01-20 Excelerate Energy Ltd Partners Wiederverdampfung an bord für flüssigerdgasträger mit alternativen antriebsanlagen
US7308863B2 (en) * 2003-08-22 2007-12-18 De Baan Jaap Offshore LNG regasification system and method
US7080673B2 (en) * 2004-04-30 2006-07-25 Sbm-Imodco, Inc. Quick LNG offloading
WO2006031634A1 (en) * 2004-09-13 2006-03-23 Argent Marine Operations, Inc System and process for transporting lng by non-self-propelled marine lng carrier
NO20050856L (no) * 2005-02-17 2006-08-18 Statoil Asa System og fremgangsmate for offshore lossing og regassifisering av LNG
SG174767A1 (en) * 2006-09-11 2011-10-28 Exxonmobil Upstream Res Co Transporting and managing liquefied natural gas
US8448673B2 (en) * 2006-11-15 2013-05-28 Exxonmobil Upstream Research Company Transporting and transferring fluid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2007104078A1 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107826230A (zh) * 2017-10-23 2018-03-23 王金昌 巨型远洋运输系统

Also Published As

Publication number Publication date
WO2007104078A1 (en) 2007-09-20
EP1994328A4 (de) 2018-03-07
AU2007224992A1 (en) 2007-09-20
KR20080111463A (ko) 2008-12-23
JP2013079069A (ja) 2013-05-02
AU2007224992B2 (en) 2011-09-01
JP2009529456A (ja) 2009-08-20
JP5283514B2 (ja) 2013-09-04

Similar Documents

Publication Publication Date Title
AU2007224992B2 (en) Onboard regasification of LNG
US20070214804A1 (en) Onboard Regasification of LNG
US8069677B2 (en) Regasification of LNG using ambient air and supplemental heat
US20070214805A1 (en) Onboard Regasification of LNG Using Ambient Air
US20090199575A1 (en) Boil off gas management during ship-to-ship transfer of lng
US20120324910A1 (en) Articulated Tug and Barge Arrangement for LNG Storage, Transportation and Regasification
US6546739B2 (en) Method and apparatus for offshore LNG regasification
AU2007295027B2 (en) Transporting and managing liquefied natural gas
JP2002506960A (ja) 輸送船内のlngの再ガス化
US20140290281A1 (en) Articulated tug and barge arrangement for LNG storage, transportation and regasification
US20210214050A1 (en) Liquefied natural gas vessel
US20240240761A1 (en) Hybrid marine regasification system
WO2018139997A1 (en) Floating liquid natural gas storage, regasification, and generation vessel
WO2024155196A2 (en) Hybrid marine regasification system
Sagau LNG IMPORT FACILITY CONSISTING OF EXISTING LNG MOSS TYPE VESSEL INTO FLOATING TERMINAL WITH REGASIFICATION UNIT.

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20080924

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20180202

RIC1 Information provided on ipc code assigned before grant

Ipc: F17C 13/10 20060101ALI20180129BHEP

Ipc: F17C 13/02 20060101ALI20180129BHEP

Ipc: F17C 9/02 20060101ALI20180129BHEP

Ipc: F17C 5/06 20060101AFI20180129BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20190107

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20210621

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20211103