AU2007295027B2 - Transporting and managing liquefied natural gas - Google Patents

Transporting and managing liquefied natural gas Download PDF

Info

Publication number
AU2007295027B2
AU2007295027B2 AU2007295027A AU2007295027A AU2007295027B2 AU 2007295027 B2 AU2007295027 B2 AU 2007295027B2 AU 2007295027 A AU2007295027 A AU 2007295027A AU 2007295027 A AU2007295027 A AU 2007295027A AU 2007295027 B2 AU2007295027 B2 AU 2007295027B2
Authority
AU
Australia
Prior art keywords
lng
import
vessel
vessels
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU2007295027A
Other versions
AU2007295027A1 (en
Inventor
Mark E. Ehrhardt
William S. Mathews
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Upstream Research Co
Original Assignee
ExxonMobil Upstream Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=38051381&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=AU2007295027(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by ExxonMobil Upstream Research Co filed Critical ExxonMobil Upstream Research Co
Publication of AU2007295027A1 publication Critical patent/AU2007295027A1/en
Application granted granted Critical
Publication of AU2007295027B2 publication Critical patent/AU2007295027B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C9/00Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure
    • F17C9/02Methods or apparatus for discharging liquefied or solidified gases from vessels not under pressure with change of state, e.g. vaporisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/01Pure fluids
    • F17C2221/013Carbone dioxide
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/01Pure fluids
    • F17C2221/016Noble gases (Ar, Kr, Xe)
    • F17C2221/017Helium
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2221/00Handled fluid, in particular type of fluid
    • F17C2221/03Mixtures
    • F17C2221/032Hydrocarbons
    • F17C2221/033Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • F17C2223/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/03Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
    • F17C2223/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/04Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by other properties of handled fluid before transfer
    • F17C2223/042Localisation of the removal point
    • F17C2223/046Localisation of the removal point in the liquid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0107Single phase
    • F17C2225/0123Single phase gaseous, e.g. CNG, GNC
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/01Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
    • F17C2225/0146Two-phase
    • F17C2225/0153Liquefied gas, e.g. LPG, GPL
    • F17C2225/0161Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/03Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
    • F17C2225/033Small pressure, e.g. for liquefied gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2225/00Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
    • F17C2225/03Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
    • F17C2225/035High pressure, i.e. between 10 and 80 bars
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0302Heat exchange with the fluid by heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2227/00Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
    • F17C2227/03Heat exchange with the fluid
    • F17C2227/0367Localisation of heat exchange
    • F17C2227/0388Localisation of heat exchange separate
    • F17C2227/0393Localisation of heat exchange separate using a vaporiser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2250/00Accessories; Control means; Indicating, measuring or monitoring of parameters
    • F17C2250/01Intermediate tanks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2260/00Purposes of gas storage and gas handling
    • F17C2260/04Reducing risks and environmental impact
    • F17C2260/048Refurbishing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/05Regasification
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2265/00Effects achieved by gas storage or gas handling
    • F17C2265/06Fluid distribution
    • F17C2265/061Fluid distribution for supply of supplying vehicles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/01Applications for fluid transport or storage
    • F17C2270/0102Applications for fluid transport or storage on or in the water
    • F17C2270/0105Ships

Abstract

The present application is directed to methods and systems for transporting or importing LNG via vessels. Under the present techniques, SRTs, which are equipped with regasification equipment, LNG offloading equipment (e.g. marinized mechanical loading arms), LNG storage tanks, and equipment to transfer natural gas to an import terminal are utilized as temporary interchangeable FSRUs (TIFs). Two or more TIFs in conjunction with transport vessels (e.g. LNGCs) are utilized to transfer LNG between an export terminal and an import terminal. A first of the TIFs is utilized at an import terminal to offload LNG from LNGCs, while the second of the TIFs is utilized as a LNGC, carrying LNG between the export terminal and import terminal. The first of the TIFs may be replaced by the second of the TIFs to maintain operations for the import terminal. The use of multiple TlFs in combination with LNGCs provides an alterative LNG delivery approach in comparison to having a permanently moored FSRU located at the import terminal or using a fleet of SRT vessels to transport LNG between an export terminal and an import terminal.

Description

WO 2008/033183 PCT/US2007/016547 TRANSPORTING AND MANAGING LIQUEFIED NATURAL GAS CROSS REFERENCE TO RELATED APPLICATIONS [00011 This application claims the benefit of U.S. Provisional Application No. 60/843,658, filed 11 September 2006. FIELD OF THE INVENTION [00021 This invention relates generally to a method of transferring fluids. In particular, the method and system relate to delivery of cargo, such as liquefied natural gas (LNG), via vessels between export and import terminals in various markets throughout the world. BACKGROUND [0003] This section is intended to introduce the reader to various aspects of art, which may be associated with exemplary embodiments of the present invention, which are described and/or claimed below. This discussion is believed to be helpful in providing the reader with information to facilitate a better understanding of particular techniques of the present invention. Accordingly, it should be understood that these statements are to be read in this light, and not necessarily as admissions of prior art. [00041 Cargo is generally transferred from one port location to another port location by vessels, such as carriers. These carriers have propulsion and navigation systems for movement across large bodies of water, which may be referred to as open seas. In addition, the carriers may include accommodations for marine operations, storage tanks for liquid cargo and bays for solid cargo. With some carriers, special equipment and systems may be installed to assist with the transport of specific cargo. As such, carriers include equipment and systems to economically transfer cargo between market locations.
WO 2008/033183 PCT/US2007/016547 -2 [0005] For instance, after natural gas is produced, it is processed and may be liquefied at export terminals or other facilities to convert it into LNG. LNG is the basis of a delivery technology that allows remote natural gas resources to be economically delivered to the market. The LNG is shipped to market in specially designed LNG carriers (LNGCs) that are configured to store and transport the LNG across the large bodies of water. Then, the LNG is converted back into natural gas at an import terminal near the market location. Typically, the import terminals are located onshore or offshore near a port location. Regardless, the import terminal is connected through a pipeline to onshore equipment for further processing and/or distribution of the natural gas. [0006] Offshore import or export terminals may be beneficial because they do not utilize onshore property, which may reduce some security concerns. However, significant technical challenges need to be addressed to successfully implement offshore terminals. An example of an offshore LNG import terminal is a floating storage and regasification unit (FSRU). An FSRU is a dedicated, moored offshore structure that transfers LNG from LNGCs, stores the LNG in storage tanks, regasifies the LNG using heat exchangers, and delivers the natural gas to a pipeline. An FSRU generally includes cryogenic cargo transfer equipment and LNG vaporization facilities, which may be located on the deck of the FSRU. [0007] Further, offshore environmental conditions are a factor that limit the time periods that the LNGCs are able to offload LNG into an FSRU. For instance, harsh environmental conditions may provide periods of time where connecting the LNGCs and FSRU cannot be done safely and reliably. Further, if the offshore environmental conditions are too severe to allow the LNGCs and FSRU to connect, then the FSRU can only deliver natural gas to the pipeline from its stored reserves. Because of this, stored reserves on the FSRU may become depleted, leading to an interruption of natural gas delivery to the pipeline. Intermittent service or interruptions to the flow of natural gas into or from a pipeline may result in penalties and cost increases for companies operating the import or export terminals.
WO 2008/033183 PCT/US2007/016547 -3 [0008] To address the environmental conditions, various offloading approaches are utilized to transfer LNG between LNGCs and FSRUs. For instance, one offloading approach is side-by-side offloading, which is currently employed at land-based import and export terminals. Side-by-side offloading may be performed with the LNGC and FSRU arranged in a side-by-side configuration with the LNG transfer occurring using marinized mechanical loading arms located near amidships of each LNGC and FSRU. Conventional land-based cargo transfer using mechanical loading arms is typically performed in protected waters. [0009] A second offloading approach is tandem offloading. Tandem offloading of LNG parallels existing technology used to transfer oil between floating production storage and offloading (FPSO) vessels and shuttle tankers. Typically, the two vessels are arranged bow-to-stern with the cargo transfer achieved using flexible hoses. For LNG transfer, flexible cryogenic hoses or large loading arms, which are called booms, may be utilized with the LNGCs carrier bow located behind the stern of the FSRU. With these flexible cryogenic hoses or large loading arms, the tandem offloading approach may remain operable in more severe seastates than the side-by side offloading approach. [0010] A third offloading approach employs a subsea cryogenic fluid transfer system, which is described in International Patent Application No. W02006/044053. In this offloading approach, the LNGC and FSRU are connected over a distance of about 2 kilometers (km) by cryogenic turrets, risers and pipelines. The LNGC is connected to a submerged, disconnectable cryogenic buoy and transfers the LNG through this buoy and one or more flexible cryogenic risers to the seafloor, over to the FSRU location through one or more cryogenic pipelines, up one or more flexible cryogenic risers and into the FSRU through a cryogenic internal turret mooring system. Because the LNGC and FSRU are separated and may move independently, this offloading system may operate in extreme seastates, such as 4 to 5 meter significant wave heights.
WO 2008/033183 PCT/US2007/016547 -4- [00111 While each of these offloading approaches may be utilized to maintain uniform delivery of natural gas to the pipeline, the use of FSRUs with any of these offloading approaches suffers from technical and commercial limitations. For instance, because FSRUs are permanently moored with no access to drydock maintenance, numerous upgrades are made to ensure that the facility remains operable over the project lifetime, which results in significant capital expenditure. Examples of these upgrades include additional hull steel for lengthening of fatigue life, improved hull coatings for corrosion resistance, and additional provisions for onsite inspections. This large initial capital expenditure results in a significant reduction in the overall LNG delivery chain economics. Also, additional equipment and operations, such as dedicated positioning tugs or navigation systems on the LNGCs, are involved to facilitate berthing operations for the LNGCs with the FSRU. While improved relative to onshore terminals, FSRUs still pose a security threat and have to be managed to address the open access provided in an offshore setting. [0012] An alternate to the FSRU-based LNG import terminal is to include the regasification equipment on the LNGC. See U.S. Patent No. 6,089,022. These vessels are LNGCs with extensive modifications to allow shipboard regasification of the LNG and offloading of the natural gas into the pipeline. These carriers, which may be referred to as Shipboard Regasification Terminals (SRTs), are equipped with regasification equipment and traditional LNGC offloading equipment (i.e. a manifold to accept loading arms) to interact with conventional LNG terminals. Disadvantageously, the capital expense of these SRTs may be greater than traditional LNGCs because each SRT vessel is modified with heat exchangers for regasification operations, a natural gas offloading system, and reinforced LNG cargo tanks to withstand sloshing loads. Because of these additional capital expenses, using only SRTs to deliver LNG tends to be uneconomic for long distances and/or large volumes. In addition, the LNG storage on the SRTs is somewhat limited because these vessels are designed for efficient transit over long distances.
WO 2008/033183 PCT/US2007/016547 [00131 As such, a method or mechanism for enhancing delivery of cargo, such as LNG, in an efficient manner is needed. This efficient method or mechanism may ideally alleviate the issues associated with operating offshore LNG import terminals. 100141 Other related material may be found in at least U.S. Patent No. 3,590,407; U.S. Patent No. 5,501,625; U.S. Patent No. 5,549,164; U.S. Patent No. 6,003,603; U.S. Patent No. 6,089,022; U.S. Patent No. 6,637,479; U.S. Patent No. 6,923,225; U.S. Patent No. 7,080,673; U.S. Patent Application Publication No. 2002/0174662; U.S. Patent Application Publication No. 2004/0187385; U.S. Patent Application Publication No. 2006/0010911; European Patent Application No. 1,383,676; International Patent Application No. WO 01/03793; International Patent Application No. W02006/044053; Loez, Bernard "New Technical and Economic Aspects of LNG Terminals," Petrole Information, pp. 85-86, August 1987; Hans Y.S. Han et al., "Design Development of FSRU from LNG Carrier and FPSO Construction Experiences," Offshore Technology Conference May 6-9, 2002, OTC-14098; "The Application of the FSRU for LNG Imports," Annual GAP Europe Chapter Meeting September 25-26, 2003; and O.B. Larsen et al., "The LNG (Liquefied Natural Gas) Shuttle and Regas Vessel System," Offshore Technology Conference May 3-6, 2004, OTC-16580. SUMMARY [0015] In one embodiment, a method for importing liquefied natural gas (LNG) is described. The method comprises providing a first import vessel operatively coupled to an import terminal, a second import vessel transporting LNG, and transport vessels, wherein each of the first import vessel and the second import vessel has regasification equipment, LNG offloading equipment, LNG storage tanks and natural gas transfer equipment to transfer natural gas from the first import vessel or the second import vessel to an import terminal; determining whether the first import vessel is to be replaced by the second import vessel; if the first import vessel is to be replaced by the second import vessel, decoupling the first import vessel from the import terminal, coupling the second import vessel to the import terminal and WO 2008/033183 PCT/US2007/016547 -6 offloading LNG from transport vessels to the second import vessel; and if the first import vessel is to remain at the import terminal, offloading LNG from the second import vessel and from the transport vessels to the first import vessel. The importing of a carrier load may include offloading, receiving or otherwise transferring the carrier load, such as LNG, between two locations, which may include transporting the cargo load in international and/or territorial waters. [0016] In another embodiment, a fluid transport system is described. The fluid transport system comprises at least one terminal; a plurality of transport vessels; and a plurality of regasification vessels. Each of the transport vessels has storage tanks and is configured to transport liquefied natural gas (LNG) in an open sea environment, while each of the regasification vessels is equipped regasification equipment, LNG offloading equipment, LNG storage tanks, and natural gas transfer equipment, and is configured to transport LNG in the open sea environment. One of the regasification vessels transports LNG in the open sea environment, while another of the regasification vessels is coupled to one of the at least one terminal to provide natural gas to the one of the at least one terminal from one of the transport vessels and the one of the regasification vessels. The regasification vessels may be configured to couple to the terminal; transfer the LNG from one of the transport vessels and another regasification vessel; regasify the LNG provided from one of the transport vessels and the other of the regasification vessels; and transfer the natural gas to the terminal. [00171 In yet another embodiment, another method of transporting liquefied natural gas (LNG) is described. The method comprises providing a plurality of transport vessels having LNG storage tanks and configured to transport liquefied natural gas (LNG) in an open sea environment; and providing a plurality of regasification vessels, wherein each of the plurality of regasification vessels have regasification equipment, LNG offloading equipment, LNG storage tanks, equipment to transfer natural gas, and is configured to transport liquefied natural gas (LNG) in an open sea environment, and offloading LNG from one of the plurality of transport vessels by one of the plurality of regasification vessels at a first terminal concurrently WO 2008/033183 PCT/US2007/016547 -7 while an other of the plurality of regasification vessels transports LNG in the open sea environment. [0018] In still another embodiment, a method for transporting fluid is described. The method comprises coupling a first vessel to a terminal, wherein the first vessel has regasification equipment, offloading equipment, storage tanks, and equipment to transfer regasified fluid from the first vessel to the terminal; offloading the fluid to the first vessel from one of a plurality of transport vessels having storage tanks and a second vessel, wherein the second vessel has regasification equipment, offloading equipment, storage tanks, and equipment to transfer regasified fluid from the second vessel to the terminal; deberthing the first vessel from the terminal; berthing the second vessel adjacent to the terminal; coupling the second vessel to the terminal; offloading the fluid to the second vessel from one of the plurality of transport vessels and the first vessel. The fluid in the method may comprise liquefied natural gas, liquefied carbon dioxide, liquefied helium, and other suitable liquefied gases. 10019] In addition, one or more embodiment may include other features. For instance, the methods may comprise regasifying the LNG on the first import vessel to deliver natural gas to a pipeline operatively coupled to the import terminal; wherein offloading LNG from transport vessels into the first import vessel comprises storing at least a portion of the LNG in the LNG storage tanks on the first import vessel; and wherein offloading LNG from transport vessels into the first import vessel comprises storing at least a portion of the LNG in LNG storage tanks associated with the terminal. [00201 Further, one or more of the embodiments may include specific equipment. For instance, the regasification equipment may utilize one of an open loop regasificiation system and closed-loop regasification system; may utilize sensible heat from another liquid as the heat source for the vaporization of the LNG; may utilize sensible heat from the combustion of a fuel as the heat source for the vaporization of the LNG; and/or may utilize latent heat from a condensable liquid as WO 2008/033183 PCT/US2007/016547 -8 the heat source for the vaporization of the LNG. Also, the LNG offloading equipment may comprise cryogenic loading arms to transfer the LNG from the first import vessel and/or cryogenic hoses to transfer the LNG from the first import vessel. Also, the LNG may be offloaded by side-by-side offloading; tandem offloading; and/or subsea cryogenic fluid transfer system offloading. The LNG storage tanks may comprise spherical tanks, membrane tanks, self-supporting prismatic tanks, and/or modular tanks. The terminal may comprise two or more berthing structures, wherein the berthing structures comprises berthing dolphins fixed to the seafloor, a spread mooring system, submerged turret loading system, and any combination thereof. BRIEF DESCRIPTION OF THE DRAWINGS [0021] The foregoing and other advantages of the present invention may become apparent upon reading the following detailed description and upon reference to the drawings in which: [0022] FIG. 1 is an exemplary flow chart of the LNG transfer operations in, accordance with certain aspects of the present invention; [0023] FIG. 2 is an exemplary fluid transport system or fleet in accordance with certain aspects of the present invention; and [0024] FIG. 3 is another exemplary fluid transport system or fleet in accordance with certain aspects of the present invention. DETAILED DESCRIPTION [0025] In the following detailed description and example, the invention will be described in connection with its preferred embodiments. However, to the extent that the following description is specific to a particular embodiment or a particular use of the invention, this is intended to be illustrative only. Accordingly, the invention is not limited to the specific embodiments described below, but rather, the invention WO 2008/033183 PCT/US2007/016547 -9 includes all alternatives, modifications, and equivalents falling within the true scope of the appended claims. [0026] At least some embodiments of the present invention are directed to methods and systems for transporting LNG via vessels between an export location and an import location. Under some embodiments of the present invention, SRTs, which are equipped with regasification equipment, LNG offloading equipment (e.g. marinized mechanical loading arms), LNG storage tanks, and equipment to transfer natural gas to the import terminal is utilized as temporary interchangeable FSRUs (TIFs). A first TIF, in conjunction with transport vessels (e.g. LNGCs), is utilized to transfer LNG between an export terminal and an import terminal. A second TIF is utilized in the system as a LNGC, carrying LNG between the export terminal and import terminal. Accordingly, the first TIF is temporarily moored at and in fluid communication with the import terminal and transfers LNG from the LNGCs (including the second TIF) into the TIF's LNG storage tanks. Concurrent with the LNG offloading operations, the first TIF is continuously regasifying the LNG from its, LNG storage tanks and sending natural gas to the import terminal and ultimately to a pipeline. The first TIF may be replaced by the second TIF to maintain operations for the import terminal. The use of multiple TIFs in combination with LNGCs provides an alterative LNG delivery approach in comparison to having a permanently moored FSRU located at the import terminal or using a fleet of SRT vessels to transport LNG between an export terminal and an import terminal. Accordingly, the present invention may enhance delivery of LNG from one location to another location and may enhance importation of LNG at a particular location. [0027] Turning now to the drawings, and referring initially to FIG. 1, an exemplary flow chart of fluid transfer operations in accordance with certain aspects of the present invention is illustrated. In the exemplary flow chart, which may be referred to by reference numeral 100, various operations may be performed to transfer fluids, such as LNG, from an export terminal to an import terminal. The transfer operations include the use of TIFs, which are vessels equipped with regasification WO 2008/033183 PCT/US2007/016547 -10 equipment, LNG storage tanks, LNG offloading equipment (e.g. marinized mechanical loading arms), and equipment to transfer natural gas to the import terminal. The first TIF or TIF at the terminal interacts with transport vessels in the transport fleet, which include LNGCs and may include a second TIF. In particular, at least the first TIF is temporarily moored at and in fluid communication with an import terminal, while the second TIF or another TIF is utilized as a transport vessel in the transport fleet with one or more transport vessels. The use of these vessels is discussed further below. [0028] The flow chart begins at block 102. At block 104, LNG is obtained by a transport vessel. The LNG may be obtained from the transfer of LNG from an export terminal, such as an onshore or offshore LNG plant, which is designed to receive, process, and liquefy natural gas. The transport vessel fleet may include vessels, such LNGCs and at least one TIF, which are configured to transport LNG across the open sea. The open sea refers to any division of a large body of water, which may include bays, lakes, seas, oceans, gulfs or the like. The open sea may include territorial waters or international waters, as well. At block 106, the transport vessel is moved toward an import terminal, such as an onshore or offshore import terminal designed to receive and regasify LNG for sendout as natural gas through a pipeline to a market location. [00291 Then, a determination is made whether the approaching transport vessel is a TIF, as shown in block 108. If the transport vessel is not a TIF, the transport vessel is moored to the first TIF, which is temporarily moored at and in fluid communication with the import terminal, as shown at block 110. The first TlF or TIF at the terminal may be moored at the import terminal and operated to receive LNG from the transport vessels in the transport fleet. The transport vessel is moored to the first TIEF in an appropriate offloading configuration, while the LNG offloading equipment is prepared for offloading operations. At block 112, the LNG is transferred from the transport vessel to the first TIEF. The transfer of LNG between vessels may be performed by side-by-side offloading, tandem offloading, or by utilizing a subsea WO 2008/033183 PCT/US2007/016547 - 11 LNG transfer system (SLTS). Once LNG offloading operations are complete, the transport vessel departs from the first TIF, as shown in block 114. The departure of the transport vessel from the first TIF may include preparing the fluid transfer equipment and mooring lines for disconnection, and moving the transfer vessel away from the import terminal. [0030] However, if the transport vessel is the other or second TIF, then a determination is made whether to replace the first TIF currently temporarily moored at and in fluid communication with the import terminal, as shown in block 116. The first TIF at the import terminal may be replaced if it is scheduled for maintenance that requires drydocking, if the first TIF is notified a second TIF is approaching, or based on procedures for the import terminal. If the first TIF at the import terminal is not replaced, then the transfer of LNG from the second TIF to the first TIF may be performed in a similar manner to the transfer of LNG from transport vessels, as shown in block 110. However, if the first TIF at the import terminal is to be replaced, the second TIF may replace the first TIF in block 118. The replacement of the first TIF at the import terminal with the second TIF may include mooring the second TIF at the import terminal, preparing the regasification equipment on the second TIF to begin delivery of regasified LNG, beginning delivery of natural gas to the pipeline from the second TIF, preparing the regasification equipment on the first TIF to stop delivery of regasified LNG, stopping delivery of natural gas to the pipeline from the first TIF, and departure of the first TIF from the import terminal. Further, the first TIF and second TIF may be used at the import terminal concurrently to handle additional LNG transfers in some embodiments. At block 120, the other TIF may be replaced by another transport vessel to maintain capacity in the transport fleet. The other transport vessel may be the first TIF that was replaced at the import terminal, another chartered LNGC, or some other suitable vessel. [0031] Then, a determination is made whether operations are to continue in block 122. This may include determining to continue importing LNG at the import terminal. If operations continue, the transport vessel may be moved to receive WO 2008/033183 PCT/US2007/016547 - 12 additional LNG at block 124. In this manner, the shipment of LNG to the import terminal may continue. However, if the operations are not to continue, the process ends at block 126. [00321 Beneficially, the use of the present invention may enhance the transfer of cargo, such as LNG, over other techniques from a commercial perspective. For instance, the present invention limit the permanent equipment (e.g. structures, regasification equipment, and LNG storage tanks) installed at the import terminal. That is, two or more TIFs may be utilized with a first TIF at the terminal to receive LNG and a second TIF being part of the transport fleet with other LNGCs. In this configuration, the overall cost of an offshore LNG import terminal may be reduced by the use of two or more TIFs, which may be less expensive than a permanent installation because of the ability to build and maintain (e.g. their ability to enable drydocking) these vessels with the efficiencies associated with shipyard fabrication. By utilizing a limited amount of permanently installed equipment, issues with permitting and concerns about public opposition may also be alleviated. Further, because of the limited amount of permanently installed equipment, flexibility of market supply may be achieved by installing numerous import terminals for the TIFs to choose from within a given region. [00331 Exemplary embodiments of the above described process are discussed below. For instance, FIG. 2 is an exemplary fluid transport system or fleet 200 in accordance with certain aspects of the present invention. In the exemplary fluid transport system 200, an import terminal 202, which is in fluid communication with a pipeline 204, may be positioned at an offshore location. The pipeline 204 may receive natural gas or vaporized LNG from TIFs 210 and/or 212, which are LNGC-based vessels functioning as FSRUs. One of the TIFs, such as the first TIF 210 may be temporarily moored at and in fluid communication with the import terminal 202, while the other TIF, such as the second TIF 212, is concurrently utilized as a transport vessel in the transport fleet 213. The first TIF 210 may receive LNG from transport vessels 214a-214n and the second TIF 212, convert the LNG into natural gas with the WO 2008/033183 PCT/US2007/016547 - 13 regasification equipment on the first TIF 210 and provide the natural gas to the import terminal 202 and ultimately to the pipeline 204. In this manner, the first TIF 210 may be replaced by the second TIF 212, which is part of the transport fleet 213, when maintenance is required or based on specific procedures. Beneficially, the TIFs 210 and 212 enhance transfer operations over existing procedures, while also reducing costs and limitations of the existing permanent import terminal designs. 100341 The import terminal 202 may include various mechanisms for mooring one or more TIFs 210 and 212. For instance, the import terminal 202 may include two or more Submerged Turret Loading (STL) offloading buoys, such as a first buoy 206 and a second buoy 208, which may be fixed to the seafloor in an open sea environment to provide a berth for the TIFs. Other methods of mooring one or more TIFs 210 and 212 include single point mooring systems, such as a Catenary Anchor Leg Mooring (CALM) system, a Jacket Soft Yoke (JSY) system, a Fixed Tower Single Point Mooring (FTSPM) system, and/or a Single Anchor Leg Mooring (SALM) system. It should be noted that the import terminal 202 may also be any offshore structure known in the art, which may have one or more berths for mooring one or more TIFs 210 and 212. [00351 There are various ways for the import terminal 202 to be in fluid communication with the pipeline 204. For instance, the import terminal 202 may include two or more STL offloading buoys, such as the first buoy 206 and the second buoy 208, to sendout the natural gas through one or more dynamic flexible risers, a pipeline end manifold (PLEM) and to the pipeline 204. The pipeline 204 is configured to receive natural gas and transfer the natural gas to onshore facilities (not shown). Other mechanisms for gas sendout (e.g. used in conjunction with aforementioned mooring systems) include hard pipe systems incorporating high pressure gas swivels and/or high-pressure gas hoses either suspended in the air or floating in the water. It should be noted that any mechanism in the current art allowing gas sendout to the pipeline 204 may be used.
WO 2008/033183 PCT/US2007/016547 - 14 [0036] To provide the LNG to the import terminal 202, the LNGCs 214a-214n and one of the TIFs 210 and 212 may travel across the open sea to an export terminal. Accordingly, the TIFs 210 and 212 and LNGCs 214a-214n may be equipped with typical systems for propulsion and navigation along with accommodations for marine operations and LNG storage tanks, which are used for open sea transport of LNG. The LNG storage tanks may include various types of tank designs, such as spherical, membrane, self-supporting prismatic (SPB), or rectangular (modular) tanks, which are suitable for storing LNG. In addition, the TIFs 210 and 212 and LNGCs 214a-214n may include ancillary systems, such as living quarters and maintenance facilities, safety systems, emergency escape and evacuation systems, logistics systems, power generation and other utilities to support operations. As noted above, while each of the TIFs 210 and 212 and LNGCs 214a-214n include LNG storage tanks and other typical equipment, the TIFs 210 and 212 may also include regasification equipment, LNG offloading equipment, and equipment for transfer of natural gas to the import terminal 202 and ultimately to the pipeline 204. The regasification equipment may include any of a variety of conventional types of equipment that are combined to make up a regasification system in an onshore LNG import terminal, such as pumps, vessels and heat exchangers. The regasification system may be an open-loop or closed-loop system, and may utilize any number of heat sources, including sensible heat in seawater, sensible heat from the combustion of fuels, latent heat from a condensable liquid, or other heat sources that are known in the art. The LNG offloading equipment may include cryogenic loading arms, cryogenic hoses or other equipment utilized in the transfer of LNG. In particular, the cryogenic loading arms and cryogenic hoses may be designed to accommodate LNG carrier motions in the offshore environment during offloading operations, such as connection, LNG transfer and disconnection. The equipment for transfer of natural gas to the import terminal 202 may include mechanical hard arms which are upgraded for high-pressure gas sendout, a compartment within the vessel's hull for receiving a system such as an STL buoy, bow modifications for high-pressure gas transfer to a tower-toke mooring system, or other means for transfer of natural gas as is known in the art. As a specific example, each WO 2008/033183 PCT/US2007/016547 - 15 of the TIFs 210 and 212 may be LNGC-based vessels having five membrane storage tanks that provide 265,000 cubic meters (M 3 ) of total LNG storage, an open-loop regasification system utilizing seawater providing 1.0 billion standard cubic feet per day (BScf/d), marinized mechanical hard arms for LNG offloading, and a compartment integrated into the vessel's hull to accept an STL buoy that allows both mooring at the import terminal 202 and send out of natural gas to the import terminal 202 and ultimately to the pipeline 204. [0037] As a specific, non-limiting example of the operation, the first TIF 210 may be temporarily moored at and in fluid communication with the import terminal 202, while the second TIF 212 is utilized as a transport vessel in the transport fleet. That is, the first TIF 210 may be in fluid communication with the pipeline 204 through the import terminal 202, while the second TIF 212 functions in a manner similar to the LNGCs 214a-214n. In this configuration, the LNG cargo is transferred from one of the second TIF 212 and LNGCs 214a-214n to the first TIF 210, which is temporarily moored at and in fluid communication with the import terminal 202, through the offloading approaches discussed above. Once the first TIF 210 requires maintenance (e.g. drydocking), the second or other TIF 212, which is part of the transport fleet 213, may replace the first TIF 210, or temporarily moor at and be in fluid communication with the STL buoy 208. Another LNGC may be chartered to replace the second TIF 212 in the transport fleet 213 or the first TIEF 210 may join the transport fleet 213. [0038] Benefically, the use of multiple TIFs for an import terminal provides an inexpensive alternative to permanent facilities because of the efficiencies associated with shipyard fabrication, rather than a custom built permanent installation. Additionally, because one of the TIFs is acting as a transport vessel, the capital expense for a single LNGC in the transport fleet is eliminated, again reducing the overall expenditure. Also, the import terminal may be scalable through the use of three or more TIFs and two or more import terminals, as is shown in greater detail in FIG. 3.
WO 2008/033183 PCT/US2007/016547 - 16 [00391 FIG. 3 is another exemplary fluid transport system or fleet 300 in accordance with certain aspects of the present invention. In the exemplary fluid transport system 300, multiple import terminals 302a and 302b may be offshore import terminals similar to the import terminal 202, which have submerged turret loading (STL) buoys 306a, 306b, 308a and 308b. The import terminals 302a and 302b may each be coupled to a pipeline 304a and 304b to provide natural gas from one or more of the TIFs 310a-310c, such as the first and second TIFs 310a and 310b. The first and second TIFs 310a and 310b may receive LNG from the third TIF 310c or one of the LNGCs 314a-314n, which are similar to the LNGCs 210 and 212 of FIG. 2. Then, the LNG from one of the LNGCs 314a-314n or third TIF 310c may be regasified and transferred to the respective pipeline 304a and 304b by the associated first and second TIF 310a and 310b and one of the import terminals 302a and 302b. The selection of the import terminal 302a or 302b may be based on the terminal having the highest demand or offering the best price. In one preferred embodiment, there is one more TIF than there are import terminals. However, it should be noted that the number of TIFs and import terminals may be any integer number based on a specific configuration. [0040] As another non-limiting example, a first TIF 310a is temporarily moored at and in fluid communication with the first import terminal 302a, and offloads LNG from a first LNGC 314a. The first TIF 310a regasifies the LNG and sends this natural gas to the first pipeline 304a through the first import terminal 302a. Once the first LNGC 314a completes the LNG offloading process with the first TIF 310a, it departs from the first import terminal 302a and travels to an export terminal to receive additional LNG. Concurrent with the operations at the first import terminal 302a, a second TIF 310b is temporarily moored at and in fluid communication with the second import terminal 302b. The second TIF 310b offloads LNG from a second LNGC 314b. The second TIF 310b regasifies the LNG and sends this natural gas to the second pipeline 304b through the second import terminal 302b. In this configuration, the selection of import terminals 302a and 302b for LNG offloading from LNGCs 314a-314n may be based upon environmental conditions (e.g. weather WO 2008/033183 PCT/US2007/016547 - 17 or waves at one of the import terminals) or even commercial conditions (e.g. locations relative to best market, contractual obligations, etc.). Further, the import terminals 302a and 302b may both be located in the same location for the sole purpose of providing double the volumes of natural gas to the market that a single import terminal could supply. [00411 In addition to providing flexibility in the selection of import terminals for the LNG, the process provides flexibility for selecting import terminals based on the replacement of an existing TIF operating at the terminal. That is, a third TIF 310c, which is part of the transport fleet 300, may select an import terminal 302a or 302b, as it travels across the open sea. The selection may be based on one of the TIFs 310a or 310b needing service or needing to be replaced for operations. The existing TIF 310a or 310b may depart from their respective import terminals. Then, the TIF 310a or 310b may join the transport fleet by traveling to the export terminal to receive LNG or travel to receive maintenance at a drydock. In fact, some maintenance performed on the TIF may even be performed as it is traveling to receive a shipment of LNG from an export terminal. As such, the use of the multiple TIFs may enhance transport operations for LNG. [0042] Beneficially, the present invention are scalable with the installation of two or more import terminals 302a and 302b and three or more TIFs 310a-310c. By standardizing the methods of mooring the TIFs at and transferring the natural gas to the import terminals (e.g. utilizing STL buoys), the TIFs 310a-310c may relocate between different import terminal locations 302a and 302b in response to market forces and local gas prices. Further, where multiple import terminals are in operation with TIFs, a single additional TIF may serve as the replacement TIF for multiple terminals. This affords an additional cost saving benefit compared to operations with a single import terminal by "sharing" the cost of the replacement TIF among many projects. [00431 Further, it should be noted that other fluid cargos may be transferred instead of LNG. For instance, the cargo may include C0 2 , He, or other gases that may WO 2008/033183 PCT/US2007/016547 - 18 be converted into a liquid at certain temperatures and. pressures. Similar to the systems and methods discussed above, two or more vessels may include special hardware to manage the transfer of cargo and regasification of the fluid cargo to a pipeline. For instance, a first vessel may be operatively coupled to a terminal, wherein the first vessel has regasification equipment, offloading equipment, storage tanks, and equipment to transfer regasified fluid from the first vessel to the terminal. Then, a fluid may be offloaded to the first vessel from one of one or more transport vessels having storage tanks and a second vessel having regasification equipment, offloading equipment, storage tanks, and equipment to transfer regasified fluid from the second vessel to the terminal. The first vessel may deberth from the terminal, before or concurrently with the berthing and coupling of the second vessel to the terminal. Then, the fluid may be offloaded to the second vessel from one of the transport vessels and the first vessel. [00441 While the present invention may be susceptible to various modifications and alternative forms, the exemplary embodiments discussed above have been shown by way of example. However, it should again be understood that the invention is not intended to be limited to the particular embodiments disclosed herein. Indeed, the present invention covers all modifications, equivalents, and alternatives falling within the spirit and scope of the invention as defined by the following appended claims.

Claims (44)

1. A method for importing liquefied natural gas (LNG) comprising: providing a first import vessel operatively coupled to an import terminal, a second import vessel transporting LNG, and transport vessels, wherein each of 5 the first import vessel and the second import vessel has regasification equipment, LNG offloading equipment, LNG storage tanks and natural gas transfer equipment to transfer natural gas from the first import vessel or the second import vessel to an import terminal; determining whether the second import vessel is to replace the first import 10 vessel; if the first import vessel is to be replaced by the second import vessel, decoupling the first import vessel from the import terminal, coupling the second import vessel to the import terminal and offloading LNG from transport vessels to the second import vessel; and 15 if the first import vessel is to remain at the import terminal, offloading LNG from the second import vessel to the first import vessel.
2. The method of claim 1 further comprising regasifying the LNG on the first import vessel to deliver natural gas to a pipeline operatively coupled to the import terminal. 20
3. The method of any one of claims 1-2 wherein offloading LNG from the transport vessels into the second import vessel comprises storing at least a portion of the LNG in the LNG storage tanks on the first import vessel.
4. The method of any one of claims 1-3 wherein offloading LNG from the transport vessels into the second import vessel comprises storing at least a 25 portion of the LNG in LNG storage tanks associated with the import terminal.
5. The method of any one of claims 1-4 wherein the regasification equipment utilizes one of an open-loop regasification system and closed-loop regasification system. 20
6. The method of any one of claims 1-5 wherein the regasification equipment utilizes sensible heat from another liquid as the heat source for the vaporization of the LNG.
7. The method of any one of claims 1-6 wherein the regasification equipment 5 utilizes sensible heat from the combustion of a fuel as the heat source for the vaporization of the LNG.
8. The method of any one of claims 1-7 wherein the regasification equipment utilizes latent heat from a condensable liquid as the heat source for the vaporization of the LNG. 10
9. The method of any one of claims 1-8 wherein the LNG offloading equipment comprises cryogenic loading arms to transfer the LNG from the first import vessel.
10. The method of any one of claims 1-9 wherein the LNG offloading equipment comprises cryogenic hoses to transfer the LNG from the first import 15 vessel.
11. The method of any one of claims 1-10 wherein offloading LNG from transport vessels into the first import vessel comprises side-by-side offloading.
12. The method of any one of claims 1-11 wherein offloading LNG from transport vessels into the first import vessel comprises tandem offloading. 20
13. The method of any one of claims 1-12 wherein offloading LNG from transport vessels into the first import vessel comprises subsea cryogenic fluid transfer system offloading.
14. The method of any one of claims 1-13 wherein the LNG storage tanks comprise spherical tanks. 21
15. The method of any one of claims 1-14, wherein the LNG storage tanks comprise membrane tanks.
16. The method of any one of claims 1-15 wherein the LNG storage tanks comprise self-supporting prismatic tanks. 5
17. The method of any one of claims 1-16 wherein the LNG storage tanks comprise modular tanks.
18. The method of any one of claims 1-17 further comprising offloading LNG from the transport vessels into the second import vessel if it replaces the first import vessel. 10
19. The method of any one of claims 1-18 further comprising offloading LNG from the transport vessels into the first import vessel until a second import vessel arrives at the import terminal.
20. A fluid transport system comprising: at least one terminal; 15 a plurality of transport vessels having storage tanks and configured to transport liquefied natural gas (LNG) in an open sea environment; and a plurality of regasification vessels, wherein each of the plurality of regasification vessels is equipped regasification equipment, LNG offloading equipment, LNG storage tanks, and natural gas transfer equipment, and is 20 configured to transport LNG in the open sea environment; and wherein one of the plurality of regasification vessels transports LNG in the open sea environment, while another of the plurality of regasification vessels is coupled to one of the at least one terminal to provide natural gas to the one of the at least one terminal from one of the plurality of transport vessels and the one of 25 the plurality of regasification vessels.
21. The fluid transport system of claim 20, wherein the plurality of the regasification vessels are configured to: couple to the terminal; 22 transfer the LNG from one of the plurality of transport vessels and another of the plurality of regasification vessels; regasify the LNG provided from one of the plurality of transport vessels and the other of the plurality of regasification vessels; and 5 transfer the natural gas to the at least one terminal.
22. The fluid transport system of any one of claims 20-21, wherein the at least one terminal comprises one or more submerged turret loading buoys utilized to couple the other of the plurality of regasification vessels.
23. The fluid transport system of any one of claims 20-22, wherein the at least 10 one terminal is secured to the seafloor and coupled to a pipeline that provides natural gas to onshore equipment.
24. The fluid transport system of any one of claims 20-23, wherein each of the plurality of regasification vessels further comprises at least one of living quarters, maintenance facilities, safety systems, emergency escape and evacuation 15 systems, logistics systems and power generation.
25. The fluid transport system of any one of claims 20-24 wherein the regasification equipment utilizes one of an open-loop regasification system and closed-loop regasification system.
26. The fluid transport system of any one of claims 20-25 wherein the 20 regasification equipment utilizes sensible heat from another liquid as the heat source for the vaporization of the LNG.
27. The fluid transport system of any one of claims 20-26 wherein the regasification equipment utilizes sensible heat from the combustion of a fuel as the heat source for the vaporization of the LNG. 25
28. The fluid transport system of any one of claims 20-27 wherein the regasification equipment utilizes latent heat from a condensable liquid as the heat source for the vaporization of the LNG. 23
29. The fluid transport system of any one of claims 20-28, wherein the LNG offloading equipment comprise cryogenic loading arms for transferring the LNG.
30. The fluid transport system of any one of claims 20-29, wherein the LNG offloading equipment comprises cryogenic hoses for transferring the LNG. 5
31. The fluid transport system of any one of claims 20-30, wherein the one of the plurality of transport vessels and the other of the plurality of regasification vessels are positioned in a side-by-side offloading configuration to offload LNG.
32. The fluid transport system of any one of claims 20-31, wherein the one of the plurality of transport vessels and the other of the plurality of regasification 10 vessels are positioned in a tandem offloading configuration to offload LNG.
33. The fluid transport system of any one of claims 20-32, wherein the one of the plurality of transport vessels and the other of the plurality of regasification vessels are positioned in a subsea cryogenic fluid transfer system offloading configuration to offload LNG. 15
34. The fluid transport system of any one of claims 20-33, wherein the LNG storage tanks comprise spherical tanks.
35. The fluid transport system of any one of claims 20-34, wherein the LNG storage tanks comprise membrane tanks.
36. The fluid transport system of any one of claims 20-35, wherein the LNG 20 storage tanks comprise self-supporting prismatic tanks.
37. The fluid transport system of any one of claims 20-36, wherein the LNG storage tanks comprise modular tanks.
38. The fluid transport system of any one of claims 20-37, wherein the at least one terminal comprises two or more berthing structures. 24
39. The fluid transport system of claim 38, wherein the two or more berthing structures comprise one of berthing dolphins fixed to the seafloor, a spread mooring system, submerged turret loading system, and any combination thereof.
40. A method of transporting liquefied natural gas (LNG) comprising: 5 providing a plurality of transport vessels having LNG storage tanks and configured to transport liquefied natural gas (LNG) in an open sea environment; and providing a plurality of regasification vessels, wherein each of the plurality of regasification vessels have regasification equipment, LNG offloading 10 equipment, LNG storage tanks, equipment to transfer natural gas, and is configured to transport liquefied natural gas (LNG) in an open sea environment, and offloading LNG from one of the plurality of transport vessels by one of the plurality of regasification vessels at a first terminal concurrently while an other of 15 the plurality of regasification vessels transport LNG in the open sea environment.
41. A method for transporting fluid comprising: coupling a first vessel to a terminal, wherein the first vessel has regasification equipment offloading equipment, storage tanks, and equipment to transfer regasified fluid from the first vessel to the terminal; 20 offloading the fluid to the first vessel from one of a plurality of transport vessels having storage tanks and a second vessel, wherein the second vessel has regasification equipment, offloading equipment, storage tanks, and equipment to transfer regasified fluid from the second vessel to the terminal; deberthing the first vessel from the terminal; 25 berthing the second vessel adjacent to the terminal; coupling the second vessel to the terminal; offloading the fluid to the second vessel from one of the plurality of transport vessels and the first vessel.
42. The method of claim 41, wherein the fluid is liquefied natural gas. 30
43. The method of claim 41, wherein the fluid is carbon dioxide. 25
44. The method of claim 41, wherein the fluid is liquefied helium. EXXONMOBIL UPSTREAM RESEARCH COMPANY WATERMARK PATENT & TRADE MARK ATTORNEYS P31588AU00
AU2007295027A 2006-09-11 2007-07-23 Transporting and managing liquefied natural gas Ceased AU2007295027B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US84365806P 2006-09-11 2006-09-11
US60/843,658 2006-09-11
PCT/US2007/016547 WO2008033183A2 (en) 2006-09-11 2007-07-23 Transporting and managing liquefied natural gas

Publications (2)

Publication Number Publication Date
AU2007295027A1 AU2007295027A1 (en) 2008-03-20
AU2007295027B2 true AU2007295027B2 (en) 2013-05-02

Family

ID=38051381

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2007295027A Ceased AU2007295027B2 (en) 2006-09-11 2007-07-23 Transporting and managing liquefied natural gas

Country Status (12)

Country Link
US (1) US8959931B2 (en)
EP (1) EP2061989A4 (en)
JP (1) JP2010503132A (en)
CN (2) CN101512214A (en)
AU (1) AU2007295027B2 (en)
BR (1) BRPI0716258A2 (en)
CA (1) CA2663060C (en)
MX (1) MX2009002474A (en)
MY (1) MY154465A (en)
SG (1) SG174767A1 (en)
TW (1) TWI464104B (en)
WO (1) WO2008033183A2 (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1994328A4 (en) * 2006-03-15 2018-03-07 Woodside Energy Limited Onboard regasification of lng
WO2008060350A2 (en) * 2006-11-15 2008-05-22 Exxonmobil Upstream Research Company Transporting and transferring fluid
US9919774B2 (en) 2010-05-20 2018-03-20 Excelerate Energy Limited Partnership Systems and methods for treatment of LNG cargo tanks
CN102050208B (en) * 2010-11-19 2013-05-01 益资海洋工程技术(北京)有限公司 LNG storage and transportation system and floating type receiving platform thereof
CN102155614B (en) * 2011-01-21 2013-05-01 中国石油天然气股份有限公司 Recovery method and recovery system of natural gas in marginal offshore oil field
CN102314173A (en) * 2011-06-10 2012-01-11 武汉富高流体控制系统工程有限公司 Liquid cargo control system of liquefied gas carrier
EP2756220A1 (en) * 2011-08-18 2014-07-23 Stamicarbon B.V. Shipping method for co2 storage and import of cng
KR101293393B1 (en) 2011-12-26 2013-08-05 한국해양과학기술원 Bending tube effect analysis experimental device with vertical U-tube and horizontal tube for safety analysis of pipeline transport process in CO2 marine geological storage
WO2013109149A1 (en) * 2012-01-17 2013-07-25 Golar Management Oslo Small scale lng terminal
US9261236B2 (en) * 2012-09-24 2016-02-16 Elwha Llc Train propellant management systems and methods
AU2014224154B8 (en) * 2014-07-09 2015-07-02 Woodside Energy Technologies Pty Ltd System and method for heading control of a floating lng vessel using a set of real-time monitored cargo containment system strain data
AU2014224153B8 (en) * 2014-07-09 2015-07-02 Woodside Energy Technologies Pty Ltd System and method for heading control of a floating lng vessel using a set of real-time monitored hull integrity data
CN104317272A (en) * 2014-11-05 2015-01-28 无锡新人居科贸有限公司 Remote greenhouse environment adjusting system
CN106907570B (en) * 2017-03-03 2022-07-29 中国寰球工程有限公司 Ship-to-ship transfer system based on shore-based liquefied natural gas receiving station
JP7365992B2 (en) 2020-10-28 2023-10-20 三菱造船株式会社 Liquefied carbon dioxide transfer method, floating body

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6089022A (en) * 1998-03-18 2000-07-18 Mobil Oil Corporation Regasification of liquefied natural gas (LNG) aboard a transport vessel
US6546739B2 (en) * 2001-05-23 2003-04-15 Exmar Offshore Company Method and apparatus for offshore LNG regasification
WO2006044053A1 (en) * 2004-10-15 2006-04-27 Exxonmobil Upstream Research Company Subsea cryogenic fluid transfer system

Family Cites Families (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3590407A (en) 1968-11-13 1971-07-06 Mobil Oil Corp Swivel tanker floating storage system
CA946629A (en) 1970-07-02 1974-05-07 Gulf Oil Corporation Portable products terminal
US4207827A (en) * 1976-08-20 1980-06-17 Michel Gondouin System, tooling and method of construction of cryogenic tanks for LNG tankers and for LNG storage
US5117914A (en) 1990-12-13 1992-06-02 Blandford Joseph W Method and apparatus for production of subsea hydrocarbon formations
US5501625A (en) 1992-08-24 1996-03-26 Belinsky; Sidney I. Floating terminal
NO179986C (en) 1994-12-08 1997-01-22 Norske Stats Oljeselskap Process and system for producing liquefied natural gas at sea
DZ2528A1 (en) 1997-06-20 2003-02-01 Exxon Production Research Co Container for the storage of pressurized liquefied natural gas and a process for the transport of pressurized liquefied natural gas and natural gas treatment system to produce liquefied natural gas under pressure.
JP3676604B2 (en) 1999-02-04 2005-07-27 株式会社神戸製鋼所 Intermediate medium type vaporizer and method of supplying natural gas using the vaporizer
NO308714B1 (en) 1999-07-09 2000-10-16 Moss Maritime As Underwater evaporator for LNG
US6673249B2 (en) * 2000-11-22 2004-01-06 Marine Desalination Systems, L.L.C. Efficiency water desalination/purification
NO312715B1 (en) 1999-10-27 2002-06-24 Statoil Asa System for offshore transmission of liquefied natural gas
FR2800349B1 (en) 1999-10-27 2002-01-18 Bouygues Offshore LIQUEFIED GAS STORAGE BARGE WITH FLOATING CONCRETE STRUCTURE
US6298671B1 (en) 2000-06-14 2001-10-09 Bp Amoco Corporation Method for producing, transporting, offloading, storing and distributing natural gas to a marketplace
US20020073619A1 (en) 2000-12-14 2002-06-20 William Perkins Method and apparatus for delivering natural gas to remote locations
NO20011524L (en) * 2001-03-23 2002-09-24 Leif Hoeegh & Co Asa Vessels and unloading system
US20020134455A1 (en) 2001-03-23 2002-09-26 Leif Hoegh & Co. Asa Vessel and unloading system
EP1283159A1 (en) 2001-08-06 2003-02-12 Single Buoy Moorings Inc. Hydrocarbon fluid transfer system
WO2003049994A1 (en) 2001-12-12 2003-06-19 Single Buoy Moorings Inc. Weathervaning lng offloading system
US7293600B2 (en) 2002-02-27 2007-11-13 Excelerate Energy Limited Parnership Apparatus for the regasification of LNG onboard a carrier
KR100609350B1 (en) * 2002-03-29 2006-08-08 엑셀레이트 에너지 리미티드 파트너쉽 Improved LNG carrier
US6598408B1 (en) * 2002-03-29 2003-07-29 El Paso Corporation Method and apparatus for transporting LNG
US6805598B2 (en) 2002-09-06 2004-10-19 Dorob International Ltd. Liquid natural gas transfer station
WO2004031644A1 (en) 2002-10-04 2004-04-15 Hamworthy Kse A.S. Regasification system and method
NO330955B1 (en) 2003-04-30 2011-08-22 Torp Tech As Unloading and cargo evaporation device for ships
US7308863B2 (en) * 2003-08-22 2007-12-18 De Baan Jaap Offshore LNG regasification system and method
US7360367B2 (en) 2004-07-18 2008-04-22 Wood Group Advanced Parts Manufacture Apparatus for cryogenic fluids having floating liquefaction unit and floating regasification unit connected by shuttle vessel, and cryogenic fluid methods
WO2005105565A1 (en) 2004-04-29 2005-11-10 Single Buoy Moorings Inc. Side-by-side hydrocarbon transfer system
US7080673B2 (en) 2004-04-30 2006-07-25 Sbm-Imodco, Inc. Quick LNG offloading
EP1809940A1 (en) 2004-11-08 2007-07-25 Shell Internationale Researchmaatschappij B.V. Liquefied natural gas floating storage regasification unit
GB0503213D0 (en) 2005-02-16 2005-03-23 Bp Exploration Operating Process for conditioning liquefied natural gas
WO2006087332A1 (en) 2005-02-17 2006-08-24 Shell Internationale Research Maatschappij B.V. Method for removing contaminating gaseous components from a natural gas stream
JP2008530505A (en) 2005-02-17 2008-08-07 シエル・インターナシヨネイル・リサーチ・マーチヤツピイ・ベー・ウイ Plant and method for liquefying natural gas
FR2882129A1 (en) 2005-02-17 2006-08-18 Inst Francais Du Petrole LIQUEFIED NATURAL GAS REGASIFICATION INSTALLATION
US8402983B2 (en) 2005-02-17 2013-03-26 Single Bouy Moorings, Inc. Gas distribution system
NO20050856L (en) 2005-02-17 2006-08-18 Statoil Asa System and procedure for offshore unloading and regasification of LNG
US20080011357A1 (en) 2005-10-13 2008-01-17 Hein Wille LNG tanker offloading in shallow waters
WO2008060350A2 (en) * 2006-11-15 2008-05-22 Exxonmobil Upstream Research Company Transporting and transferring fluid

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6089022A (en) * 1998-03-18 2000-07-18 Mobil Oil Corporation Regasification of liquefied natural gas (LNG) aboard a transport vessel
US6546739B2 (en) * 2001-05-23 2003-04-15 Exmar Offshore Company Method and apparatus for offshore LNG regasification
WO2006044053A1 (en) * 2004-10-15 2006-04-27 Exxonmobil Upstream Research Company Subsea cryogenic fluid transfer system

Also Published As

Publication number Publication date
CA2663060A1 (en) 2008-03-20
US8959931B2 (en) 2015-02-24
CN103697326A (en) 2014-04-02
MY154465A (en) 2015-06-30
TW200831390A (en) 2008-08-01
WO2008033183A2 (en) 2008-03-20
JP2010503132A (en) 2010-01-28
EP2061989A2 (en) 2009-05-27
MX2009002474A (en) 2009-03-20
CA2663060C (en) 2014-08-12
SG174767A1 (en) 2011-10-28
WO2008033183A3 (en) 2008-05-15
AU2007295027A1 (en) 2008-03-20
BRPI0716258A2 (en) 2013-08-06
TWI464104B (en) 2014-12-11
CN101512214A (en) 2009-08-19
EP2061989A4 (en) 2018-06-20
US20090272126A1 (en) 2009-11-05

Similar Documents

Publication Publication Date Title
AU2007295027B2 (en) Transporting and managing liquefied natural gas
US8448673B2 (en) Transporting and transferring fluid
US6546739B2 (en) Method and apparatus for offshore LNG regasification
US10359229B2 (en) Floating liquefied natural gas commissioning system and method
AU2007332978B2 (en) Open-sea berth LNG import terminal
US20060231155A1 (en) Enhanced gas distribution system
AU2007295937A1 (en) Boil off gas management during ship-to-ship transfer of LNG
KR100676615B1 (en) Lng regasification system and method using offshore floating structure
US20020134455A1 (en) Vessel and unloading system
EP1383676B1 (en) Vessel and unloading system
Davis Enabling Technologies for Mooring, Unloading Regasification and Storage for Offshore LNG Receiving Terminals
Larsen et al. SRV-the LNG Shuttle and Regas Vessel System
Sagau LNG IMPORT FACILITY CONSISTING OF EXISTING LNG MOSS TYPE VESSEL INTO FLOATING TERMINAL WITH REGASIFICATION UNIT.
Claes et al. GIFT (Gas Import Floating Terminal): A New Concept of Floating LNG Terminal
NO315040B1 (en) Shuttle system and unloading system

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired