EP1974099A1 - Method for producing a ballastless track - Google Patents

Method for producing a ballastless track

Info

Publication number
EP1974099A1
EP1974099A1 EP07711153A EP07711153A EP1974099A1 EP 1974099 A1 EP1974099 A1 EP 1974099A1 EP 07711153 A EP07711153 A EP 07711153A EP 07711153 A EP07711153 A EP 07711153A EP 1974099 A1 EP1974099 A1 EP 1974099A1
Authority
EP
European Patent Office
Prior art keywords
caissons
cross member
foundations
track
longitudinal members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP07711153A
Other languages
German (de)
French (fr)
Inventor
Wolfgang Markus
Horst Eduard Steinfeld
Heiko Sante
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ls Beratungsbuero Lublow GmbH
Hain Silke
ThyssenKrupp GfT Gleistechnik GmbH
Hain Uwe
Original Assignee
Ls Beratungsbuero Lublow GmbH
Hain Silke
ThyssenKrupp GfT Gleistechnik GmbH
Hain Uwe
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ls Beratungsbuero Lublow GmbH, Hain Silke, ThyssenKrupp GfT Gleistechnik GmbH, Hain Uwe filed Critical Ls Beratungsbuero Lublow GmbH
Publication of EP1974099A1 publication Critical patent/EP1974099A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors

Definitions

  • the invention relates to a method for the production of non-overlying superposed railways in the manner of a fixed track, in particular for the renovation of existing track systems.
  • WO 2004/031483 a solid roadway for rail transport has become known, which is characterized by a frame-like construction.
  • the frame-like construction incorporates two rail-parallel prefabricated reinforced concrete elements, whereby pre-assembled track rail supports of a statically limited length running parallel to the track are used.
  • the track rail supports are supported on high pressure injection earth-nested reinforced concrete composite piles.
  • a method for laying railway rails comprising the steps of holding the rails in a predetermined track and horizontal and vertical alignment, on a continuous support in the form of foundation beams.
  • An elongated trench or elongated trenches are formed under the rails to receive flexible tubular elements that are filled with a curable composition so that their upper surfaces contact the foot of the rails and crawl around that leg to form a continuous bed to form for the rails.
  • the DE-Utility Model 89 11 400 is a ballastless superstructure, mainly for metro and light rail, refer to, in which the area is seeded next to and between precast with grass.
  • the superstructure consists of two finished parts. These finished parts have bearing cusps, between which there are rail fasteners that hold the rail position properly.
  • DE-A 40 27 836 a substructure for a running at the same height with the individual traffic or laid in tunnels track for rail vehicles is described, wherein the track-forming rails are mounted so elastically that they are under load by a driving above Rail vehicle can move over a predeterminable travel.
  • a rigid, continuous carrier is provided, which may be formed for example by a precast concrete part.
  • the aim of the subject invention is to provide a novel method for the production of non-superimposed superimposed railways in the manner of a fixed carriageway, in particular for rehabilitation of existing track systems, taking into account the specified safety and strength requirements, especially when train operation, within a short period can be created.
  • downtime for train traffic should be kept as low as possible.
  • This object is achieved by a method for the production of non-overlying superposed railways in the manner of a fixed track, in particular for rehabilitation of existing track systems by foundations, in particular in the form of Verpresspfählen, introduced at predetermined intervals along the rail in the ground, the ground up be excavated to a specifiable level and placed at least in the area above the previously introduced foundations sinker, the soil is removed within the caissons to create a pit while lowering the caissons to another level, then with the foundation, in particular the injection piles, at least one cross member brought into operative connection and selbiger in a subsequent working step with, the non-overlying superimposed rail path based, longitudinal beams is connected.
  • the foundations in particular the injection piles, are introduced through the ballast bed of a track to be reinforced, wherein the segmentation of the threaded rods of the Pressing piles made in such a way that after pressing the respective threaded rod ends at a depth of about 75 to 95 cm below the lower edge of the remaining rails.
  • the existing rails and sleepers are removed first. Subsequently, the old ballast / substructure is ground dependent removed to a depth of about 55 to 85 cm below the lower edge of the former rails.
  • caissons are then designed on the then given level, the free inner dimension advantageously circumferentially by a predetermined amount, e.g. 1 to 2 cm, is larger than the cross member used in each case.
  • the existing material is gently removed in particular by means of suction and exposing the threaded rod heads, the sinkers to be re-used fall to the predetermined depth.
  • At least one cross member is installed in the area of the need for extended elongated threaded heads and connected to the foundation height and correct position.
  • the given openings in the region of the / of the cross member) are then filled with mortar, in particular a slightly swelling and fast-curing special mortar, to the upper edge of the respective cross member.
  • the caissons are dismantled and removed.
  • the longitudinal members can be installed in the correct position on the / the cross member (s) that the extended threaded rod heads protrude into corresponding opening areas of pre-assembled connections of the longitudinal beams formed of steel or reinforced concrete.
  • the openings still given in the area of the side members with mortar, especially a slightly swelling and fast-curing special mortar, filled.
  • the interposed ballast can then be reinstalled between the side rails and laterally the same to the neighboring track and the free side, so that on the one hand improves the sound insulation and on the other hand, the bottom is not sealed.
  • the subject invention thus shows ways to provide on the one hand in relatively rapid construction progress new railways to the system slab track.
  • an excellent opportunity is presented to equip existing old plants in such a way with new solid lanes that the train traffic is only slightly affected.
  • Figures 1 to 4 Various steps for upgrading a track on a double track railway in this example.
  • Figures 1 to 4 show in chronological order the basic workflows of the method according to the invention for the production of non-overlying superimposed railways in the manner of a fixed carriageway.
  • the right track 1 "is to be upgraded without significantly impairing the train traffic.
  • the selected foundations here injection piles 5, introduced by the ballast 4 to a lower level.
  • the injection piles 5 together with threaded rods 6 are to be introduced to a predefinable depth into the surrounding soil 5 'for static reasons, the injection piles 5 being provided at predeterminable angles of inclination
  • the injection piles 5 each contain a threaded rod 6.
  • the segmentation of the threaded rods 6 of the injection piles 5 takes place in such a way that after the pressing, the respective threaded rod 6 ends at a depth of approximately 80 to 90 cm below the lower edge 7 of the rails 3.
  • the height and positionally accurate alignment can be achieved, for example, by simple wooden or steel wedges for force transmission between cross member 12 and foundations 5, for example, fixed by nuts 13. Subsequently, the threaded rod 6 is extended upwards by about 50 to 60 cm via a connecting sleeve 14 with internal thread Cross member 12, which are located around the threaded rod heads 10, filled with a slightly swelling and fast-curing special mortar to the top 16 of the cross member 12.
  • the longitudinal members 17 are installed in the correct position such that the elongated threaded rod heads 18 protrude into corresponding openings 19 of the existing steel or reinforced concrete longitudinal member 17 (Figure 4).
  • the side members 17 are now adjusted by means of commercially available height and side adjustable spacers (not shown) to the exact height and location. Analogous to the power transmission through the threaded rods 6 between the foundations 5 and the cross member 12 are now in the openings 19 of the longitudinal beams 17, between and laterally the same on the threaded rod heads 18 of the connecting sleeves 14, steel plates 20 with nuts 20 'fixed.
  • the still given openings 19 of the longitudinal members 17 are closed by backfilling with a slightly swelling and fast-curing special mortar.
  • ballast 4 can be reinstalled, so that on the one hand the soundproofing improved and on the other hand, the bottom is not sealed.
  • the original rails 3 can be reused as needed.
  • connection and support means for example in the form of ribbed plates, are used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention relates to a method for producing railway tracks of the ballastless track-type that are not entirely supported, especially for the reconstruction of existing railway systems. According to said method, foundations are introduced into the soil (5) at predetermined intervals along the railway track, especially in the form of injection piles (5), the soil is dug out down to a predetermined level and caissons (8) are positioned at least in the area above the previously introduced foundations. The soil inside the caissons (8) is removed down to a further level while simultaneously lowering the caissons, thereby producing an excavation, at least one transverse girder (12) is functionally connected to the foundation, especially the injection piles, and said transverse girder is connected in a subsequent step to the longitudinal girders (17) which support the track that is not entirely supported.

Description

Verfahren zur Herstellung einer festen Fahrbahn Method for producing a solid roadway
Die Erfindung betrifft ein Verfahren zur Herstellung von nicht vollflächig aufgelagerten Schienenwegen nach Art einer festen Fahrbahn, insbesondere zur Sanierung bestehender Gleissysteme.The invention relates to a method for the production of non-overlying superposed railways in the manner of a fixed track, in particular for the renovation of existing track systems.
Durch die WO 2004/031483 ist eine feste Fahrbahn für den Schienenverkehr bekannt geworden, die sich durch eine rahmenartige Konstruktion auszeichnet. Die rahmenartige Konstruktion beinhaltet zwei schienenparallele Stahlbetonfertigteile, wobei gleisparallel verlaufende vormontierte Spurwegschienenträger von statisch begrenzter Länge zum Einsatz gelangen. Die Spurwegschienenträger sind auf durch Hochdruckinjektion erdvernagelten Stahlbeton-Verbundpfählen gelagert.By WO 2004/031483 a solid roadway for rail transport has become known, which is characterized by a frame-like construction. The frame-like construction incorporates two rail-parallel prefabricated reinforced concrete elements, whereby pre-assembled track rail supports of a statically limited length running parallel to the track are used. The track rail supports are supported on high pressure injection earth-nested reinforced concrete composite piles.
In der DE-C 39 27 251 wird ein Verfahren zum Legen von Eisenbahnschienen abgehandelt, das die Schritte des Haltens der Schienen in einer vorbestimmten Spur und Horizontal- und Vertikalausrichtung umfasst, auf einem durchgehenden Auflager in Form von Fundamentbalken. Ein länglicher Graben oder längliche Gräben werden unter den Schienen gebildet, um flexible rohrförmige Elemente aufzunehmen, die mit einer aushärtbaren Mischung so gefüllt werden, dass ihre oberen Flächen mit dem Fuß der Schienen in Kontakt kommen und um diesen Fuß herum kriechen, um ein durchgehendes Bett für die Schienen zu bilden.In DE-C 39 27 251 a method for laying railway rails is dealt with, comprising the steps of holding the rails in a predetermined track and horizontal and vertical alignment, on a continuous support in the form of foundation beams. An elongated trench or elongated trenches are formed under the rails to receive flexible tubular elements that are filled with a curable composition so that their upper surfaces contact the foot of the rails and crawl around that leg to form a continuous bed to form for the rails.
Dem DE-Gebrauchsmuster 89 11 400 ist ein schotterloser Oberbau, hauptsächlich für U- und Stadtbahnen, zu entnehmen, bei dem der Bereich neben und zwischen Fertigteilen mit Gras ausgesät wird. Der Oberbau besteht aus zwei Fertigteilen. Diese Fertigteile besitzen Auflagerhöcker, zwischen denen sich Schienenbefestigungselemente befinden, die die Schienenlage richtig festhalten.The DE-Utility Model 89 11 400 is a ballastless superstructure, mainly for metro and light rail, refer to, in which the area is seeded next to and between precast with grass. The superstructure consists of two finished parts. These finished parts have bearing cusps, between which there are rail fasteners that hold the rail position properly.
In der DE-A 40 27 836 wird ein Unterbau für ein in gleicher Höhe mit dem Individualverkehr verlaufendes oder in Tunneln verlegtes Gleis für Schienenfahrzeuge beschrieben, wobei die das Gleis bildenden Schienen derart elastisch gelagert sind, dass sie sich bei Belastung durch ein darüber fahrendes Schienenfahrzeug über einen vorgebbaren Federweg bewegen können. Unter jeder Schiene des Gleises ist ein biegesteifer durchlaufender Träger vorgesehen, der beispielsweise durch ein Betonfertigteil gebildet sein kann.In DE-A 40 27 836 a substructure for a running at the same height with the individual traffic or laid in tunnels track for rail vehicles is described, wherein the track-forming rails are mounted so elastically that they are under load by a driving above Rail vehicle can move over a predeterminable travel. Under each rail of the track, a rigid, continuous carrier is provided, which may be formed for example by a precast concrete part.
Ziel des Erfindungsgegenstandes ist es, ein neuartiges Verfahren zur Erzeugung von nicht vollflächig aufgelagerten Schienenwegen nach Art einer festen Fahrbahn, insbesondere zur Sanierung bestehender Gleissysteme, bereitzustellen, das unter Berücksichtigung der vorgegebenen Sicherheits- und Festigkeitsanforderungen, insbesondere auch bei laufendem Zugbetrieb, innerhalb eines kurzen Zeitraumes erstellt werden kann. Im Sanierungsfall sollen Ausfallzeiten für den Zugverkehr so gering wie möglich gehalten werden.The aim of the subject invention is to provide a novel method for the production of non-superimposed superimposed railways in the manner of a fixed carriageway, in particular for rehabilitation of existing track systems, taking into account the specified safety and strength requirements, especially when train operation, within a short period can be created. In the case of redevelopment, downtime for train traffic should be kept as low as possible.
Diese Aufgabe wird gelöst durch ein Verfahren zur Herstellung von nicht vollflächig aufgelagerten Schienenwegen nach Art einer festen Fahrbahn, insbesondere zur Sanierung bestehender Gleissysteme, indem in vorgebbaren Abständen entlang des Schienenweges in das Erdreich Fundamente, insbesondere in Form von Verpresspfählen, eingebracht werden, das Erdreich bis auf eine vorgebbares Niveau ausgehoben und zumindest im Bereich oberhalb der vorab eingebrachten Fundamente Senkkasten platziert werden, wobei das Erdreich innerhalb der Senkkästen zur Erzeugung einer Baugrube bei gleichzeitigem Absenken der Senkkästen bis auf ein weiteres Niveau entfernt wird, anschließend mit dem Fundament, insbesondere den Verpresspfählen, mindestens ein Querträger in Wirkverbindung gebracht und selbiger in einem Folgearbeitsschritt mit, den nicht vollflächig aufgelagerten Schienenweg begründenden, Längsträgern verbunden wird.This object is achieved by a method for the production of non-overlying superposed railways in the manner of a fixed track, in particular for rehabilitation of existing track systems by foundations, in particular in the form of Verpresspfählen, introduced at predetermined intervals along the rail in the ground, the ground up be excavated to a specifiable level and placed at least in the area above the previously introduced foundations sinker, the soil is removed within the caissons to create a pit while lowering the caissons to another level, then with the foundation, in particular the injection piles, at least one cross member brought into operative connection and selbiger in a subsequent working step with, the non-overlying superimposed rail path based, longitudinal beams is connected.
Vorteilhafte Weiterbildungen des Erfindungsgegenstandes sind den Unteransprüchen zu entnehmen.Advantageous developments of the subject invention can be found in the dependent claims.
Im Falle einer Sanierung bestehender Gleissysteme werden die Fundamente, insbesondere die Verpresspfähle, durch das Schotterbett eines zu ertüchtigenden Gleises eingebracht, wobei die Segmentierung der Gewindestangen der Verpresspfähle dergestalt erfolgt, dass nach dem Verpressen die jeweilige Gewindestange in einer Tiefe von ca. 75 bis 95 cm unterhalb der Unterkante der noch vorhandenen Schienen endet.In the case of a renovation of existing track systems, the foundations, in particular the injection piles, are introduced through the ballast bed of a track to be reinforced, wherein the segmentation of the threaded rods of the Pressing piles made in such a way that after pressing the respective threaded rod ends at a depth of about 75 to 95 cm below the lower edge of the remaining rails.
Nach dem Aushärten der Fundamente werden zuerst die vorhandenen Schienen und Schwellen entfernt. Anschließend wird der Altschotter/Unterbau bodenabhängig bis zu einer Tiefe von ca. 55 bis 85 cm unterhalb der Unterkante der ehemaligen Schienen entfernt. Im Bereich der Fundamente werden dann Senkkästen auf dem dann gegebenen Niveau ausgelegt, deren freies Innenmaß vorteilhafterweise umlaufend um einen vorgebbaren Betrag, z.B. 1 bis 2 cm, größer ist als der jeweils zum Einsatz gelangende Querträger.After the foundations have hardened, the existing rails and sleepers are removed first. Subsequently, the old ballast / substructure is ground dependent removed to a depth of about 55 to 85 cm below the lower edge of the former rails. In the field of foundations then caissons are then designed on the then given level, the free inner dimension advantageously circumferentially by a predetermined amount, e.g. 1 to 2 cm, is larger than the cross member used in each case.
Innerhalb der Senkkästen, die nun eine Art Baugrube bilden, wird insbesondere mittels Absaugverfahren und unter Freilegung der Gewindestangenköpfe das vorhandene Material schonend entfernt, wobei die wieder zu verwendenden Senkkästen bis auf die vorgegebene Tiefe absinken.Within the caissons, which now form a kind of excavation, the existing material is gently removed in particular by means of suction and exposing the threaded rod heads, the sinkers to be re-used fall to the predetermined depth.
Innerhalb der Baugrube wird dann im Bereich der bedarfsweise verlängerten freiliegenden Gewindeköpfe mindestens ein Querträger eingebaut und mit dem Fundament höhen- und lagerichtig verbunden.Within the pit then at least one cross member is installed in the area of the need for extended elongated threaded heads and connected to the foundation height and correct position.
Die gegebenen Öffnungen im Bereich des/der Querträgers) werden anschließend mit Mörtel, insbesondere einem leicht quellenden und schnell aushärtenden Spezialmörtel, bis zur Oberkante des jeweiligen Querträgers verfüllt.The given openings in the region of the / of the cross member) are then filled with mortar, in particular a slightly swelling and fast-curing special mortar, to the upper edge of the respective cross member.
Sobald die erforderliche Anfangsfestigkeit des Mörtels erreicht ist, werden die Senkkästen demontiert und entfernt.Once the required initial strength of the mortar is achieved, the caissons are dismantled and removed.
Anschließend können die Längsträger lagerichtig derart auf dem/den Querträger(n) eingebaut werden, dass die verlängerten Gewindestangenköpfe in entsprechende Öffnungsbereiche vormontierter Verbindungen der aus Stahl oder Stahlbeton gebildeten Längsträger ragen. Hier findet nun die höhen- und seitenverstellbare Justierung der Längsträger statt, wobei auf den freien Köpfen der (verlängerten) Gewindestangen Stahlplatten mit Muttern fixiert werden.Subsequently, the longitudinal members can be installed in the correct position on the / the cross member (s) that the extended threaded rod heads protrude into corresponding opening areas of pre-assembled connections of the longitudinal beams formed of steel or reinforced concrete. Here you will find the height and side adjustable Adjustment of the longitudinal beams instead, with fixed on the free heads of the (extended) threaded rods steel plates with nuts.
Nach mindestens einer Probebelastung des Gesamtsystems und anschließender bedarfsweiser Nachjustierung nach vorheriger exakter Vermessung werden die noch gegebenen Öffnungen im Bereich der Längsträger mit Mörtel, insbesondere einem leicht quellenden und schnell aushärtenden Spezialmörtel, verfüllt.After at least one test load of the entire system and subsequent on-demand readjustment after prior accurate measurement, the openings still given in the area of the side members with mortar, especially a slightly swelling and fast-curing special mortar, filled.
Der zwischengelagerte Schotter kann dann zwischen den Längsträgern und seitlich derselben zum Nachbargleis und zur freien Seite hin wieder eingebaut werden, so dass einerseits der Schallschutz verbessert und andererseits der Boden nicht versiegelt wird.The interposed ballast can then be reinstalled between the side rails and laterally the same to the neighboring track and the free side, so that on the one hand improves the sound insulation and on the other hand, the bottom is not sealed.
Der Erfindungsgegenstand zeigt somit Möglichkeiten auf, einerseits in verhältnismäßig schnellem Baufortschritt neue Schienenwege nach dem System Feste Fahrbahn bereitzustellen. Auf der anderen Seite wird eine hervorragende Möglichkeit dargelegt, bestehende Altanlagen dergestalt mit neuartigen festen Fahrbahnen auszurüsten, dass der Zugverkehr nur geringfügig beeinträchtigt wird.The subject invention thus shows ways to provide on the one hand in relatively rapid construction progress new railways to the system slab track. On the other hand, an excellent opportunity is presented to equip existing old plants in such a way with new solid lanes that the train traffic is only slightly affected.
Die sich beispielsweise durch den Schienenverkehr ergebenden Kräfte, sowohl horizontal in Längs- und Querrichtung als auch vertikal, werden bei der neuartigen Systemlösung zur Auflagerherstellung linienförmig über eine kastenförmige horizontal quer zur Längsrichtung verlaufenden Konstruktion in die als Teil eines Gewölbes wirkenden Pfähle der Einzelfundamente abgeführt. Diese kastenförmige Konstruktion kann aus einem Stahlrahmen mit entsprechenden Aussteifungen und Öffnungen für den Anschluss der Fundamente bestehen oder aber aus entsprechenden Stahlbetonrahmen. Der Anschluss der Fundamente an den Querrahmen und weiter an die Längsträger wird vorteilhafterweise über eine handelsübliche Gewindehohlstange ausgeführt, die aber auch konstruktiv über andere Stahl- oder Betonkonstruktionen möglich ist. Der Erfindungsgegenstand ist anhand eines Ausführungsbeispiels in der Zeichnung dargestellt und wird wie folgt beschrieben. Es zeigen:The resulting, for example, by the rail forces, both horizontally in the longitudinal and transverse direction and vertically, are discharged in the novel system solution for Auflagerherstellung linear over a box-shaped horizontally extending transversely to the longitudinal direction construction in acting as part of a vault piles of individual foundations. This box-shaped construction may consist of a steel frame with corresponding stiffeners and openings for the connection of the foundations or of corresponding reinforced concrete frames. The connection of the foundations to the transverse frame and further to the longitudinal members is advantageously carried out via a commercially available threaded hollow rod, but also structurally possible over other steel or concrete structures. The subject invention is illustrated by means of an embodiment in the drawing and will be described as follows. Show it:
Figuren 1 bis 4 Verschiedene Arbeitsschritte zur Ertüchtigung eines Gleises an einer in diesem Beispiel zweigleisigen Eisenbahnstrecke.Figures 1 to 4 Various steps for upgrading a track on a double track railway in this example.
Die Figuren 1 bis 4 zeigen in chronologischer Reihenfolge die prinzipiellen Arbeitsabläufe des erfindungsgemäßen Verfahrens zur Herstellung von nicht vollflächig aufgelagerten Schienenwegen nach Art einer festen Fahrbahn.Figures 1 to 4 show in chronological order the basic workflows of the method according to the invention for the production of non-overlying superimposed railways in the manner of a fixed carriageway.
Dargestellt ist eine zweigleisige Eisenbahnstrecke 1 (Figur 1), beinhaltend die Gleise 1',1". Die Schwellen 2 für die Schienen 3 sind jeweils in einem Schotterbett 4 positioniert. Dies ist die herkömmliche, seit Jahrzehnten übliche Lagerung für Schienen 3 in Eisenbahnstrecken 1.Shown is a double track railway 1 (Figure 1) including the tracks 1 ', 1 "The sleepers 2 for the rails 3 are each positioned in a ballast bed 4. This is the conventional storage for rails 3 in railway lines 1 which has been common for decades ,
In diesem Beispiel soll ohne größere Beeinträchtigung des Zugverkehrs das rechte Gleis 1" ertüchtigt werden.In this example, the right track 1 "is to be upgraded without significantly impairing the train traffic.
Beispielsweise in einer nächtlichen Sperrpause werden die gewählten Fundamente, hier Verpresspfähle 5, durch den Schotter 4 auf ein tieferes Niveau eingebracht. In diesem Beispiel sollen zur Ertüchtigung des Gleises 1" aus statischen Gründen die Verpresspfähle 5 samt Gewindestangen 6 bis auf eine vorgebbare Tiefe in das umgebende Erdreich 5' eingebracht werden, wobei die Verpresspfähle 5 unter vorgebbaren Neigungswinkeln vorgesehen sind. Die Verpresspfähle 5 beinhalten jeweils eine Gewindestange 6. Die Segmentierung der Gewindestangen 6 der Verpresspfähle 5 erfolgt derart, dass nach dem Verpressen die jeweilige Gewindestange 6 in einer Tiefe von ca. 80 bis 90 cm unterhalb der Unterkante 7 der Schienen 3 endet. Die Aushärtung des Verpressbetons der Verpresspfähle 5 erfolgt anschließend unter laufendem Zugbetrieb, so dass die Sperrpausen für den Zugbetrieb gering sind. Nach dem Aushärten des Betons wird zur Fertigstellung des dann ertüchtigten Gleises 1" eine weitere Sperrpause für den Zugbetrieb auf diesem Gleis 1" erforderlich. Zuerst werden die vorhandenen Schienen 3 demontiert und je nach Zustand seitlich gelagert oder abgefahren (Figur 2). Die Schwellen 2 werden demontiert und abgefahren. Anschließend wird der Altschotter 4/Unterbau bis in ein Niveau 4' von ca. 60 bis 75 cm unterhalb der Unterkante 7 der Schienen 3 abgebaut, abgefahren und gelagert. Dies ist aufgrund der Geometrie einer zweigleisigen Eisenbahnstrecke 1 ohne Verbau zum Nachbargleis 1' und ohne größere Einschränkung der Fahrtüchtigkeit desselben gegeben. Für den nun erforderlichen weiteren Aushub einer Baugrube für im Abstand von ca. 5 bis 7 m einzubauenden kastenförmigen Querträger wäre normalerweise die Erstellung eines zeit- und kostenaufwändigen Verbaus zum Nachbargleis 1' hin erforderlich. Dieser Aufwand wird folgendermaßen umgangen:For example, in a nocturnal break pause the selected foundations, here injection piles 5, introduced by the ballast 4 to a lower level. In this example, to improve the track 1 ", the injection piles 5 together with threaded rods 6 are to be introduced to a predefinable depth into the surrounding soil 5 'for static reasons, the injection piles 5 being provided at predeterminable angles of inclination The injection piles 5 each contain a threaded rod 6. The segmentation of the threaded rods 6 of the injection piles 5 takes place in such a way that after the pressing, the respective threaded rod 6 ends at a depth of approximately 80 to 90 cm below the lower edge 7 of the rails 3. The hardening of the injection concrete of the injection piles 5 then takes place under running train operation, so that the lock pauses for train operation are low. After curing of the concrete is to complete the then upgraded track 1 "a further break for the train operation on this track 1" required. First, the existing rails 3 are dismantled and depending on the state laterally stored or driven off (Figure 2). The sleepers 2 are dismantled and driven off. Subsequently, the old ballast 4 / substructure is reduced to a level 4 'of about 60 to 75 cm below the lower edge 7 of the rails 3, traversed and stored. This is given due to the geometry of a double-railed railway line 1 without shoring to neighboring track 1 'and without much restriction of the ability to drive the same. For the now required further excavation of a pit for at a distance of about 5 to 7 m to be installed box-shaped cross member would normally be the preparation of a time-consuming and costly construction to neighboring track 1 'down. This effort is bypassed as follows:
Es werden an den Einbaustellen der Querträger Stahlsenkkästen 8 lagerichtig auf dem zu entfernenden Unterbau 9 ausgelegt. Diese Stahlsenkkästen 8 haben ein freies Innenmaß, das in diesem Beispiel umlaufend etwa 1 cm größer ist als die zum Einsatz gelangenden Querträger. Die Höhe der Stahlsenkkästen 8 soll in diesem Beispiel ca. 40 bis 70 cm betragen. Nun wird der Unterbau 9 innerhalb der Stahlsenkkästen 8, beispielsweise mittels Absaugverfahren, auch für die freizulegenden Gewindestangenköpfe 10 der Gewindestangen 6 schonend entfernt, wobei die wieder zu verwendenden Senkkästen 8 quasi als temporärer Verbau bis auf das erforderliche Niveau 4" absinken (Figur 3). In die so entstandene abgesicherte Baugrube 11 wird nun höhen- und lagerichtig mindestens ein Querträger 12 eingebaut, wobei die höhen- und lagegenaue Ausrichtung, beispielsweise durch einfache Holz- oder Stahlkeile erfolgen kann. Auf die freiliegenden Gewindestangenköpfe 10 der Gewindestangen 6 werden nun handelsübliche Stahlplatten 13 zur Kraftübertragung zwischen Querträger 12 und Fundamenten 5, beispielsweise durch Muttern 13' fixiert, eingebaut. Anschließend wird über eine Verbindungsmuffe 14 mit Innengewinde die Gewindestange 6 um ca. 50 bis 60 cm nach oben verlängert. Nun werden die Öffnungen 15 des Querträgers 12, die um die Gewindestangenköpfe 10 liegen, mit einem leicht quellenden und schnell aushärtenden Spezialmörtel bis zur Oberkante 16 des Querträgers 12 verfüllt.There are at the installation sites of the cross member steel boxes 8 in the correct position designed on the substructure 9 to be removed. These steel caissons 8 have a free inner dimension, which in this example circumferentially about 1 cm larger than the used reaching cross member. The height of the steel caissons 8 should be approximately 40 to 70 cm in this example. Now, the substructure 9 within the steel caissons 8, for example by means of suction, for the exposed threaded rod heads 10 of the threaded rods 6 gently removed, the reusable boxes to be used 8 as a temporary shoring down to the required level 4 "fall (Figure 3). At least one cross member 12 is installed in height and position in the secured excavation 11. The height and positionally accurate alignment can be achieved, for example, by simple wooden or steel wedges for force transmission between cross member 12 and foundations 5, for example, fixed by nuts 13. Subsequently, the threaded rod 6 is extended upwards by about 50 to 60 cm via a connecting sleeve 14 with internal thread Cross member 12, which are located around the threaded rod heads 10, filled with a slightly swelling and fast-curing special mortar to the top 16 of the cross member 12.
Nach Erreichen der erforderlichen Anfangsfestigkeit (ca. 1 bis 2 Stunden) können die wieder verwendbaren Stahlsenkkästen 8 demontiert werden, da die Aufgabe des Verbaus nun vom Querträger 12 übernommen wird.After reaching the required initial strength (about 1 to 2 hours), the reusable steel boxes 8 can be dismantled, since the task of the Verbaus is now taken over by the cross member 12.
Anschließend werden Längsträger 17 lagerichtig derart eingebaut, dass die verlängerten Gewindestangenköpfe 18 in entsprechende Öffnungen 19 der aus Stahl oder Stahlbeton bestehenden Längsträger 17 hineinragen (Figur 4). Die Längsträger 17 werden nun mittels handelsüblicher höhen- und seitenverstellbarer Abstandshalter (nicht dargestellt) auf die exakte Höhe und Lage justiert. Analog zur Kraftübertragung durch die Gewindestangen 6 zwischen den Fundamenten 5 und dem Querträger 12 werden nun in den Öffnungen 19 der Längsträger 17, zwischen und seitlich derselben auf den Gewindestangenköpfen 18 der Verbindungsmuffen 14, Stahlplatten 20 mit Muttern 20' fixiert. Nach einer Probebelastung des Systems und bedarfsweiser Nachjustierung im Anschluss an eine exakte Vermessung werden die noch gegebenen Öffnungen 19 der Längsträger 17 durch Verfüllung mit einem leicht quellenden und schnell aushärtenden Spezialmörtel geschlossen.Subsequently, the longitudinal members 17 are installed in the correct position such that the elongated threaded rod heads 18 protrude into corresponding openings 19 of the existing steel or reinforced concrete longitudinal member 17 (Figure 4). The side members 17 are now adjusted by means of commercially available height and side adjustable spacers (not shown) to the exact height and location. Analogous to the power transmission through the threaded rods 6 between the foundations 5 and the cross member 12 are now in the openings 19 of the longitudinal beams 17, between and laterally the same on the threaded rod heads 18 of the connecting sleeves 14, steel plates 20 with nuts 20 'fixed. After a trial load of the system and on-demand readjustment following an exact measurement, the still given openings 19 of the longitudinal members 17 are closed by backfilling with a slightly swelling and fast-curing special mortar.
Durch dieses Verfahren wird eine exakt ausgerichtete und kurzfristig hochbelastbare neue feste Fahrbahn für Schienenwege in nicht vollflächig aufgelagerter Form bereitgestellt.By this method, a precisely aligned and short-term high loadable new solid roadway for railways is provided in not completely superimposed form.
Zwischen die Längsträger 17 außerhalb der konstruktiven Verbindungen und seitlich der Längsträger 17 zum Nachbargleis 1' sowie zur freien Seite hin kann ein großer Teil des vorher entfernten Schotters 4 wieder eingebaut werden, so dass einerseits der Schallschutz verbessert und andererseits der Boden nicht versiegelt wird. Je nach Zustand können die ursprünglichen Schienen 3 bedarfsweise wieder eingesetzt werden. Zum Einsatz gelangen handelsübliche Verbindungs- und Auflagermittel, beispielsweise in Form von Rippenplatten. Between the longitudinal members 17 outside the structural joints and the side of the side rail 17 to the neighboring track 1 'and the free side, a large part of the previously removed ballast 4 can be reinstalled, so that on the one hand the soundproofing improved and on the other hand, the bottom is not sealed. Depending on the condition, the original rails 3 can be reused as needed. Commercially available connection and support means, for example in the form of ribbed plates, are used.
BezugszeichenlisteLIST OF REFERENCE NUMBERS
1 Eisenbahnstreckθ r Gleis1 EisenbahnstreckÖ r track
1" Gleis1 "track
2 Schwelle2 threshold
3 Schiene3 rail
Schotter ' Niveau " NiveauGravel 'level' level
5 Verpresspfahl ' Erdreich5 injection pile 'soil
Gewindestangethreaded rod
Unterkante SchieneLower edge of rail
StahlsenkkastenStahlsenkkasten
Unterbausubstructure
10 Gewindestangenkopf10 threaded rod end
11 Baugrube11 excavation pit
12 Querträger12 cross members
13 Stahlplatte13 steel plate
13' Mutter13 'mother
14 Verbindungsmuffe14 connecting sleeve
15 Öffnung Querträger15 opening cross member
16 Oberkante Querträger16 top edge cross member
17 Längsträger17 side members
18 Gewindestangenkopf (verlängert)18 threaded rod end (extended)
19 Öffnung Längsträger 0 Stahlplatte 0' Mutter 19 Opening side member 0 Steel plate 0 'Nut

Claims

Patentansprüche claims
1. Verfahren zur Herstellung von nicht vollflächig aufgelagerten Schienenwegen nach Art einer festen Fahrbahn, insbesondere zur Sanierung bestehender Gleissysteme, indem in vorgebbaren Abständen entlang des Schienenweges in das Erdreich Fundamente, insbesondere in Form von Verpresspfählen (5) eingebracht werden, das Erdreich bis auf ein vorgebbares Niveau (41) ausgehoben und zumindest im Bereich oberhalb der vorab eingebrachten Fundamente (5) Senkkästen (8) platziert werden, wobei das Erdreich innerhalb der Senkkästen (8) zur Erzeugung einer Baugrube (11) bei gleichzeitigem Absenken der Senkkästen (8) bis auf ein weiteres Niveau (4") entfernt wird, anschließend mit dem Fundament, insbesondere den Verpresspfählen (5), mindestens ein Querträger (12) in Wirkverbindung gebracht und selbiger in einem Folgearbeitsschritt mit, den nicht vollflächig aufgelagerten Schienenweg begründenden, Längsträgern (17) verbunden wird.1. A process for the production of not fully superimposed railways in the manner of a fixed track, especially for rehabilitation of existing track systems by foundations at predetermined intervals along the rail in the soil foundations, in particular in the form of Verpresspfählen (5) are introduced, the soil except for one Predetermined level (4 1 ) excavated and at least in the area above the previously introduced foundations (5) caissons (8) are placed, the soil within the caissons (8) for generating a pit (11) while lowering the caissons (8) is removed to a further level (4 "), then brought into operative connection with the foundation, in particular the injection piles (5), at least one cross member (12) and selbiger in a subsequent working step with, not the full surface superimposed rail established, longitudinal beams (17 ) is connected.
2. Verfahren nach Anspruch 1 , dadurch gekennzeichnet, dass als Fundamente Gewindestangen (6) enthaltende Verpresspfähle (5) eingesetzt werden.2. The method according to claim 1, characterized in that as foundations threaded rods (6) containing injection piles (5) are used.
3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Verpresspfähle (5) unter vorgebbaren Neigungswinkeln in das tiefergehende Erdreich (5') eingebracht werden.3. The method according to claim 1 or 2, characterized in that the Verpresspfähle (5) are introduced under predeterminable inclination angles in the deeper soil (5 ').
4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass nach Einbringung des bzw. der Querträger(s) (12) im Bereich des Senkkastens (8) selbiger/selbige höhen- und lagerichtig mit dem Fundament, insbesondere den Verpresspfählen (5) in Wirkverbindung gebracht wird bzw. werden.4. The method according to any one of claims 1 to 3, characterized in that after introduction of the or the cross member (s) (12) in the region of the caisson (8) selbiger / selbige height and correct position with the foundation, in particular the Verpresspfählen ( 5) is brought into operative connection or be.
5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die Fundamente (5) zusammen mit dem bzw. den Querträger(n) (12) mit Mörtel, insbesondere einem leicht quellenden und schnell aushärtenden Spezialmörtel, bis zur Oberkante (16) des/der Querträger(s) (12) verfüllt werden.5. The method according to any one of claims 1 to 4, characterized in that the foundations (5) together with the or the cross member (s) (12) with mortar, in particular a lightly swelling and fast-curing special mortar, to the top edge (16) of the / the cross member (s) (12) are filled.
6. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass nach Erreichen einer erforderlichen Anfangsfestigkeit die Senkkästen (8) demontiert und entfernt werden.6. The method according to any one of claims 1 to 5, characterized in that after reaching a required initial strength, the caissons (8) are dismantled and removed.
7. Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die Längsträger (17) lagerichtig derart eingebaut werden, dass, bei Verwendung von Gewindestangen (6), die freien Enden der bedarfsweise verlängerten Gewindestangen (6) in entsprechende Öffnungen (19) vormontierter Verbindungen der Längsträger (17) ragen.7. The method according to any one of claims 1 to 6, characterized in that the longitudinal members (17) are installed in the correct position such that, when using threaded rods (6), the free ends of the optionally elongated threaded rods (6) in corresponding openings (19 ) Pre-assembled connections of the longitudinal members (17) protrude.
8. Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass die Längsträger (17) mittels höhen- und seitenverstellbarer Abstandshalter auf ihre exakte Höhe und Lage justiert werden.8. The method according to any one of claims 1 to 7, characterized in that the longitudinal members (17) are adjusted by means of height and side adjustable spacers to their exact height and location.
9. Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass im Anschluss an mindestens eine Probebelastung des Systems und bedarfsweiser Nachjustierung nach vorangegangener exakter Vermessung durch Verfüllung der Öffnungen (19) mit Mörtel, insbesondere mit einem leicht quellenden und schnell aushärtenden Spezialmörtel, eine exakt ausgerichtete und hochbelastbare feste Fahrbahn gebildet wird.9. The method according to any one of claims 1 to 8, characterized in that following at least one test load of the system and on-demand readjustment after previous exact survey by filling the openings (19) with mortar, in particular with a slightly swelling and fast-curing special mortar, a precisely aligned and heavy duty solid roadway is formed.
10. Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass zur Sanierung bestehender Gleissysteme (1',1") die Fundamente, insbesondere die Verpresspfähle (5), durch das Schotterbett (4) eines zu ertüchtigenden Gleises (1") in tieferes Erdreich (5') eingebracht werden, wobei die Segmentierung der Gewindestangen (6) der Verpresspfähle (5) derart erfolgt, dass nach dem Verpressen die jeweilige Gewindestange (6) in einer Tiefe von ca. 75 bis 95 cm unterhalb der Unterkante (7) der noch vorhandenen Schienen (3) endet.10. The method according to any one of claims 1 to 9, characterized in that for the renovation of existing track systems (1 ', 1 ") the foundations, in particular the Verpresspfähle (5), through the ballast bed (4) of a track to be ertüchtigenden (1") be introduced into deeper soil (5 '), wherein the segmentation of the threaded rods (6) of the injection piles (5) takes place in such a way that after pressing the respective threaded rod (6) at a depth of about 75 to 95 cm below the lower edge (7) of the remaining rails (3) ends.
11. Verfahren nach Anspruch 10, dadurch gekennzeichnet, dass nach dem Aushärten des Fundamentes (5) zuerst die vorhandenen Schienen (3) und die zugehörigen Schwellen (2) demontiert werden, anschließend der Altschotter (4)/Unterbau bis in eine Tiefe von ca. 55 bis 85 cm unterhalb der Unterkante (7) der ehemaligen Schienen (3) entfernt wird, im Bereich der Fundamente (5) Senkkästen (8) auf dem dann gegebenen Niveau (4') ausgelegt werden, deren freies Innenmaß umlaufend um einen vorgebbaren Betrag größer ist als der bzw. die zum Einsatz gelangenden Querträger (12).11. The method according to claim 10, characterized in that after curing of the foundation (5) first the existing rails (3) and the associated sleepers (2) are dismantled, then the old ballast (4) / substructure to a depth of approx . 55 to 85 cm below the lower edge (7) of the former rails (3) is removed in the area of the foundations (5) caissons (8) on the then given level (4 ') are designed, the free inner dimension circumferentially by a predetermined Amount is greater than the or used reaching cross member (12).
12. Verfahren nach Anspruch 10 oder 11 , dadurch gekennzeichnet, dass der Unterbau insbesondere mittels Absaugverfahren innerhalb der Senkkästen (8) unter Freilegung der Gewindestangenköpfe (10) schonend entfernt wird, wobei die wieder zu verwendenden Senkkästen (8) bis auf das gewählte Niveau (4") absinken.12. The method according to claim 10 or 11, characterized in that the substructure in particular by means of extraction within the caissons (8) exposing the threaded rod heads (10) is gently removed, with the re-used caissons (8) down to the selected level ( 4 ").
13. Verfahren nach einem der Ansprüche 10 bis 12, dadurch gekennzeichnet, dass in die so entstandene Baugrube (11) höhen- und lagerichtig mindestens ein Querträger (12) eingebaut wird, wobei auf die freiliegenden Gewindestangenköpfe (10) Stahlplatten (13) zur Kraftübertragung zwischen Querträger (12) und Fundament (5), durch Muttern (13') fixiert, aufgebracht werden.13. The method according to any one of claims 10 to 12, characterized in that in the resulting excavation (11) height and positionally at least one cross member (12) is installed, wherein the exposed threaded rod heads (10) steel plates (13) for power transmission between cross member (12) and foundation (5), fixed by nuts (13 ') applied.
14. Verfahren nach einem der Ansprüche 10 bis 13, dadurch gekennzeichnet, dass über eine Verbindungsmuffe (14) mit Innengewinde die jeweilige Gewindestange (6) um ca. 45 bis 65 cm nach oben verlängert wird und dann anschließend die Öffnungen (15) des Querträgers (12), die um die Gewindestangenköpfe (10) der Gewindestangen (6) liegen, mit Mörtel, insbesondere einem leicht quellenden und schnell aushärtenden Spezialmörtel, bis zur Oberkante (16) des Querträgers (12) verfüllt werden.14. The method according to any one of claims 10 to 13, characterized in that via a connecting sleeve (14) with internal thread, the respective threaded rod (6) is extended by approximately 45 to 65 cm upwards and then subsequently the openings (15) of the cross member (12), which lie around the threaded rod heads (10) of the threaded rods (6), with mortar, in particular a lightly swelling and fast-curing special mortar, to the top edge (16) of the cross member (12) are filled.
15. Verfahren nach einem der Ansprüche 10 bis 14, dadurch gekennzeichnet, dass nach Erreichen einer erforderlichen Anfangsfestigkeit die wieder verwendbaren Senkkästen (8) demontiert und entfernt werden.15. The method according to any one of claims 10 to 14, characterized in that after reaching a required initial strength, the reusable caissons (8) are dismantled and removed.
16. Verfahren nach einem der Ansprüche 10 bis 15, dadurch gekennzeichnet, dass anschließend die Längsträger (17) lagerichtig derart eingebaut werden, dass die verlängerten Gewindestangenköpfe (18) in entsprechende Öffnungsbereiche (19) vormontierter Verbindungen der aus Stahl oder Stahlbeton gebildeten Längsträger (17) ragen.16. The method according to any one of claims 10 to 15, characterized in that then the longitudinal members (17) are installed in the correct position such that the elongated threaded rod heads (18) in corresponding opening portions (19) of pre-assembled compounds of steel or reinforced concrete longitudinal members (17 ) protrude.
17. Verfahren nach einem der Ansprüche 10 bis 16, dadurch gekennzeichnet, dass die Längsträger (17) mittels höhen- und seitenverstellbarer Abstandshalter auf ihre exakte Höhe und Lage justiert werden, wobei in den Öffnungen (19) der Längsträger (17) auf den freien Gewindestangen köpfen (18) der Verbindungsmuffen (14) Stahlplatten (20) mit Muttern (20') fixiert werden.17. The method according to any one of claims 10 to 16, characterized in that the longitudinal members (17) are adjusted by means of height and side adjustable spacers to their exact height and position, wherein in the openings (19) of the longitudinal members (17) on the free Head threaded rods (18) of the connecting sleeves (14) steel plates (20) with nuts (20 ') are fixed.
18. Verfahren nach einem der Ansprüche 10 bis 17, dadurch gekennzeichnet, dass nach mindestens einer Probebelastung des Gesamtsystems und bedarfsweiser Nachjustierung nach vorangegangener exakter Vermessung durch Verfüllung der Öffnungen (19) mit Mörtel, insbesondere mit einem leicht quellenden und schnell aushärtenden Spezialmörtel, eine exakt ausgerichtete und kurzfristig hochbelastbare feste Fahrbahn gebildet wird.18. The method according to any one of claims 10 to 17, characterized in that after at least one test load of the overall system and on-demand readjustment after previous exact survey by filling the openings (19) with mortar, especially with a slightly swelling and fast-curing special mortar, a precise aligned and short term heavy duty solid roadway is formed.
19. Verfahren nach einem der Ansprüche 10 bis 18, dadurch gekennzeichnet, dass zwischen den Längsträgern (17), außerhalb der konstruktiven Verbindungen und seitlich der Längsträger (17) bedarfsweise zu einem Nachbargleis (1') hin, zumindest ein Teil des vorher entfernten Schotters (4) wieder eingebaut wird. 19. The method according to any one of claims 10 to 18, characterized in that between the longitudinal members (17), outside of the structural joints and the side of the side members (17), if necessary, to a neighboring track (1 ') out, at least a portion of the previously removed ballast (4) is reinstalled.
20. Verfahren nach einem der Ansprüche 1 bis 19, dadurch gekennzeichnet, dass Schienen (3) mittels standardisierter Verbindungsmittel auf den Längsträgern (17) aufgebracht werden, wobei bedarfsweise ebenfalls standardisierte Rippenplatten als Auflagermittel für die Schienen (3) zum Einsatz gelangen. 20. The method according to any one of claims 1 to 19, characterized in that rails (3) are applied by means of standardized connecting means on the longitudinal members (17), wherein, if necessary, also standardized ribbed plates as bearing means for the rails (3) are used.
EP07711153A 2006-01-17 2007-01-17 Method for producing a ballastless track Withdrawn EP1974099A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE200610002375 DE102006002375B3 (en) 2006-01-17 2006-01-17 Method for producing a solid roadway
PCT/DE2007/000109 WO2007082519A1 (en) 2006-01-17 2007-01-17 Method for producing a ballastless track

Publications (1)

Publication Number Publication Date
EP1974099A1 true EP1974099A1 (en) 2008-10-01

Family

ID=38106884

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07711153A Withdrawn EP1974099A1 (en) 2006-01-17 2007-01-17 Method for producing a ballastless track

Country Status (4)

Country Link
EP (1) EP1974099A1 (en)
CA (1) CA2637208A1 (en)
DE (1) DE102006002375B3 (en)
WO (1) WO2007082519A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10741154B2 (en) 2013-12-06 2020-08-11 Intelliterran, Inc. Synthesized percussion pedal and looping station
US10741155B2 (en) 2013-12-06 2020-08-11 Intelliterran, Inc. Synthesized percussion pedal and looping station
US10991350B2 (en) 2017-08-29 2021-04-27 Intelliterran, Inc. Apparatus, system, and method for recording and rendering multimedia
US11688377B2 (en) 2013-12-06 2023-06-27 Intelliterran, Inc. Synthesized percussion pedal and docking station

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867200B (en) * 2018-06-05 2023-07-18 中铁二院工程集团有限责任公司 Anti-bulge rock cutting structure of high-speed railway and design method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60152720A (en) * 1984-01-18 1985-08-12 Toyo Kiko:Kk Method of improving railroad ground having lower part reinforced by hardener
US4947756A (en) * 1988-08-18 1990-08-14 Peter G. Kusel Laying railway track
DE8911400U1 (en) * 1989-09-25 1990-05-23 Ed. Züblin AG, 7000 Stuttgart Ballast-free superstructure made of prefabricated elements
DE4027836A1 (en) * 1990-09-03 1992-03-05 Hermann Ortwein BASE FOR A TRACK FOR RAIL VEHICLES
CH687031A5 (en) * 1993-08-24 1996-08-30 Hermann Claus A method for creating or restructuring a laengs an embankment extending edge path.
DE19623305A1 (en) * 1996-06-11 1997-12-18 Keller Grundbau Gmbh Ground hardening equipment to prevent subsidence of railway line
DE19719757B4 (en) * 1997-05-10 2006-06-01 Gerd Prof. Dr.-Ing. Gudehus Method for reducing track bed shafts
DE19744318C1 (en) * 1997-10-08 1999-05-27 Juergen Kretschmar Earth barrier fixing for railway cutting
DE20215204U1 (en) * 2002-10-01 2002-12-05 Markus, Wolfgang, 46487 Wesel Novel system Fixed carriageway for rail traffic

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2007082519A1 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10741154B2 (en) 2013-12-06 2020-08-11 Intelliterran, Inc. Synthesized percussion pedal and looping station
US10741155B2 (en) 2013-12-06 2020-08-11 Intelliterran, Inc. Synthesized percussion pedal and looping station
US10957296B2 (en) 2013-12-06 2021-03-23 Intelliterran, Inc. Synthesized percussion pedal and looping station
US10997958B2 (en) 2013-12-06 2021-05-04 Intelliterran, Inc. Synthesized percussion pedal and looping station
US11688377B2 (en) 2013-12-06 2023-06-27 Intelliterran, Inc. Synthesized percussion pedal and docking station
US12046222B2 (en) 2013-12-06 2024-07-23 Intelliterran, Inc. Synthesized percussion pedal and looping station
US12046223B2 (en) 2013-12-06 2024-07-23 Intelliterran, Inc. Synthesized percussion pedal and looping station
US10991350B2 (en) 2017-08-29 2021-04-27 Intelliterran, Inc. Apparatus, system, and method for recording and rendering multimedia
US11710471B2 (en) 2017-08-29 2023-07-25 Intelliterran, Inc. Apparatus, system, and method for recording and rendering multimedia

Also Published As

Publication number Publication date
CA2637208A1 (en) 2007-07-26
WO2007082519A1 (en) 2007-07-26
DE102006002375B3 (en) 2007-07-19

Similar Documents

Publication Publication Date Title
WO2006102866A1 (en) Method for correcting the height of a fixed railway track
AT391499B (en) RAILWAY CONSTRUCTION, ESPECIALLY FOR RAILWAY VEHICLES WITH VERY HIGH TRAVELING SPEEDS
EP3460125B1 (en) Railway track construction
DE102006002375B3 (en) Method for producing a solid roadway
EP1026320B1 (en) Method for building a ballastless track
EP1558815B1 (en) Fixed track for rail vehicles and method for production thereof
EP1061176B1 (en) Process for equalisation of the vertical displacements of structural track elements of a fixed railway track
EP1048783A1 (en) Railway track and its construction method
AT520614B1 (en) Process for the production of a carriageway slab with precast slabs underneath
EP0905319B1 (en) Railway track and its construction method
DE2233263A1 (en) CONSTRUCTION PROCEDURES FOR UNDERPASSES (RAILWAYS, ROADS) IN PARTICULAR FOR CASES WHERE TRAFFIC MUST NOT BE INTERRUPTED ON THE ROUTE TO BE UNDERPASSED
EP1216326B1 (en) Method for producing a soundproofed track
DE10004626A1 (en) Construction method for derailment guard for railway tracks with shutterings constructed on site on concrete track bed plate beside track, and space filled with concrete and reinforcements
DE102004019083A1 (en) Method for laying rail track on uneven ground especially in tunnels using integral alignment means which are removed after the sleepers are secured with poured concrete
AT500876B1 (en) METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY
DE102005027758B3 (en) Method of renewing a track laid by means of sleepers and a threshold for use in the method
DE1220879B (en) Underpass structure and procedure for its subsequent installation
EP0968330B1 (en) Elevated track slab device
WO2018121902A1 (en) Trough-shaped superstructure for a bridge, bridge, finished part for a trough wall of a bridge, and method for producing a bridge
DE10310754B4 (en) Method for producing a solid rail track; Fixed railroad track
DE2143487A1 (en) PROCESS AND DEVICE FOR ERECTING TRAFFIC STRUCTURES AT CROSSROADS ON THE LOWER LEVEL
DE19621170C2 (en) Method for compensating settlements on solid carriageways for rail-bound traffic
DE102021115681A1 (en) Process for the renovation of railway sleepers for rail vehicles
DE4335877A1 (en) Ballast-less superstructure with concrete sleepers
DE10033272A1 (en) Railway permanent way has a concrete layer to support the sleepers, in one-piece slabs with reinforcement steel fibers, extending over several sleepers for rapid laying with accurate alignment

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20080603

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

RIN1 Information on inventor provided before grant (corrected)

Inventor name: SANTE, HEIKO

Inventor name: STEINFELD, HORST EDUARD

Inventor name: MARKUS, WOLFGANG

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20100727