EP1914160A2 - Procédé de transformation d'un pétrolier à une paroi en un pétrolier à double paroi - Google Patents

Procédé de transformation d'un pétrolier à une paroi en un pétrolier à double paroi Download PDF

Info

Publication number
EP1914160A2
EP1914160A2 EP07013839A EP07013839A EP1914160A2 EP 1914160 A2 EP1914160 A2 EP 1914160A2 EP 07013839 A EP07013839 A EP 07013839A EP 07013839 A EP07013839 A EP 07013839A EP 1914160 A2 EP1914160 A2 EP 1914160A2
Authority
EP
European Patent Office
Prior art keywords
hull
section
tank
shell
tank section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP07013839A
Other languages
German (de)
English (en)
Other versions
EP1914160A3 (fr
Inventor
Rudolf Hye
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Donau-Tankschiffahrtsgesellschaft Mbh
Original Assignee
Donau-Tankschiffahrtsgesellschaft Mbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Donau-Tankschiffahrtsgesellschaft Mbh filed Critical Donau-Tankschiffahrtsgesellschaft Mbh
Publication of EP1914160A2 publication Critical patent/EP1914160A2/fr
Publication of EP1914160A3 publication Critical patent/EP1914160A3/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B3/00Hulls characterised by their structure or component parts
    • B63B3/14Hull parts
    • B63B3/16Shells
    • B63B3/20Shells of double type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B83/00Rebuilding or retrofitting vessels, e.g. retrofitting ballast water treatment systems

Definitions

  • the invention relates to a method for converting a single-hull tanker into a double-hull tanker, and a tanker formed by this method.
  • the hull of a ship is formed by the outer skin and this forms also the ship shape and especially the hull shape.
  • This shell serves frames, Bodenwrangen and bulkhead.
  • the most important stiffening elements are the frames, which can be arranged transversely and / or fore and aft. Accordingly, one speaks then of transverse bulkhead design or Lekssspantbauweise.
  • the ribs are arranged at intervals of, for example, 500 to 600 mm distance transverse or fore and aft.
  • the advantage of the Lekssspantbauweise is that steel weight can be saved.
  • frame frames are arranged at intervals of 2.5 to 3m.
  • the frame frames are formed by much stronger steel beams.
  • the outer walls of the ship and the tank walls are separated laterally and in the ground by intermediate spaces.
  • the clear minimum distance between the walls and the floor is precisely prescribed and serves to preserve the tank walls and floors as undamaged as possible in the case of accidents (collisions, ground contact) that damage the bottom of the ship or the outer skin. Environmental damage can be avoided as much as possible.
  • the method according to the invention avoids all the above-mentioned disadvantages and enables the cost-effective and rapid conversion of existing, even slim single-hull tankers into a double-hull tanker.
  • the present invention is based on the recognition that the desired double hull is needed only in the area of the tanks and that the double hull can also be produced by forming the second new hull at a distance around the existing first outer hull of a ship.
  • the novelty of the procedure is that around the existing ship in the tank area a new ship is built around.
  • the previous outer wall of the ship subsequently represents the tank wall and the bottom of the ship becomes the tank bottom.
  • the new outer wall and the new floor of the ship are being built.
  • the new tanks were used in the existing ship after the previous conversion methods.
  • the outer wall and the bottom of the ship remain the same. Only the tank walls and the tank bottoms were newly installed.
  • FIG. 1 shows from top to bottom the four consecutive process steps.
  • Fig. 2 is the top view of the deck of a converted ship.
  • 3 and 4 show two different cross sections through the finished ship in the double hull section, namely FIG. 3 along a frame frame and FIG. 4 along a normal frame.
  • FIG. 1a shows the schematic side view of a single-hull tank ship 1.
  • the hull comprises the stern section 2, the tank section 3 and the bow section 4.
  • the tank section 3 comprises twelve tanks 14, which are formed by seven transverse bulkheads and a continuous central longitudinal bulkhead and each have a transverse cofferdam at the ends of this section. The tanks are used to transport liquid petroleum products.
  • the tank section 3 may also consist of a plurality of separate tank sections arranged one behind the other.
  • the tank section 3 is separated along the dividing lines 5 from the stern section 2 and bow section 4, as shown in the illustration b). Subsequently, the tank section 3 is raised, as indicated by the arrow 6 in b).
  • the first fuselage shell 7 is rebuilt at a distance 9 with a second fuselage shell 8.
  • the distance 9 is prescribed by law as the minimum distance for double-hull tankers.
  • the tank internals and structures such as the tank lines 15 and all associated equipment must not be dismantled, but are simply lifted with the existing tank section 3 and used unchanged.
  • the new second hull 8 now forms the new bottom 10 of the ship.
  • a transition section 12 is preferably used in the tank section 3 towards the rear section.
  • the transition section 12 serves to compensate for the widening and thickening of the hull caused by the second sheath 8, resulting in a sliding transition to the old tail section 2.
  • the previous ship deck 16 can remain essentially unchanged.
  • the broadening of the ship's hull is covered by the additional cover strip 17.
  • the transition section 12 serves inter alia to streamline the widened hull to the old hull of the stern section 2. The same happens at the bow section 4 through the transitions 18, which are also shown in Fig. 1d.
  • FIG. 3 shows a cross section through the double-hull tanker produced according to the invention along a massive frame chippings both in the old hull and in the new double hull.
  • the old termespant 19 includes in a known manner, the old floor 21, the rising frame frames 22, the breech plates 23 and the deck beams 24 of the old ship's hull.
  • the ship's longitudinal center plane sits the longitudinal central bulkhead 25, whereby the ship stiffened and the tanks are each divided into two in length.
  • new second hull envelope 8 is built around the old hull envelope 7.
  • new frame ribs 20 are also provided here, which has uprising for the stiffening of the side wall of the ship frame frames 26, at their upper ends short beams 27 are fixed, which are so strong that the old inner hull are held with all the structures can.
  • the joists 27 serve to receive the new cover strip 17, about the double width of which the entire ship is wider.
  • the longitudinal center partition 25 is supported along the entire length of the tank section by the central web 28.
  • FIG 4 shows a cross section through the tank section of the new ship in the region of a normal frame.
  • a free space 29 which is also accessible depending on the dimension and the inspection and maintenance of the Tank walls that are identical to the earlier first hull shells 7 is used.
  • the new hull envelope 8 comprises transverse frames 30 and longitudinal frames 31.
  • Corresponding knee plates 32 are used for stiffening.
  • connection of the existing ship with the new parts takes place in terms of strength on the welding of the new cover strip at the level of the existing deck, on the central longitudinal beams in the new floor and on the frame part located in the new part.
  • the new parts can be prepared as area sections, or the extension piece as room section.
  • Area sections are the partially welded together steel plates of the floor, the side walls and the deck on which the stiffening elements have already been welded.
  • the 3m long intermediate piece is completely finished as a room section.
  • the central nave is then raised hydraulically by the height necessary for the raised floor.
  • the assembly of the floor panels is started, to do so, the ship must be continuously implemented on the car in order to assemble all floor panels can.
  • the next step is the welding of the additional deck plates at the height of the existing deck. Then the side plates are welded.
  • the chill panels 33 are mounted, which are the curved panels between the vertical side walls and the horizontal floor, and which are larger in size than the floor and side panels.
  • the old foredeck is welded and connected with cover plates streamlined to the centerpiece.
  • the value of 95% refers to the requirement that - depending on the load - the cargo tanks may only be filled up to a certain limit - for gasoline 95%.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Revetment (AREA)
EP07013839A 2006-10-16 2007-07-14 Procédé de transformation d'un pétrolier à une paroi en un pétrolier à double paroi Withdrawn EP1914160A3 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT0171406A AT504464B1 (de) 2006-10-16 2006-10-16 Verfahren zum umbau eines einhüllentankschiffes in ein doppelhüllentankschiff

Publications (2)

Publication Number Publication Date
EP1914160A2 true EP1914160A2 (fr) 2008-04-23
EP1914160A3 EP1914160A3 (fr) 2010-05-26

Family

ID=38582311

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07013839A Withdrawn EP1914160A3 (fr) 2006-10-16 2007-07-14 Procédé de transformation d'un pétrolier à une paroi en un pétrolier à double paroi

Country Status (2)

Country Link
EP (1) EP1914160A3 (fr)
AT (1) AT504464B1 (fr)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9045194B2 (en) 2012-08-09 2015-06-02 Martin Operating Partnership L.P. Retrofitting a conventional containment vessel into a complete integral tank double-hull cargo containment vessel
US9302562B2 (en) 2012-08-09 2016-04-05 Martin Operating Partnership L.P. Heating a hot cargo barge using recovered heat from another vessel using an umbilical
CN105658513A (zh) * 2013-09-27 2016-06-08 Nsb尼德埃尔贝航运有限责任两合公司 用于加大船舶的方法和加大的船舶
CN105905256A (zh) * 2016-04-21 2016-08-31 上海外高桥造船有限公司 浮式储油装置及包含其的浮式储油装置单元
EP3594099A1 (fr) * 2018-07-10 2020-01-15 SDC Ship Design & Consult GmbH Procédé d'agrandissement d'un bateau et bateau agrandi

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992010396A1 (fr) * 1990-12-05 1992-06-25 William Stuart Procede permettant de modifier la coque d'un bateau
WO1994026585A1 (fr) * 1993-05-18 1994-11-24 Special Projects Research Corp. Procede et dispositif destines a l'installation d'un systeme de protection a deux coques
WO1996037401A1 (fr) * 1995-05-26 1996-11-28 Les Industries Verreault (1991) Inc. Reconstruction de petroliers
GB2307452A (en) * 1995-10-30 1997-05-28 Malaysia Shipyard & Engineerin Conversion of a single hull vessel to a double hull vessel.
US6637359B1 (en) * 1998-12-15 2003-10-28 Maritrans Inc. System and method for internally fitting a new inner hull to an existing outer hull to form a rebuilt double hull vessel
US20050204982A1 (en) * 2004-03-18 2005-09-22 Neu Richard W Double-hull ore carrying vessel conversion from single-hull oil tanker and method of performing the same
WO2005092699A1 (fr) * 2004-03-23 2005-10-06 Maritrans, Inc. Petrolier reconstruit a double coque et procede de reconstruction d'un petrolier existant a coque unique en un petrolier a double coque reconstruit

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992010396A1 (fr) * 1990-12-05 1992-06-25 William Stuart Procede permettant de modifier la coque d'un bateau
WO1994026585A1 (fr) * 1993-05-18 1994-11-24 Special Projects Research Corp. Procede et dispositif destines a l'installation d'un systeme de protection a deux coques
WO1996037401A1 (fr) * 1995-05-26 1996-11-28 Les Industries Verreault (1991) Inc. Reconstruction de petroliers
GB2307452A (en) * 1995-10-30 1997-05-28 Malaysia Shipyard & Engineerin Conversion of a single hull vessel to a double hull vessel.
US6637359B1 (en) * 1998-12-15 2003-10-28 Maritrans Inc. System and method for internally fitting a new inner hull to an existing outer hull to form a rebuilt double hull vessel
US20050204982A1 (en) * 2004-03-18 2005-09-22 Neu Richard W Double-hull ore carrying vessel conversion from single-hull oil tanker and method of performing the same
WO2005092699A1 (fr) * 2004-03-23 2005-10-06 Maritrans, Inc. Petrolier reconstruit a double coque et procede de reconstruction d'un petrolier existant a coque unique en un petrolier a double coque reconstruit

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9045194B2 (en) 2012-08-09 2015-06-02 Martin Operating Partnership L.P. Retrofitting a conventional containment vessel into a complete integral tank double-hull cargo containment vessel
US9302562B2 (en) 2012-08-09 2016-04-05 Martin Operating Partnership L.P. Heating a hot cargo barge using recovered heat from another vessel using an umbilical
US9555870B2 (en) 2012-08-09 2017-01-31 Martin Operating Partnership L.P. Heating a cargo barge using recovered energy from another vessel using an umbilical
CN105658513A (zh) * 2013-09-27 2016-06-08 Nsb尼德埃尔贝航运有限责任两合公司 用于加大船舶的方法和加大的船舶
EP2853477B1 (fr) * 2013-09-27 2018-03-14 NSB niederelbe Schiffahrtgesellschaft mbH & Co. KG Procédé d'agrandissement d'un bateau et bateau agrandi
CN105905256A (zh) * 2016-04-21 2016-08-31 上海外高桥造船有限公司 浮式储油装置及包含其的浮式储油装置单元
EP3594099A1 (fr) * 2018-07-10 2020-01-15 SDC Ship Design & Consult GmbH Procédé d'agrandissement d'un bateau et bateau agrandi

Also Published As

Publication number Publication date
EP1914160A3 (fr) 2010-05-26
AT504464B1 (de) 2008-08-15
AT504464A1 (de) 2008-05-15

Similar Documents

Publication Publication Date Title
DE1802114C3 (de) Membrantank eines Tankschiffs für tiefsiedende verflüssigte Gase
EP3049320B1 (fr) Procédé d'agrandissement d'un navire et le navire agrandi correspondant
DE69405213T2 (de) Frachtschiff mit frachteinheiten
EP1957354B1 (fr) Superstructures pour bateaux
DE1481622A1 (de) Rumpf fuer Fluggeraete grossen Fassungsvermoegens
AT504464B1 (de) Verfahren zum umbau eines einhüllentankschiffes in ein doppelhüllentankschiff
EP3099563B1 (fr) Navire comprenant un réservoir à carburant pour gaz liquéfié
DE2339305A1 (de) Tragflaechenboot mit halber wasserverdraengung
DE69511437T2 (de) Tankschiff-umbau
DE4117055C2 (de) Tankschiff
DE2208139C3 (de) Transportbehälter für Flüssigkeiten, insbesondere für flüssige Gase und vorzugsweise zum Einbau in Schiffe
DE102018115541B4 (de) Druckschott für einen druckbeaufschlagten Rumpf eines Fahrzeugs
DE2303381C2 (de) Schiff
DE3878255T2 (de) Geruest fuer ein unter externem druck gesetztes gefaess.
DE4139542C2 (de) Schiff, insbesondere Handelsschiff
DE2942620A1 (de) Doppelschaliger umwandelbarer tanker
DE69932111T2 (de) Transportvorrichtung mit einem Tank
DE3119765A1 (de) Frachtschiff aus mehreren laengsseitig aneinanderliegend gekuppelten schwimmkoerpern
EP3594099B1 (fr) Procédé d'agrandissement d'un bateau et bateau agrandi
DE2543729A1 (de) Druckfester tankcontainer
DE2328629A1 (de) Tankschiff, insbesondere fuer fluessiggas
DE69103802T2 (de) Tankschiff.
EP2313308B1 (fr) Bateau fluvial pour le transport de conteneurs
DE69706078T2 (de) Seefähiger Leichter und Schubeinheit mit solchem Leichter
DE3244052A1 (de) Schiff fuer den transport von fluessigkeiten und gasen unter druck

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

AKY No designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20101127