EP1895074A2 - Gabarit de montage, élément d'insertion pour la production de canaux de vis dans un élément de béton plat, élément composite en bois/béton et ossature porteuse composite en bois/béton - Google Patents

Gabarit de montage, élément d'insertion pour la production de canaux de vis dans un élément de béton plat, élément composite en bois/béton et ossature porteuse composite en bois/béton Download PDF

Info

Publication number
EP1895074A2
EP1895074A2 EP07017081A EP07017081A EP1895074A2 EP 1895074 A2 EP1895074 A2 EP 1895074A2 EP 07017081 A EP07017081 A EP 07017081A EP 07017081 A EP07017081 A EP 07017081A EP 1895074 A2 EP1895074 A2 EP 1895074A2
Authority
EP
European Patent Office
Prior art keywords
wood
screw
elements
wooden
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP07017081A
Other languages
German (de)
English (en)
Inventor
Heinz Wieland
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Com-Ing AG
Original Assignee
Com-Ing AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Com-Ing AG filed Critical Com-Ing AG
Publication of EP1895074A2 publication Critical patent/EP1895074A2/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1891Cut-marking templates for rafters; Templates used for assembling building frameworks

Definitions

  • the present invention relates to an assembly jig for a connection of two at least partially flat juxtaposed wooden elements and an insert element for generating screw channels in a flat concrete element. Further, the present invention relates to a wood / concrete composite element with at least one such insert element and to a wood / concrete composite structure with at least two wood / concrete composite elements and to the corresponding connection methods.
  • the present invention therefore has the object to solve the problem of connecting wood / wood composite elements, wood / concrete composite elements for the creation of wood / concrete composite structures with simpler means and more cost-effective.
  • the static properties of a connection of the wooden beams which can be achieved by screwing the screws through the conduits, can be achieved particularly well if the spatial course of the conduits in a Cartesian coordination system with the directions x, y and z a course of a spatial diagonal ( or with several conduits also several spatial diagonals) corresponds.
  • This is basically to be understood that in a compound with, for example, four screws, the four screw tips and the four screw heads an octagonal, essentially represent cuboid composite.
  • connection it is also expedient with regard to the computability of the connection and the uniform distribution of tensile and compressive moments on the screws, if the spatial course through an angle of 30 to 60 °, preferably in the range of 45 °, to each of the three directions x, y and z is coined.
  • the screws can be screwed with a manageable amount of force and have an X-shaped arrangement to each other.
  • the one or more conduits of the insert elements during the concreting concrete element can not be closed (unintentionally), the base plate opposite the end of the empty tube with a removable lid can be designed lockable.
  • Screwing the screws through the conduits into the wooden beams requires a comparatively high pressure of the screwing tool on the screw head, which may not protrude significantly beyond the thread cross section of the screw.
  • the above object is achieved by a wood / concrete composite element with at least one insert element according to the above type.
  • a suitable number of such integrated insert elements is provided.
  • a wood / concrete composite structure in particular wall and / or ceiling part, having at least two of the above wood / concrete composite elements, wherein adjacent timber support of at least two Wood / concrete composite elements are connected flat by means driven by the screw channels screws.
  • FIG. 1 shows a perspective view of two wood / concrete composite elements 2, 4, which must be connected to form a wood / concrete composite structure.
  • Each wood / concrete composite element 2, 4, has a concrete slab 6, which runs in the diagram in the xy plane and is significantly longer in the x-direction as well as in the y-direction than they strong in the z-direction.
  • the concrete slab 6 is in the drawing on wooden beams 8, wherein the adjacently arranged wooden beams 8l and 8r are to be connected to create a wood / concrete composite.
  • FIG. 2 now shows, in an enlarged detail view, the two wood / concrete composite elements 2, 4.
  • an insert element 10l and 10r On each of the wooden beams 8l and 8r there is an insert element 10l and 10r.
  • the insert elements 10l, 10r have a flat base plate 12l, 12r which in each case terminate flush with the lateral edge region of the concrete elements 6 extending in the xy direction.
  • the insert elements 10l, 10r have been fastened here with screws not shown here on the wooden beams 8l and 8r before the concrete slab 6 were concreted.
  • This screw 22 is shown in Figure 2 in an enlarged view (relative to the remaining contents of Figure 2) on the left edge of the picture.
  • the empty tubes 14l, 16l and 18r, 20r have a spatial course in such a way that the at the base plates 12l, 12r opposite ends 24 of the conduits 14l, 16l and 18r, 20r entering screws 22 takes a ringweg over the lateral edge regions of the concrete elements 6 goes out, which is shown in Figure 3 and will be explained in more detail below.
  • the spatial course depending on the selected cuboid composite can be characterized by angles of 30 to 60 °. Especially for static reasons and because of the better predictability of the load moments in the three directions of the Cartesian coordinate system, an angle of about 45 ° is selected for the spatial course, as is the case here in the exemplary embodiments.
  • the two empty tubes 14l, 16l and 18r, 20r are provided, which are aligned substantially orthogonal to each other, but have a certain asymmetrical arrangement, so that their through the screw channels pre-drawn screw paths are crossing free.
  • the distance of the empty tube 18r from the lower edge of the base plate 12r is substantially smaller than the distance of the empty tube 20r from the upper edge of the base plate 12r. This can also be clearly seen on the insert element 101 positioned on the other side, the position of which results from the rotation of the insert element 10r by 180 ° in the xy plane.
  • FIG. 3 shows the cutout according to FIG. 2 after a connection of the two wood / concrete composite elements 2, 4 to a wood / concrete composite structure 26.
  • the asymmetrical alignment of the empty tubes 14l, 16l or 18r, 20r is clearly recognizable two with their base plates 12r, 12l abutting insert elements 2, 4 predetermined screw paths essentially the four space diagonals of a cuboid, preferably a cube, describe, the screw paths are crossing free.
  • the screw 22vl is here passed through the empty tube 14l when screwing. Accordingly, the screws 22hl, 22vr and 22hr have been screwed through the empty tubes 16l and 18r and 20r, respectively.
  • Figure 4 shows a sketch of ervous T1 to T4 for a cubic Elemementarzelle with an edge length of 10 cm.
  • the screw T1 to T4 each extend at an angle of 45 ° to all three directions x, y, z.
  • the screw paths T1 to T4 run through the unit cell without crossing (unlike the four space diagonals of the unit cell meeting in the center Z).
  • the ends 24 of the conduits 14l, 16l, 18r, 20r can be closed with a removable, but not shown here lid.
  • the conduits 14l, 16l, 18r, 20r are telescopically adjustable in length in not shown here.
  • FIG. 5 shows, in strong analogy to FIG. 3, a connection of two wooden beams 291, 29r with the aid of an assembly jig 30.
  • the assembly jig 30, unlike in the exemplary embodiment according to FIG. 3, is now configured in one piece and therefore has a substantially square base plate 32, from the (analogous to the embodiment of Figure 3) now more the four conduits 14l, 16l, 18r and 20r protrude.
  • the empty tubes 14l, 16l, 18r and 20r give Here, due to their spatial orientation, the screw paths for the four screws 22vl, 22hl, 22vr and 22hr, wherein the letters attached to the reference numeral 22 represent, through which the conduits 14l, 16l, 18r and 20r, the respective screw was screwed. Also in this embodiment, the diameter of the head 28 of the screw 22 is only about as large as the diameter of the screw 22 itself.
  • openings may also be present in the base plate 32, in which other screws for temporary fixing of the assembly jig 30 on the two wooden beams 291, 29r can be arranged.
  • An alternative or additional fastening method can also be achieved by means of screw clamps. After screwing the four screws 22vl, 22hl, 22vr and 22hr through the four empty tubes 14l, 16l, 18r and 20r, these temporary fixing means can be released again and the assembly jig 30 can be inserted elsewhere.
  • the assembly jig 30 can also be made entirely of metal or a correspondingly stable plastic.
  • the conduits 14l, 16l, 18r and 20r may each be supported in their own position by additional means, for example by supporting webs.
  • additional means for example by supporting webs.
  • other means may also be provided which also support the empty tubes 14l, 16l, 18r and 20r with one another and thus contribute to the stability of the assembly jig 30.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
EP07017081A 2006-09-04 2007-08-31 Gabarit de montage, élément d'insertion pour la production de canaux de vis dans un élément de béton plat, élément composite en bois/béton et ossature porteuse composite en bois/béton Withdrawn EP1895074A2 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102006041773 2006-09-04
DE102006043209A DE102006043209A1 (de) 2006-09-04 2006-09-11 Montagelehre, Einlegeelement zur Erzeugung von Schraubenkanälen in einem flächigen Betonelement, Holz/Beton-Verbundelement und Holz/Beton-Verbundtragwerk

Publications (1)

Publication Number Publication Date
EP1895074A2 true EP1895074A2 (fr) 2008-03-05

Family

ID=38787593

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07017081A Withdrawn EP1895074A2 (fr) 2006-09-04 2007-08-31 Gabarit de montage, élément d'insertion pour la production de canaux de vis dans un élément de béton plat, élément composite en bois/béton et ossature porteuse composite en bois/béton

Country Status (2)

Country Link
EP (1) EP1895074A2 (fr)
DE (1) DE102006043209A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016146543A1 (fr) * 2015-03-13 2016-09-22 ZPP International GmbH Élément en béton armé
ES2694031A1 (es) * 2017-06-15 2018-12-17 Universidad De Valladolid Plantilla de colocación de conectores en forjado colaborante de madera-hormigón

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009008720A1 (de) * 2009-02-06 2010-08-12 Swg Schraubenwerk Gaisbach Gmbh Verbindungselement
DE102022116558A1 (de) 2021-07-06 2023-01-12 Erne Ag Holzbau System zur Verbindung eines Holzträgerelements mit einem Betonelement
DE102023108875A1 (de) 2023-03-01 2024-09-05 Reisser Schraubentechnik Gmbh Verfahren zum Herstellen einer Holz-Beton-Verbunddecke, Holz-Beton-Verbunddecke, Schraube und Markierungsteil

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016146543A1 (fr) * 2015-03-13 2016-09-22 ZPP International GmbH Élément en béton armé
ES2694031A1 (es) * 2017-06-15 2018-12-17 Universidad De Valladolid Plantilla de colocación de conectores en forjado colaborante de madera-hormigón
WO2018229320A1 (fr) * 2017-06-15 2018-12-20 Universidad De Valladolid Gabarit de mise en place de connecteurs dans un hourdi bois-béton

Also Published As

Publication number Publication date
DE102006043209A1 (de) 2008-03-13

Similar Documents

Publication Publication Date Title
DE3303190C2 (de) Bausatz zur Erstellung mobiler Bauten, insbesondere für Messe- und Ausstellungsbauten
AT394225B (de) Baukoerper
EP1895074A2 (fr) Gabarit de montage, élément d'insertion pour la production de canaux de vis dans un élément de béton plat, élément composite en bois/béton et ossature porteuse composite en bois/béton
DE3879497T2 (de) Metallstuetze.
DE2020607C3 (de) Mehrstöckiges Gebäude aus einheitlichen, vorgefertigten Raumzellen
DE202007000776U1 (de) Montagelehre, Einlegeelement zur Erzeugung von Schraubenkanälen in einem flächigen Betonelement, Holz/Beton-Verbundelement und Holz/Beton-Verbundtragwerk
DE202018003027U1 (de) Verbindungsstück zur winkeligen Verbindung zweier Bauteile
DE3241424C2 (de) Verbindungseinrichtung
DE9203849U1 (de) Bauelement zur Erstellung von Wänden, insbesondere auf Schiffen
DE3902290C2 (de) Messestand zur Vorführung von Bauelementen, insbesondere von Toren
DE202016105596U1 (de) Tragwerk und Gebäude
DE10320003A1 (de) Positioniervorrichtung, Schalungseinheit und Wandschalung
DE102021132930A1 (de) Justier-Abschalstütze
DE29805952U1 (de) Schalldämmende Innen- oder Außenwandbekleidung
DE10017564A1 (de) Vorrichtung zur Positionierung von Stützen zur Aufnahme von Bodenplatten für einen doppelten Boden
DE7513823U (de) Traegerrost zum befestigen von platten, insbesondere von isolierplatten fuer nichttragende trennwaende, falsche decken, dielen o.dgl.
DE938987C (de) Vorrichtung zur Herstellung von Bauwerken, insbesondere von Mauerwerken aus Schuettbeton u. dgl.
DE102020002251A1 (de) Verbindungselement für den Anschluss zweier Holzbauteile
WO2024189140A1 (fr) Ensemble de construction pour une structure de construction, structure de construction et procédé permettant de produire la structure de construction
DE9314486U1 (de) Verkleidung
DE1950783U (de) Hohlprofil-bauteil.
DE2352801A1 (de) Vorrichtung zum befestigen von wandelementen auf fusspunktteilen
WO2010069935A2 (fr) Éléments composites à base de bois et de matière plastique renforcée par fibres
DE102018114737A1 (de) Vorrichtung zum Einstellen und Halten wenigstens einer Richtschnur für eine Mauerwerkskante und Verfahren zum Herstellen eines Mauerwerks mit einer solchen Vorrichtung
DE2750760A1 (de) Deckenverschalung

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20130301