EP1662049A2 - Method for positioning concrete piles - Google Patents

Method for positioning concrete piles Download PDF

Info

Publication number
EP1662049A2
EP1662049A2 EP05077158A EP05077158A EP1662049A2 EP 1662049 A2 EP1662049 A2 EP 1662049A2 EP 05077158 A EP05077158 A EP 05077158A EP 05077158 A EP05077158 A EP 05077158A EP 1662049 A2 EP1662049 A2 EP 1662049A2
Authority
EP
European Patent Office
Prior art keywords
pile
reinforcement
driven
ground
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP05077158A
Other languages
German (de)
French (fr)
Inventor
Jan Wind
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from NL1027135A external-priority patent/NL1027135C1/en
Application filed by Individual filed Critical Individual
Publication of EP1662049A2 publication Critical patent/EP1662049A2/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work

Definitions

  • the invention relates to a method for positioning concrete piles, according to which a number of piles is driven into the ground on previously determined locations on a building land.
  • a pile is continued to be driven into the ground until the pile obviously has sufficient bearing.
  • the parts of the piles projecting from the building land are trimmed to a previously determined height above the building land. This trimming is labour-intensive and it produces a lot of rubbish.
  • the method according to the invention obviates this drawback and is characterised in that beforehand the building land is probed, that for every previously determined location a pile is manufactured with a length determined on the basis of data obtained during probing and that subsequently each pile is driven into the ground on the corresponding location. In this way, the length of the ends of the piles projecting from the building land can be determined relatively precisely, which means that it is no longer necessary to shorten them.
  • the projecting parts of the piles are subsequently treated such that the part of the reinforcement is exposed, so that the reinforcement can be included perfectly well in a foundation to be cast on top of the piles.
  • This treatment is labour-intensive as well and produces a lot of rubbish.
  • a favourable realisation of the inventive method which substantially obviates this disadvantage is characterised in that the pile is fabricated such that on one end a reinforcement projects from the pile or that on one end an opening is made in which a reinforcement may be put in after the pile is driven into the ground.
  • the projecting reinforcement may be covered by a head while driving the pile in the ground. The result is that the foundation may be cast directly onto and round the end of the pile.
  • a favourable realisation of the inventive method with which a very precise positioning of the end of the pile may be obtained is characterised in that a pile is fabricated such that on one end a reinforcement projects from the pile and that after the pile has been driven into the ground practically each pile is provided with an individual form round the end, into which subsequently concrete is poured. In this way, corrections may easily be made in the height and in a horizontal position.
  • a favourable embodiment which enables a precise coupling between a column and a pile is characterised in that before pouring the concrete into the form, a column is placed into the form, which column is fabricated such that on one end a reinforcement projects from the column and that when pouring the concrete this end points downwards.
  • another reinforcement is placed in the form round the projecting reinforcement of the pile and the column before pouring the concrete into the form.
  • a favourable realisation of the inventive method which makes it possible to precisely position the column with respect to the pile is characterised in that a top lid of the form is slidably mounted with respect to a bottom of the form and is provided with an opening via which the column may pass.
  • arresting means are positioned round the column before the column is placed, with which the height may be adjusted.
  • a favourable alternative realisation of the inventive method, which may be applied advantageously when the piles must be positioned precisely is characterised in that a pile is fabricated such that in one end an opening is made in which a reinforcement may be put after the pile is driven into the ground and that after the piles have been driven into the ground the opening of practically each pile is provided with a reinforcement and an already cured concrete head is grouted onto and round the end. In this case it is sufficient to temporary install a shuttering or a form under the head.
  • the invention also relates to piles, columns and forms, suitable to be used while executing a method according to the invention.
  • Fig. 1 gives as an example of a possible application of the inventive method a floor plan of a prefab house in top view.
  • the floor consists of prefab floor parts 1a,1b,.. of which corners and edges rest onto columns 2a,2b,...
  • the upper ends of the columns 2a,2b,.. must be precisely positioned, as they directly determine the position of floor parts 1a,1b,.. For that reason, it is impossible to directly drive the columns 2a,2b,.. into the ground, as on the one hand it is not known to what depth the piles can and/or must be driven and on the other hand because the ends of columns 2a,2b,.. tend to move in a horizontal direction while being driven.
  • the underlying ground is probed beforehand, preferably at those places where afterwards the columns 2a,2b,.. will be driven into the ground.
  • piles are produced on the basis of data obtained during probing, such that every pile can be driven substantially completely into the ground.
  • Fig. 2A shows a pile 3 according to the invention, after it has been driven substantially completely into the ground 4. Special is that the top side is finished in such a way that a reinforcement 5 projects from pile 3 in a previously determined pattern. It is simple now to cast a short, concrete column on top of pile 3 after pile 3 has been driven into the ground, which column forms the actual support for floor parts 1a, 1b,.. in Fig. 1.
  • Fig. 2B shows pile 3 while being driven into the ground, with a steel head 6 being placed on top of it, which is internally provided with recesses which may accommodate the projecting reinforcement 5 and which conducts the impulse of hammer 7 directly to pile 3.
  • Fig. 3A shows in side view pile 3, after a form 8 has been placed round the upper end.
  • the height of the form can be adjusted in an obvious manner with the aid of a clamping ring 9 which has previously been placed round pile 3, after which the form is filled up.
  • the top side of the short column thus obtained, is precisely positioned and forms a supporting surface for the floor parts 1a,1b,.. in Fig. 1.
  • Fig. 3B shows pile 3 together with form 8 in top view.
  • Form 8 is made of two halves 8a,8b, which may be uncoupled with the aid of bolts 10a,10b, so that form 8 may easily be removed and can be reused.
  • Fig. 4 shows in side view pile 3, after a form 8 has been placed round the upper end.
  • the height of the form can be adjusted in an obvious manner with the aid of a clamping ring 9 which has previously been placed round pile 3.
  • a lid 11 is placed, provided with an opening through which a prefab column 12 can enter form 8.
  • the depth to which column 12 can enter may be adjusted with the aid of a clamping ring 13 which has previously been placed round column 12.
  • a bottom side of column 12 is provided with a projecting reinforcement 14.
  • Lid 11 can be placed on top of form 8 and be shifted, until column 12 is positioned exactly at the right place, after which form 8 can be filled up, for example via a funnel 15.
  • a steel basket 16 can be placed round the projecting reinforcement 5 of pile 3 and round the projecting reinforcement 14 of column 12 in order to strengthen the connection.
  • inventive method is not only suitable for supporting floor parts of prefab buildings, but that it can be used in fact whenever a classical foundation is unnecessary or unwanted.
  • Fig. 5A shows in side view a pile 3, in which centrally an opening 17 is made, which does not require special provisions when being driven, but which may accommodate a reinforcement after the pile has been driven and round which a slightly adjustable head may be fitted.
  • Fig. 5B shows pile 3 in cross section, with an opening 17 in it, into which a steel rod 18 is placed which acts as a reinforcement.
  • Round pile 3 and rod 18 a prefabricated concrete head 19 is placed and adjusted with the aid of a clamping ring 9, whereby head 19 can be positioned in a horizontal direction as well as in a vertical direction with respect to pile 3, in order to compensate for small displacements arising from the driving action.
  • the space between head 19 and pile 3 and opening 20 itself can be filled up with concrete via opening 20, with the aid of a funnel 15.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a method for positioning the ends of concrete piles (3). Before piles (3) are driven into the ground, the building land is probed, after which a fitting pile (3) is manufactured for every location. The piles (3) are manufactured such that on a top side a reinforcement (5) projects from the pile or may be inserted into the pile (3).

Description

  • The invention relates to a method for positioning concrete piles, according to which a number of piles is driven into the ground on previously determined locations on a building land. According to the state of the art, a pile is continued to be driven into the ground until the pile obviously has sufficient bearing. Subsequently, the parts of the piles projecting from the building land are trimmed to a previously determined height above the building land. This trimming is labour-intensive and it produces a lot of rubbish. The method according to the invention obviates this drawback and is characterised in that beforehand the building land is probed, that for every previously determined location a pile is manufactured with a length determined on the basis of data obtained during probing and that subsequently each pile is driven into the ground on the corresponding location. In this way, the length of the ends of the piles projecting from the building land can be determined relatively precisely, which means that it is no longer necessary to shorten them.
  • According to the state of the art, the projecting parts of the piles are subsequently treated such that the part of the reinforcement is exposed, so that the reinforcement can be included perfectly well in a foundation to be cast on top of the piles. This treatment is labour-intensive as well and produces a lot of rubbish. A favourable realisation of the inventive method which substantially obviates this disadvantage is characterised in that the pile is fabricated such that on one end a reinforcement projects from the pile or that on one end an opening is made in which a reinforcement may be put in after the pile is driven into the ground. The projecting reinforcement may be covered by a head while driving the pile in the ground. The result is that the foundation may be cast directly onto and round the end of the pile.
  • As the positions of the ends of the piles are known rather precisely now, it becomes possible to leave out the foundation and to make the pile as such support a building construction instead. A favourable realisation of the inventive method with which a very precise positioning of the end of the pile may be obtained is characterised in that a pile is fabricated such that on one end a reinforcement projects from the pile and that after the pile has been driven into the ground practically each pile is provided with an individual form round the end, into which subsequently concrete is poured. In this way, corrections may easily be made in the height and in a horizontal position.
  • For example for prefabricated houses, it may be advantageous to make the floor parts rest directly onto columns, with the columns being anchored into the ground. A favourable embodiment which enables a precise coupling between a column and a pile is characterised in that before pouring the concrete into the form, a column is placed into the form, which column is fabricated such that on one end a reinforcement projects from the column and that when pouring the concrete this end points downwards. Preferably, another reinforcement is placed in the form round the projecting reinforcement of the pile and the column before pouring the concrete into the form.
  • A favourable realisation of the inventive method which makes it possible to precisely position the column with respect to the pile is characterised in that a top lid of the form is slidably mounted with respect to a bottom of the form and is provided with an opening via which the column may pass. Preferably, arresting means are positioned round the column before the column is placed, with which the height may be adjusted.
  • A favourable alternative realisation of the inventive method, which may be applied advantageously when the piles must be positioned precisely is characterised in that a pile is fabricated such that in one end an opening is made in which a reinforcement may be put after the pile is driven into the ground and that after the piles have been driven into the ground the opening of practically each pile is provided with a reinforcement and an already cured concrete head is grouted onto and round the end. In this case it is sufficient to temporary install a shuttering or a form under the head.
  • The invention also relates to piles, columns and forms, suitable to be used while executing a method according to the invention.
  • The invention will now be further explained with a reference to the following figures, in which:
  • Fig. 1
    schematically shows a floor plan for a prefab house in top view;
    Fig. 2A
    shows a pile according to the invention;
    Fig. 2B
    shows the pile while being driven;
    Fig. 3A
    shows the pile together with a form in side view;
    Fig. 3B
    shows the pile together with form in top view;
    Fig. 4
    shows the pile together with a form and a column;
    Fig. 5A
    shows a pile provided with a central opening in side view;
    Fig. 5B
    shows the pile in cross section, together with a prefabricated head placed on top.
  • Fig. 1 gives as an example of a possible application of the inventive method a floor plan of a prefab house in top view. The floor consists of prefab floor parts 1a,1b,.. of which corners and edges rest onto columns 2a,2b,... Obviously, the upper ends of the columns 2a,2b,.. must be precisely positioned, as they directly determine the position of floor parts 1a,1b,.. For that reason, it is impossible to directly drive the columns 2a,2b,.. into the ground, as on the one hand it is not known to what depth the piles can and/or must be driven and on the other hand because the ends of columns 2a,2b,.. tend to move in a horizontal direction while being driven. According to the invention, the underlying ground is probed beforehand, preferably at those places where afterwards the columns 2a,2b,.. will be driven into the ground. Next, piles are produced on the basis of data obtained during probing, such that every pile can be driven substantially completely into the ground.
  • Fig. 2A shows a pile 3 according to the invention, after it has been driven substantially completely into the ground 4. Special is that the top side is finished in such a way that a reinforcement 5 projects from pile 3 in a previously determined pattern. It is simple now to cast a short, concrete column on top of pile 3 after pile 3 has been driven into the ground, which column forms the actual support for floor parts 1a, 1b,.. in Fig. 1. Fig. 2B shows pile 3 while being driven into the ground, with a steel head 6 being placed on top of it, which is internally provided with recesses which may accommodate the projecting reinforcement 5 and which conducts the impulse of hammer 7 directly to pile 3.
  • Fig. 3A shows in side view pile 3, after a form 8 has been placed round the upper end. The height of the form can be adjusted in an obvious manner with the aid of a clamping ring 9 which has previously been placed round pile 3, after which the form is filled up. The top side of the short column thus obtained, is precisely positioned and forms a supporting surface for the floor parts 1a,1b,.. in Fig. 1. Fig. 3B shows pile 3 together with form 8 in top view. Form 8 is made of two halves 8a,8b, which may be uncoupled with the aid of bolts 10a,10b, so that form 8 may easily be removed and can be reused.
  • Fig. 4 shows in side view pile 3, after a form 8 has been placed round the upper end. The height of the form can be adjusted in an obvious manner with the aid of a clamping ring 9 which has previously been placed round pile 3. Onto form 8 a lid 11 is placed, provided with an opening through which a prefab column 12 can enter form 8. The depth to which column 12 can enter may be adjusted with the aid of a clamping ring 13 which has previously been placed round column 12. A bottom side of column 12 is provided with a projecting reinforcement 14. Lid 11 can be placed on top of form 8 and be shifted, until column 12 is positioned exactly at the right place, after which form 8 can be filled up, for example via a funnel 15. If desired, a steel basket 16 can be placed round the projecting reinforcement 5 of pile 3 and round the projecting reinforcement 14 of column 12 in order to strengthen the connection.
  • It goes without saying that the inventive method is not only suitable for supporting floor parts of prefab buildings, but that it can be used in fact whenever a classical foundation is unnecessary or unwanted.
  • Fig. 5A shows in side view a pile 3, in which centrally an opening 17 is made, which does not require special provisions when being driven, but which may accommodate a reinforcement after the pile has been driven and round which a slightly adjustable head may be fitted.
  • Fig. 5B shows pile 3 in cross section, with an opening 17 in it, into which a steel rod 18 is placed which acts as a reinforcement. Round pile 3 and rod 18 a prefabricated concrete head 19 is placed and adjusted with the aid of a clamping ring 9, whereby head 19 can be positioned in a horizontal direction as well as in a vertical direction with respect to pile 3, in order to compensate for small displacements arising from the driving action. Once head 19 has been adjusted, the space between head 19 and pile 3 and opening 20 itself can be filled up with concrete via opening 20, with the aid of a funnel 15.

Claims (10)

  1. Method for positioning concrete piles, according to which a number of piles is driven into the ground on previously determined locations on a building land, characterised in that beforehand the building land is probed, that for every previously determined location a pile is manufactured with a length determined on the basis of data obtained during probing and that subsequently each pile is driven into the ground on the corresponding location.
  2. Method according to claim 1, characterised in that the pile is fabricated such that on one end a reinforcement projects from the pile or that on one end an opening is made in which a reinforcement may be put in after the pile is driven into the ground.
  3. Method according to claim 2, characterised in that a pile is fabricated such that on one end a reinforcement projects from the pile and that after the pile has been driven into the ground practically each pile is provided with an individual form round the end, into which subsequently concrete is poured.
  4. Method according to claim 3, characterised in that before pouring the concrete into the form, a column is placed into the form, which column is fabricated such that on one end a reinforcement projects from the column and that when pouring the concrete this end points downwards.
  5. Method according to claim 4, characterised in that before pouring the concrete a reinforcement is placed in the form round the projecting reinforcement of the pile and the column.
  6. Method according to claim 5, characterised in that a top lid of the form is slidably mounted with respect to a bottom of the form and is provided with an opening via which the column may pass.
  7. Method according to claim 2, characterised in that a pile is fabricated such that in one end an opening is made in which a reinforcement may be put after the pile is driven into the ground and that after the piles have been driven into the ground the opening of practically each pile is provided with a reinforcement and an already cured concrete head is grouted onto and round the end.
  8. Piles, to be used for executing a method according one of the previous claims.
  9. Columns, to be used for executing a method according one of the claims 4 to 6.
  10. Forms, to be used for executing a method according one of the claims 3 to 7.
EP05077158A 2004-09-29 2005-09-20 Method for positioning concrete piles Withdrawn EP1662049A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1027135A NL1027135C1 (en) 2004-09-29 2004-09-29 Positioning method for concrete piles by manufacturing pile with a length determined on the basis of data obtained during probing that for every previously determined location a pile is manufactured
NL1028061A NL1028061C1 (en) 2004-09-29 2005-01-18 Method for positioning concrete piles as well as piles, columns and formwork suitable for use in this method.

Publications (1)

Publication Number Publication Date
EP1662049A2 true EP1662049A2 (en) 2006-05-31

Family

ID=35686494

Family Applications (1)

Application Number Title Priority Date Filing Date
EP05077158A Withdrawn EP1662049A2 (en) 2004-09-29 2005-09-20 Method for positioning concrete piles

Country Status (2)

Country Link
EP (1) EP1662049A2 (en)
NL (1) NL1028061C1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1031964C1 (en) 2006-06-08 2007-12-11 Jan Wind Method for placing a mounting device on an already placed foundation element and a mounting device intended for use in the method.

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416679A1 (en) * 1984-05-05 1985-11-14 Gkn Keller Gmbh, 6050 Offenbach Method and apparatus for producing foundations by embedding precast members, in particular pillars, in the end base
JPS6272813A (en) * 1985-09-26 1987-04-03 Yukio Matsumoto Formation of composite foundation pile and composite foundation pile thereby
CA2009349C (en) * 1990-02-05 1994-07-12 Branko Ladanyi Method and device for in-situ determination of rheological properties of earth materials
JP2000257006A (en) * 1999-03-04 2000-09-19 Nippon Steel Corp Artificial ground structure and its construction method
EP1283307A2 (en) * 2001-08-08 2003-02-12 Cementation Foundations Skanska Limited Method of forming enlarged pile heads
JP2003321828A (en) * 2002-04-30 2003-11-14 Oyo Corp Ground investigation method making use of s wave amplitude accompanying percussive penetration

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3416679A1 (en) * 1984-05-05 1985-11-14 Gkn Keller Gmbh, 6050 Offenbach Method and apparatus for producing foundations by embedding precast members, in particular pillars, in the end base
JPS6272813A (en) * 1985-09-26 1987-04-03 Yukio Matsumoto Formation of composite foundation pile and composite foundation pile thereby
CA2009349C (en) * 1990-02-05 1994-07-12 Branko Ladanyi Method and device for in-situ determination of rheological properties of earth materials
JP2000257006A (en) * 1999-03-04 2000-09-19 Nippon Steel Corp Artificial ground structure and its construction method
EP1283307A2 (en) * 2001-08-08 2003-02-12 Cementation Foundations Skanska Limited Method of forming enlarged pile heads
JP2003321828A (en) * 2002-04-30 2003-11-14 Oyo Corp Ground investigation method making use of s wave amplitude accompanying percussive penetration

Also Published As

Publication number Publication date
NL1028061C1 (en) 2006-03-30

Similar Documents

Publication Publication Date Title
JP2002256573A (en) Foundation for existing foundation reinforcing steel tower and construction method for it
NZ620475A (en) High-protein beverages comprising whey protein
KR100694493B1 (en) Downward construction method capable of using bracket support type temporary structure as working table
JP4611113B2 (en) Integrated construction method of pile and column
KR101198731B1 (en) constructure method of vertical tunnel to build horizontal tunnel
JP2006207265A (en) Joining method of pile and column and its structure
CN107460886B (en) Light steel structure assembly and decoration integrated building foundation and construction method thereof
EP1662049A2 (en) Method for positioning concrete piles
JP4211491B2 (en) Method for constructing wall structure with permanent anchor, wall structure constructed by this method
JP5925231B2 (en) Building construction method and underground building of new building
JP4611108B2 (en) Integrated construction method of pile and column
JP4625692B2 (en) Building construction method of base-isolated structure with laminated rubber bearing
WO2008039225A2 (en) Foundation lifting asembly and method of use
JP3122850B2 (en) Construction method of building with basement floor with steel pipe pile foundation
EP0246046B1 (en) Support for building structures
KR100695877B1 (en) Form with removable coner-form and method thereof
US5070672A (en) Supports for building structures
JPH08105066A (en) Footing slab anchoring method of phc pile and earth retaining tool for anchoring part
JP2633199B2 (en) How to build a concrete foundation
GB2067623A (en) Method for supporting buildings
JP3700119B2 (en) Pillar construction method
NL1027135C1 (en) Positioning method for concrete piles by manufacturing pile with a length determined on the basis of data obtained during probing that for every previously determined location a pile is manufactured
JP6534026B2 (en) Seismic isolation building and its construction method
JPH10299003A (en) Foundation work using precast concrete member
JP3567387B2 (en) How to build an underground skeleton

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

PUAF Information related to the publication of a search report (a3 document) modified or deleted

Free format text: ORIGINAL CODE: 0009199SEPU

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

D17D Deferred search report published (deleted)
PUAF Information related to the publication of a search report (a3 document) modified or deleted

Free format text: ORIGINAL CODE: 0009199SEPU

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

D17D Deferred search report published (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20080401