KR100695877B1 - Form with removable coner-form and method thereof - Google Patents

Form with removable coner-form and method thereof Download PDF

Info

Publication number
KR100695877B1
KR100695877B1 KR1020050109087A KR20050109087A KR100695877B1 KR 100695877 B1 KR100695877 B1 KR 100695877B1 KR 1020050109087 A KR1020050109087 A KR 1020050109087A KR 20050109087 A KR20050109087 A KR 20050109087A KR 100695877 B1 KR100695877 B1 KR 100695877B1
Authority
KR
South Korea
Prior art keywords
slab
formwork
corner
corner form
formwork member
Prior art date
Application number
KR1020050109087A
Other languages
Korean (ko)
Inventor
이병영
Original Assignee
이병영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이병영 filed Critical 이병영
Priority to KR1020050109087A priority Critical patent/KR100695877B1/en
Application granted granted Critical
Publication of KR100695877B1 publication Critical patent/KR100695877B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/40Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001Corner fastening or connecting means for forming or stiffening elements

Abstract

A form with a detachable corner form and the using method thereof are provided to reduce working hours by integrally connecting a slab form member and a beam form member with a support member, to place the corner form in a seating part of the slab form member by perpendicularly forming a boundary of a beam and a slab, and to disassemble the corner form easily by hinge-combining a vertical part with a horizontal part. A form includes a slab form member(30) for a slab(20), a beam form member(40) arranged at a lower side of the slab form member for forming a beam(10), and a support member(50) connecting and supporting the beam and slab form members. A side of the beam form member is connected to a side of the slab form member by a corner form(60) vertically bent, and the corner form is detachably mounted not to be moved down in moving the beam and slab form members down. Lower parts of the slab and beam form members are connected to each other by the support member. A seating part(37) is formed at the side of the slab form member, and the corner form is composed of a horizontal part(62) arranged in parallel with the upper part of the slab form member and placed in the seating part and a vertical part(64) vertically combined with the horizontal part and arranged in the upper part of the beam form member. An end of the horizontal part is placed in the seating part without combination, and the vertical part is combined with the upper part of the beam form member by an assembling angle.

Description

탈착형 코너폼이 장착된 거푸집 및 그 사용공법 { FORM WITH REMOVABLE CONER-FORM AND METHOD THEREOF }Formwork equipped with removable corner form and its use method {FORM WITH REMOVABLE CONER-FORM AND METHOD THEREOF}

도 1은 종래의 거푸집을 도시한 측면도,1 is a side view showing a conventional formwork,

도 2는 본 발명의 실시예에 따른 해체전 거푸집의 상태를 도시한 사시도,2 is a perspective view showing a state of the formwork before disassembly according to an embodiment of the present invention,

도 3은 도 2의 측면도,3 is a side view of FIG.

도 4는 본 발명의 실시예에 따른 해체후 거푸집의 상태를 도시한 사시도,4 is a perspective view showing a state of formwork after dismantling according to an embodiment of the present invention;

도 5는 도 4의 측면도.5 is a side view of FIG. 4.

<도면의 주요부분에 대한 부호의 설명><Description of Symbols for Main Parts of Drawings>

10 : 보 , 20 : 슬래브,10: beam, 20: slab,

30 : 슬래브거푸집부재, 35 : 각재,30: slab formwork member, 35: wood material,

37 : 안착부, 40 : 보거푸집부재,37: seating portion, 40: formwork member,

50 : 지지부재, 60 : 코너폼,50: support member, 60: corner foam,

62 : 수평부, 64 : 수직부,62: horizontal portion, 64: vertical portion,

66 : 결합용 각재, 70 : 달대,66: bonding material, 70: moon,

75 : 와이어, 80 : 동바리.75: wire, 80: copper.

본 발명은 거푸집 및 그 사용공법에 관한 것으로서, 특히 탈착형 코너폼을 장착하여 보와 슬래브를 한꺼번에 여러개를 형성할 수 있도록 하는 탈착형 코너폼이 장착된 거푸집 및 그 사용공법에 관한 것이다.The present invention relates to a formwork and a method of using the same, and more particularly, to a formwork equipped with a detachable cornerform to form a plurality of beams and slabs at once by attaching a removable cornerform and a method of using the same.

콘크리트 구조물은 거푸집을 일정 형상으로 만들어 거푸집에 콘크리트를 채워 일정한 모양을 가진 부재를 형성시킨다. Concrete structures form the molds into a certain shape to fill the formwork with concrete to form a member having a certain shape.

콘크리트를 사용하여 건축물을 축조할 때에는 통상 아래쪽에서 위로 올라가면서 부재를 형성시키는 순서로 진행한다. When constructing a building using concrete, it is generally progressed from the bottom to the top in order to form the member.

땅 값이 비싼 도심지에 건물을 지으려 할 때에는 토지를 효율적으로 이용하기 위하여 여러 층의 지하층을 만들므로 점차 지하층은 깊어져 가는 추세이다.When building buildings in urban areas where the cost of land is expensive, underground floors are gradually becoming deeper because several layers of basements are created in order to use land efficiently.

통상 지하에 구조물을 축조할 경우 지하의 흙이나 암반을 파내고 지하 구조물이 완성될 때까지 오랜 기간 방치해야 하므로 주변 지반이 붕괴할 우려가 있고, 시각상 불안하며, 지하 토공사 중에 발생하는 소음, 분진 등 건설공해로 인해 민원이 발생하며, 도심지 공사에서 건설자재, 중장비를 위한 공간이 부족하며, 지하 구조물부터 축조하여 올라올 경우 공사기간이 긴 점 등의 문제점을 해결하기 위하여 지하층을 위에서 아래로 축조해 나가고 동시에 지상층 공사를 병행할 수 있는 역타설 공법이 개발되어 적용되고 있다.In general, when constructing a structure underground, it is necessary to dig underground soil or rock and leave it for a long time until the underground structure is completed. Therefore, the surrounding ground may collapse, visually unstable, and noise and dust generated during underground earthwork Civil complaints are caused by construction pollution, and there is a lack of space for construction materials and heavy equipment in urban construction, and when building from underground structures, the basement floor is constructed from top to bottom to solve problems such as long construction period. A reverse casting method has been developed and applied to go out and carry out ground floor construction simultaneously.

역타설 공법은 Top down 공법으로 불리기도 하며, 선 시공한 강기둥을 묶는 슬래브와 보 콘크리트를 타설하고 이 구조체가 수평토압에 대응하는 수평지지대 역할을 하여 지상층을 위로 시공하면서 동시에 지하층은 아래로 구조물을 형성해 나 가는 공법이다.The reverse casting method is also called top down method, and the slab and beam concrete that binds the pre-installed steel columns are cast and this structure acts as a horizontal support that corresponds to the horizontal earth pressure. It is a method of forming.

상기 보는 상기 슬래브보다 두께가 더 두꺼워 상기 슬래브와 상기 보 사이에는 단차가 있었다.The beam was thicker than the slab and there was a step between the slab and the beam.

이러한 단차가 있는 상기 슬래브와 보를 제작하기 위해서 종래에는 슬래브를 만들기 위한 거푸집과 보를 만들기 위한 거푸집을 별개로 각각 제작하여 이를 하부에서 동바리를 이용하여 지지하거나 달대를 이용하여 상부에서 매달고 있었다.In order to manufacture the slab and the beam having such a step, conventionally, the formwork for making the slab and the formwork for making the beam were separately produced, respectively, which were supported at the bottom by using a clubbock or suspended from the upper by using a moon.

상기 슬래브거푸집과 보거푸집을 별도로 제작하여 사용하는 것은, 슬래브와 보의 단차부위에서 콘크리트와 거푸집이 함께 밀착되어 거푸집이 용이하게 해체되지 않기 때문이다.The manufacturing of the slab formwork and the boring formwork is used separately because the formwork is not easily dismantled because the concrete and the formwork are in close contact with each other at the stepped portion of the slab and the beam.

이때, 상기 슬래브거푸집과 보거푸집이 각각 별개로 제작되어 있어 거푸집 조립시 또는 해체작업시 각각의 거푸집에 대하여 작업을 수행하여야 하는바, 작업시간이 많이 소요되었다.At this time, the slab formwork and the bor formwork are manufactured separately, so that the work for each formwork at the time of assembling or dismantling the formwork, the work time was required a lot.

한편, 등록특허공보 공고번호제10-261775호에는 도 1에 도시된 바와 같이, 보거푸집(140)과 슬래브거푸집(130)이 상호 일체로 연결되어 상기 보거푸집(140)과 슬래브거푸집(130)이 한꺼번에 이동하는 구조를 취하고 있어 작업시간을 단축하고자 하였다.On the other hand, Patent Publication No. 10-261775, as shown in Figure 1, the formwork 140 and the slab formwork 130 is integrally connected to each other, the formwork 140 and the slab formwork 130 This structure is to move all at once to reduce the working time.

그러나, 이러한 거푸집구조는 슬래브(110)에 하향 돌출된 보(120)로부터 거푸집을 용이하게 해체하여 하강시키기 위해 상기 슬래브거푸집의 양단(135)을 도 1에 도시된 바와 같이 경사지게 형성하여야만 하였다.However, this formwork structure had to be formed at both ends 135 of the slab formwork to be inclined as shown in FIG. 1 to easily dismantle and lower the formwork from the beam 120 projecting downward on the slab 110.

즉, 상기 슬래브거푸집의 양단(135)이 보(120)의 측면에 밀착되어 해체되지 않는 것을 방지하기 위하여 슬래브거푸집의 양단(135)을 경사지게 형성하였다.That is, both ends 135 of the slab formwork are formed to be inclined at both ends 135 of the slab formwork to prevent the slab formwork from coming into close contact with the side of the beam 120.

따라서, 이러한 거푸집을 사용하는 경우에는 보(120)가 항상 사다리꼴 형상으로 이루어지고, 이로 인해 보다 많은 콘크리트가 소모되며, 자중이 증가될 뿐만 아니라, 단면변경으로 인한 구조설계변경으로 원가가 상승되는 등의 문제가 있다.Therefore, in the case of using such formwork, the beam 120 is always made of a trapezoidal shape, which consumes more concrete, thereby increasing its own weight, as well as an increase in cost due to a structural design change due to a cross-sectional change. There is a problem.

본 발명은 전술한 문제점을 해결하기 위하여 안출된 것으로서, 슬래브거부집과 보거푸집을 일체로 형성하되, 탈착형 코너폼을 장착하여 보와 슬래브의 단차부위를 쉽게 직각으로 형성할 수 있는 탈착형 코너폼이 장착된 거푸집 및 그 사용공법을 제공하는데 그 목적이 있다.The present invention has been made in order to solve the above-mentioned problems, the slab rejection and the formwork to form a unit integrally, detachable corner that can be easily formed at right angles to the stepped portion of the beam and the slab by mounting a removable corner form. Its purpose is to provide formwork with foam and its method of use.

상기 목적을 달성하기 위하여 본 발명의 탈착형 코너폼이 장착된 거푸집은, 슬래브를 형성하기 위한 슬래브거푸집부재와; 보를 형성하기 위하여 상기 슬래브거푸집부재의 측하부에 배치되는 보거푸집부재와; 상기 보거푸집부재의 하부와 상기 슬래브거푸집부재의 하부를 상호 연결하여 지지하는 지지부재로 이루어지되, 상기 보거푸집부재의 측부와 상기 슬래브거푸집부재의 측부는 절곡된 코너폼에 의해 상호 연결되고, 상기 코너폼은 탈착 가능한 것을 특징으로 한다.In order to achieve the above object, the formwork is equipped with a removable corner form of the present invention, the slab formwork member for forming a slab; A bogie form member disposed on the side lower portion of the slab form member to form a beam; The lower side of the formwork member and the lower portion of the slab formwork member is made of a support member for interconnecting, the side portion of the formwork member and the side portion of the slab formwork member are interconnected by a bent corner form, the Corner foam is characterized in that the removable.

상기 슬래브거푸집부재의 측부에는 안착부가 형성되어 있고, 상기 코너폼은, 상기 슬래브거푸집부재의 상부와 평행하고 일단이 상기 안착부에 안착되는 수평부와, 일단이 상기 수평부의 타단과 수직으로 결합되고 타단이 상기 보거푸집부재의 상부에 배치되는 수직부로 이루어진다.A seating portion is formed on a side of the slab formwork member, and the corner form is horizontally parallel with an upper portion of the slab formwork member and one end thereof is vertically coupled to the other end of the horizontal portion. The other end consists of a vertical portion disposed above the boring die member.

이때, 상기 수평부와 수직부는 상호 힌지결합되어 있을 수 있다.In this case, the horizontal portion and the vertical portion may be hinged to each other.

그리고, 상기 목적을 달성하기 위하여 본 발명의 탈착형 코너폼이 장착된 거푸집 공법은, 슬래브와 보를 형성하는 거푸집 공법에 있어서, 상기 슬래브와 보를 형성하는 슬래브거푸집부재와 보거푸집부재가 일체로 연결되어 있고 상기 슬래브거푸집부재의 측부와 상기 보거푸집부재의 측부가 절곡된 코너폼에 의해 상호 연결되어 있어, 콘크리트 타설후 상기 슬래브거푸집부재과 보거푸집부재를 한꺼번에 해체하고 하강시킨 후에 상기 슬래브와 보의 코너에 부착된 코너폼을 해체하는 것을 특징으로 한다.And, in order to achieve the above object, the formwork method is equipped with a removable corner form of the present invention, in the formwork method for forming the slab and the beam, the slab formwork member and the formwork member forming the slab and the beam is integrally connected And the sides of the slab formwork member and the side of the formwork member are connected to each other by a bent corner form. Disassemble the attached corner form.

이하에서는 첨부된 도면을 참조하여 본 발명의 바람직한 실시예에 대하여 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail a preferred embodiment of the present invention.

도 2는 본 발명의 실시예에 따른 해체전 거푸집의 상태를 도시한 사시도이고, 도 3은 도 2의 측면도이며, 도 4는 본 발명의 실시예에 따른 해체후 거푸집의 상태를 도시한 사시도이고, 도 5는 도 4의 측면도이다.Figure 2 is a perspective view showing the state of the formwork before disassembly according to an embodiment of the present invention, Figure 3 is a side view of Figure 2, Figure 4 is a perspective view showing the state of formwork after disassembly according to an embodiment of the present invention. 5 is a side view of FIG. 4.

도 2 내지 도 5에 도시된 바와 같이, 본 발명의 탈착형 코너폼(60)이 장착된 거푸집은, 슬래브거푸집부재(30)와, 보거푸집부재(40)와, 지지부재(50)와, 코너폼(60)으로 이루어진다.As shown in Figures 2 to 5, the formwork on which the removable corner form 60 of the present invention is mounted, the slab formwork member 30, the formwork member 40, the support member 50, It is made of a corner form (60).

상기 슬래브거푸집부재(30)는 슬래브(20)를 형성하기 위한 거푸집으로써, 상부에는 평평한 합판이 놓이고 그 하부에는 각재(35)가 결합되어 있다.The slab formwork member 30 is a formwork for forming the slab 20, a flat plywood is placed on the top and the lumber 35 is coupled to the bottom.

그리고, 상기 보거푸집부재(40)는 보(10)를 형성하기 위한 거푸집으로써, 상 부에는 평평한 합판이 놓이고 그 하부에는 각재가 결합되어 있으며, 상기 슬래브거푸집부재(30)의 측하부에 배치된다.In addition, the formwork member 40 is a formwork for forming the beam 10, a flat plywood is placed on the upper portion and the bottom is coupled to the bottom, the slab formwork member 30 is disposed on the lower side of the slab formwork member 30 do.

즉, 상기 보거푸집부재(40)는 상기 슬래브거푸집부재(30)의 측부에서 상기 슬래브거푸집부재(30)보다 높이가 낮게 배치된다.That is, the boring die member 40 is disposed at a height lower than the slab formwork member 30 at the side of the slab formwork member 30.

이때, 상기 슬래브거푸집부재(30)와 보거푸집부재(40)의 하부에 장착되는 각재(35)는 그 필요한 높이에 따라 여러개의 각재(35)를 격자형식으로 다층으로 배열하여 결합할 수도 있다.At this time, the slab formwork member 30 and the horn member 35 mounted to the lower portion of the bobbin formwork member 40 may be combined by arranging a plurality of lumber materials 35 in a lattice form according to their required height.

상기 지지부재(50)는 상기 보거푸집부재(40)의 하부와 상기 슬래브거푸집부재(30)의 하부를 상호 연결하여 지지하는데, 상기 지지부재(50)에 의해 상기 보거푸집부재(40)와 슬래브거푸집부재(30)는 일체로 형성된다.The support member 50 supports the lower portion of the bobbin formwork member 40 and the lower portion of the slab formwork member 30 by mutually connecting the borer formwork member 40 and the slab by the support member 50. The formwork member 30 is integrally formed.

상기 지지부재(50)는, 상기 슬래브거푸집부재(30)와 보거푸집부재(40)의 높이차만큼 절곡 형성되어 그 하부에 결합될 수도 있으나, 상기 슬래브거푸집부재(30)의 하부에 결합되는 각재(35)를 상기 보거푸집부재(40)와의 높이차만큼 다층 격자형식으로 배열하여 결합하도록 하여 상기 슬래브거푸집부재(30)와 보거푸집부재(40)의 하부 높이를 동일하고, 그 하부에 직선형태의 상기 지지부재(50)를 결합하도록 함이 바람직하다.The support member 50 may be bent by a height difference between the slab formwork member 30 and the borer formwork member 40 and be coupled to the lower portion thereof, but may be coupled to the lower portion of the slab formwork member 30. (35) arranged in a multi-layered lattice form by coupling the height difference with the formwork member 40, so that the lower height of the slab formwork member 30 and the formwork member 40 is the same, and a straight line at the bottom thereof. It is preferable to couple the support member 50 of the.

이때, 상기 지지부재(50)는 다수의 철재 H빔으로 이루어지도록 함이 바람직하다.At this time, the support member 50 is preferably made of a plurality of steel H beam.

그리고, 상기 보거푸집부재(40)의 측부와 상기 슬래브거푸집부재(30)의 측부는 상호 개방되어 있는데, 여기에 상기 코너폼(60)을 장착하여 폐쇄시키면서 상호 연결한다.In addition, the side of the boring die member 40 and the side of the slab formwork member 30 are open to each other, and the corner form 60 is attached to it while being connected to each other.

이를 위해 상기 코너폼(60)을 수평부(62)와 수직부(64)가 직각으로 결합되는 절곡형태로 이루어진다.To this end, the corner form 60 is formed in a bent form in which the horizontal portion 62 and the vertical portion 64 are coupled at right angles.

이때, 상기 슬래브거푸집부재(30)의 측부에는 안착부(37)가 형성되어 있도록 함이 바람직한데, 상기 안착부(37)에는 상기 코너폼(60)의 수평부(62)의 일단이 안착되도록 한다.At this time, it is preferable that the seating portion 37 is formed on the side portion of the slab formwork member 30, so that one end of the horizontal portion 62 of the corner form 60 is seated on the seating portion 37. do.

상기 수평부(62)는 상기 슬래브거푸집부재(30)의 상부와 평행하고, 상기 수직부(64)는 상기 수평부(62)의 타단과 수직으로 결합되며 타단이 상기 보거푸집부재(40)의 상부에 배치된다.The horizontal portion 62 is parallel to the upper portion of the slab formwork member 30, the vertical portion 64 is vertically coupled with the other end of the horizontal portion 62 and the other end of the formwork member 40 Is placed on top.

상기 수평부(62)의 타단과 수직부(64)의 일단은 도 3에 도시된 바와 같이, 각재(67)에 의해 상호 고정 결합될 수도 있고, 경첩(68) 등을 이용하여 힌지 결합되도록 할 수도 있다.The other end of the horizontal portion 62 and one end of the vertical portion 64 may be fixed to each other by the lumber 67, as shown in Figure 3, to be hinged using a hinge 68, etc. It may be.

상기 수평부(62)의 일단은 상기 안착부(37)에 결합됨이 없이 단순히 안착되도록 하고, 상기 수직부(64)의 타단은 상기 보거푸집부재(40)의 상부에 결합용 각재(66)를 이용하여 상호 결합되도록 함이 바람직하다.One end of the horizontal portion 62 is simply to be seated without being coupled to the seating portion 37, and the other end of the vertical portion 64 is coupled to the upper corner of the boring die member 40, 66 It is preferable to be coupled to each other using.

이를 위해, 상기 결합용 각재(66)는 상기 수직부(64) 및 상기 보거푸집부재(40)의 상부와 각각 못 등을 이용하여 결합되도록 한다.To this end, the coupling shell 66 is coupled to the upper portion of the vertical portion 64 and the boring die member 40 by using a nail or the like.

이하, 상술한 구성요소로 이루어진 본 발명의 사용방법에 대하여 알아본다.Hereinafter, the method of using the present invention consisting of the above-described components will be described.

먼저, 상기 슬래브거푸집부재(30)와 보거푸집부재(40)를 상기 지지부재(50)를 이용하여 일체로 연결한다.First, the slab formwork member 30 and the borer formwork member 40 are integrally connected by using the support member 50.

그리고, 상기 슬래브거푸집부재(30)의 측부와 상기 보거푸집부재(40)의 측부를 절곡된 상기 코너폼(60)을 이용하여 상호 연결한다.Then, the side portion of the slab formwork member 30 and the side portion of the boring formwork member 40 are connected to each other using the bent corner form (60).

상기 거푸집의 하부에 동바리(80)를 세우며, 상부에는 달대(70)를 장착한 후에, 거푸집의 상부에 콘크리트를 타설하여 도 2 및 도 3에 도시된 바와 같은 형상을 이루도록 한다.The bottom of the formwork to form a circle (80), the upper portion is mounted to the moon (70), after pouring the concrete on the top of the form to achieve the shape as shown in Figs.

이때, 상기 동바리(80)와 달대(70)는 필요에 따라 하나만을 사용할 수도 있고, 함께 사용할 수도 있다.At this time, the copper rod 80 and the moon 70 may be used only one, if necessary, may be used together.

타설된 콘크리트가 양생되면, 도 4 및 도 5에 도시된 바와 같이 동바리(80)를 해체하고 상기 슬래브거푸집부재(30)와 보거푸집부재(40)를 콘크리트로부터 한꺼번에 해체하고 동시에 하강시킨다.When the poured concrete is cured, as shown in Figs. 4 and 5, the copper bar 80 is dismantled, and the slab formwork member 30 and the formwork member 40 are dismantled from the concrete at the same time and simultaneously lowered.

이를 위해, 상기 코너폼(60)의 수직부(64) 타단에 상기 보거푸집부재(40)의 상부와 결합되는 결합용 각재(66)를 제거하고, 상기 달대(70)에 장착되어 있는 와이어(75)를 천천히 풀음으로써 상기 거푸집을 하강시킬 수 있다.To this end, the coupling horn member 66 coupled to the upper portion of the boring die member 40 is removed at the other end of the vertical portion 64 of the corner form 60, and the wire is mounted to the moon 70 ( By slowly loosening 75) the formwork can be lowered.

이때, 상기 수직부(64) 타단에 결합된 결합용 각재(66)를 먼저 제거하고 상기 동바리(80)를 해체할 수도 있음은 물론이다.At this time, of course, it is also possible to dismantle the copper rod 80 after removing the coupling horn member 66 coupled to the other end of the vertical portion 64.

상기 수직부(64) 타단에 상기 보거푸집부재(40)의 상부와 결합되는 결합용 각재(66)를 제거하였기 때문에, 상기 슬래브거푸집부재(30)와 보거푸집부재(40)를 하강할 때 상기 코너폼(60)은 하강됨이 없이 상기 슬래브거푸집부재(30)와 상기 보거푸집부재(40)만 하강하게 되어 도 4 및 도 5에 도시된 바와 같은 형태를 이룬다.Since the coupling corner member 66 coupled to the upper portion of the boring die member 40 is removed at the other end of the vertical portion 64, the slab formwork member 30 and the boring die member 40 are lowered when the slab formwork member 30 is lowered. Corner form 60 is lowered without the slab formwork member 30 and the formwork member 40 is lowered to form the shape shown in Figures 4 and 5.

그 후에 상기 코너폼(60)을 콘크리트로부터 해체함으로써, 슬래브(20)와 보 (10)가 직각을 이루는 구조를 용이하게 만들 수 있다.After that, by dismantling the corner form 60 from the concrete, it is possible to easily make a structure in which the slab 20 and the beam 10 forms a right angle.

이때, 상기 코너폼(60)의 수평부(62)와 수직부(64)가 경첩(68)등에 의해 힌지결합되어 있으면 상기 수평부(62) 또는 수직부(64)를 회전시켜 콘크리트로부터 해체할 수 있기 때문에 해체작업이 더 용이하다.At this time, if the horizontal portion 62 and the vertical portion 64 of the corner form 60 are hinged by a hinge 68 or the like, the horizontal portion 62 or the vertical portion 64 may be rotated to be disassembled from concrete. It is easier to dismantle because it can be.

해체된 코너폼(60)은 다시 상기 슬래브거푸집부재(30)의 측부와 상기 보거푸집부재(40)의 측부 또는 상부에 결합되도록 하여 상기와 같은 공정을 반복하도록 한다.The dismantled corner form 60 is coupled to the side of the slab formwork member 30 and the side or the top of the formwork member 40 to repeat the above process.

위와 같은 본 발명의 거푸집 및 그 사용공법은 상술한 바와 같은 지하층 시공뿐만 아니라 지상층 시공에도 사용할 수 있다.Formwork of the present invention as described above and the method of using the same can be used in the ground floor construction as well as the basement construction as described above.

본 발명인 탈착형 코너폼이 장착된 거푸집 및 그 사용공법은 전술한 실시예에 국한하지 않고, 본 발명의 기술 사상이 허용되는 범위 내에서 다양하게 변형하여 실시할 수 있다.Formwork equipped with a removable corner form of the present invention and a method of using the same is not limited to the above-described embodiment, it can be carried out in a variety of modifications within the allowable scope of the technical idea of the present invention.

이상에서 설명한 바와 같은 본 발명의 탈착형 코너폼이 장착된 거푸집 및 그 사용공법에 따르면 다음과 같은 효과가 있다.According to the formwork equipped with the removable corner foam of the present invention as described above and a method of using the same, the following effects are obtained.

첫째, 슬래브거푸집부재와 보거푸집부재를 지지부재를 이용하여 일체로 연결함으로써, 슬래브거푸집부재와 보거푸집부재를 한번에 조립 및 해체할 수 있어 작업시간을 단축시킬 수 있으며, 보에 의해 경계지어지는 여러개의 칸을 상기 거푸집 전체를 한번 승강시킴으로써 용이하게 완성시킬 수 있다.First, by connecting the slab formwork member and the formwork member integrally using the support member, the slab formwork member and the formwork member can be assembled and dismantled at once, so that the work time can be shortened, and the several bordered by the beam The square of can be easily completed by elevating the entire formwork once.

또한, 탈착가능한 코너폼을 장착함으로써, 구조설계변경없이 그대로 사용할 수 있어 설계 변경에 따른 비용을 절감할 수 있다.In addition, by mounting a removable corner form, can be used as it is without structural design changes can reduce the cost of design changes.

둘째, 코너폼을 수직부와 수평부로 이루어지게 함으로써, 보와 슬래브의 경계부위를 직각으로 형성할 수 있으며, 슬래브거푸집부재에 형성된 안착부에 의해 상기 코너폼을 상기 슬래브거푸집부재에 쉽게 안착시킬 수 있다.Second, by forming the corner form of the vertical portion and the horizontal portion, it is possible to form a boundary between the beam and the slab at a right angle, it can be easily seated in the slab formwork member by the seating portion formed in the slab formwork member. have.

셋째, 수직부와 수평부를 힌지결합함으로써, 상기 코너폼 해체작업시 작업이 용이한 효과가 있다.Third, by hinge coupling the vertical portion and the horizontal portion, there is an effect that is easy to work during the corner form dismantling operation.

Claims (4)

슬래브를 형성하기 위한 슬래브거푸집부재와;A slab formwork member for forming a slab; 보를 형성하기 위하여 상기 슬래브거푸집부재의 측하부에 배치되는 보거푸집부재와;A bogie form member disposed on the side lower portion of the slab form member to form a beam; 상기 보거푸집부재와 상기 슬래브거푸집부재를 상호 연결하여 지지하는 지지부재로 이루어지되,It is made of a support member for supporting the boring die member and the slab formwork member connected to each other, 상기 보거푸집부재의 측부와 상기 슬래브거푸집부재의 측부는 수직 절곡된 코너폼에 의해 상호 연결되고, The side of the boring die member and the side of the slab formwork members are interconnected by a vertical bent corner form, 상기 코너폼은 상기 보거푸집부재와 슬래브거푸집부재의 하강시 하강되지 않도록 탈착 가능하게 장착되며,The corner form is detachably mounted so that the corner form member and the slab formwork member are not lowered when descending. 상기 지지부재는 상기 슬래브거푸집부재의 하부와 상기 보거푸집부재의 하부를 상호 연결하여 일체로 형성하는 것을 특징으로 하는 탈착형 코너폼이 장착된 거푸집.The support member is a formwork with a removable corner form, characterized in that the lower portion of the slab formwork member and the bottom of the formwork member connected to each other formed integrally. 제 1항에 있어서,The method of claim 1, 상기 슬래브거푸집부재의 측부에는 안착부가 형성되어 있고,The seating portion is formed on the side of the slab formwork member, 상기 코너폼은, 상기 슬래브거푸집부재의 상부와 평행하고 일단이 상기 안착부에 안착되는 수평부와, 일단이 상기 수평부의 타단과 수직으로 결합되고 타단이 상기 보거푸집부재의 상부에 배치되는 수직부로 이루어지되,The corner form is a horizontal portion parallel to the upper portion of the slab formwork member, one end of which is seated on the seating portion, and one end of which is vertically coupled to the other end of the horizontal portion, and the other end of which is disposed on the upper portion of the formwork member. It's done, 상기 수평부의 일단은 상기 안착부에 결합됨이 없이 단순히 안착되고,One end of the horizontal portion is simply seated without being coupled to the seating portion, 상기 수직부는 상기 보거푸집부재의 상부에 결합용각재를 이용하여 상호 결합하는 것을 특징으로 하는 탈착형 코너폼이 장착된 거푸집.The vertical portion is a formwork equipped with a removable corner form, characterized in that the mutual coupling to the upper portion of the boring die member using a coupling angular material. 제 2항에 있어서The method of claim 2 상기 수평부와 수직부는 힌지결합되어 있는 것을 특징으로 하는 탈착형 코너 폼이 장착된 거푸집.The formwork with a removable corner form, characterized in that the horizontal portion and the vertical portion is hinged. 슬래브와 보를 형성하는 거푸집 공법에 있어서, In the formwork for forming slabs and beams, 상기 슬래브와 보를 형성하는 슬래브거푸집부재와 보거푸집부재가 일체로 연결되어 있고 상기 슬래브거푸집부재의 측부와 상기 보거푸집부재의 측부가 수직 절곡된 코너폼에 의해 상호 연결되어 있어, The slab formwork member and the formwork formwork member forming the slab and the beam are integrally connected, and the side portion of the slab formwork member and the side portion of the formwork member are interconnected by a vertical bent corner form, 콘크리트 타설후 상기 코너폼의 하강없이 상기 슬래브거푸집부재와 보거푸집부재를 한꺼번에 해체하고 하강시킨 후에,After the concrete is poured, the slab formwork member and the formwork member are dismantled and lowered at the same time without lowering the corner form. 상기 슬래브와 보의 코너에 부착된 코너폼을 해체하는 것을 특징으로 하는 탈착형 코너폼이 장착된 거푸집 공법.Forming method with a removable corner form, characterized in that for dismantling the corner form attached to the corner of the slab and beam.
KR1020050109087A 2005-11-15 2005-11-15 Form with removable coner-form and method thereof KR100695877B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050109087A KR100695877B1 (en) 2005-11-15 2005-11-15 Form with removable coner-form and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050109087A KR100695877B1 (en) 2005-11-15 2005-11-15 Form with removable coner-form and method thereof

Publications (1)

Publication Number Publication Date
KR100695877B1 true KR100695877B1 (en) 2007-03-19

Family

ID=41623523

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050109087A KR100695877B1 (en) 2005-11-15 2005-11-15 Form with removable coner-form and method thereof

Country Status (1)

Country Link
KR (1) KR100695877B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100925548B1 (en) 2009-04-30 2009-11-06 주식회사 엘에스폼웍 Methode and device for disjoint a ceil mold
KR101586858B1 (en) * 2014-12-16 2016-01-19 서보산업 주식회사 Method for constructing slab and girder of concrete building
KR101586855B1 (en) * 2014-12-16 2016-01-19 서보산업 주식회사 Assembly type concrete mold for constructing slab and girder

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950018960A (en) * 1993-12-07 1995-07-22 박정진 Apparatus and construction method for constructing temporary wall for permanent wall (building base wall)
KR19990068561A (en) * 1999-06-02 1999-09-06 박정진 Adjustable beam/slab hanging form system
KR20000018037A (en) * 2000-01-05 2000-04-06 박정진 Hanging form system
KR20040104218A (en) * 2003-06-03 2004-12-10 삼지건설(주) Construction method for Sub-terranean slab of Sink-down method
KR20050080400A (en) * 2004-02-09 2005-08-12 삼성중공업 주식회사 Bracket support type downward construction system and construction method using the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950018960A (en) * 1993-12-07 1995-07-22 박정진 Apparatus and construction method for constructing temporary wall for permanent wall (building base wall)
KR19990068561A (en) * 1999-06-02 1999-09-06 박정진 Adjustable beam/slab hanging form system
KR20000018037A (en) * 2000-01-05 2000-04-06 박정진 Hanging form system
KR20040104218A (en) * 2003-06-03 2004-12-10 삼지건설(주) Construction method for Sub-terranean slab of Sink-down method
KR20050080400A (en) * 2004-02-09 2005-08-12 삼성중공업 주식회사 Bracket support type downward construction system and construction method using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100925548B1 (en) 2009-04-30 2009-11-06 주식회사 엘에스폼웍 Methode and device for disjoint a ceil mold
KR101586858B1 (en) * 2014-12-16 2016-01-19 서보산업 주식회사 Method for constructing slab and girder of concrete building
KR101586855B1 (en) * 2014-12-16 2016-01-19 서보산업 주식회사 Assembly type concrete mold for constructing slab and girder

Similar Documents

Publication Publication Date Title
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
KR100694493B1 (en) Downward construction method capable of using bracket support type temporary structure as working table
JP3219644U (en) Foundation structure and building
GB2371313A (en) Partially prefabricated waffle slab
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
KR100695877B1 (en) Form with removable coner-form and method thereof
KR20100100193A (en) Form system for constructing rc-girder in rc top down method and the rc top down method using the same
CN104088473A (en) Construction structure and method used for underpinning load-bearing wall
KR20090044195A (en) Core and construction method thereof for extension of elevator operation floor and elevation of seismic resistant performance in remodeling of structure
JP2020079496A (en) Method for constructing top slab for underground structure
KR101748781B1 (en) Precast wall structure construction method
CN210177680U (en) Prefabricated excrement ditch of combination formula convenient to on-spot is assembled
JP5865567B2 (en) Connecting slab and its construction method
JP5532468B1 (en) Formwork support member in the slab
CN208219844U (en) A kind of prefabrication system
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
JP6855296B2 (en) Building foundation structure and its construction method
JPH05287901A (en) Construction of stairs
JP5003253B2 (en) RC beam construction method
CN212802189U (en) Assembly type disassembly-free template
JPH0657956A (en) Construction of concrete structure
JP6767552B1 (en) Wood fence straight pin construction method
JP2015021314A (en) Solid foundation method using pc unit, and pc unit
KR200370135Y1 (en) Forms for edge girder construction
JP7095839B2 (en) Slab support structure and slab construction method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120403

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee